Anda di halaman 1dari 63

LEMBAR PENGESAHAN

Oleh
Yeyen Fajar Herlambang
2141320026
Program Studi D-IV Manajemen Rekayasa Konstruksi
Jurusan Teknik Sipil
POLITEKNIK NEGERI MALANG

Disetujui
Pembimbing
16/12/2022

______________________
Agus Suhardono, ST., MT

1
DAFTAR ISI

LEMBAR PENGESAHAN .................................................................................. 1


DAFTAR ISI .......................................................................................................... 2
DAFTAR TABEL.................................................................................................. 4
DAFTAR GAMBAR ............................................................................................. 5
KATA PENGANTAR ........................................................................................... 6
BAB I PENDAHULUAN ...................................................................................... 7
1.1 Latar Belakang.......................................................................................... 7
1.2 Tujuan & Manfaat .................................................................................... 8
1.3 Identifikasi Masalah ................................................................................. 8
1.4 Rumusan Masalah .................................................................................... 8
BAB II DASAR TEORI ........................................................................................ 9
2.1 Drainase .................................................................................................... 9
2.1.1 Pengertian Drainase .......................................................................... 9
2.1.2 Fungsi Drainase................................................................................. 9
2.1.3 Jenis Drainase.................................................................................... 9
2.1.4 Bagian Drainase Perkotaan ............................................................. 12
2.1.5 Struktur Drainase Perkotaan ........................................................... 13
2.1.6 Prinsip Prinsip Perencanaan ............................................................ 13
2.1.7 Data Yang Diperlukan..................................................................... 13
2.1.8 Langkah – Langkah Perencanaan Jaringan Drainase Terpisah ....... 14
2.2 Hidrologi................................................................................................. 14
2.2.1 Pengertian Hidrologi ....................................................................... 14
2.2.2 Siklus Hidrologi .............................................................................. 15
2.3 Jaringan Drainase ................................................................................... 15
2.3.1 Macam-Macam Jaringan Drainase .................................................. 15
b. Kriteria Design Jaringan Drainase.......................................................... 16
2.4 Debit Banjir Rancangan ......................................................................... 17
2.4.1 Limpasan Permukaan ...................................................................... 17
2.5 Dimensi Saluran ..................................................................................... 19
BAB III DATA DAN METODE ........................................................................ 21
3.1 Analisis Hidrologi .................................................................................. 21

2
3.1.1 Persiapan Data Hujan ...................................................................... 21
3.1.2 Uji Konsistensi ................................................................................ 21
3.1.3 Hujan Daerah .................................................................................. 22
3.1.4 Hujan Rancangan ............................................................................ 23
3.1.5 Distribusi Data Hujan...................................................................... 26
3.2 Jaringan Drainase ................................................................................... 28
3.2.1 Perencanaan Jaringan Drainase ....................................................... 28
3.3 Debit Banjir Rancangan ......................................................................... 31
3.3.1 Koefisien Limpasan/ Pengaliran (C). .............................................. 31
3.3.2 Waktu Konsentrasi. ......................................................................... 32
3.3.3 Intesitas Hujan................................................................................. 33
3.4 Perencanaan Dimensi Saluran ................................................................ 35
BAB IV PERHITUNGAN DAN PEMBAHASAN ........................................... 42
4.1 Data Curah Hujan ................................................................................... 42
4.2 Uji Konsistensi ....................................................................................... 43
4.3 Curah Hujan Rancangan ......................................................................... 46
4.4 Rencana Jaringan .................................................................................... 51
4.5 Debit Rancangan .................................................................................... 52
4.5.1 Menentukan Waktu Konsentrasi ..............................................................53
4.5.2 Menentukan Debit Rencana .....................................................................54
4.6 Dimensi Rancangan ................................................................................ 55
4.6.1 Perancangan Dimensi ...............................................................................55
BAB V KESIMPULAN....................................................................................... 58
4.7 Kesimpulan ............................................................................................. 58
4.8 Saran ....................................................................................................... 58
DAFTAR PUSTAKA .......................................................................................... 59
LAMPIRAN ......................................................................................................... 60

3
DAFTAR TABEL

Tabel 3. 1 Data Curah Hujan Maksimal................................................................ 21


Tabel 3. 2 Curah Hujan Daerah............................................................................. 22
Tabel 3. 3 Data Hujan Rancangan......................................................................... 23
Tabel 3. 4 Data Dari Terbesar ke Terkecil ............................................................ 23
Tabel 3. 5 Tabel Yn dan Sn ................................................................................... 24
Tabel 3. 6 Rencana Kala Ulang Curah Hujan ....................................................... 25
Tabel 3. 7 Data Terbesar ke Terkecil .................................................................... 25
Tabel 3. 8 Tabel G Jika Cs Positif......................................................................... 26
Tabel 3. 9 Tabel G Jika Cs Negatif ....................................................................... 26
Tabel 3. 10 Kala Ulang Rencana Curah Hujan ..................................................... 26
Tabel 3. 11 Tabel Uji Smirnov Kolmogorof ......................................................... 27
Tabel 3. 12 Tabel Uji Simpangan Vertikal 1 ........................................................ 28
Tabel 3. 13 Tabel Uji Simpangan Vertikal 2 ........................................................ 28
Tabel 3. 14 Tabel Rencana Jaringan ..................................................................... 30
Tabel 3. 15 Tabel Koefisien Kekasaran ................................................................ 31
Tabel 3. 16 Tabel koefisien permukaan limpasan (nd) ......................................... 32
Tabel 3. 17 Tabel Kecepatan ijin (v) ..................................................................... 33
Tabel 3. 18 Tabel Debit Limpasan Ke Arah Kiri .................................................. 34
Tabel 3. 19 Tabel Debit Limpasan Ke Arah Kanan .............................................. 35
Tabel 3. 20 Tabel Kapasitas Saluran ABC............................................................ 35
Tabel 3. 21 Tabel Kapasitas Saluran DEF ............................................................ 36
Tabel 3. 22 Tabel Kapasitas Saluran GHI ............................................................. 36
Tabel 3. 23 Tabel Kapasitas Saluran I .................................................................. 36
Tabel 3. 24 Tabel Rencana Saluran Drainase ....................................................... 40
Tabel 3. 25 Tabel Rencana Saluran Drainase ....................................................... 41

4
DAFTAR GAMBAR
Gambar 2. 1 Drainase Alamiah ............................................................................. 10
Gambar 2. 2 Drainase Buatan ............................................................................... 10
Gambar 2. 3 Pengaliran Tertutup .......................................................................... 11
Gambar 2. 4 Drainase Menurut Fungsi ................................................................. 11
Gambar 2. 5 Innet.................................................................................................. 12
Gambar 2. 6 Bak Kontrol ...................................................................................... 12
Gambar 2. 7 Struktur Drainase Perkotaan............................................................. 13
Gambar 2. 8 Siklus Hidrologi ............................................................................... 15

Gambar 3. 1 Gambar Arah Aliran ......................................................................... 29


Gambar 3. 2 Gambar Arah Aliran ......................................................................... 29
Gambar 3. 3 Gambar Penampang Melintang ........................................................ 38

5
KATA PENGANTAR

Puji Syukur kehadirat Tuhan Yang Maha Esa atas rahmat dan karunia-Nya
sehingga Laporan Drainase Perkotaan dapat terselesaikan sesuai rencana.

Laporan ini memberikan perhatian besar terhadap ilmu pengetahuan dan


teknologi, khususnya pada bidang Teknik Sipil. Oleh karena itu selain menyajikan
materi tentang perencanaan pembuatan saluran drainase, laporan ini juga
menyajikan materi data hasil perhitungan yang terperinci dan disertai gambar.
Dengan demikian diharapkan laporan ini dapat dijadikan acuan dan pedoman
mahasiswa Teknik Sipil dalam mengikuti mata kuliah Drainase Perkotaan.
Dengan selesainya laporan ini kami mengucapkan terimakasih kepada:
1. Tuhan Yang Maha Esa.
2. Bapak Agus Suhardono S.T, M.T. selaku dosen Drainase Perkotaan.
3. Teman-teman dan semua pihak yang terlibat dan telah memberikan
dukungan dalam praktik dan membuat laporan ini.

Semoga laporan ini dapat memberikan manfaat dalam meningkatkan


kualitas pembelajaran di Politeknik Negeri Malang.

Demikian laporan ini yang jauh dari kata sempurna. Oleh karena itu, saran
dan kritik yang membangun tetap kami terima demi kesempurnaan laporan ini.

Malang, 16 Desember 2022

Penulis

6
BAB I
PENDAHULUAN

1.1 Latar Belakang

Kota merupakan tempat bagi banyak orang untuk melakukan berbagai


aktivitas, maka untuk menjamin kesehatan dan kenyamanan penduduknya harus
ada sanitasi yang memadai, misalnya drainase. Dengan adanya drainase tersebut
genangan air hujan dapat disalurkan sehingga banjir dapat dihindari dan tidak akan
menimbulkan dampak gangguan kesehatan pada masyarakat serta aktivitas
masyarakat tidak akan terganggu.
Drainase merupakan suatu sistem untuk menyalurkan air hujan. Sistem ini
mempunyai peranan yang sangat penting dalam menciptakan lingkungan yang
sehat, apalagi di daerah yang berpenduduk padat seperti di perkotaan. Drainase juga
merupakan salah satu fasilitas dasar yang dirancang sebagai sistem guna memenuhi
kebutuhan masyarakat dan merupakan komponen penting dalam perencanaan kota
(perencanaan infrastruktur khususnya). Secara umum, drainase didefinisikan
sebagai serangkaian bangunan air yang berfungsi untuk mengurangi dan/atau
membuang kelebihan air dari suatu kawasan atau lahan, sehingga lahan dapat
difungsikan secara optimal.Drainase juga diartikan sebagai usaha untuk mengontrol
kualitas air tanah dalam kaitannya dengan salinitas, dimana drainase merupakan
suatu cara pembuangan kelebihan air yang tidak diinginkan pada suatu daerah, serta
cara-cara penangggulangan akibat yang ditimbulkan oleh kelebihan air tersebut.
Dari sudut pandang yang lain, drainase adalah salah satu unsur dari prasarana
umum yang dibutuhkan masyarakat kota dalam rangka menuju kehidupan kota
yang aman, nyaman, bersih, dan sehat. Prasarana drainase disini berfungsi untuk
mengalirkan air permukaan ke badan air (sumber air permukaan dan bawah
permkaantanah) dan atau bangunan resapan. Selain itu juga berfungsi sebagai
pengendali kebutuhan air permukaan dengan tindakan untuk memperbaiki daerah
becek, genangan air dan banjir.

7
1.2 Tujuan & Manfaat

Tujuan dari tugas untuk memberikan persoalan kepada mahasiswa


sedemikian rupa sehingga mahasiswa tersebut dapat atau mampu untuk merancang
sistem penyaluran air hujan, dimana perhitungan-perhitungan yang berkaitan
dengan rancangan disesuaikan dengan kriteria desain dan mempresentasikannya
rancangan tersebut dalam bentuk gambar teknik yang memenuhi kaidah-kaidah
perencanaan.
Tujuan dan manfaat dari tugas drainase ini adalah agar mahasiswa dapat
mengerti dan memahami sistem drainase di perkotaan dan tujuannya, serta bisa
mengaplikasikannya di lapangan.

1.3 Identifikasi Masalah

Ruang lingkup dari tugas ini adalah sebagai berikut:


a. Analisis curah hujan.
• Menghitung curah hujan rata-rata.
• Menghitung curah hujan maksimum tahunan.
• Menghitung intensitas hujan.
b. Merencanakan saluran drainase
• Merencanakan dimensi dan bentuk saluran drainase.

1.4 Rumusan Masalah

Atas dasar penentuan latar belakang dan identiikasi masalah diatas, maka
kami dapat mengambil perumusan masalah sebagai berikut,
a. Berapa curah hujan maksimum yang terjadi di daerah tersebut?
b. Bagaimana distribusi hujan rancangan?
c. Berapa debit saluran yang terjadi pada daerah tersebut?
d. Bagaimana rencana dimensi saluran drainase?

8
BAB II
DASAR TEORI

2.1 Drainase

2.1.1 Pengertian Drainase


Menurut Suripin, drainase berasal dari kata “drainage” yang memiliki arti
menguras, membuang, dan mengalihkan air. Drainase perkotaan (urban
drainage) didefinisikan sebagai ilmu drainase yang mengkhususkan
pengkajian pada kawasan perkotaan yang erat kaitannya dengan kondisi
lingkungan yang ada di kawasan kota. Desain drainase perkotaan memiliki
keterkaitan dengan tata guna lahan, rencana tata ruang kota, dan kondisi sosial
ekonomi budaya masyarakat.
2.1.2 Fungsi Drainase
a. Mengeringkan daerah becek dan genangan air sehingga tidak ada
akumulasi air di permukaan tanah
b. Menurunkan permukaan air tanah pada tingkat yang ideal
c. Mengendalikan erosi air tanah, kerusakan jalan dan bangunan yang ada
d. Mengendalikan air hujan yang berkelebihan sehingga tidak terjadi
bencana banjir

2.1.3 Jenis Drainase


a. Jenis Drainase Berdasarkan Sistem Jaringannya
• Sistem drainase mayor/makro/pembuangan utama. Menampung dan
mengalirkan air dari suatu daerah tangkapan air hujan yang berskala
besar dan luas seperti saluran drainase primer, kanal-kanal, atau sungai-
sungai. Pengukuran topografi yang detail mutlak diperlukan dalam
perencanaan sistem drainase ini.
• Sistem drainase minor/mikro. Menampung dan mengalirkan air dari
daerah tangkapan hujan dengan debit air yang tidak terlalu besar.
Termasuk saluran di sepanjang sisi jalan, saluran/selokan air hujan di
sekitar bangunan, gorong-gorong, saluran drainase kota. Sistem

9
drainase untuk lingkungan permukiman lebih cenderung sebagai sistem
drainase mikro.
b. Jenis Drainase Menurut Sejarah Terbentuknya
• Drainase alamiah (natural drainage). Drainase yang terbenuk secara
alami, saluran terbentuk oleh gerusan air yang bergerak karena grafitasi
yang lambat laun terbentuk jalan air yang permanen seperti sungai.

Gambar 2. 1 Drainase Alamiah

• Drainase buatan (artificial drainage). Drainase yang dibuat dengan


maksud dan tujuan tertentu sehingga memerlukan bangunan-bangunan
khusus seperti selokan pasangan/ beton/ batu, gorong-gorong dsb.

Gambar 2. 2 Drainase Buatan

c. Jenis Drainase Menurut Konstruksi


• Pengaliran terbuka. Sistem saluran biasanya direncanakan hanya untuk
menampung dan mengalirkan air hujan (sistem terpisah), kebanyakan
berfungsi sebagai saluran campuran. Pada pinggiran kota, saluran
terbuka ini biasanya tidak diberi lining, namun di dalam kota harus
diberi lining.
• Pengaliran tidak terbuka, saluran untuk air kotor yang mengganggu
kesehatan lingkungan. Alasannya adalah artistik dan fungsi permukaan
tanah yang tidak membolehkan adanya saluran di permukaan tanah
seperti lapangan sepak bola, lapangan terbang, taman, daerah perkotaan
dengan kepadatan penduduk yang tinggi.

10
Gambar 2. 3 Pengaliran Tertutup

d. Jenis Drainase Berdasarkan Letaknya


• Drainase permukaan tanah (surface drainage). Saluran drainase yang
berada diatas permukaan tanah yang berfungsi mengalirkan air
limpasan permukaan. Analisis airnya merupakan aliran saluran terbuka
(open chennel)
• Drainase bawah permukaan tanah (subsurface drainage). Saluran
drainase yang bertujuan mengalirkan air limpasan permukaan melalui
media dibawah permukaan tanah (pipa-pipa), dikarenakan alasan
tertentu, seperti lapangan sepak bola, lapangan terbang dan lain-lain.
e. Jenis Drainase Menurut Fungsinya
• Single purpose (terpisah) yaitu saluran yang berfungsi mengalirkan satu
jenis air buangan saja, yaitu air hujan saja, atau limbah cair saja
• Multi purpose (tercampur) yaitu saluran yang berfungsi mengalirkan air
hujan dan limbah cair, baik secara bersama maupun bergantian. Limbah
cair dapat berasal dari: rumah tangga/domestik, perdagangan dan
industri dan prasarana umum (pendidikan, kesehatan, peribadatan,
rekreasi)

Gambar 2. 4 Drainase Menurut Fungsi

f. Jenis Drainase Berwawasan Lingkungan


Untuk menanggulangi banjir/ genangan yang berwawasan lingkungan bisa
dilakukan dengan :

11
• Perbaikan/ rehabilitasi dimensi saluran, misalnya membangun saluran
yang mampu meresapkan air kebawah tanah → saluran resapan
• Pengaturan tata guna lahan dengan memperbanyak ruang terbuka hijau
• Sumur resapan, polder, kolam tampungan, telaga buatan dll
• Waduk untuk pengendalian banjir

2.1.4 Bagian Drainase Perkotaan


Komponen yang ada dalam drainase perkotaan antara lain sebagai berikut :
a. Saluran
b. Inlet drain
c. Cutting drain
d. Manhole (bak control)
e. Culvert (gorong-gorong)
f. Outlet drain (pembuangan akhir)

Gambar 2. 5 Innet

Gambar 2. 6 Bak Kontrol

12
2.1.5 Struktur Drainase Perkotaan

Gambar 2. 7 Struktur Drainase Perkotaan

2.1.6 Prinsip Prinsip Perencanaan


a. Efektif . Sistem drainase harus dapat mengeringkan air di permukaan
perkerasan jalan dengan cepat
b. Efisien. Penentuan layout jaringan, serta bentuk dan dimensi saluran
harus mempertimbangkan faktor ekonomis
c. Aman. Dimensi yang disediakan harus mampu mengalirkan air dalam
kapasitas yang direncanakan dalam taraf yang aman
d. Kemudahan pemeliharaan. Perencanaan sistem drainase harus
mempertimbangkan segi kemudahan dan nilai ekonomis
pemeliharaannya
e. Terpadu. Memperhatikan pertumbuhan penduduk, perubahan tata guna
lahan, dan satu kesatuan dengan daerah sekitarnya
f. Berwawasan lingkungan. Debit dialirkan dengan waktu yang tidak
menyebabkan terjadinya masalah kesehatan dan banjir namun berupaya
memperlambat aliran limpasan air hujan

2.1.7 Data Yang Diperlukan


a. Peta situasi
b. Denah rencana jalan raya dan Trase memanjang jalan
c. Peta topografi
d. Data Peta Genangan dan banjir
e. Data hidrologi
f. Peta geologi tata guna lahan & perkembangannya

13
g. Data Demografi dan Limbah domistik
h. Data lainnya

2.1.8 Langkah – Langkah Perencanaan Jaringan Drainase Terpisah


a. Merencanakan drainase air hujan
• Menentukan system jaringan drainase
• Merencanakan layout jaringan drainase
• Menghitung waktu konsentrasi
• Menghitung debit banjir rancangan
• Merencanakan dimensi saluran dan bangunan pelengkep drainase
b. Merencanakan drainase air kotor limbah rumah tangga
• Menghitung jumlah penduduk
• Meghitung proyeksi jumlah penduduk
• Menghitung debit air limbah per orang per hari
• Menghitung debit air limbah
• Merencanakan dimensi saluran dan bangunan pelengkap drainase

2.2 Hidrologi

2.2.1 Pengertian Hidrologi


Hidrologi adalah ilmu yang mempelajari
kejadian, pergerakan, sirkulasi, dan distribusi air di bumi.Termasuk di dalam
ranah imlu hidrologi adalah sifat-sifat fisis air, perubahan bentuk air, di di
darat, laut, dan.udara. Namun demikian hidrologi erat kaitannya dengan
ketidakpastian.Ketidakpastian dalan hidrologi bersumber dari sifat keacakan
alam, keterbatasan teori dalam menjelaskan fenomena alam, dan
ketidakakuratan dalam pencatatan data. Sehubungan dengan ini, terdapat
faktor keyakinan perencana dalam pemanfaatan hidrologi untuk perencanaan
bangunan air.
Hidrologi teknik adalah aplikasi dari ilmu hidrologi yang berkaitan
dengan perencanaan teknis dan pelaksanaan proyek yang di dalamnya
terdapat aspek pemanfatan dan pengaturan air.

14
2.2.2 Siklus Hidrologi

Gambar 2. 8 Siklus Hidrologi


Siklus hidrologi mendeskripsikan pergerakan terus menerus dari air di
bawah permukaan bumi, di permukaan bumi, dan di atas permukaan bumi.
Massa air berada dalam kondisi yang tetap namun bentuknya berubah-ubah.
Jika diawali dari evaporasi/penguapan, uap air akan terkumpul di atmosfer
dan membentuk awan. Dalam kondisi yang memungkinkan, awan yang
terkumpul akan terkondensasi dan turun ke permukaan bumi dalam bentuk
hujan atau salju . Presipitasi yang jatuh ke permukaan tanah menyebar dalam
berbagai cara. Sebagian mengalir di permukaan tanah sebagai
limpasan/runoff. Air juga dapat bergerak secara lateral di zona bawah tanah,
atau disebut interflow. Sebagian air hujan yang turun juga ada yang tertahan
sementara di permukaan bumi sebagai es atau genangan air pada danau,
waduk, atau rawa-rawa. Sebagian lagi akan kembali ke atmosfer melalui
evaporasi dan penguapan oleh tanaman.

2.3 Jaringan Drainase

2.3.1 Macam-Macam Jaringan Drainase


Pola - Pola Jaringan Drainase dibagi menjadi:
a. Siku.
Dibuat pada daerah yang mempunyai topografi sedikit lebih tinggi
dari pada sungai. Sungai sebagai saluran pembuang akhir berada akhir
berada di tengah kota.

15
b. Paralel
Saluran utama terletak sejajar dengan saluran cabang. Dengan
saluran cabang (sekunder) yang cukup banyak dan pendek-pendek,
apabila terjadi perkembangan kota, saluran-saluran akan dapat
menyesuaikan diri.
c. Grid Iron
Untuk daerah dimana sungainya terletak di pinggir kota, sehingga
saluran-saluran cabang dikumpulkan dulu pada saluran pengumpulan.
d. Alamiah
Sama seperti pola siku, hanya beban sungai pada pola alamiah lebih
besar.
e. Radial
Pada daerah berbukit, sehingga pola saluran memencar ke segala
arah.
b. Kriteria Design Jaringan Drainase
Kriteria design jaringan drainase
a. Jenis saluran adalah saluran terbuka.
b. Aliran air secara grafitasi, sehingga diupayakan bagian hilir selalu lebih
rendah elevasinya dari bagian hulu
c. Akhir aliran diupayakan menuju saluran akhir (sungai) atau daerah
cekungan sebagai kolam tampungan.
d. Debit aliran diupayakan terbagi secara merata sehingga debit aliran
pada akhir saluran tidak terlalu besar.
e. Kecepatan aliran diupayakan sesuai dengan kecepatan ijin, sehingga
tidak terjadi erosi pada saluran.
f. Kebutuhan bangunan inlet menuju saluran (pada drainase jalan) dibuat
dalam jumlah yang cukup

c. Tata Letak Jaringan Drainase dengan Peruntukan Khusus


a. Drainase Pada Zona Wisata

16
Pada zona ini, air hujan yang ditampung di kolam dapat digunakan
sebagai sarana wisata pancing sehingga sistem drainase air hujan
diarahkan ke kolam tersebut.
b. Drainase Jalan Raya
Umumnya di perkotaan dan luar perkotaan, drainase jalan raya selalu
menggunakan drainase muka tanah (surface drainage).
c. Drainase Lapangan Terbang.
Kemiringan keadaan melintang untuk runway umumnya lebih kecil
atau sama dengan 1,50 %, kemiringan shoulder ditentukan antara 2,50 %
sampai 5 %. Kemiringan kearah memanjang ditentukan sebesar 0,10 %,
ketentuan dari FAA.
d. Drainase Lapangan Olahraga
Drainase lapangan olahraga direncanakan berdasarkan infiltrasi atau
resapan air hujan pada lapisan tanah.
e. Drainase Pada Zona Industri
Kawasan industri memiliki limbah yang mengandung bahan-bahan
kimia yang berbahaya. Keberadaan Instalasi Pengolahan Air Limbah
(IPAL) wajib ada.
2.4 Debit Banjir Rancangan

2.4.1 Limpasan Permukaan


Limpasan permukaan merupakan komponen siklus hidrologi, dimana air
hujan yang turun dari atmosfir yang ditangkap oleh permukaan buatan/alam
menuju aliran terdekat seperti sungai dalam perencanaan drainase bagian air
hujan yang menjadi perhatian adalah aliran permukaan (surface runoff),
sedangkan untuk pengendalian banjir tidak hanya aliran permukaan, tetapi
limpasan permukaan (runoff). Limpasan permukaan merupakan gabungan
antara aliran permukaan, aliran yang tertunda dicekungan-cekungan dan
aliran bawah permukaan (subsurface flow).

17
b. Faktor-faktor yang mempengaruhi Limpasan Permukaan
Berkaitan dengan limpasan faktor yang berpengaruh dikelompokkan
menjadi 2 kelompok yaitu
a. Faktor Meteorologi
Faktor meteorologi yang berpengaruh terutama karakteristik hujan yaitu
• Intensitas Hujan.
Pengaruhnya terhadap limpasan sangat tergantung pada laju
infiltrasi. Intensitas hujan berpengaruh pada debit dan volume
limpasan.
• Durasi hujan.
Durasi hujan dengan intensitas tertentu akan berkaitan langsung
dengan total limpasan. Setiap daerah aliran sungai mempunyai satuan
durasi hujan atau lama hujan kritis.
• Distribusi curah hujan.
Laju dan volume limpasan dipengaruhi oleh distribusi dan
intensitas diseluruh daerah aliran sungai. Hujan dengan intensitas
tinggi pada sebagian daerah aliran sungai dapat menghasilkan
limpasan yang lebih besar dibandingkan dengan hujan biasa yang
turun diseluruh daerah aliran sungai.
b. Faktor Karakteristik Daerah Aliran Sungai
Faktor karakteristik daerah aliran sungai yang berpengaruh adalah
• Luas dan Bentuk daerah aliran sungai.
Laju dan volume aliran permukaan, makin bertambah besar
dengan bertambahnya luas daerah aliran sungai. Sedangkan bentuk
daerah aliran sungai berpengaruh pada pola aliran sungai.
• Topografi.
Kemiringan lahan, keadaan dan kerapatan parit dan / salura dan
bentuk-bentukcekungan mempunyai pengaruh terhadap laju dan
volume aliran permukaan.
• Tata guna Lahan.
Pengaruh tataguna lahan pada aliran permukaan dinyatakan
dalam koefisien aliran permukaan (C), yaitu bilangan yang

18
menunjukkan perbandingan antara besarnya aliran permukaan dengan
besarnya curah hujan. Nilai C berkisar antara 0 sd. 1, harga C
mendekati 0 indikasi daerah aliran sungai semakin rusak.

2.5 Dimensi Saluran

Dalam perencanaan dimensi saluran, terdapat beberapa hal yang harus


dipertimbangkan. Dimensi saluran harus direncanakan secara terintegrasi pada satu
wilayah yang direncanakan. Semua saluran harus dirancang dengan
berkesinambungan dari hulu sampai hilir.
a. Bentuk Saluran
Secara umum sifat saluran drainase ada dua macam, yaitu
a. Saluran Terbuka
Saluran terbuka adalah saluran tanpa penutup di mana terdapat
permukaan air yang bebas (free surface). Permukaan bebas ini dapat
dipengaruhi oleh tekanan udara luar secara langsung (open channel flow).
b. Saluran Tertutup
Saluran tidak terbuka adalah saluran yang tidak memiliki penutup di
bagian atasnya. Jika air memenuhi seluruh bagian penampang saluran
tersebut, maka secara hidrolika saluran ini disebut saluran tertutup atau
aliran pipa (pipe flow).
b. Bahan Saluran
Lapisan dasar dan dinding saluran drainase tanah erosi bisa dibuat dari:
• Beton
• pasangan batu kali
• pasangan batu merah,
• besi cor, dll.
Pilihan materialnya tergantung pada tersedianya serta harga bahan, cara
konstruksi saluran. Tetapi pada prakteknya di Indonesia hanya ada tiga bahan
yang dianjurkan pemakaiannya, yaitu pasangan batu, beton, dan tanah.

19
2.5.3 Penampang Saluran Terekonomis
Dalam merencanakan dimensi saluran, pertimbangan bentuk penampang
saluran drainase yang paling ekonomis dapat dijadikan pertimbangan.
Penampag terekonomis adalah dimensi saluran yang dapat melewatkan debit
maksimum untuk luas penampang basah tertentu.

20
BAB III
DATA DAN METODE

3.1 Analisis Hidrologi

Analisa hidrologi yang terkait langsung dengan perencanaan drainase


perkotaan adalah analisa curah hujan. Adapun tahapan analisi curah hujan sebagai
berikut:

3.1.1 Persiapan Data Hujan


Data hidrologi utama yang diperlukan dalam perencanaan drainase
adalah data hujan. Jika tersedia, maka data pengamatan debit banjir di sungai,
evaporasi, dan infiltrasi dapat digunakan juga. Data hujan didapat dari
pengamatan menggunakan alat ukur di darat manual, alat ukur di darat
otomatis, radar, atau satelit. menunjukkan bentuk data hujan yang didapatkan
dari Badan Meteorologi dan Geofisika.
CURAH HUJAN MAKSIMUM/TAHUN
NO Tahun sta A sta B sta C
1 2012 296.1 109.1 103.1
2 2013 274.1 107.1 193.1
3 2014 293.1 105.1 103.1
4 2015 277.1 111.1 103.1
5 2016 296.1 109.1 103.1
6 2017 293.1 105.1 103.1
7 2018 113.0 103.1 194.1
8 2019 93.1 193.1 113.1
9 2020 116.1 107.1 103.1
10 2021 203.0 205.0 221.0

Tabel 3. 1 Data Curah Hujan Maksimal


3.1.2 Uji Konsistensi
Data hujan yang digunakan untuk analisa hujan harus dilakukan analisa
masa ganda, yaitu uji kosistensi data hujan, hal ini dikarenakan adanya
kemungkinan perubahan lokasi sta., cara pengamatan, perubahan alat ukur,
dll.
Analisa masa ganda adalah untuk menguji konsistensi hasil pengukuran
pada suatu STA (sebagai STA dasar) dan membandingkan dengan

21
pengukuran pada STA terdekat disekitarnya (sebagai sta.pembanding).
Penyajian uji konsistensi dalam suatu grafik dimana sb.x merupakan
akumulasi rata-rata STA pembanding dan sumbu Y merupakan akumulasi
hujan dari STA dasar. Dari pengujian tersebut dapat diketahui apakah terjadi
perubahan lingkungan atau cara menakar, jika hasil uji menyatakan konsisten
berarti daerah tsb. tidak terjadi perubahan lingkungan dan sebaliknya.
3.1.3 Hujan Daerah
Curah hujan yang diperlukan untuk merencanakan bangunan air pada
suatu titik di dalam DAS adalah data curah hujan rata-rata di seluruh daerah
yang bersangkutan. Data ini merupakan rata-rata dari tiga stasiun hujan atau
lebih atau rata-rata dari titik- titik pengamataan hujan dari radar/satelit pada
daerah tesebut. Dua metode yang banyak digunakan dalam perencanaan
drainase adalah metode rata-rata aljabar dan metode poligon Thiessen.
Curah Hujan Daerah berdasarkan curah Harian Maksimum. Hujan
daerah dalam suatu wilayah untuk perencanaan drainase merupakan rata-rata
curah hujan harian maksimum dari stasiun curah hujan yang ada disekitar
wilayah tersebut. Penyiapan data-data curah hujan dilakukan dengan
mencatat curah hujan yang maksimum di STA hujan, sebagaimana table
berikut,
Tabel 3. 2 Curah Hujan Daerah
Tabel Curah Hujan Daerah
Tahun Tgl-Bln Sta A Sta B Sta C Rata - Rata CH Max
30 Des 97,8 27,0 100,0 74,9
2012 02-Jan 93,0 109,1 35,0 79,0 79,0
24-Feb 23,0 60,0 103,1 62,0
23 Des 90,6 23,0 100,0 71,2
2013 21-Jan 90,0 185,0 35,0 103,3 103,3
14-Feb 20,0 56,0 96,5 57,5
30 Des 96,9 23,0 100,0 73,3
2014 27-Jan 90,0 181,5 35,0 102,2 101,2
04-Feb 20,0 56,0 103,1 59,7
23 Des 91,6 27,0 100,0 72,9
2015 23-Jan 93,0 191,9 35,0 106,6 106,6
04-Feb 23,0 60,0 90,1 57,7
23 Des 97,8 27,0 100,0 74,9
2016 23-Jan 93,0 188,4 35,0 105,5 105,5
04-Feb 23,0 60,0 103,1 62,0
3 Des 96,9 23,0 100,0 73,3
2017 02-Jan 90,0 181,5 35,0 102,2 102,2
04-Feb 20,0 56,0 103,1 59,7
3 Des 86,9 0,0 100,0 62,3
2018 02-Jan 90,0 173,8 35,0 99,6 99,6
04-Feb 20,0 29,0 97,0 48,7
3 Des 93,1 23,0 100,0 72,0
2019 02-Jan 90,0 193,1 35,0 106,0 106,0
04-Feb 20,0 56,0 93,7 56,6
02-Jan 89,3 0,0 100,0 63,1
2020 14-Feb 93,0 185,0 35,0 104,3 104,3
04-Feb 23,0 33,0 103,1 53,0
9Des 67,1 23,0 0,0 30,0
2021 14-Feb 13,0 205,0 0,0 72,7 72,7
16-Sep 0,0 56,4 96,5 51,0

22
3.1.4 Hujan Rancangan
Dalam hujan rancangan berkaitan erat dengan pendistribusiannya.

Tabel 3. 3 Data Hujan Rancangan


Curah Hujan Max
Tahun (xi-xr) (xi-xr)^2 (xi-xr)^3 (xi-xr)^4
Setahun
2012 79.033 -19.01 361.38 -6869.84 130595.58
2013 103.333 5.29 27.98 148.04 783.11
2014 101.167 3.12 9.76 30.47 95.16
2015 106.633 8.59 73.79 633.84 5444.68
2016 105.467 7.42 55.11 409.07 3036.66
2017 102.167 4.12 17.00 70.10 289.06
2018 99.600 1.56 2.42 3.77 5.87
2019 106.033 7.99 63.84 510.08 4075.56
2020 104.333 6.29 39.56 248.86 1565.32
2021 72.667 -25.38 643.98 -16341.94 414704.07
Jumlah 980.43 0.00 1294.82 -21157.55 560595.08
Rata-rata 98.04
Standar Deviasi 11.995 11.995
Cs -1.703
Ck 5.374

Dalam menentukan distribusi hujan rancangan dapat menggunakan metode


sebagai berikut:

3.1.4.1 Metode Gumbel


Langkah-langkah perhitungan adalah sebagai berikut:
• Kumpulkan data hujan minimal 10 tahun terakhir yang telah
melalui proses penyiapan.
• Urutkan data dari besar ke kecil.

Tabel 3. 4 Data Dari Terbesar ke Terkecil

No Data Gumbel
1 106.633
2 106.033
3 105.467
4 104.333
5 103.333
6 102.167
7 101.167
8 99.600
9 79.033
10 72.667

• Hitung peluang dan kala ulang masing-masing data,


𝑚 1
𝑃= 𝑇𝑅 =
𝑛+1 𝑃

23
P = Peluang
TR = Kala Ulang
m = data urutaan ke..
n = jumlah data
• Hitung standar deviasi data curah hujan tersebut

Ʃ(𝑋𝑖 − 𝑋̅)2
𝑆=√
𝑛−1

Xi = Data hujan,
X = Rata Hujan,
n = jumlah data
• Berdasarkan jumlah data n cari nilai Yn dan Sn

Tabel 3. 5 Tabel Yn dan Sn

• Berapa kala ulang (TR) yang dikehendaki


• Hitung Yt
𝑇𝑅 − 1
𝑌𝑇 = −𝐼𝑛 (−𝐼𝑛 )
𝑇𝑅

• Hitung curah hujan rancangan, d rancangan n = R24 dengan TR


….th

24
𝑆
𝑑𝑟𝑎𝑛𝑐𝑎𝑛𝑔𝑎𝑛𝑛 = 𝑑̅ + (𝑌𝑇 − 𝑌𝑛) ×
𝑆𝑛

Tabel 3. 6 Rencana Kala Ulang Curah Hujan

TR Yt Yn Sn S R rata- rata R24


2 0.366512921 96.41804
5 1.499939987 110.733
10 2.250367327 0.4952 0.9497 11.995 98.043 120.2108
25 3.198534261 132.1859
50 3.901938658 141.0698

3.1.4.2 Metode LOG Pearson Tipe III


Langkah-langkah perhitungan:
• Urutkan data hujan (d) dari besar ke kecil.

Tabel 3. 7 Data Terbesar ke Terkecil


DATA TAHUN x Log (x)
1 2012 106,633 2,028
2 2012 106,033 2,025
3 2012 105,467 2,023
4 2012 104,333 2,018
5 2012 103,333 2,014
6 2012 102,167 2,009
7 2012 101,167 2,005
8 2012 99,600 1,998
9 2012 79,033 1,898
10 2012 72,667 1,861

• Ubah data hujan d menjadi log d


• Hitung rata-rata log dr (log x)
∑𝑋𝑖
𝐿𝑜𝑔 𝑋𝑟 =
𝑛
• Hitung standar deviasi log d (s) atau Sd

Ʃ(𝑙𝑜𝑔𝑋𝑖 − 𝑙𝑜𝑔𝑋𝑟)2
𝑆=√
𝑛−1

• Hitung koefisien kepencengan/ skewness log d (Cs)


𝑛. ∑(𝑋 − 𝑋̅)3
𝐶𝑠 =
(𝑛 − 1)(𝑛 − 2). 𝑆 3

25
• Berapa kala ulang yang dikehendaki? (TR)
• Cari nilai G dari tabel berdasarkan Cs dan TR
Tabel 3. 8 Tabel G Tabel 3. 9 Tabel G Jika
Jika Cs Positif Cs Negatif

• Buat persamaan log d


𝑙𝑜𝑔𝑑𝑟𝑎𝑛𝑐𝑎𝑛𝑔𝑎𝑛 = log 𝑑𝑟 + 𝐺. 𝑠
• Hitung nilai log d dan drancangan untuk TR yang dikehendaki

Tabel 3. 10 Kala Ulang Rencana Curah Hujan


TR CS G S Log Rata-Rata Log R24 R24
2 0,277 2,004 100,999
5 0,802 2,035 108,409
10 -1,765 0,954 0,059 1,988 2,044 110,648
25 1,049 2,050 112,078
50 1,085 2,052 112,630

3.1.5 Distribusi Data Hujan


Data hidrologi yang dipakai untuk mengistimasi hujan/banjir rancangan
atau andalan menggunakan analisa frekuensi belum tentu sesuai dengan
distribusi-distribusi yang dipilih. Uji kesesuaian distribusi dilakukan dengan
menggunakan:

26
3.1.5.1 Uji Smirnov Kolmogorof
Uji Smirnov Kolmogorof merupakan uji simpangan secara
horisontal
(peluang).
Untuk
melihat apakah distribusi ini sesuai utuk data hujan yang ada
tersebut. Jika tidak, bisa diganti distribusi yang lain. Perhitungan uji
smirnov-kolmogorof cara analitis:
• Urutkan data dar iyang terbesar ke terkecil kemudian hitung
nilai probabilitas P dengan rumus Weilbull (Sri Harto, 1993
:179)
𝑚
𝑃= × 100%
𝑛+1
P = probabilitas (%),
m = nomor urut data
n = jumlah data
• Urutkan nilai masing-masing peluang teoritis dari hasil
penggambaran data (persamaan distribusinya)
• Dari kedua nilai peluang tersebut, ditentukan selisih
terbesarnya antara peluang pengamatan dengan peluang
teoritis.
• Berdasarkan tabel nilai kritis uji Smirnov Kolmogorof
ditentukan nilai D tersebut
Tabel 3. 11 Tabel Uji Smirnov Kolmogorof
UJI SMIRNOV
NO Pe(X) Xi LOG Xi G Pr(%) Pt(X) Pe-Pt
A B C D E F G H
1 0,090909091 72,667 1,861335 -2,164300923 95,48300638 0,04517 0,045739
2 0,181818182 79,03333333 1,89781 -1,541482944 91,68539173 0,083146 0,098672
3 0,272727273 99,6 1,998259 0,173701813 53,51237363 0,464876 0,192149
4 0,363636364 101,1666667 2,005037 0,289439084 49,56833167 0,504317 0,14068
5 0,454545455 102,1666667 2,009309 0,362380527 45,33575278 0,546642 0,092097
6 0,545454545 103,3333333 2,01424 0,446581878 40,44979433 0,595502 0,050048
7 0,636363636 104,3333333 2,018423 0,518001244 36,30553709 0,636945 0,000581
8 0,727272727 105,4666667 2,023115 0,598120302 31,65646219 0,683435 0,043837
9 0,818181818 106,0333333 2,025442 0,637857547 29,35062588 0,706494 0,111688
10 0,909090909 106,6333333 2,027893 0,679701472 26,92254517 0,730775 0,178316
JUMLAH 19,88087 D maks 0,953808
RATA-RATA 1,988087 D krt,a=5% (tabel) 0,994043
SIMPANGAN BAKU/ SD 0,058565
D maks < D krt, maka DITERMA
CS -1,76503

27
3.1.5.2 Uji Chi Squere
Uji Chi Square merupakan uji simpangan secara vertikal (hujan).
Berikut adalah langkah perhitungan secara grafis,
• Tarik garis dari tiap titik empiris (Pempiris) ke garis persamaan
• Tarik garis ke atas sampai sampai bertemu dengan absis peluang
• Baca nilai Pteoritis
• Hitung DP= |Pempiris-Pteoritis|, cari yang maksimal
• Cari nilai Do (tabel) untuk n tertentu dan a tertentu (tergantung
nilai keyakinan, umunya a=0.05)
• Jika DP<Do → sesuai

Tabel 3. 12 Tabel Uji Simpangan Vertikal 1


TABEL UJI SIMPANGAN VERTIKAL 1
No Pr (%) Log Xr Cs G Sd Log X X (mm)
1 75 1,988 -1,765 -0,489 0,059 1,959 91,087
2 50 1,988 -1,765 0,282 0,059 2,005 101,065
3 25 1,988 -1,765 0,713 0,059 2,030 107,111

Tabel 3. 13 Tabel Uji Simpangan Vertikal 2


TABEL UJI SIMPANGAN VERTIKAL 2
Jumlah Data Dk 1
No Batas Kelas Oi-Ei (Oi-Ei)²/Ei
Oi Ei a 0,05
1 0-91,087 2 2,5 -0,5 0,1 D hitung 11,6
2 91,087 - 101,065 1 2,5 -1,5 0,9 Delta P Tabel 3,841
3 101,065- 107,111 7 2,5 4,5 8,1 Kesimpulan Tidak Memenuhi
4 > 107,111 0 2,5 -2,5 2,5
D hitung>D tabel(5%) Tidak memenuhi
Jumlah 10 10 11,6

3.2 Jaringan Drainase

3.2.1 Perencanaan Jaringan Drainase


Saluran drainase harus didesain untuk menjamin kecepatan aliran tidak
kurang dari kecepatan minimum untuk terjadinya scouring sehingga
pengedapan tidak menjadi masalah (Suripin, 2003).
Langkah-langkah perencanaan jaringan drainase permukaan adalah
sebagai berikut.
a. Penentuan posisi saluran. Umumnya saluran berada di depan
pemukiman, di samping jalan, atau di sisi luar suatu lahan.
b. Penentuan arah aliran berdasarkan kontur tiap titik.
c. Penentuan jenis saluran dan penempatan gorong-gorong.

28
d. Penentuan dan penempatan bangunan drainase.

Gambar 3. 1 Gambar Arah Aliran

Gambar 3. 2 Gambar Arah Aliran

29
Tabel 3. 14 Tabel Rencana Jaringan
Rencana Jaringan Drainase
Beda Panjang Saluran
Patok Elevasi Elevasi
No. Tinggi Sloop (%)
Saluran Awal (m) Akhir (m) cm m
(m)
1 39-1 256,3 246,2 10,1 10000,0 100,0 10,10%
2 40-39 259,2 256,3 2,9 5000,0 50,0 5,80%
3 2-40 262,2 259,2 3,0 5879,6 58,8 5,10%
4 3-2 263,7 262,2 1,5 2270,4 22,7 6,61%
5 41-3 269,3 263,7 5,6 10000,0 100,0 5,60%
6 42-41 275,2 269,3 5,9 10000,0 100,0 5,90%
7 4-42 276,1 275,2 0,9 4375,0 43,8 2,06%
8 5-4 277,0 276,1 0,9 1725,0 17,3 5,22%
9 43-5 281,2 277,0 4,2 10000,0 100,0 4,20%
10 6-43 283,8 281,2 2,6 3375,1 33,8 7,70%
11 44-7 259,4 248,1 11,3 10000,0 100,0 11,30%
12 45-44 261,3 259,4 1,9 5000,0 50,0 3,80%
13 8-45 265,2 261,3 3,9 5879,6 58,8 6,63%
14 9-8 267,3 265,2 2,1 2270,4 22,7 9,25%
15 46-9 276,2 267,3 8,9 10000,0 100,0 8,90%
16 47-46 281,6 276,2 5,4 10000,0 100,0 5,40%
17 10-47 286,0 281,6 4,4 4375,0 43,8 10,06%
18 11-10 287,5 286,0 1,5 1725,0 17,3 8,70%
19 48-11 292,2 287,5 4,7 10000,0 100,0 4,70%
20 12-48 293,3 292,2 1,1 3375,1 33,8 3,26%
21 49-13 260,8 250,0 10,8 10000,0 100,0 10,80%
22 50-49 264,3 260,8 3,5 5000,0 50,0 7,00%
23 14-50 267,5 264,3 3,2 5910,0 59,1 5,41%
24 15-14 269,8 267,5 2,3 3465,0 34,7 6,64%
25 51-15 278,2 269,8 8,4 10000,0 100,0 8,40%
26 52-51 284,4 278,2 6,2 9993,0 99,9 6,20%
27 16-52 288,1 284,4 3,7 3632,1 36,3 10,19%
28 17-16 290,3 288,1 2,2 1749,9 17,5 12,57%
29 53-17 296,4 290,3 6,1 10000,0 100,0 6,10%
30 18-53 297,5 296,4 1,1 3375,1 33,8 3,26%
31 54-19 262,8 257,0 5,8 10000,0 100,0 5,80%
32 55-54 267,6 262,8 4,8 5000,0 50,0 9,60%
33 20-55 273,1 267,6 5,5 5910,0 59,1 9,31%
34 21-20 274,7 273,1 1,6 3465,0 34,7 4,62%
35 56-21 283,2 274,7 8,5 10000,0 100,0 8,50%
36 57-56 291,2 283,2 8,0 9993,0 99,9 8,01%
37 22-57 294,1 291,2 2,9 3632,1 36,3 7,98%
38 23-22 295,9 294,1 1,8 1749,9 17,5 10,29%
39 58-23 303,0 295,9 7,1 10000,0 100,0 7,10%
40 24-58 303,6 303,0 0,6 3375,1 33,8 1,78%
41 59-25 264,7 260,2 4,5 10000,0 100,0 4,50%
42 60-59 269,9 264,7 5,2 5000,0 50,0 10,40%
43 26-60 274,7 269,9 4,8 5813,1 58,1 8,26%
44 27-26 277,5 274,7 2,8 3491,1 34,9 8,02%
45 28-27 282,3 277,5 4,8 7250,0 72,5 6,62%
46 29-28 284,5 282,3 2,2 1950,0 19,5 11,28%
47 61-29 294,0 284,5 9,5 10000,0 100,0 9,50%
48 62-61 301,7 294,0 7,7 10000,0 100,0 7,70%
49 30-62 305,0 301,7 3,3 3131,7 31,3 10,54%
50 30-31 305,0 303,0 2,0 6493,3 64,9 3,08%
51 69-32 275,7 271,5 4,2 10000,0 100,0 4,20%
52 70-69 278,9 275,7 3,2 5000,0 50,0 6,40%
53 33-70 282,5 278,9 3,6 5813,1 58,1 6,19%
54 34-33 284,4 282,5 1,9 3491,1 34,911 5,44%
55 35-34 290,6 284,4 6,2 7250,0 72,5004 8,55%
56 36-35 292,7 290,6 2,1 1950,0 19,5 10,77%
57 37-36 305 292,7 12,3 7590,37 75,9037 16,20%
58 37-71 305 303,2 1,8 2409,63 24,0963 7,47%
59 71-72 303,2 296,4 6,8 10000 100 6,80%
60 72-38 296,4 296 0,4 9625 96,25 0,42%
61 7-1 248,1 246,2 1,9 7250,04 72,5004 3%
62 8-2 265,2 262,2 3,0 7250,04 72,5004 4,14%
63 9-3 267,3 263,7 3,6 7250,04 72,5004 4,97%
64 10-4 286 276,1 9,9 7250,04 72,5004 13,66%
65 11-5 287,5 277 10,5 7250,04 72,5004 14,48%
66 12-6 293,3 283,8 9,5 7250,04 72,5004 13,10%
67 19-13 257 250 7,0 8750,04 87,5004 8,00%
68 20-14 273,1 267,5 5,6 8750,04 87,5004 6,40%
69 21-15 274,7 269,8 4,9 8750,04 87,5004 5,60%
70 22-16 294,1 288,1 6,0 8750,04 87,5004 6,86%
71 23-17 295,9 290,3 5,6 8750,04 87,5004 6,40%
72 24-18 303,6 297,5 6,1 8750,04 87,5004 6,97%
73 63-25 265,4 260,2 5,2 5000 50 10,40%
74 32-63 271,5 265,4 6,1 7314,8 73,148 8,34%
75 64-26 278,1 271,5 6,6 5000 50 13,20%
76 33-64 282,5 278,1 4,4 7314,8 73,148 6,02%
77 65-27 280 277,5 2,5 5000 50 5,00%
78 34-65 284,4 280 4,4 7314,8 73,148 6,02%
79 66-28 285,3 282,3 3,0 5000 50 6,00%
80 35-66 290,6 285,3 5,3 7314,8 73,148 7,25%
81 67-29 288 284,5 3,5 5000 50 7,00%
82 36-67 292,7 288 4,7 7314,8 73,148 6,43%
83 31-68 303 298,9 4,1 5000 50 8,20%
84 68-38 298,9 296 2,9 7314,8 73,148 3,96%

30
3.3 Debit Banjir Rancangan

Besarnya debit rencana dihitung dengan memakai metode rasional kalau


daerah alirannya kurang dari 300 Ha. Untuk daerah yang alirannya lebih luas
sampai dengan 5000 Ha, dapat digunakan metode rasional yang diubah. Untuk luas
daerah yang lebih dari 5000 Ha, digunakan hidrograf satuan atau metode rasional
yang diubah. Metode untuk memperkirakan laju aliran puncak yang umum dipakai
metode Rasional USSCS (1973), mempunyai persamaan berikut:

𝐐 = 𝐂. 𝐈. 𝐀
dengan,
3
Q = debit aliran (𝑚 ⁄𝑑𝑡 )
C = koefisien pengaliran (0<C<1)
I = Intensitas hujan (𝑚⁄𝑑𝑡 )
A = Luas DAS (Ha)

3.3.1 Koefisien Limpasan/ Pengaliran (C).


Koefisien C didefinisikan sebagai nisbah antara debit aliran terhadap
intensitas hujan dan menentukan hasil perhitungan debit. Pemilihan harga C
yang tepat memerlukan pengalaman hidrologi yang luas. Faktor utama yang
menentukan C adalah laju infiltrasi, prosentase lahan kedap air, kemiringan
lahan, tanaman penutup tanah dan intensitas hujan.
Kenyataan dilapangan sangat jarang dijumpai lahan yang seragam, untuk
itu jika suatu DAS terdiri lebih dari satu jenis tanah/penutup tanah maka dapat
diambil rata rata dari koefisien tersebut.
Tabel 3. 15 Tabel Koefisien Kekasaran

31
3.3.2 Waktu Konsentrasi.
Waktu konsentrasi suatu daerah aliran sungai adalah waktu yang
diperlukan oleh air hujan yang jatuh untuk mengalir dari titik terjauh sampai
ketempat keluaran daerah aliran sungai, setelah tanah menjadi jenuh dan
dipresi-dipresi kecil terpenuhi. Jika durasi hujan sama dengan waktu
konsentrasi maka semua air hujan menjadi aliran permukaan secara
keseluruhan. Waktu Konsentrasi dihitung dengan rumus berikut,

𝑡𝑐 = 𝑡𝑜 + 𝑡𝑑
1
2 𝑛𝑑 6
𝑡𝑜 = ( × 3,28 × 𝐿𝑜 × )
3 √𝑆𝑜

𝐿𝑑
𝑡𝑑 =
60𝑉

dimana,
to = waktu yang dibutuhkan untuk mengalir di permukaan untuk
mencapai saluran (menit)
td = waktu yang diperlukan untuk mengalir disepanjang saluran (menit)
tc = waktu konsentrasi. (menit)
V = Kecepatan ijin (m/dt)
Ld = Panjang saluran (m)
Lo = panjang lintasan aliran di daerah limpasan (m)
nd = koefisien permukaan limpasan
So = Kemiringan lahan limpasan

Tabel 3. 16 Tabel koefisien permukaan limpasan (nd)

32
Tabel 3. 17 Tabel Kecepatan ijin (v)

3.3.3 Intesitas Hujan


Intensitas hujan adalah tinggi atau kedalaman air hujan persatuan waktu.
Intensitas hujan tergantung dari lama dan besarnya hujan. Semakin lama
hujan berlangsung maka intensitasnya akan cenderung makin tinggi, begitu
juga sebaliknya semakin pendek lamanya hujan maka semakin kecil juga
intensitasnya. Adapun rumus dari intensitas hujan adalah sebagai berikut:

2
𝑅24 24 3
𝐼= ×( )
24 𝑡𝑐

dimana,
I = Intensitas hujan (𝑚⁄𝑑𝑡)

tc = waktu konsentrasi (menit)


R24 = rancangan hujan dalam 5 tahun

3.1.1 Daerah Limpasan


Daerah limpasan adalah luas areal tangkapan curah hujan yang
berpengaruh secara langsung terhadap limpasan aliran permukaan.
Adapun rumus dari daerah limpasan adalah sebagai berikut,

𝐴 = 𝐿𝑜 × 𝐿𝑑

dimana,
A = Luas daerah limpasan (𝑚2 )
Lo = Panjang lintasan aliran di daerah limpasan (m).
Ld = Panjang saluran (m).

33
Tabel 3. 18 Tabel Debit Limpasan Ke Arah Kiri
Data Air Limpasan ke Arah Kiri

Lo Ld tc I
No. Lahan Blok Posis Saluran Sloof (%) to (menit) td (menit) A (m²) Qr (m³/dt)
cm m cm m menit jam mm/jam mm/dt

39-1 10,10% 3625,02 36,2502 10000,0 100 1,217 1,190 2,407 0,040 328 0,000091 3625,02 0,2309
atas 40-39 5,80% 3625,02 36,2502 5000,0 50 1,274 0,595 1,869 0,031 388 0,000108 1812,51 0,1366
2-40 5,10% 3625,02 36,2502 5879,6 58,7957 1,288 0,700 1,988 0,033 372 0,000103 2131,36 0,1542
Rumah
44-7 11,30% 3625,02 36,2502 10000,0 100 1,205 1,190 2,396 0,040 329 0,000091 3625,02 0,2316
bawah 45-44 3,80% 281,2 2,812 5000,0 50 0,862 0,595 1,457 0,024 458 0,000127 140,60 0,0125
8-45 6,63% 3625,02 36,2502 5879,6 58,7957 1,260 0,700 1,960 0,033 376 0,000104 2131,36 0,1557
39-1 10,10% 1929,96 19,2996 10000,0 100 1,095 1,190 2,286 0,038 339 0,000094 1929,96 0,1272
1 A
atas 40-39 5,80% 1929,96 19,2996 5000,0 50 1,147 0,595 1,742 0,029 406 0,000113 964,98 0,0762
2-40 5,10% 1929,96 19,2996 5879,6 58,7957 1,159 0,700 1,859 0,031 389 0,000108 1134,73 0,0859
44-7 11,30% 2068,32 20,6832 10000,0 100 1,098 1,190 2,288 0,038 339 0,000094 2068,32 0,1363
Jalan
bawah 45-44 3,80% 2068,32 20,6832 5000,0 50 1,202 0,595 1,797 0,030 398 0,000111 1034,16 0,0800
8-45 6,63% 2068,32 20,6832 5879,6 58,7957 1,147 0,700 1,847 0,031 391 0,000109 1216,08 0,0924
kanan 8-2 4,14% 1534,21 15,3421 7250,0 72,5004 1,136 0,863 1,999 0,033 371 0,000103 1112,31 0,0802
kiri 7-1 2,62% 1236,18 12,3618 7250,0 72,5004 1,138 0,863 2,001 0,033 371 0,000103 896,24 0,0646
41-3 5,60% 3625 36,2502 10000 100 1,278 1,190 2,468 0,041 322 0,000089 3625,02 0,2271
atas 42-41 5,90% 3625 36,2502 10000 100 1,272 1,190 2,463 0,041 323 0,000090 3625,02 0,2274
4-42 2,06% 3625 36,2502 4375 43,75 1,389 0,521 1,910 0,032 382 0,000106 1585,95 0,1179
Rumah
46-9 8,90% 3625 36,2502 10000 100 1,229 1,190 2,420 0,040 326 0,000091 3625,02 0,2301
bawah 47-46 5,40% 3625 36,2502 10000 100 1,282 1,190 2,472 0,041 322 0,000089 3625,02 0,2268
10-47 10,06% 3625 36,2502 4375 43,75 1,217 0,521 1,738 0,029 407 0,000113 1585,95 0,1255
41-3 5,90% 1930 19,2996 10000 100 1,145 1,190 2,336 0,039 334 0,000093 1929,96 0,1254
B
atas 42-41 2,06% 1930 19,2996 10000 100 1,251 1,190 2,441 0,041 325 0,000090 1929,96 0,1218
2
4-42 5,22% 1930 19,2996 4375 43,75 1,157 0,521 1,678 0,028 417 0,000116 844,36 0,0684
46-9 8,90% 2068 20,6832 10000 100 1,120 1,190 2,310 0,039 337 0,000094 2068,32 0,1354
Jalan
bawah 47-46 5,40% 2068 20,6832 10000 100 1,167 1,190 2,358 0,039 332 0,000092 2068,32 0,1336
10-47 10,06% 2068 20,6832 4375 43,75 1,108 0,521 1,629 0,027 425 0,000118 904,89 0,0748
kanan 10-4 13,66% 789 7,8882 7250 72,5004 0,920 0,863 1,783 0,030 400 0,000111 571,90 0,0445
kiri 9-3 4,97% 1236 12,3618 7250 72,5004 1,079 0,863 1,942 0,032 378 0,000105 896,24 0,0659
atas 3-2 6,61% 1929,96 19,2996 2270,4 22,7039 1,135 0,270 1,405 0,023 469 0,000130 438,18 0,0400
Gorong² B-A
bawah 9-8 9,25% 2068,32 20,6832 2270,4 22,7039 1,116 0,270 1,386 0,023 473 0,000131 469,59 0,0432
43-5 4,20% 3625,02 36,2502 10000,0 100 1,309 1,190 2,499 0,042 319 0,000089 3625,02 0,2252
atas
6-43 7,70% 3625,02 36,2502 3375,1 33,7508 1,244 0,402 1,646 0,027 422 0,000117 1223,47 0,1004
Rumah
48-11 4,70% 3625,02 36,2502 10000,0 100 1,297 1,190 2,487 0,041 321 0,000089 3625,02 0,2259
bawah
12-48 3,26% 3625,02 36,2502 3375,1 33,7508 1,337 0,402 1,739 0,029 407 0,000113 1223,47 0,0968
43-5 4,20% 1929,96 19,2996 10000 100 1,178 1,190 2,369 0,039 331 0,000092 1929,96 0,1242
C atas
6-43 7,70% 1929,96 19,2996 3375 33,7508 1,120 0,402 1,522 0,025 445 0,000124 651,38 0,0563
3
48-11 4,70% 2068,32 20,6832 10000 100 1,181 1,190 2,371 0,040 331 0,000092 2068,32 0,1331
Jalan bawah
12-48 3,26% 2068,32 20,6832 3375 33,7508 1,217 0,402 1,619 0,027 427 0,000119 698,07 0,0579
kanan 12-6 13,10% 788,82 7,8882 7250 72,5004 0,923 0,863 1,786 0,030 400 0,000111 571,90 0,0444
kiri 11-5 14,48% 935,93 9,3593 7250 72,5004 0,942 0,863 1,805 0,030 397 0,000110 678,55 0,0524
atas 5-4 5,22% 1929,96 19,2996 1725,0 17,25 1,157 0,205 1,363 0,023 479 0,000133 332,92 0,0310
Gorong² C-B
bawah 11-10 8,70% 2068,32 20,6832 1725,0 17,25 1,122 0,205 1,327 0,022 487 0,000135 356,79 0,0338
49-13 10,80% 4375 43,7502 10000 100 1,248 1,190 2,439 0,041 325 0,000090 4375,02 0,2762
atas 50-49 7,00% 4375 43,7502 5000 50 1,294 0,595 1,890 0,031 385 0,000107 2187,51 0,1637
Rumah 14-50 5,41% 4375 43,7502 5910 59,1 1,322 0,704 2,026 0,034 367 0,000102 2585,64 0,1848
54-19 8,50% 4375 43,7502 10000 100 1,274 1,190 2,464 0,041 323 0,000090 4375,02 0,2744
bawah 55-54 8,01% 4375 43,7502 5000 50 1,280 0,595 1,875 0,031 387 0,000107 2187,51 0,1646
20-55 7,98% 4375 43,7502 5910 59,1 1,280 0,704 1,984 0,033 373 0,000104 2585,64 0,1874
4 D 49-13 10,80% 2068 20,6832 10000 100 1,102 1,190 2,292 0,038 338 0,000094 2068,32 0,1361
atas 50-49 7,00% 2068 20,6832 5000 50 1,142 0,595 1,738 0,029 407 0,000113 1034,16 0,0819
14-50 5,41% 2068 20,6832 5910 59,1 1,167 0,704 1,871 0,031 388 0,000108 1222,38 0,0921
54-19 8,50% 1512 15,1164 10000 100 1,067 1,190 2,257 0,038 342 0,000095 1511,64 0,1005
Jalan
bawah 55-54 8,01% 1512 15,1164 5000 50 1,072 0,595 1,667 0,028 418 0,000116 755,82 0,0615
20-55 7,98% 1512 15,1164 5910 59,1 1,072 0,704 1,776 0,030 401 0,000111 893,38 0,0697
kanan 20-14 6,40% 1504 15,0378 8750 87,5004 1,091 1,042 2,133 0,036 355 0,000099 1315,81 0,0908
kiri 19-13 6,97% 1236 12,3618 8750 87,5004 1,049 1,042 2,090 0,035 360 0,000100 1081,66 0,0757
51-15 8,40% 4375 43,7502 10000 100 1,275 1,190 2,465 0,041 322 0,000090 4375,02 0,2743
atas 52-51 6,20% 4375 43,7502 9993 99,9295 1,307 1,190 2,497 0,042 320 0,000089 4371,94 0,2717
16-52 10,19% 4375 43,7502 3632 36,3205 1,254 0,432 1,687 0,028 415 0,000115 1589,03 0,1283
Rumah
56-21 8,50% 4375 43,7502 10000 100 1,274 1,190 2,464 0,041 323 0,000090 4375,02 0,2744
bawah 57-56 8,01% 4375 43,7502 9993 99,9295 1,280 1,190 2,470 0,041 322 0,000089 4371,94 0,2738
22-57 7,98% 4375 43,7502 3632 36,3205 1,280 0,432 1,713 0,029 411 0,000114 1589,03 0,1270
51-15 8,40% 2068 20,6832 10000 100 1,125 1,190 2,316 0,039 336 0,000093 2068,32 0,1352
E
atas 52-51 6,20% 2068 20,6832 9993 99,9295 1,154 1,190 2,344 0,039 333 0,000093 2066,86 0,1340
5
16-52 10,19% 2068 20,6832 3632 36,3205 1,107 0,432 1,540 0,026 441 0,000123 751,22 0,0645
56-21 8,50% 1512 15,1164 10000 100 1,067 1,190 2,257 0,038 342 0,000095 1511,64 0,1005
Jalan
bawah 57-56 8,01% 1512 15,1164 9993 99,9295 1,072 1,190 2,262 0,038 341 0,000095 1510,57 0,1003
22-57 7,98% 1512 15,1164 3632 36,3205 1,072 0,432 1,505 0,025 448 0,000124 549,04 0,0478
kanan 22-16 6,86% 814 8,1378 8750 87,5004 0,980 1,042 2,021 0,034 368 0,000102 712,06 0,0510
kiri 21-15 5,60% 1961 19,6122 8750 87,5004 1,154 1,042 2,195 0,037 348 0,000097 1716,08 0,1162
atas 15-14 6,20% 1929,96 19,2996 3465,0 34,65 1,141 0,413 1,553 0,026 439 0,000122 668,73 0,0570
Gorong² E-D
Bawah 21-20 4,62% 1646,64 16,4664 3465,0 34,65 1,139 0,413 1,551 0,026 439 0,000122 570,56 0,0487
53-17 6,10% 4375,02 43,7502 10000,0 100 1,309 1,190 2,500 0,042 319 0,000089 4375,02 0,2717
atas
18-53 3,26% 4375,02 43,7502 3375,1 33,7511 1,379 0,402 1,781 0,030 400 0,000111 1476,62 0,1150
Rumah
58-23 7,10% 4375,02 43,7502 10000,0 100 1,293 1,190 2,483 0,041 321 0,000089 4375,02 0,2729
bawah
24-58 1,78% 4375,02 43,7502 3375,1 33,7511 1,451 0,402 1,853 0,031 390 0,000108 1476,62 0,1120
53-17 6,10% 2068 20,6832 10000 100 1,156 1,190 2,346 0,039 333 0,000093 2068,32 0,1340
F atas
18-53 3,26% 2068 20,6832 3375 33,7511 1,217 0,402 1,619 0,027 427 0,000119 698,08 0,0579
6
58-23 7,10% 1512 15,1164 10000 100 1,083 1,190 2,273 0,038 340 0,000095 1511,64 0,1000
jalan bawah
24-58 1,78% 1512 15,1164 3375 33,7511 1,215 0,402 1,617 0,027 427 0,000119 510,20 0,0424
kanan 24-18 6,97% 789 7,8882 8750 87,5004 0,973 1,042 2,015 0,034 369 0,000102 690,22 0,0495
kiri 23-17 6,40% 936 9,3613 8750 87,5004 1,008 1,042 2,050 0,034 365 0,000101 819,12 0,0581
atas 17-16 12,57% 1929,96 19,2996 1749,9 17,4991 1,075 0,208 1,284 0,021 498 0,000138 337,73 0,0327
Gorong² F-E
Bawah 23-22 10,29% 1646,64 16,4664 1749,9 17,4991 1,065 0,208 1,273 0,021 501 0,000139 288,15 0,0281
59-25 4,50% 6157,4 61,574 10000,0 100 1,422 1,190 2,612 0,044 310 0,000086 6157,40 0,3714
atas 60-59 10,40% 6157,4 61,574 5000,0 50 1,326 0,595 1,921 0,032 381 0,000106 3078,70 0,2279
Rumah 26-60 8,26% 6157,4 61,574 5813,1 58,131 1,351 0,692 2,043 0,034 365 0,000101 3579,36 0,2543
69-32 4,20% 6157,4 61,574 10000,0 100 1,430 1,190 2,620 0,044 310 0,000086 6157,40 0,3706
bawah 70-69 6,40% 6157,4 61,574 5000,0 50 1,380 0,595 1,976 0,033 374 0,000104 3078,70 0,2237
33-70 6,19% 6157,4 61,574 5813,1 58,131 1,384 0,692 2,076 0,035 362 0,000100 3579,36 0,2516
59-25 4,50% 1647 16,4664 10000 100 1,141 1,190 2,331 0,039 335 0,000093 1646,64 0,1071
7 G atas 60-59 10,40% 1647 16,4664 5000 50 1,064 0,595 1,659 0,028 420 0,000117 823,32 0,0672
26-60 8,26% 1647 16,4664 5813 58,131 1,085 0,692 1,777 0,030 401 0,000111 957,21 0,0746
69-32 4,20% 1512 15,1164 10000 100 1,131 1,190 2,322 0,039 336 0,000093 1511,64 0,0986
bawah 70-69 6,40% 1512 15,1164 5000 50 1,092 0,595 1,688 0,028 415 0,000115 755,82 0,0610
jalan
33-70 6,19% 1512 15,1164 5813 58,131 1,095 0,692 1,787 0,030 399 0,000111 878,73 0,0683
64-26 13,20% 1576 15,7633 5000 50 1,036 0,595 1,631 0,027 425 0,000118 788,17 0,0651
kanan
33-64 6,02% 1576 15,7633 7315 73,148 1,106 0,871 1,976 0,033 374 0,000104 1153,05 0,0838
63-25 10,40% 1236 12,3618 5000 50 1,014 0,595 1,610 0,027 428 0,000119 618,09 0,0515
kiri
32-63 8,34% 1236 12,3618 7315 73,148 1,033 0,871 1,904 0,032 383 0,000106 904,24 0,0673
atas 28-27 6,62% 6157,4 61,574 7250,0 72,5004 1,377 0,863 2,240 0,037 344 0,000095 4464,14 0,2984
Rumah
bawah 35-34 8,55% 6157,4 61,574 7250,0 72,5004 1,347 0,863 2,211 0,037 347 0,000096 4464,14 0,3010
atas 28-27 6,62% 1646,64 16,4664 7250 72,5004 1,105 0,863 1,968 0,033 375 0,000104 1193,82 0,0870
bawah 35-34 8,55% 1511,64 15,1164 7250 72,5004 1,066 0,863 1,929 0,032 380 0,000105 1095,95 0,0809
H
66-28 6,00% 879,08 8,7908 5000 50 1,003 0,595 1,599 0,027 430 0,000120 439,54 0,0368
8 jalan kanan
35-66 7,25% 879,08 8,7908 7315 73,148 0,988 0,871 1,858 0,031 389 0,000108 643,03 0,0487
65-27 5,00% 1886,22 18,8622 5000 50 1,157 0,595 1,752 0,029 405 0,000112 943,11 0,0742
kiri
34-65 6,02% 1886,22 18,8622 7315 73,148 1,139 0,871 2,010 0,034 369 0,000103 1379,73 0,0991
atas 27-26 8,02% 1511,64 15,1164 3491,1 34,911 1,072 0,416 1,488 0,025 451 0,000125 527,73 0,0463
Gorong² H-G
bawah 34-33 5,44% 1646,64 16,4664 3491,1 34,911 1,123 0,416 1,539 0,026 441 0,000123 574,86 0,0493
Rumah I 61-29 9,50% 6157,4 61,574 10000,0 100 1,336 1,190 2,526 0,042 317 0,000088 6157,40 0,3798
atas 62-61 7,70% 6157,4 61,574 3375,1 33,7511 1,359 0,402 1,761 0,029 403 0,000112 2078,19 0,1630
30-62 10,54% 6157,4 61,574 10000,0 100 1,324 1,190 2,515 0,042 318 0,000088 6157,40 0,3809
bawah 37-36 16,20% 6157,4 61,574 7590,4 75,9037 1,278 0,904 2,181 0,036 350 0,000097 4673,69 0,3179
jalan 61-29 9,50% 1646,64 16,4664 10000 100 1,072 1,190 2,263 0,038 341 0,000095 1646,64 0,1093
atas 62-61 7,70% 1646,64 16,4664 3375 33,7511 1,091 0,402 1,493 0,025 450 0,000125 555,76 0,0487
9
30-62 10,54% 1646,64 16,4664 10000 100 1,063 1,190 2,253 0,038 342 0,000095 1646,64 0,1096
bawah 37-36 16,20% 1511,64 15,1164 7590 75,9037 1,011 0,904 1,915 0,032 382 0,000106 1147,39 0,0851
67-29 7,00% 1070,92 10,7092 5000 50 1,024 0,595 1,619 0,027 427 0,000119 535,46 0,0444
kiri
36-67 6,43% 1070,92 10,7092 7315 73,148 1,031 0,871 1,902 0,032 383 0,000106 783,36 0,0584
Gorong² I-H atas 29-28 11,28% 1511,64 15,1164 1950,0 19,5 1,042 0,232 1,274 0,021 501 0,000139 294,77 0,0287
bawah 36-35 10,77% 1646,64 16,4664 1950,0 19,5 1,061 0,232 1,293 0,022 496 0,000138 321,09 0,0309

34
Tabel 3. 19 Tabel Debit Limpasan Ke Arah Kanan

Data Air Limpasan ke Arah Kanan


Lo Ld tc I
No. Lahan Blok Posis Saluran Sloof (%) to (menit) td (menit) A (m²) Qr (m³/dt)
cm m cm m menit jam mm/jam mm/dt
atas 30-31 0,030801169 6157,4 61,574 2409,63 85 1,467145831 1,011904762 2,47905059 0,04131751 321,2061906 8,92239E-05 5233,79 0,32688556
37-71 0,162047436 6157,4 61,574 2410 81 1,277567054 0,964285714 2,24185277 0,03736421 343,4810448 9,54114E-05 4987,494 0,33310465
Rumah
bawah 71-72 0,074700265 6157,4 61,574 10000 100 1,362731742 1,19047619 2,55320793 0,04255347 314,956114 8,74878E-05 6157,4 0,37708821
72-38 0,068 6157,4 61,574 9625 97,5 1,373445639 1,160714286 2,53415992 0,042236 316,5323881 8,79257E-05 6003,465 0,36950105
atas 30-31 0,030801169 1646,64 16,4664 2410 85 1,177624501 1,011904762 2,18952926 0,03649215 348,9316233 9,69255E-05 1399,644 0,09496279
1 I
37-71 0,074700265 1511,64 15,1164 2409,63 81 1,078331289 0,964285714 2,042617 0,03404362 365,4681529 0,000101519 1224,4284 0,08701186
bawah 71-72 0,068 1511,64 15,1164 10000 100 1,086809208 1,19047619 2,2772854 0,03795476 339,9088919 9,44191E-05 1511,64 0,09990942
Jalan
72-38 0,004155844 1511,64 15,1164 9625 97,5 1,37185259 1,160714286 2,53256688 0,04220945 316,6651121 8,79625E-05 1473,849 0,09075044
31-68 0,082 788,82 7,8882 5000 62,5 0,960062458 0,744047619 1,70411008 0,02840183 412,3908972 0,000114553 493,0125 0,03953325
kanan
68-38 0,03964565 788,82 7,8882 7315 56,75 1,020001976 0,675595238 1,69559721 0,02825995 413,770036 0,000114936 447,65535 0,03601624

3.4 Perencanaan Dimensi Saluran

3.1.2 Kapasitas Saluran Drainase


Dalam merencanakan dimensi saluran, langkah pertama yang harus
diketahui adalah mengetahui besar debit rencana berdasarkan
perhitungan curah hujan rancangan dan tata letak jaringan drainase. Tata
letak direncana berdasarkan peta kota dan peta topografi. Tentukan letak
saluran-saluran, kemudian hitung beban saluran-saluran tersebut secara
kumulatif, dari saluran penangkap, pengumpul, dan pembuang dengan
mempertimbangkan kontribusi dari saluran sebelumnya.

Tabel 3. 20 Tabel Kapasitas Saluran ABC


Debit Saluran C-B-A

Debit Limpasan
Jumlah Debit pada
No Saluran Saluran Sebelumnya Debit limpasan dari saluran lain Keterangan Debit Air ke Sungai Kiri
Perumaha saluran tsb
Jalan Gorong²
n
1 12-6 0,044 tidak ada 0,044 hulu
2 6-43 0,100 0,056 12-6 0,044 0,201
3 43-5 0,225 0,124 6-43 0,201 0,551
4 11-5 0,052 48-11 0,25684757 0,309
5 5-4 0,03 43-5&11-5 0,860 0,891
6 10-4 0,044 11-10 0,145322209 0,190
7 4-42 0,118 0,068 5-4&10-4 1,081 1,267
8 42-41 0,227 0,122 4-42 1,267 1,616
9 41-3 0,227 0,125 42-41 1,616 1,969
10 9-3 0,066 46-9 0,535742279 0,602
11 8-2 0,080 9-8 0,269 0,349
12 3-2 0,04 41-3&9-3 2,570 2,610
13 2-40 0,154 0,086 3-2&8-2 2,959 3,199
4,833
14 40-39 0,137 0,076 2-40 3,199 3,412
15 39-1 0,231 0,127 40-39 3,412 3,770 hilir
16 12-48 0,097 0,058 tidak ada 0,155 hulu
17 48-11 0,226 0,133 12-48 0,155 0,514
18 11-10 0,034 48-11 0,257 0,291
19 10-47 0,126 0,075 11-10 0,145 0,346
20 47-46 0,227 0,134 10-47 0,346 0,706
21 46-9 0,230 0,135 47-46 0,706 1,071
22 9-8 0,043 46-9 0,536 0,579
23 8-45 0,156 0,092 9-8 0,289 0,538
24 45-44 0,013 0,080 8-45 0,538 0,630
25 44-7 0,232 0,136 45-44 0,630 0,998
26 7-1 0,065 44-7 0,998 1,063 hilir

35
Tabel 3. 21 Tabel Kapasitas Saluran DEF
Debit Saluran F-E-D
Debit Limpasan
Jumlah Debit pada
No Saluran Perumaha Saluran Sebelumnya Debit limpasan dari saluran lain Keterangan Debit Air ke Sungai Kiri
Jalan Gorong² saluran tsb
n
1 24-18 0,049 tidak ada 0,049 hulu
2 18-53 0,115 0,058 24-18 0,049 0,222
3 53-17 0,272 0,134 18-53 0,222 0,628
4 23-17 0,058 58-23 0,263660037 0,322
5 17-16 0,03 53-17&23-17 0,950 0,983
6 22-16 0,051 23-22 0,145859855 0,197
7 16-52 0,128 0,064 17-16&22-16 1,179 1,372
8 52-51 0,272 0,134 16-52 1,372 1,778
9 51-15 0,274 0,135 52-51 1,778 2,187
10 21-15 0,116 56-21 0,534805322 0,651
11 15-14 0,06 51-15&21-15 2,838 2,895
12 20-14 0,091 21-20 0,291759679 0,383
13 14-50 0,185 0,092 15-14&20-14 3,278 3,555
5,438
14 50-49 0,164 0,082 14-50 3,555 3,801
15 49-13 0,276 0,136 50-49 3,801 4,213 hilir
16 24-58 0,112 0,042 tidak ada 0,154 hulu
17 58-23 0,273 0,100 24-58 0,154 0,527
18 23-22 0,0281 58-23 0,263660037 0,292
19 22-57 0,127 0,048 23-22 0,146 0,321
20 57-56 0,274 0,100 22-57 0,321 0,695
21 56-21 0,274 0,100 57-56 0,695 1,070
22 21-20 0,0487 56-21 0,53 0,584
23 20-55 0,187 0,070 21-20 0,29 0,549
24 55-54 0,165 0,061 20-55 0,55 0,775
25 54-19 0,274 0,100 55-54 0,77 1,150
26 19-13 0,076 54-19 1,15 1,225 hilir

Tabel 3. 22 Tabel Kapasitas Saluran GHI


Debit Saluran I-H-G
Debit Limpasan
Jumlah Debit pada
No Saluran Perumaha Saluran Sebelumnya Debit limpasan dari saluran lain Keterangan Debit Air ke Sungai Kiri
Jalan Gorong² saluran tsb
n
1 30-62 0,381 0,110 tidak ada 0,491 hulu
2 62-61 0,163 0,049 30-62 0,491 0,702
3 61-29 0,380 0,109 62-61 0,702 1,191
4 36-67 0,058 37-36 0,201521135 0,260
5 67-29 0,044 36-67 0,260 0,304
6 29-28 0,029 61-29&67-29 0,564 0,593
7 35-66 0,049 36-35 0,116 0,165
8 66-28 0,037 35-66 0,165 0,202
9 28-27 0,298 0,087 29-28&66-28 0,367 0,752
10 34-65 0,099 35-34 0,249046725 0,348
11 65-27 0,074 34-65 0,348 0,422
12 27-26 0,046 28-27&265-27 0,771 0,817
13 33-64 0,084 34-33 0,149195302 0,233
2,975
14 64-26 0,065 33-64 0,233 0,298
15 26-60 0,254 0,075 27-26&64-26 0,531 0,860
16 60-59 0,228 0,067 26-60 0,860 1,155
17 59-25 0,371 0,107 60-59 1,155 1,634 hilir
18 37-36 0,318 0,085 tidak ada 0,403 hulu
19 36-35 0,03 37-36 0,201521135 0,232
20 35-34 0,301 0,081 36-35 0,116 0,498
21 34-33 0,05 35-34 0,249046725 0,298
22 33-70 0,252 0,068 34-33 0,15 0,469
23 70-69 0,224 0,061 33-70 0,47 0,754
24 69-32 0,371 0,099 70-69 0,75 1,223
25 32-63 0,067 69-32 1,22 1,290
26 63-25 0,051 32-63 1,29 1,342 hilir

Tabel 3. 23 Tabel Kapasitas Saluran I


Debit Saluran I
Debit Limpasan
Jumlah Debit pada
No Saluran Perumaha Saluran Sebelumnya Debit limpasan dari saluran lain Keterangan Debit Air ke Sungai Kanan
Jalan Gorong² saluran tsb
n
1 30-31 0,327 0,095 tidak ada 0,422 hulu
2 31-68 0,040 30-31 0,422 0,461
3 68-38 0,036 31-68 0,461 0,497 hilir
1,855
4 37-71 0,333 0,087 tidak ada 0,420 hulu
5 71-72 0,377 0,100 37-71 0,420 0,897
6 72-38 0,370 0,091 72-71 0,897 1,357 hilir

3.1.3 Kecepatan Aliran


Untuk merencanakan dimensi penampang pada saluran drainase
digunakan pendekatan rumus-rumus aliran seragam. Pada aliran seragam

36
garis energi dan dasar saluran selalu sejajar. Dimensi saluran
direncanakan dengan rumus Manning, Chezy, atau Strickler. Pada
saluran drainase yang terpengaruh oleh pengempangan (back water
effect), perlu diperhitungkan pasang surutnya dengan standard step
method.
Rumus kecepatan rata-rata pada perhitungan dimensi penampang
saluran menggunakan metode Manning dijelaskan sebagai berikut:

1 2⁄
𝑉= 𝑅 3√𝑆𝑑
𝑛
Dimana:
V = Kecepatan rata-rata dalam saluran (m/detik)
n = Koefisien kekasaran Manning
R = Jari-jari hidrolis (m)
Sd = Kemiringan dasar saluran

3.1.4 Tinggi Saluran


Tinggi saluran merupakan jarak dari dasar saluran sampai dengan
muka tanah asli.. Pada penampang melintang saluran berbentuk persegi
dapat ditulis sebagai berikut:
• Bila h sudah Diketaui
𝐴 =ℎ×𝑏
• Bila h belum diketahui
𝑄
𝐴=
𝑣
𝐴
𝑦=
𝑏
𝐹 = 0,18√𝑦
𝒉 =𝒚+𝑭
𝑃 = 𝑏 + (2 × 𝑦 )
𝐴
𝑅=
𝑃

37
𝑣
𝑆𝑑 = 2
1 2
( × 𝑅3 )
𝑛
Dimana:
v = Kecepatan rata-rata dalam saluran (m/detik)
A = Luas penampang aliran saluran
R = Jari-jari hidrolis (m)
Sd = Kemiringan dasar saluran
y = Kedalaman air
F = Tinggi jagaan
h = Tinggi saluran
n = Koefisien kekasaran Manning

Gambar 3. 3 Gambar Penampang Melintang

3.1.5 Kontrol Kecepatan Aliran


Dalam perencanaan dimensi saluran drainase, perlu diperhitungkan
kecepatan dan tegangan geser (shear stress). Kecepatan diterima sebagai
faktor yang paling penting dalam perencanaan saluran yang stabil.
Aliran dikatakan kritis apabila kecepatan aliran sama dengan
kecepatan gelombang gravitasi dengan amplitude kecil. Gelombang
gravitas dapat dibangkitkan dengan merubah kedalaman. Aliran disebut
subkritis apabila kecepatan aliran lebih kecil daripada kecepatan kritis,
sedangkan jika kecepatan alirannya lebih besar daripada kecepatan kritis,
maka alirannya disebut super kritis.
Parameter yang menetukan jenis saluran kritis, subkritris, dan super
kritis adalah nisbah antara gaya gravitasi dan gaya inersia, yang

38
dinyatakan dengan bilangan Froude (Fr), bilangan Froude didefinisikan
sebagai (Suripin, 2003).

𝑣
𝐹𝑟 =
√𝑔. ℎ

Dimana:
v = Kecepatan aliran (𝑚⁄𝑑𝑡 )
h = Kedalaman aliran (m)
g = Percepatan gravitasi (𝑚⁄𝑑𝑡 2 )

3.1.6 Tinggi Jagaan.


Jagaan (freeboard) suatu saluran ialah jarak vertikal dari puncak
saluran ke permukaan air pada kondisi rencana. Jarak ini harus cukup
untuk mencegah gelombang atau kenaikan muka air yang melimpah ke
tepi.
𝐹 = 0,18√𝑦

Dimana:
y = Kedalaman air
F = Tinggi jagaan

39
Tabel 3. 24 Tabel Rencana Saluran Drainase
Tabel Dimensi Saluran
Q Saluran Elevasi
No. Saluran A (m²) y (m) F (m) P (m) h (m) R (m) Sd ΔH Ld Ssal So ≤ Ssal cek
(m/dt) Awal (m) Akhir (m)
1 12-6 0,044 0,032 0,063 0,045 0,627 0,109 0,051 0,024218 293,3 283,8 9,5 72,5 13,10% 13,10% 13,10% 1
2 6-43 0,201 0,144 0,287 0,096 1,075 0,384 0,134 0,006635 283,8 281,2 2,6 33,8 7,70% 7,70% 7,70% 1
3 43-5 0,551 0,393 0,787 0,160 2,073 0,946 0,190 0,004161 281,2 277,0 4,2 100,0 4,20% 4,20% 4,20% 1
4 11-5 0,309 0,221 0,442 0,120 1,383 0,561 0,160 0,005238 287,5 277,0 10,5 72,5 14,48% 14,48% 14,48% 1
5 5-4 0,891 0,636 1,273 0,203 3,045 1,476 0,209 0,003658 277,0 276,1 0,9 17,3 5,22% 5,22% 5,22% 1
6 10-4 0,190 0,136 0,271 0,094 1,042 0,365 0,130 0,006882 286,0 276,1 9,9 72,5 13,66% 13,66% 13,66% 1
7 4-42 1,267 0,905 1,810 0,242 4,120 2,052 0,220 0,003423 276,1 275,2 0,9 43,8 2,06% 2,06% 2,06% 1
8 42-41 1,616 1,154 2,309 0,273 5,117 2,582 0,226 0,003303 275,2 269,3 5,9 100,0 5,90% 5,90% 5,90% 1
9 41-3 1,969 1,406 2,812 0,302 6,124 3,114 0,230 0,003227 269,3 263,7 5,6 100,0 5,60% 5,60% 5,60% 1
10 9-3 0,602 0,430 0,859 0,167 2,219 1,026 0,194 0,004048 267,3 263,7 3,6 72,5 4,97% 4,97% 4,97% 1
11 8-2 0,349 0,249 0,499 0,127 1,497 0,626 0,167 0,004952 265,2 262,2 3,0 72,5 4,14% 4,14% 4,14% 1
12 3-2 2,610 1,864 3,729 0,348 7,957 4,076 0,234 0,00314 263,7 262,2 1,5 22,7 6,61% 6,61% 6,61% 1
13 2-40 3,199 2,285 4,570 0,385 9,640 4,955 0,237 0,003092 262,2 259,2 3,0 58,8 5,10% 5,10% 5,10% 1
14 40-39 3,412 2,437 4,874 0,397 10,249 5,272 0,238 0,003079 259,2 256,3 2,9 50,0 5,80% 5,80% 5,80% 1
15 39-1 3,770 2,693 5,386 0,418 11,272 5,804 0,239 0,00306 256,3 246,2 10,1 100,0 10,10% 10,10% 10,10% 1
16 12-48 0,155 0,111 0,221 0,085 0,942 0,306 0,117 0,007899 293,3 292,2 1,1 33,8 3,26% 3,26% 3,26% 1
17 48-11 0,514 0,367 0,734 0,154 1,968 0,888 0,186 0,004258 292,2 287,5 4,7 100,0 4,70% 4,70% 4,70% 1
18 11-10 0,291 0,208 0,415 0,116 1,330 0,531 0,156 0,005399 287,5 286,0 1,5 17,3 8,70% 8,70% 8,70% 1
19 10-47 0,346 0,247 0,494 0,126 1,487 0,620 0,166 0,004973 286,0 281,6 4,4 43,8 10,06% 10,06% 10,06% 1
20 47-46 0,706 0,504 1,009 0,181 2,517 1,189 0,200 0,003869 281,6 276,2 5,4 100,0 5,40% 5,40% 5,40% 1
21 46-9 1,071 0,765 1,531 0,223 3,561 1,753 0,215 0,003524 276,2 267,3 8,9 100,0 8,90% 8,90% 8,90% 1
22 9-8 0,579 0,414 0,827 0,164 2,154 0,991 0,192 0,004096 267,3 265,2 2,1 22,7 9,25% 9,25% 9,25% 1
23 8-45 0,538 0,384 0,768 0,158 2,036 0,926 0,189 0,004194 265,2 261,3 3,9 58,8 6,63% 6,63% 6,63% 1
24 45-44 0,630 0,450 0,900 0,171 2,300 1,071 0,196 0,003993 261,3 259,4 1,9 50,0 3,80% 3,80% 3,80% 1
25 44-7 0,998 0,713 1,426 0,215 3,351 1,641 0,213 0,003573 259,4 248,1 11,3 100,0 11,30% 11,30% 11,30% 1
26 7-1 1,063 0,759 1,518 0,222 3,536 1,740 0,215 0,003529 248,1 246,2 1,9 72,5 2,62% 2,62% 2,62% 1
27 24-18 0,049 0,035 0,071 0,048 0,641 0,119 0,055 0,021622 303,6 297,5 6,1 87,5 6,97% 6,97% 6,97% 1
28 18-53 0,222 0,159 0,318 0,101 1,135 0,419 0,140 0,006246 297,5 296,4 1,1 33,8 3,26% 3,26% 3,26% 1
29 53-17 0,628 0,449 0,897 0,171 2,295 1,068 0,196 0,003997 296,4 290,3 6,1 100,0 6,10% 6,10% 6,10% 1
30 23-17 0,322 0,230 0,460 0,122 1,419 0,582 0,162 0,00514 295,9 290,3 5,6 87,5 6,40% 6,40% 6,40% 1
31 17-16 0,983 0,702 1,404 0,213 3,307 1,617 0,212 0,003584 290,3 288,1 2,2 17,5 12,57% 12,57% 12,57% 1
32 22-16 0,197 0,141 0,281 0,095 1,062 0,377 0,132 0,006726 294,1 288,1 6,0 87,5 6,86% 6,86% 6,86% 1
33 16-52 1,372 0,980 1,960 0,252 4,420 2,212 0,222 0,00338 288,1 284,4 3,7 36,3 10,19% 10,19% 10,19% 1
34 52-51 1,778 1,270 2,540 0,287 5,580 2,827 0,228 0,003264 284,4 278,2 6,2 99,9 6,20% 6,20% 6,20% 1
35 51-15 2,187 1,562 3,125 0,318 6,750 3,443 0,231 0,003191 278,2 269,8 8,4 100,0 8,40% 8,40% 8,40% 1
36 21-15 0,651 0,465 0,930 0,174 2,360 1,104 0,197 0,003956 274,7 269,8 4,9 87,5 5,60% 5,60% 5,60% 1
37 15-14 2,895 2,068 4,136 0,366 8,773 4,502 0,236 0,003115 269,8 267,5 2,3 34,7 6,64% 6,64% 6,64% 1
38 20-14 0,383 0,273 0,547 0,133 1,593 0,680 0,172 0,004759 273,1 267,5 5,6 87,5 6,40% 6,40% 6,40% 1
39 14-50 3,555 2,539 5,078 0,406 10,657 5,484 0,238 0,003071 267,5 264,3 3,2 59,1 5,41% 5,41% 5,41% 1
40 50-49 3,801 2,715 5,429 0,419 11,359 5,849 0,239 0,003058 264,3 260,8 3,5 50,0 7,00% 7,00% 7,00% 1
41 49-13 4,213 3,009 6,018 0,442 12,537 6,460 0,240 0,003041 260,8 250,0 10,8 100,0 10,80% 10,80% 10,80% 1
42 24-58 0,154 0,110 0,221 0,085 0,941 0,305 0,117 0,007912 303,6 303,0 0,6 33,8 1,78% 1,78% 1,78% 1
43 58-23 0,527 0,377 0,753 0,156 2,007 0,910 0,188 0,004221 303,0 295,9 7,1 100,0 7,10% 7,10% 7,10% 1
44 23-22 0,292 0,208 0,417 0,116 1,333 0,533 0,156 0,005389 295,9 294,1 1,8 17,5 10,29% 10,29% 10,29% 1
45 22-57 0,321 0,229 0,458 0,122 1,416 0,580 0,162 0,005147 294,1 291,2 2,9 36,3 7,98% 7,98% 7,98% 1
46 57-56 0,695 0,496 0,992 0,179 2,485 1,172 0,200 0,003886 291,2 283,2 8,0 99,9 8,01% 8,01% 8,01% 1
47 56-21 1,070 0,764 1,528 0,223 3,556 1,751 0,215 0,003525 283,2 274,7 8,5 100,0 8,50% 8,50% 8,50% 1
48 21-20 0,584 0,417 0,834 0,164 2,167 0,998 0,192 0,004086 274,7 273,1 1,6 34,7 4,62% 4,62% 4,62% 1
49 20-55 0,549 0,392 0,784 0,159 2,068 0,943 0,190 0,004166 273,1 267,6 5,5 59,1 9,31% 9,31% 9,31% 1
50 55-54 0,775 0,553 1,107 0,189 2,714 1,296 0,204 0,003779 267,6 262,8 4,8 50,0 9,60% 9,60% 9,60% 1
51 54-19 1,150 0,821 1,642 0,231 3,785 1,873 0,217 0,003479 262,8 257,0 5,8 100,0 5,80% 5,80% 5,80% 1
52 19-13 1,225 0,875 1,751 0,238 4,001 1,989 0,219 0,003441 257,0 250,0 7,0 87,5 8,00% 8,00% 8,00% 1
53 30-62 0,491 0,350 0,701 0,151 1,902 0,851 0,184 0,004326 305,0 301,7 3,3 31,3 10,54% 10,54% 10,54% 1
54 62-61 0,702 0,502 1,003 0,180 2,506 1,183 0,200 0,003875 301,7 294,0 7,7 100,0 7,70% 7,70% 7,70% 1
55 61-29 1,191 0,851 1,702 0,235 3,904 1,937 0,218 0,003458 294,0 284,5 9,5 100,0 9,50% 9,50% 9,50% 1
56 36-67 0,260 0,186 0,371 0,110 1,243 0,481 0,149 0,005722 292,7 288,0 4,7 73,1 6,43% 6,43% 6,43% 1
57 67-29 0,304 0,217 0,435 0,119 1,370 0,553 0,159 0,005278 288,0 284,5 3,5 50,0 7,00% 7,00% 7,00% 1
58 29-28 0,593 0,424 0,847 0,166 2,194 1,013 0,193 0,004066 284,5 282,3 2,2 19,5 11,28% 11,28% 11,28% 1
59 35-66 0,165 0,118 0,236 0,087 0,971 0,323 0,121 0,007555 290,6 285,3 5,3 73,1 7,25% 7,25% 7,25% 1
60 66-28 0,202 0,144 0,288 0,097 1,076 0,385 0,134 0,006625 285,3 282,3 3,0 50,0 6,00% 6,00% 6,00% 1
61 28-27 0,752 0,537 1,074 0,187 2,648 1,261 0,203 0,003807 282,3 277,5 4,8 72,5 6,62% 6,62% 6,62% 1
62 34-65 0,348 0,249 0,497 0,127 1,495 0,624 0,166 0,004957 284,4 280,0 4,4 73,1 6,02% 6,02% 6,02% 1
63 65-27 0,422 0,302 0,603 0,140 1,707 0,743 0,177 0,004572 280,0 277,5 2,5 50,0 5,00% 5,00% 5,00% 1
64 27-26 0,817 0,583 1,167 0,194 2,834 1,361 0,206 0,003731 277,5 274,7 2,8 34,9 8,02% 8,02% 8,02% 1
65 33-64 0,233 0,166 0,333 0,104 1,166 0,437 0,143 0,00608 282,5 278,1 4,4 73,1 6,02% 6,02% 6,02% 1
66 64-26 0,298 0,213 0,426 0,117 1,352 0,543 0,158 0,005332 278,1 271,5 6,6 50,0 13,20% 13,20% 13,20% 1
67 26-60 0,860 0,614 1,228 0,200 2,957 1,428 0,208 0,003687 274,7 269,9 4,8 58,1 8,26% 8,26% 8,26% 1
68 60-59 1,155 0,825 1,650 0,231 3,800 1,881 0,217 0,003476 269,9 264,7 5,2 50,0 10,40% 10,40% 10,40% 1
69 59-25 1,634 1,167 2,334 0,275 5,167 2,609 0,226 0,003299 264,7 260,2 4,5 100,0 4,50% 4,50% 4,50% 1
70 37-36 0,403 0,288 0,576 0,137 1,652 0,712 0,174 0,004658 305,0 292,7 12,3 75,9 16,20% 16,20% 16,20% 1
71 36-35 0,232 0,166 0,332 0,104 1,164 0,436 0,143 0,006087 292,7 290,6 2,1 19,5 10,77% 10,77% 10,77% 1
72 35-34 0,498 0,356 0,712 0,152 1,923 0,863 0,185 0,004303 290,6 284,4 6,2 72,5 8,55% 8,55% 8,55% 1
73 34-33 0,298 0,213 0,426 0,118 1,353 0,544 0,158 0,005329 284,4 282,5 1,9 34,9 5,44% 5,44% 5,44% 1
74 33-70 0,469 0,335 0,670 0,147 1,840 0,817 0,182 0,004396 282,5 278,9 3,6 58,1 6,19% 6,19% 6,19% 1
75 70-69 0,754 0,538 1,077 0,187 2,654 1,264 0,203 0,003805 278,9 275,7 3,2 50,0 6,40% 6,40% 6,40% 1
76 69-32 1,223 0,874 1,747 0,238 3,994 1,985 0,219 0,003442 275,7 271,5 4,2 100,0 4,20% 4,20% 4,20% 1
77 32-63 1,290 0,922 1,843 0,244 4,187 2,088 0,220 0,003412 271,5 265,4 6,1 73,1 8,34% 8,34% 8,34% 1
78 63-25 1,342 0,958 1,917 0,249 4,334 2,166 0,221 0,003392 265,4 260,2 5,2 50,0 10,40% 10,40% 10,40% 1
79 30-31 0,422 0,301 0,603 0,140 1,705 0,742 0,177 0,004575 305,0 303,0 2,0 64,9 3,08% 3,08% 3,08% 1
80 31-68 0,461 0,330 0,659 0,146 1,818 0,805 0,181 0,004422 303,0 298,9 4,1 50,0 8,20% 8,20% 8,20% 1
81 68-38 0,497 0,355 0,711 0,152 1,921 0,862 0,185 0,004305 298,9 296,0 2,9 73,1 3,96% 3,96% 3,96% 1
82 37-71 0,420 0,300 0,600 0,139 1,700 0,740 0,176 0,004582 305,0 303,2 1,8 24,1 7,47% 7,47% 7,47% 1
83 71-72 0,897 0,641 1,282 0,204 3,063 1,485 0,209 0,003653 303,2 296,4 6,8 100,0 6,80% 6,80% 6,80% 1
84 72-38 1,357 0,970 1,939 0,251 4,378 2,190 0,221 0,003386 296,4 296,0 0,4 96,3 0,42% 0,42% 0,42% 1

40
Tabel 3. 25 Tabel Rencana Saluran Drainase
Saluran Drainase
Fr Fr > 1 → Fr = S ds Terhadap Elevasi Bangunan Terjunan Elv. Akhir
No. Saluran h (m) A (m²) P (m) R (m) Sd S mt F (m) ∆Hs Ket
Nilai Aliran 0.8 S mt Awal (m) Akhir (m) n Lt ht Saluran (m)
1 0,032 1,355 super kritis 0.8 0,109 0,054 0,718 0,076 0,0141 0,131 S ds < S mt 0,045 1,024664 283,646 282,621 Curam 9,271 7,820 1,025 273,121
2 0,143681 0,721 sub kritis 0,7 0,384 0,192 1,268 0,151 0,0056 0,077 S ds < S mt 0,096 0,189730 280,720 280,530 Curam 13,704 2,463 0,190 277,930
3 0,393273 0,460 sub kritis 0,5 0,946 0,473 2,392 0,198 0,0039 0,042 S ds < S mt 0,160 0,393716 275,894 275,500 Curam 10,668 9,374 0,394 271,300
4 0,220863 0,597 sub kritis 0,6 0,561 0,281 1,623 0,173 0,0047 0,145 S ds < S mt 0,120 0,341237 276,319 275,978 Curam 30,770 2,356 0,341 265,478
5 0,63627 0,368 sub kritis 0,4 1,476 0,738 3,451 0,214 0,0035 0,052 S ds < S mt 0,203 0,061212 274,421 274,360 Curam 14,703 1,173 0,061 273,460
6 0,135582 0,740 sub kritis 0,7 0,365 0,182 1,230 0,148 0,0058 0,137 S ds < S mt 0,094 0,418733 275,641 275,223 Curam 23,643 3,066 0,419 265,323
7 0,904901 0,312 sub kritis 0,3 2,052 1,026 4,604 0,223 0,0034 0,021 S ds < S mt 0,242 0,146882 272,906 272,759 Curam 6,127 7,140 0,147 271,859
8 1,154321 0,278 sub kritis 0,3 2,582 1,291 5,664 0,228 0,0033 0,059 S ds < S mt 0,273 0,325786 266,444 266,119 Curam 18,110 5,522 0,326 260,219
9 1,406089 0,253 sub kritis 0,3 3,114 1,557 6,728 0,231 0,0032 0,056 S ds < S mt 0,302 0,319254 260,284 259,965 Curam 17,541 5,701 0,319 254,365
10 0,429724 0,441 sub kritis 0,4 1,026 0,513 2,553 0,201 0,0039 0,050 S ds < S mt 0,167 0,279252 262,507 262,228 Curam 12,892 5,624 0,279 258,628
11 0,249275 0,565 sub kritis 0,6 0,626 0,313 1,751 0,179 0,0045 0,041 S ds < S mt 0,127 0,326909 261,447 261,120 Curam 9,177 7,900 0,327 258,120
12 1,864356 0,221 sub kritis 0,2 4,076 2,038 8,653 0,236 0,0031 0,066 S ds < S mt 0,348 0,070793 257,776 257,705 Curam 21,189 1,072 0,071 256,205
13 2,285122 0,201 sub kritis 0,2 4,955 2,478 10,410 0,238 0,0031 0,051 S ds < S mt 0,385 0,180829 253,860 253,679 Curam 16,590 3,544 0,181 250,679
14 2,437183 0,195 sub kritis 0,2 5,272 2,636 11,044 0,239 0,0031 0,058 S ds < S mt 0,397 0,153186 250,631 250,478 Curam 18,931 2,641 0,153 247,578
15 2,692998 0,186 sub kritis 0,2 5,804 2,902 12,107 0,240 0,0030 0,101 S ds < S mt 0,418 0,304678 239,979 239,674 Curam 33,150 3,017 0,305 229,574
16 0,110513 0,809 sub kritis 0,8 0,306 0,153 1,111 0,138 0,0064 0,033 S ds < S mt 0,085 0,215678 291,810 291,594 Curam 5,100 6,618 0,216 290,494
17 0,366925 0,474 sub kritis 0,5 0,888 0,444 2,276 0,195 0,0040 0,047 S ds < S mt 0,154 0,400915 286,458 286,057 Curam 11,723 8,530 0,401 281,357
18 0,207603 0,613 sub kritis 0,6 0,531 0,266 1,562 0,170 0,0048 0,087 S ds < S mt 0,116 0,083090 285,353 285,270 Curam 18,053 0,956 0,083 283,770
19 0,246865 0,568 sub kritis 0,6 0,620 0,310 1,740 0,178 0,0045 0,101 S ds < S mt 0,126 0,197930 280,853 280,655 Curam 22,230 1,968 0,198 276,255
20 0,50429 0,410 sub kritis 0,4 1,189 0,595 2,879 0,207 0,0037 0,054 S ds < S mt 0,181 0,371446 274,830 274,458 Curam 14,538 6,879 0,371 269,058
21 0,765346 0,338 sub kritis 0,3 1,753 0,877 4,007 0,219 0,0034 0,089 S ds < S mt 0,223 0,344035 265,324 264,980 Curam 25,869 3,866 0,344 256,080
22 0,413536 0,449 sub kritis 0,4 0,991 0,495 2,482 0,200 0,0039 0,092 S ds < S mt 0,164 0,088270 264,046 263,957 Curam 23,791 0,954 0,088 261,857
23 0,383979 0,465 sub kritis 0,5 0,926 0,463 2,351 0,197 0,0040 0,066 S ds < S mt 0,158 0,232917 260,217 259,984 Curam 16,744 3,511 0,233 256,084
24 0,450086 0,432 sub kritis 0,4 1,071 0,535 2,642 0,203 0,0038 0,038 S ds < S mt 0,171 0,190493 258,158 257,968 Curam 9,974 5,013 0,190 256,068
25 0,712869 0,349 sub kritis 0,3 1,641 0,820 3,781 0,217 0,0035 0,113 S ds < S mt 0,215 0,347973 246,244 245,896 Curam 32,474 3,079 0,348 234,596
26 0,75899 0,339 sub kritis 0,3 1,740 0,870 3,980 0,219 0,0034 0,026 S ds < S mt 0,222 0,249752 244,238 243,989 Curam 7,608 9,530 0,250 242,089
27 0,035357 1,298 super kritis 0.8 0,119 0,059 0,737 0,080 0,0131 0,070 S ds < S mt 0,048 1,143208 297,334 296,190 Curam 5,336 16,399 1,143 290,090
28 0,158842 0,690 sub kritis 0,7 0,419 0,210 1,338 0,157 0,0054 0,033 S ds < S mt 0,101 0,181378 295,879 295,698 Curam 6,065 5,565 0,181 294,598
29 0,448673 0,433 sub kritis 0,4 1,068 0,534 2,636 0,203 0,0038 0,061 S ds < S mt 0,171 0,381265 289,062 288,680 Curam 15,999 6,250 0,381 282,580
30 0,229805 0,586 sub kritis 0,6 0,582 0,291 1,663 0,175 0,0046 0,064 S ds < S mt 0,122 0,405949 289,596 289,190 Curam 13,795 6,343 0,406 283,590
31 0,701842 0,352 sub kritis 0,4 1,617 0,808 3,734 0,217 0,0035 0,126 S ds < S mt 0,213 0,061050 286,270 286,209 Curam 36,036 0,486 0,061 284,009
32 0,140584 0,728 sub kritis 0,7 0,377 0,188 1,253 0,150 0,0057 0,069 S ds < S mt 0,095 0,496861 287,628 287,131 Curam 12,076 7,246 0,497 281,131
33 0,980102 0,301 sub kritis 0,3 2,212 1,106 4,924 0,225 0,0033 0,102 S ds < S mt 0,252 0,120662 281,936 281,815 Curam 30,664 1,184 0,121 278,115
34 1,269935 0,266 sub kritis 0,3 2,827 1,413 6,153 0,230 0,0032 0,062 S ds < S mt 0,287 0,322245 275,086 274,764 Curam 19,240 5,194 0,322 268,564
35 1,562407 0,241 sub kritis 0,2 3,443 1,722 7,386 0,233 0,0032 0,084 S ds < S mt 0,318 0,316235 266,039 265,723 Curam 26,563 3,765 0,316 257,323
36 0,465026 0,425 sub kritis 0,4 1,104 0,552 2,707 0,204 0,0038 0,056 S ds < S mt 0,174 0,330875 268,523 268,192 Curam 14,809 5,909 0,331 263,292
37 2,068179 0,211 sub kritis 0,2 4,502 2,251 9,505 0,237 0,0031 0,066 S ds < S mt 0,366 0,107254 262,631 262,524 Curam 21,444 1,616 0,107 260,224
38 0,273289 0,542 sub kritis 0,5 0,680 0,340 1,859 0,183 0,0044 0,064 S ds < S mt 0,133 0,382655 266,687 266,305 Curam 14,635 5,979 0,383 260,705
39 2,539231 0,191 sub kritis 0,2 5,484 2,742 11,468 0,239 0,0031 0,054 S ds < S mt 0,406 0,180643 258,410 258,230 Curam 17,715 3,336 0,181 255,030
40 2,714657 0,185 sub kritis 0,2 5,849 2,924 12,197 0,240 0,0030 0,070 S ds < S mt 0,419 0,152274 254,532 254,380 Curam 22,985 2,175 0,152 250,880
41 3,009195 0,176 sub kritis 0,2 6,460 3,230 13,420 0,241 0,0030 0,108 S ds < S mt 0,442 0,302975 243,098 242,795 Curam 35,647 2,805 0,303 231,995
42 0,110252 0,809 sub kritis 0,8 0,305 0,153 1,110 0,137 0,0064 0,018 S ds < S mt 0,085 0,215944 302,610 302,395 Curam 2,778 12,147 0,216 301,795
43 0,376657 0,469 sub kritis 0,5 0,910 0,455 2,319 0,196 0,0040 0,071 S ds < S mt 0,156 0,398142 294,834 294,436 Curam 17,833 5,608 0,398 287,336
44 0,208371 0,612 sub kritis 0,6 0,533 0,266 1,566 0,170 0,0048 0,103 S ds < S mt 0,116 0,084172 293,451 293,367 Curam 21,385 0,818 0,084 291,567
45 0,229067 0,587 sub kritis 0,6 0,580 0,290 1,660 0,175 0,0046 0,080 S ds < S mt 0,122 0,168700 290,498 290,329 Curam 17,190 2,113 0,169 287,429
46 0,496249 0,413 sub kritis 0,4 1,172 0,586 2,844 0,206 0,0037 0,080 S ds < S mt 0,179 0,372470 281,849 281,476 Curam 21,478 4,653 0,372 273,476
47 0,764008 0,338 sub kritis 0,3 1,751 0,875 4,001 0,219 0,0034 0,085 S ds < S mt 0,223 0,344129 272,727 272,383 Curam 24,700 4,049 0,344 263,883
48 0,4168 0,447 sub kritis 0,4 0,998 0,499 2,496 0,200 0,0039 0,046 S ds < S mt 0,164 0,134454 271,938 271,803 Curam 11,900 2,912 0,134 270,203
49 0,392011 0,460 sub kritis 0,5 0,943 0,472 2,387 0,198 0,0039 0,093 S ds < S mt 0,159 0,232877 266,497 266,264 Curam 23,618 2,502 0,233 260,764
50 0,55349 0,393 sub kritis 0,4 1,296 0,648 3,093 0,210 0,0036 0,096 S ds < S mt 0,189 0,182181 261,314 261,132 Curam 26,347 1,898 0,182 256,332
51 0,821248 0,327 sub kritis 0,3 1,873 0,937 4,246 0,221 0,0034 0,058 S ds < S mt 0,231 0,340379 254,896 254,556 Curam 17,040 5,869 0,340 248,756
52 0,875312 0,317 sub kritis 0,3 1,989 0,994 4,478 0,222 0,0034 0,080 S ds < S mt 0,238 0,295118 247,773 247,478 Curam 23,719 3,689 0,295 240,478
53 0,350378 0,484 sub kritis 0,5 0,851 0,426 2,203 0,193 0,0041 0,105 S ds < S mt 0,151 0,127140 300,698 300,571 Curam 25,956 1,207 0,127 297,271
54 0,501596 0,411 sub kritis 0,4 1,183 0,592 2,867 0,206 0,0037 0,077 S ds < S mt 0,180 0,371873 292,636 292,264 Curam 20,706 4,830 0,372 284,564
55 0,850936 0,321 sub kritis 0,3 1,937 0,968 4,373 0,221 0,0034 0,095 S ds < S mt 0,235 0,338628 282,328 281,990 Curam 28,054 3,565 0,339 272,490
56 0,185646 0,645 sub kritis 0,6 0,481 0,240 1,462 0,164 0,0050 0,064 S ds < S mt 0,110 0,368126 287,409 287,041 Curam 12,767 5,729 0,368 282,341
57 0,217382 0,601 sub kritis 0,6 0,553 0,277 1,607 0,172 0,0047 0,070 S ds < S mt 0,119 0,236717 283,828 283,591 Curam 14,786 3,382 0,237 280,091
58 0,423524 0,444 sub kritis 0,4 1,013 0,506 2,525 0,201 0,0039 0,113 S ds < S mt 0,166 0,075372 281,122 281,046 Curam 29,188 0,668 0,075 278,846
59 0,117786 0,787 sub kritis 0,8 0,323 0,161 1,146 0,141 0,0062 0,072 S ds < S mt 0,087 0,452488 284,890 284,437 Curam 11,713 6,245 0,452 279,137
60 0,144058 0,721 sub kritis 0,7 0,385 0,192 1,269 0,152 0,0056 0,060 S ds < S mt 0,097 0,280736 281,819 281,538 Curam 10,686 4,679 0,281 278,538
61 0,537072 0,398 sub kritis 0,4 1,261 0,630 3,021 0,209 0,0037 0,066 S ds < S mt 0,187 0,265776 276,053 275,787 Curam 18,060 4,014 0,266 270,987
62 0,248679 0,566 sub kritis 0,6 0,624 0,312 1,749 0,179 0,0045 0,060 S ds < S mt 0,127 0,330099 279,249 278,919 Curam 13,329 5,488 0,330 274,519
63 0,301705 0,518 sub kritis 0,5 0,743 0,372 1,986 0,187 0,0042 0,050 S ds < S mt 0,140 0,211978 276,617 276,405 Curam 11,794 4,240 0,212 273,905
64 0,583478 0,383 sub kritis 0,4 1,361 0,681 3,223 0,211 0,0036 0,080 S ds < S mt 0,194 0,125894 273,144 273,018 Curam 22,241 1,570 0,126 270,218
65 0,166395 0,676 sub kritis 0,7 0,437 0,218 1,373 0,159 0,0053 0,060 S ds < S mt 0,104 0,385273 277,560 277,174 Curam 11,420 6,405 0,385 272,774
66 0,212881 0,606 sub kritis 0,6 0,543 0,272 1,586 0,171 0,0048 0,132 S ds < S mt 0,117 0,238570 270,839 270,601 Curam 27,665 1,807 0,239 264,001
67 0,614235 0,374 sub kritis 0,4 1,428 0,714 3,356 0,213 0,0036 0,083 S ds < S mt 0,200 0,207610 268,273 268,065 Curam 23,120 2,514 0,208 263,265
68 0,825043 0,326 sub kritis 0,3 1,881 0,941 4,263 0,221 0,0034 0,104 S ds < S mt 0,231 0,170074 262,587 262,417 Curam 30,575 1,635 0,170 257,217
69 1,166863 0,277 sub kritis 0,3 2,609 1,304 5,717 0,228 0,0033 0,045 S ds < S mt 0,275 0,325396 257,316 256,991 Curam 13,829 7,231 0,325 252,491
70 0,287887 0,530 sub kritis 0,5 0,712 0,356 1,925 0,185 0,0043 0,162 S ds < S mt 0,137 0,326488 291,851 291,525 Curam 37,674 2,015 0,326 279,225
71 0,16605 0,677 sub kritis 0,7 0,436 0,218 1,372 0,159 0,0053 0,108 S ds < S mt 0,104 0,102798 290,060 289,958 Curam 20,428 0,955 0,103 287,858
72 0,355781 0,481 sub kritis 0,5 0,863 0,432 2,227 0,194 0,0040 0,086 S ds < S mt 0,152 0,293098 283,385 283,092 Curam 21,153 3,427 0,293 276,892
73 0,213136 0,606 sub kritis 0,6 0,544 0,272 1,588 0,171 0,0048 0,054 S ds < S mt 0,118 0,166500 281,839 281,672 Curam 11,411 3,059 0,166 279,772
74 0,335044 0,494 sub kritis 0,5 0,817 0,409 2,135 0,191 0,0041 0,062 S ds < S mt 0,147 0,238971 277,935 277,696 Curam 15,065 3,859 0,239 274,096
75 0,538403 0,398 sub kritis 0,4 1,264 0,632 3,027 0,209 0,0037 0,064 S ds < S mt 0,187 0,183200 274,250 274,066 Curam 17,467 2,863 0,183 270,866
76 0,87359 0,317 sub kritis 0,3 1,985 0,993 4,470 0,222 0,0034 0,042 S ds < S mt 0,238 0,337369 269,277 268,940 Curam 12,449 8,033 0,337 264,740
77 0,921689 0,309 sub kritis 0,3 2,088 1,044 4,676 0,223 0,0033 0,083 S ds < S mt 0,244 0,244971 263,068 262,823 Curam 24,901 2,938 0,245 256,723
78 0,958463 0,304 sub kritis 0,3 2,166 1,083 4,832 0,224 0,0033 0,104 S ds < S mt 0,249 0,166585 257,785 257,618 Curam 31,215 1,602 0,167 252,418
79 0,30132 0,519 sub kritis 0,5 0,742 0,371 1,985 0,187 0,0042 0,031 S ds < S mt 0,140 0,275393 302,118 301,842 Curam 7,262 8,941 0,275 299,842
80 0,329558 0,498 sub kritis 0,5 0,805 0,403 2,111 0,191 0,0041 0,082 S ds < S mt 0,146 0,206517 297,949 297,742 Curam 19,853 2,518 0,207 293,642
81 0,355284 0,481 sub kritis 0,5 0,862 0,431 2,225 0,194 0,0040 0,040 S ds < S mt 0,152 0,295829 294,986 294,690 Curam 9,803 7,462 0,296 291,790
82 0,300083 0,520 sub kritis 0,5 0,740 0,370 1,979 0,187 0,0042 0,075 S ds < S mt 0,139 0,102326 302,321 302,219 Curam 17,591 1,370 0,102 300,419
83 0,640796 0,367 sub kritis 0,4 1,485 0,743 3,471 0,214 0,0035 0,068 S ds < S mt 0,204 0,354402 294,711 294,356 Curam 19,187 5,212 0,354 287,556
84 0,969547 0,302 sub kritis 0,3 2,190 1,095 4,879 0,224 0,0033 0,004 S ds < S mt 0,251 0,320200 293,560 293,239 Curam 1,249 77,048 0,320 292,839

41
BAB IV
PERHITUNGAN DAN PEMBAHASAN

Setelah data yang diperlukan diperoleh, maka langkah selanjutnya adalah


mengolah data dengan menggunakan tabel dan rumus-rumus yang sudah tertera
diatas.

4.1 Data Curah Hujan

Tabel 1. Data Curah Hujan


Tahun Tgl-Bln Sta A Sta B Sta C Rata - Rata CURAH HUJAN MAKSIMUM/TAHUN
RATA-RATA
30 Des 296,1 20,1 93,1 136,4 NO Tahun sta A sta B sta C
3 02-Jan 86,1 109,1 28,1 74,4 1 2012 296,1 109,1 103,1 136,4
24-Feb 16,1 53,1 103,1 57,4 2 2013 274,1 107,1 193,1 127,8
23 Des 274,1 16,1 93,1 127,8 3 2014 293,1 105,1 103,1 134,1
4 21-Jan 83,1 107,1 28,1 72,8 4 2015 277,1 111,1 103,1 130,1
14-Feb 13,1 49,1 193,1 85,1 5 2016 296,1 109,1 103,1 136,4
30 Des 293,1 16,1 93,1 134,1 6 2017 293,1 105,1 103,1 134,1
5 27-Jan 83,1 105,1 28,1 72,1 7 2018 113,1 103,1 194,1 76,4
04-Feb 26,9 49,1 103,1 59,7 8 2019 93,1 193,1 113,1 101,4
23 Des 277,1 20,1 93,1 130,1 9 2020 116,1 107,1 103,1 73,8
6 23-Jan 86,1 111,1 28,1 75,1 10 2021 203,0 205,0 221,0 119,7
04-Feb 16,1 53,1 103,1 57,4
23 Des 296,1 20,1 93,1 136,4
7 23-Jan 86,1 109,1 28,1 74,4
04-Feb 16,1 53,1 103,1 57,4
3 Des 293,1 16,1 93,1 134,1
8 02-Jan 83,1 105,1 28,1 72,1
04-Feb 13,1 49,1 103,1 55,1
3 Des 113,1 0,0 93,1 68,7
9 02-Jan 83,1 103,1 28,1 71,4
04-Feb 13,1 22,1 194,1 76,4
3 Des 93,1 16,1 93,1 67,4
10 02-Jan 83,1 193,1 28,1 101,4
04-Feb 13,1 49,1 113,1 58,4
02-Jan 116,1 0,0 93,1 69,7
11 14-Feb 86,1 107,1 28,1 73,8
04-Feb 16,1 26,1 103,1 48,4
9Des 203,0 23,0 0,0 75,3
14 14-Feb 13,0 205,0 0,0 72,7
16-Sep 0,0 56,4 221,0 92,5

42
4.2 Uji Konsistensi

Tabel 2. Tabel Kurva Massa Ganda


Curah Hujan Maksimum Setahun (d) (mm)
di
Tahun
dx (Sta.A) kum dx(Sta.A)
Sta.B Sta.C Rata -Rata BC Kum BC

2012 296,1 296,1 109,1 103,1 106,1 106,1


2013 274,1 570,2 107,1 193,1 150,1 256,2
2014 293,1 863,3 105,1 103,1 104,1 360,3
2015 277,1 1140,4 111,1 103,1 107,1 467,4
2016 296,1 1436,5 109,1 103,1 106,1 573,5
2017 293,1 1729,6 105,1 103,1 104,1 677,6
2018 113,0 1842,6 103,1 194,1 148,6 826,2
2019 93,1 1935,7 193,1 113,1 153,1 979,3
2020 116,1 2051,8 107,1 103,1 105,1 1084,4
2021 203,0 2254,8 205,0 221,0 213,0 1297,4

Kurva Massa Ganda Data Hujan Sebelum Dikoreksi

Tabel 3. Perhitungan Uji Konsistensi Data


Tahun Y X Y.X X2
2012 296,1 106,1 31416,21 11257,2
2013 570,2 256,2 146085,24 65638,4
2014 863,3 360,3 311046,99 129816,1
M1 2,552038
2015 1140,4 467,4 533022,96 218462,8
2016 1436,5 573,5 823832,75 328902,3
2017 1729,6 677,6 1171976,96 459141,8
F= 0,330436
Total 6036,1 2441,1 3017381,1 1213218,5
2017 1729,6 677,6 1171976,96 459141,8
2018 1842,6 826,2 1522356,12 682606,4
2019 1935,7 979,3 1895631,01 959028,5
M2 0,843286
2020 2051,8 1084,4 2224971,92 1175923,4
2021 2254,8 1297,4 2925377,52 1683246,8
Total 9814,5 4864,9 9740313,5 4959946,8

𝑛 ∑ 𝑥𝑖.𝑦𝑖−(∑ 𝑥𝑖)(∑ 𝑦𝑖)


m= 2
𝑛 ∑ 𝑥𝑖 2 −(∑ 𝑥𝑖)

43
6 𝑥 3017381,1−(2441,1 x 6036,1)
m1 = = 2,55238
6 𝑥 1213218,5−(244,1)2

5 𝑥 9740313,5−(4864,9 x 9814,5)
m2 = = 0,843286
5 𝑥 4959946,8−( 4864,9)2

𝑚2
Faktor koreksi → F = 𝑚1
𝑚2 0,843286
F = 𝑚1 = = 0,330436
2,55238

Tabel 4. Koreksi Data Hujan Sta. A


Curah Hujan Maksimum Setahun (d) (mm)
di
Tahun
dx (Sta.A) kum dx(Sta.A)
Sta.B Sta.C Rata -Rata BC Kum BC

2012 97,8 97,8 109,1 103,1 106,1 106,1


2013 90,6 188,4 107,1 193,1 150,1 256,2
2014 96,9 285,3 105,1 103,1 104,1 360,3
2015 91,6 376,8 111,1 103,1 107,1 467,4
2016 97,8 474,7 109,1 103,1 106,1 573,5
2017 96,9 571,5 105,1 103,1 104,1 677,6
2018 113,0 684,5 103,1 194,1 148,6 826,2
2019 93,1 777,6 193,1 113,1 153,1 979,3
2020 116,1 893,7 107,1 103,1 105,1 1084,4
2021 67,1 960,8 205,0 221,0 213,0 1297,4

Tabel 5. Tabel Kurva Massa Ganda Terkoreksi


Tahun Y X Y.X X2
2012 97,8 106,1 10381,05892 11257,2
2013 188,4 256,2 48271,87885 65638,4
2014 285,3 360,3 102781,2435 129816,1
M1 0,843286
2015 376,8 467,4 176130,1809 218462,8
2016 474,7 573,5 272224,3171 328902,3
2017 571,5 677,6 387263,8319 459141,8
F= 0,769134
Total 1994,5 2441,1 997052,5 1213218,5
2017 571,5 677,6 387263,8319 459141,8
2018 684,5 826,2 565552,7162 682606,4
2019 777,6 979,3 761525,983 959028,5
M2 0,648601
2020 893,7 1084,4 969152,9765 1175923,4
2021 960,8 1297,4 1246543,686 1683246,8
Total 3888,2 4864,9 3930039,2 4959946,8

44
Kurva Massa Ganda Data Hujan Setelah Dikoreksi

Tabel 6. Data Hujan Daerah Setelah Dikonsistensikan


CURAH HUJAN DAERAH
NO Tahun Sta.A Sta.B Sta.C
1 2012 97,8 109,1 103,1
2 2013 90,6 185,0 96,5
3 2014 96,9 181,5 103,1
4 2015 91,6 191,9 90,1
5 2016 97,8 188,4 103,1
6 2017 96,9 181,5 103,1
7 2018 86,9 173,8 97,0
8 2019 93,1 193,1 93,7
9 2020 89,3 185,0 103,1
10 2021 67,1 205,0 96,5

45
4.3 Curah Hujan Rancangan

Tahun Curah Hujan Max Setahun (xi-xr) (xi-xr)^2 (xi-xr)^3 (xi-xr)^4

2012 79,033 -19,01 361,38 -6869,84 130595,58


2013 103,333 5,29 27,98 148,04 783,11
2014 101,167 3,12 9,76 30,47 95,16
2015 106,633 8,59 73,79 633,84 5444,68
2016 105,467 7,42 55,11 409,07 3036,66
2017 102,167 4,12 17,00 70,10 289,06
2018 99,600 1,56 2,42 3,77 5,87
2019 106,033 7,99 63,84 510,08 4075,56
2020 104,333 6,29 39,56 248,86 1565,32
2021 72,667 -25,38 643,98 -16341,94 414704,07
Jumlah 980,43 0,00 1294,82 -21157,55 560595,08
Rata-rata 98,04
Standar Deviasi 11,995 11,995
Cs -1,703
Ck 5,374

• Hitung Standar Deviasi


𝛴(𝑋𝑖−𝑥̅ )² 1294,82
𝑆=√ =√ = 11,995
𝑛−1 10−1

• Hitung Cs
𝑛 . 𝛴(𝑥 − 𝑥̅ )³ 10 . −21157,55
𝐶𝑠 = = = −1,703
(𝑛 − 1)(𝑛 − 2). 𝑆³ (10 − 1)(10 − 2) . 11,995³

• Hitung Ck
𝑛2 . 𝛴(𝑥 − 𝑥̅ )4
𝐶𝑘 =
(𝑛 − 1)(𝑛 − 2)(𝑛 − 30). 𝑆 4
10² . 560595,06
= = 5,374
(10 − 1)(10 − 2)(10 − 3) . 11,995⁴

46
• Metode Gumbel
HUJAN RANCANGAN METODE GUMBEL

No d Max P Terjadi TR (Tahun) (Xi-Xr) (Xi-Xr)^2

1 106,633 9,091% 11,000 8,590 73,788


2 106,033 18,182% 5,500 7,990 63,840
3 105,467 27,273% 3,667 7,423 55,106
4 104,333 36,364% 2,750 6,290 39,564
5 103,333 45,455% 2,200 5,290 27,984
6 102,167 54,545% 1,833 4,123 17,002
7 101,167 63,636% 1,571 3,123 9,755
8 99,600 72,727% 1,375 1,557 2,423
9 79,033 81,818% 1,222 -19,010 361,380
10 72,667 90,909% 1,100 -25,377 643,975
Jumlah 980,433 882,390 1294,818
Rata-rata (Xr) 98,043
n 10
St. Deviasi (Sd) 11,995
Ck 5,374
Yn 0,4952
Sn 0,9496
Cs -1,703
Tr
Tr 10 tahun Yt 2,250
Tr

Xranc = 120,213 mm/hari S= 11,995

• Hitung Kala Ulang Data


1
𝑇𝑅 = 𝑃 = 10 𝑡𝑎ℎ𝑢𝑛 (𝑠𝑢𝑑𝑎ℎ 𝑑𝑖𝑘𝑒𝑡𝑎ℎ𝑢𝑖)

• Hitung Standar Deviasi Curah Hujan


𝛴(𝑋𝑖−𝑥̅ )² 1294,818
𝑆=√ =√ = 11,995
𝑛−1 10−1

• Hitung Yt
𝑇𝑅−1 10−1
𝑌𝑡 = − ln (−𝑙𝑛 ) = −𝑙𝑛 (−𝑙𝑛 ) = 2,250
𝑇𝑅 10

• Hitung Curah Hujan Rancangan


𝑆𝑑
𝑋𝑟𝑎𝑛𝑐𝑎𝑔𝑎𝑛 = 𝑋𝑟 + (𝑌𝑡 − 𝑌𝑛).
𝑆𝑛
11,995
= 88,403 + (2,250 − 0,4952). = 120,218 𝑚𝑚/ℎ𝑎𝑟𝑖
0,9496

47
• Metode Log Pearson Tipe III
Metode Log Pearson tipe III
DATA TAHUN x Log (x)
1 2012 106,633 2,028
2 2012 106,033 2,025
3 2012 105,467 2,023
4 2012 104,333 2,018
5 2012 103,333 2,014
6 2012 102,167 2,009
7 2012 101,167 2,005
8 2012 99,600 1,998
9 2012 79,033 1,898
10 2012 72,667 1,861
Rata-rata 1,988
Deviasi Standart (s) 0,059
Cs -1,765
Tr (Kala Ulang 10

INTERPOLASI
Cs G
-1,765 0,954
-1,7 0,97
-1,8 0,945

Log Xrancangan 2,044


Xrancangan 110,648 mm/hari

• Hitung rata-rata log Xrancangan


𝛴𝑙𝑜𝑔𝑋𝑖 19,879
𝐿𝑜𝑔 𝑋𝑟 = = = 1,988
𝑛 10

• Hitung Standar Deviasi log X


𝛴(𝑙𝑜𝑔𝑋𝑖−𝑙𝑜𝑔𝑥̅ )² 0,016
𝑆=√ = √(10−1) = 0,059
𝑛−1

• Hitung
𝑛. 𝛴(𝑥 − ̅̅̅̅̅̅
𝑥𝑟)³ 10 . −21157,55
𝐶𝑠 = = = −1,703
(𝑛 − 1)(𝑛 − 2). 𝑆³ (10 − 1)(10 − 2). 11,995³

• Buat persamaan log X


log 𝑋𝑟𝑎𝑛𝑐𝑎𝑛𝑔𝑎𝑛 = 𝑙𝑜𝑔𝑋𝑟 + 𝐺. 𝑆 = 𝑙𝑜𝑔1,988 + 0,954. 0,059 = 2,044
𝑋𝑟𝑎𝑛𝑐𝑎𝑛𝑔𝑎𝑛 = 10𝑙𝑜𝑔𝑋𝑟𝑎𝑛𝑐𝑎𝑛𝑔𝑎𝑛 = 102,044 = 110,648 𝑚𝑚/ℎ𝑎𝑟𝑖
• Uji Smirnov Kolmogorof

48
UJI SMIRNOV
NO Pe(X) Xi LOG Xi G Pr(%) Pt(X) Pe-Pt
A B C D E F G H
1 0,090909091 72,667 1,861335 -2,164300923 95,48300638 0,04517 0,045739
2 0,181818182 79,033333 1,89781 -1,541482944 91,68539173 0,083146 0,098672
3 0,272727273 99,6 1,998259 0,173701813 53,51237363 0,464876 0,192149
4 0,363636364 101,16667 2,005037 0,289439084 49,56833167 0,504317 0,14068
5 0,454545455 102,16667 2,009309 0,362380527 45,33575278 0,546642 0,092097
6 0,545454545 103,33333 2,01424 0,446581878 40,44979433 0,595502 0,050048
7 0,636363636 104,33333 2,018423 0,518001244 36,30553709 0,636945 0,000581
8 0,727272727 105,46667 2,023115 0,598120302 31,65646219 0,683435 0,043837
9 0,818181818 106,03333 2,025442 0,637857547 29,35062588 0,706494 0,111688
10 0,909090909 106,63333 2,027893 0,679701472 26,92254517 0,730775 0,178316
JUMLAH 19,88087 D maks 0,953808
RATA-RATA 1,988087 D krt,a=5% (tabel) 0,994043
SIMPANGAN BAKU/ SD 0,058565
D maks < D krt, maka DITERMA
CS -1,76503

Data 1 Data 3 Data 5 Data 7 Data 9


Pr1 99 Pr1 80 Pr1 50 Pr1 50 Pr1 50
Pr2 95 Pr2 50 Pr2 20 Pr2 20 Pr2 20
G1 -3,499 G1 -0,643 G1 0,282 G1 0,282 G1 0,282
G2 -1,981 G2 0,282 G2 0,799 G2 0,799 G2 0,799

Data 2 Data 4 Data 6 Data 8 Data 10


Pr1 95 Pr1 50 Pr1 50 Pr1 50 Pr1 50
Pr2 90 Pr2 20 Pr2 20 Pr2 20 Pr2 20
G1 -1,981 G1 0,282 G1 0,282 G1 0,282 G1 0,282
G2 -1,318 G2 0,799 G2 0,799 G2 0,799 G2 0,799

• Hitung Pex
𝑚 . 100% 1 . 100%
𝑃𝑒𝑥 = = = 0,090909091
(𝑛 + 1) (10 + 1)

• Hitung G
(𝑙𝑜𝑔𝑋𝑖 − 𝑋𝑟) (1,861335 − 1,988087)
𝐺= = = −2,1643
𝑆𝑑 0,58565

• Hitung Prx
(𝐺𝑥 − 𝐺1)(𝑃𝑟2 − 𝑃𝑟1) (−2,1643 − (−3,499))(95 − 99)
𝑃𝑟𝑥 = =
(𝐺2 − 𝐺1) + 𝑃𝑟1 ((−1,981) − (−3,499)) + 99
= 95,48300638
• Hitung Ptx
(100 − 𝑃𝑟𝑥) (100 − 95,48300638)
𝑃𝑡𝑥 = = = 0,04517
100 100

• Hitung D
𝐷 = (𝑃𝑒 − 𝑃𝑡) = (0,09091 − 0,04517) = 0,45739
• Jika Dmaks < Dkrt,maka memenuhi Uji Smirnov Kolmogorof
• Uji Chi Square

49
Curah
Hujan
No. Tahun
Daerah
(mm/hari
1 2012 72,67
2 2013 79,03
3 2014 99,60
4 2015 101,17
5 2016 102,17
6 2017 103,33
7 2018 104,33
8 2019 105,47
9 2020 106,03
10 2021 106,63

• Hitung K Kelas
𝐾 = 1 + 3,22 𝑙𝑜𝑔 𝑛 = 1 + 3,22 log 10 = 4,22 → 4

• Hitung Batas Kelas


100% 100%
= = = 25
𝐾 4

• Hitung Standar Deviasi


𝑆 = 0,059(𝑑𝑖𝑑𝑎𝑝𝑎𝑡 𝑑𝑎𝑟𝑖 𝑈𝑗𝑖 𝑆𝑚𝑖𝑟𝑛𝑜𝑣 − 𝐾𝑜𝑙𝑚𝑜𝑔𝑜𝑟𝑜𝑓)

• Hitung Cs
𝐶𝑠 = −1.76503 (𝑑𝑖𝑑𝑎𝑝𝑎𝑡 𝑑𝑎𝑟𝑖 𝑈𝑗𝑖 𝑆𝑚𝑖𝑟𝑛𝑜𝑣 − 𝐾𝑜𝑙𝑚𝑜𝑔𝑜𝑟𝑜𝑓)

P1 P2 Pr G1 G2 Gr

80 50 75 -0,643 0,282 -0,48883


50 0,282
50 20 25 0,282 0,799 0,712833

TABEL UJI SIMPANGAN VERTIKAL 1


No Pr (%) Log Xr Cs G Sd Log X X (mm)
1 75 1,988 -1,765 -0,489 0,059 1,959 91,087
2 50 1,988 -1,765 0,282 0,059 2,005 101,065
3 25 1,988 -1,765 0,713 0,059 2,030 107,111

50
TABEL UJI SIMPANGAN VERTIKAL 2
Jumlah Data Dk 1
No Batas Kelas Oi-Ei (Oi-Ei)²/Ei
Oi Ei a 0,05
1 0-91,087 2 2,5 -0,5 0,1 D hitung 11,6
2 91,087 - 101,065 1 2,5 -1,5 0,9 Delta P Tabel 3,841
3 101,065- 107,111 7 2,5 4,5 8,1 Kesimpulan Tidak Memenuhi
4 > 107,111 0 2,5 -2,5 2,5
D hitung>D tabel(5%) Tidak memenuhi
Jumlah 10 10 11,6

• Jika D hitung < D tabel maka memenuhi uji Chi Square

4.4 Rencana Jaringan

51
Rencana Jaringan Drainase
Beda Panjang Saluran
Patok Elevasi Elevasi
No. Tinggi Sloop (%)
Saluran Awal (m) Akhir (m) cm m
(m)
1 39-1 256,3 246,2 10,1 10000,0 100,0 10,10%
2 40-39 259,2 256,3 2,9 5000,0 50,0 5,80%
3 2-40 262,2 259,2 3,0 5879,6 58,8 5,10%
4 3-2 263,7 262,2 1,5 2270,4 22,7 6,61%
5 41-3 269,3 263,7 5,6 10000,0 100,0 5,60%
6 42-41 275,2 269,3 5,9 10000,0 100,0 5,90%
7 4-42 276,1 275,2 0,9 4375,0 43,8 2,06%
8 5-4 277,0 276,1 0,9 1725,0 17,3 5,22%
9 43-5 281,2 277,0 4,2 10000,0 100,0 4,20%
10 6-43 283,8 281,2 2,6 3375,1 33,8 7,70%

• Menentukan Beda Tinggi Saluran 39-1


∆𝐻 = 𝐻𝑎𝑤𝑎𝑙 − 𝐻𝑎𝑘ℎ𝑖𝑟
∆𝐻 = 256,3 − 246,2
∆𝐻 = 10,1
• Menentukan Kemiringan Saluran 39-1
∆𝐻
𝑆𝑜 =
𝐿𝑑
10,1
𝑆𝑜 =
100
𝑆𝑜 = 10,10%

4.5 Debit Rancangan

Metode Rasional USSCS(1973)

52
4.5.1 Menentukan Waktu Konsentrasi

Lo Ld
No. Lahan Blok Posis Saluran Sloof (%)
cm m cm m

39-1 10,10% 3625,02 36,2502 10000,0 100


atas 40-39 5,80% 3625,02 36,2502 5000,0 50
2-40 5,10% 3625,02 36,2502 5879,6 58,7957
Rumah
44-7 11,30% 3625,02 36,2502 10000,0 100
bawah 45-44 3,80% 281,2 2,812 5000,0 50
8-45 6,63% 3625,02 36,2502 5879,6 58,7957
39-1 10,10% 1929,96 19,2996 10000,0 100
1 A
atas 40-39 5,80% 1929,96 19,2996 5000,0 50
2-40 5,10% 1929,96 19,2996 5879,6 58,7957
44-7 11,30% 2068,32 20,6832 10000,0 100
Jalan
bawah 45-44 3,80% 2068,32 20,6832 5000,0 50
8-45 6,63% 2068,32 20,6832 5879,6 58,7957
kanan 8-2 4,14% 1534,21 15,3421 7250,0 72,5004
kiri 7-1 2,62% 1236,18 12,3618 7250,0 72,5004

tc I
to (menit) td (menit) A (m²) Qr (m³/dt)
menit jam mm/jam mm/dt

1,217 1,190 2,407 0,040 328 0,000091 3625,02 0,2309


1,274 0,595 1,869 0,031 388 0,000108 1812,51 0,1366
1,288 0,700 1,988 0,033 372 0,000103 2131,36 0,1542
1,205 1,190 2,396 0,040 329 0,000091 3625,02 0,2316
0,862 0,595 1,457 0,024 458 0,000127 140,60 0,0125
1,260 0,700 1,960 0,033 376 0,000104 2131,36 0,1557
1,095 1,190 2,286 0,038 339 0,000094 1929,96 0,1272
1,147 0,595 1,742 0,029 406 0,000113 964,98 0,0762
1,159 0,700 1,859 0,031 389 0,000108 1134,73 0,0859
1,098 1,190 2,288 0,038 339 0,000094 2068,32 0,1363
1,202 0,595 1,797 0,030 398 0,000111 1034,16 0,0800
1,147 0,700 1,847 0,031 391 0,000109 1216,08 0,0924
1,136 0,863 1,999 0,033 371 0,000103 1112,31 0,0802
1,138 0,863 2,001 0,033 371 0,000103 896,24 0,0646

Persamaan data rumah & jalan

Kesamaan Data
No
diketahui jumlah

1 nd 0,013
2 v 1,400
3 c 0,700
4 R24 110,733
5 R24/24 4,614
6 b 0,5

Menghitung tc di saluran 39-1

• Waktu awal di lintasan

53
1
2 𝑛𝑑 6
𝑡𝑜 = ( × 3,28 × 𝐿𝑜 × )
3 √𝑆𝑜
1
2 0,013 6
𝑡𝑜 = ( × 3,28 × 36,2502 × )
3 √10,10%
𝑡𝑜 = 2,407 𝑚𝑒𝑛𝑖𝑡
• Waktu air di saluran
𝐿𝑑
𝑡𝑑 =
60𝑉
100
𝑡𝑑 =
60 × 1,4
𝑡𝑑 = 1,19 𝑚𝑒𝑛𝑖𝑡

• Waktu konsentrasi
𝑡𝑐 = 𝑡𝑜 + 𝑡𝑑
𝑡𝑐 = 2,407 + 1,19
𝑡𝑐 = 2,407 𝑚𝑒𝑛𝑖𝑡

4.5.2 Menentukan Debit Rencana


Menghitung debit di saluran 39-1
• Intensitas
2
𝑅24 24 3
𝐼= ×( )
24 𝑡𝑐
2
110,733 24 3
𝐼= ×( )
24 2,407
𝐼 = 328 𝑚𝑚/𝑗𝑎𝑚

• Luas Area
𝐴 = 𝐿𝑜 × 𝐿𝑑
𝐴 = 36,2502 × 100
𝐴 = 3625,02 𝑚2

• Debit Rencana

54
𝐐 = 𝐂. 𝐈. 𝐀
1
𝐐 = (0,7) × ( × 328 × 10−6 ) × 3625,02
3,6
𝐐 = 𝟎, 𝟐𝟑𝟎𝟗 𝒎𝟑 /𝒅𝒆𝒕𝒊𝒌
4.6 Dimensi Rancangan

4.6.1 Perancangan Dimensi


Menggunakan Rumus Manning

v c b koef. Saluran 1/n

1,4 0,7 0,5 0,018 55,556

Q Saluran Elevasi
No. Saluran A (m²) y (m) F (m) P (m) h (m) R (m) Sd
(m/dt) Awal (m) Akhir (m)
1 12-6 0,044 0,032 0,063 0,045 0,627 0,109 0,051 0,024218 293,3 283,8
2 6-43 0,201 0,144 0,287 0,096 1,075 0,384 0,134 0,006635 283,8 281,2
3 43-5 0,551 0,393 0,787 0,160 2,073 0,946 0,190 0,004161 281,2 277,0
4 11-5 0,309 0,221 0,442 0,120 1,383 0,561 0,160 0,005238 287,5 277,0
5 5-4 0,891 0,636 1,273 0,203 3,045 1,476 0,209 0,003658 277,0 276,1
6 10-4 0,190 0,136 0,271 0,094 1,042 0,365 0,130 0,006882 286,0 276,1
7 4-42 1,267 0,905 1,810 0,242 4,120 2,052 0,220 0,003423 276,1 275,2
8 42-41 1,616 1,154 2,309 0,273 5,117 2,582 0,226 0,003303 275,2 269,3
9 41-3 1,969 1,406 2,812 0,302 6,124 3,114 0,230 0,003227 269,3 263,7
10 9-3 0,602 0,430 0,859 0,167 2,219 1,026 0,194 0,004048 267,3 263,7

Fr
No. Saluran
Nilai Aliran
1 0,032 1,355 super kritis
2 0,143681 0,721 sub kritis
3 0,393273 0,460 sub kritis
4 0,220863 0,597 sub kritis
5 0,63627 0,368 sub kritis
6 0,135582 0,740 sub kritis
7 0,904901 0,312 sub kritis
8 1,154321 0,278 sub kritis
9 1,406089 0,253 sub kritis
10 0,429724 0,441 sub kritis

• Luas Penampang Aliran melalui persamaan debit


𝑄
𝐴=
𝑣
0,004
𝐴=
1,4
𝐴 = 0,032 𝑚2

• Menghitung kedalaman air

55
𝐴
𝑦=
𝑏
0,032
𝑦=
0,5
𝑦 = 0,063 𝑚

• Tinggi Jagaan
𝐹 = 0,18√𝑦
𝐹 = 0,18√0,063
𝐹 = 0,045 𝑚
• Tinggi Saluran
ℎ =𝑦+𝐹
ℎ = 0,063 + 0,045
ℎ = 0,109 𝑚

• Menentukan Keliling Basah


𝑃 = 𝑏 + (2 × 𝑦)
𝑃 = 0,5 + (2 × 0,063)
𝑃 = 0,627
• Menentukan Jari- Jari Hidrolis
𝐴
𝑅=
𝑃
0,032
𝑅=
0,627
𝑅 = 0,051 𝑚
• Menentukan Sloop Dasar
𝑣
𝑆𝑑 = 2
1
(𝑛 × 𝑅 3 )2
1,4
𝑆𝑑 = 2
1
(0,018 × 0,0513 )2
𝑆𝑑 = 0,024218

• Menentukan Saluran Kritis ,Sub Kritis, dan Super Kritis

56
𝑣
𝐹𝑟 =
√𝑔. ℎ
1,4
𝐹𝑟 =
√9,81 × 0,109
𝐹𝑟 = 1,355
Fr masuk ke Super Kritis

57
BAB V
KESIMPULAN
4.7 Kesimpulan

Berdasarkan analisis dari bab sebelumnya, dapat diambil beberapa kesimpulan:

a. Drainase merupakan suatu sistem untuk menyalurkan air hujan. Sistem ini
mempunyai peranan yang sangat penting dalam menciptakan lingkungan
yang sehat, apalagi di daerah yang berpenduduk padat seperti di perkotaan.
Sistem drainase yang ada tidak sebanding dengan tingginya curah hujan
menyebabkan banjir sehingga perlu dilakukan perencanaan ulang drainase.
b. Menentukan hujan rata-rata sepanjang tahun dan hujan maksimal rata-rata
dengan menggunakan data curah hujan dari masing-masing stasiun hujan.
c. Menggunakan data hujan maksimal rata-rata untuk menghitung curah hujan
rancangan dengan metode Log pearson type III atau Gumbel.
d. Pengujian smirnov kolmogorov mempunyai keunggulan apabila datanya
sedikit karena tiap data yang ada diuji terhadap nilai standar pada masing-
masing distribusi probabilitas.
e. Menghitung intensitas hujan menggunakan data curah hujan rancangan
dengan periode ulang 5 tahun.
f. Menghitung debit hujan rancangan dengan rumus : Q = c . I . A

4.8 Saran

Berikut merupakan saran agar pada perencanaan selanjutnya bisa lebih baik dari
sebelumnya :
a. Diperlukan pemilihan referensi yang terpercaya agar pengolahan data dapat
terlaksana dengan baik.
b. Ketelitian dan kecermatan yang tinggi diperlukan untuk mendapatkan data
yang tepat dan akurat.
c. Cermat terhadap setiap data sesuai absen yang sudah ditentukan.
d. Asistensi dalam setiap langkah pekerjaan untuk menghindari kebingungan
hingga menyebabkan pekerjaan salah.

58
DAFTAR PUSTAKA

Referensi dari modul:


Agus Suhardono, 2022. Drainase Perkotaan.
Referensi dari jurnal:
Lailatul Fitriyani, 2012. Laporan Drainase Perkotaan.
Ahmad Hidayat, 2019. Analisa Perencanaan Dimensi.
Reference dari web site:
Analisis Hidrologi . From: downacademia.com_laporan-drainase-perkotaan-jl-
patimura-malang. Diunduh pada 12 Desember 2022..

59
LAMPIRAN

CURAH HUJAN MAKSIMUM/TAHUN


NO Tahun sta A sta B sta C
1 2012 296.1 109.1 103.1
2 2013 274.1 107.1 193.1
3 2014 293.1 105.1 103.1
4 2015 277.1 111.1 103.1
5 2016 296.1 109.1 103.1
6 2017 293.1 105.1 103.1
7 2018 113.0 103.1 194.1
8 2019 93.1 193.1 113.1
9 2020 116.1 107.1 103.1
10 2021 203.0 205.0 221.0
Tabel Curah Hujan Daerah
Tahun Tgl-Bln Sta A Sta B Sta C Rata - Rata CH Max
30 Des 97,8 27,0 100,0 74,9
2012 02-Jan 93,0 109,1 35,0 79,0 79,0
24-Feb 23,0 60,0 103,1 62,0
23 Des 90,6 23,0 100,0 71,2
2013 21-Jan 90,0 185,0 35,0 103,3 103,3
14-Feb 20,0 56,0 96,5 57,5
30 Des 96,9 23,0 100,0 73,3
2014 27-Jan 90,0 181,5 35,0 102,2 101,2
04-Feb 20,0 56,0 103,1 59,7
23 Des 91,6 27,0 100,0 72,9
2015 23-Jan 93,0 191,9 35,0 106,6 106,6
04-Feb 23,0 60,0 90,1 57,7
23 Des 97,8 27,0 100,0 74,9
2016 23-Jan 93,0 188,4 35,0 105,5 105,5
04-Feb 23,0 60,0 103,1 62,0
3 Des 96,9 23,0 100,0 73,3
2017 02-Jan 90,0 181,5 35,0 102,2 102,2
04-Feb 20,0 56,0 103,1 59,7
3 Des 86,9 0,0 100,0 62,3
2018 02-Jan 90,0 173,8 35,0 99,6 99,6
04-Feb 20,0 29,0 97,0 48,7
3 Des 93,1 23,0 100,0 72,0
2019 02-Jan 90,0 193,1 35,0 106,0 106,0
04-Feb 20,0 56,0 93,7 56,6
02-Jan 89,3 0,0 100,0 63,1
2020 14-Feb 93,0 185,0 35,0 104,3 104,3
04-Feb 23,0 33,0 103,1 53,0
9Des 67,1 23,0 0,0 30,0
2021 14-Feb 13,0 205,0 0,0 72,7 72,7
16-Sep 0,0 56,4 96,5 51,0

Curah Hujan Max


Tahun (xi-xr) (xi-xr)^2 (xi-xr)^3 (xi-xr)^4
Setahun
2012 79.033 -19.01 361.38 -6869.84 130595.58
2013 103.333 5.29 27.98 148.04 783.11
2014 101.167 3.12 9.76 30.47 95.16
2015 106.633 8.59 73.79 633.84 5444.68
2016 105.467 7.42 55.11 409.07 3036.66
2017 102.167 4.12 17.00 70.10 289.06
2018 99.600 1.56 2.42 3.77 5.87
2019 106.033 7.99 63.84 510.08 4075.56
2020 104.333 6.29 39.56 248.86 1565.32
2021 72.667 -25.38 643.98 -16341.94 414704.07
Jumlah 980.43 0.00 1294.82 -21157.55 560595.08
Rata-rata 98.04
Standar Deviasi 11.995 11.995
Cs -1.703
Ck 5.374

60
No Data Gumbel
1 106.633
2 106.033
3 105.467
4 104.333
5 103.333
6 102.167
7 101.167
8 99.600
9 79.033
10 72.667

TR Yt Yn Sn S R rata- rata R24


2 0.366512921 96.41804
5 1.499939987 110.733
10 2.250367327 0.4952 0.9497 11.995 98.043 120.2108
25 3.198534261 132.1859
50 3.901938658 141.0698

DATA TAHUN x Log (x)


1 2012 106,633 2,028
2 2012 106,033 2,025
3 2012 105,467 2,023
4 2012 104,333 2,018
5 2012 103,333 2,014
6 2012 102,167 2,009
7 2012 101,167 2,005
8 2012 99,600 1,998
9 2012 79,033 1,898
10 2012 72,667 1,861

TR CS G S Log Rata-Rata Log R24 R24


2 0,277 2,004 100,999
5 0,802 2,035 108,409
10 -1,765 0,954 0,059 1,988 2,044 110,648
25 1,049 2,050 112,078
50 1,085 2,052 112,630
UJI SMIRNOV
NO Pe(X) Xi LOG Xi G Pr(%) Pt(X) Pe-Pt
A B C D E F G H
1 0,090909091 72,667 1,861335 -2,164300923 95,48300638 0,04517 0,045739
2 0,181818182 79,03333333 1,89781 -1,541482944 91,68539173 0,083146 0,098672
3 0,272727273 99,6 1,998259 0,173701813 53,51237363 0,464876 0,192149
4 0,363636364 101,1666667 2,005037 0,289439084 49,56833167 0,504317 0,14068
5 0,454545455 102,1666667 2,009309 0,362380527 45,33575278 0,546642 0,092097
6 0,545454545 103,3333333 2,01424 0,446581878 40,44979433 0,595502 0,050048
7 0,636363636 104,3333333 2,018423 0,518001244 36,30553709 0,636945 0,000581
8 0,727272727 105,4666667 2,023115 0,598120302 31,65646219 0,683435 0,043837
9 0,818181818 106,0333333 2,025442 0,637857547 29,35062588 0,706494 0,111688
10 0,909090909 106,6333333 2,027893 0,679701472 26,92254517 0,730775 0,178316
JUMLAH 19,88087 D maks 0,953808
RATA-RATA 1,988087 D krt,a=5% (tabel) 0,994043
SIMPANGAN BAKU/ SD 0,058565
D maks < D krt, maka DITERMA
CS -1,76503

61
TABEL UJI SIMPANGAN VERTIKAL 1
No Pr (%) Log Xr Cs G Sd Log X X (mm)
1 75 1,988 -1,765 -0,489 0,059 1,959 91,087
2 50 1,988 -1,765 0,282 0,059 2,005 101,065
3 25 1,988 -1,765 0,713 0,059 2,030 107,111

TABEL UJI SIMPANGAN VERTIKAL 2


Jumlah Data
No Batas Kelas Oi-Ei (Oi-Ei)²/Ei
Oi Ei
1 0-91,087 2 2,5 -0,5 0,1
2 91,087 - 101,065 1 2,5 -1,5 0,9
3 101,065- 107,111 7 2,5 4,5 8,1
4 > 107,111 0 2,5 -2,5 2,5
Jumlah 10 10 11,6

Rencana Jaringan Drainase


Beda Panjang Saluran
Patok Elevasi Elevasi
No. Tinggi Sloop (%)
Saluran Awal (m) Akhir (m) cm m
(m)
1 39-1 256,3 246,2 10,1 10000,0 100,0 10,10%
2 40-39 259,2 256,3 2,9 5000,0 50,0 5,80%
3 2-40 262,2 259,2 3,0 5879,6 58,8 5,10%
4 3-2 263,7 262,2 1,5 2270,4 22,7 6,61%
5 41-3 269,3 263,7 5,6 10000,0 100,0 5,60%
6 42-41 275,2 269,3 5,9 10000,0 100,0 5,90%
7 4-42 276,1 275,2 0,9 4375,0 43,8 2,06%
8 5-4 277,0 276,1 0,9 1725,0 17,3 5,22%
9 43-5 281,2 277,0 4,2 10000,0 100,0 4,20%
10 6-43 283,8 281,2 2,6 3375,1 33,8 7,70%
11 44-7 259,4 248,1 11,3 10000,0 100,0 11,30%
12 45-44 261,3 259,4 1,9 5000,0 50,0 3,80%
13 8-45 265,2 261,3 3,9 5879,6 58,8 6,63%
14 9-8 267,3 265,2 2,1 2270,4 22,7 9,25%
15 46-9 276,2 267,3 8,9 10000,0 100,0 8,90%
16 47-46 281,6 276,2 5,4 10000,0 100,0 5,40%
17 10-47 286,0 281,6 4,4 4375,0 43,8 10,06%
18 11-10 287,5 286,0 1,5 1725,0 17,3 8,70%
19 48-11 292,2 287,5 4,7 10000,0 100,0 4,70%
20 12-48 293,3 292,2 1,1 3375,1 33,8 3,26%
21 49-13 260,8 250,0 10,8 10000,0 100,0 10,80%
22 50-49 264,3 260,8 3,5 5000,0 50,0 7,00%
23 14-50 267,5 264,3 3,2 5910,0 59,1 5,41%
24 15-14 269,8 267,5 2,3 3465,0 34,7 6,64%
25 51-15 278,2 269,8 8,4 10000,0 100,0 8,40%
26 52-51 284,4 278,2 6,2 9993,0 99,9 6,20%
27 16-52 288,1 284,4 3,7 3632,1 36,3 10,19%
28 17-16 290,3 288,1 2,2 1749,9 17,5 12,57%
29 53-17 296,4 290,3 6,1 10000,0 100,0 6,10%
30 18-53 297,5 296,4 1,1 3375,1 33,8 3,26%
31 54-19 262,8 257,0 5,8 10000,0 100,0 5,80%
32 55-54 267,6 262,8 4,8 5000,0 50,0 9,60%
33 20-55 273,1 267,6 5,5 5910,0 59,1 9,31%
34 21-20 274,7 273,1 1,6 3465,0 34,7 4,62%
35 56-21 283,2 274,7 8,5 10000,0 100,0 8,50%
36 57-56 291,2 283,2 8,0 9993,0 99,9 8,01%
37 22-57 294,1 291,2 2,9 3632,1 36,3 7,98%
38 23-22 295,9 294,1 1,8 1749,9 17,5 10,29%
39 58-23 303,0 295,9 7,1 10000,0 100,0 7,10%
40 24-58 303,6 303,0 0,6 3375,1 33,8 1,78%
41 59-25 264,7 260,2 4,5 10000,0 100,0 4,50%
42 60-59 269,9 264,7 5,2 5000,0 50,0 10,40%
43 26-60 274,7 269,9 4,8 5813,1 58,1 8,26%
44 27-26 277,5 274,7 2,8 3491,1 34,9 8,02%
45 28-27 282,3 277,5 4,8 7250,0 72,5 6,62%
46 29-28 284,5 282,3 2,2 1950,0 19,5 11,28%
47 61-29 294,0 284,5 9,5 10000,0 100,0 9,50% 62
48 62-61 301,7 294,0 7,7 10000,0 100,0 7,70%
49 30-62 305,0 301,7 3,3 3131,7 31,3 10,54%
50 30-31 305,0 303,0 2,0 6493,3 64,9 3,08%
51 69-32 275,7 271,5 4,2 10000,0 100,0 4,20%
37 22-57 294,1 291,2 2,9 3632,1 36,3 7,98%
38 23-22 295,9 294,1 1,8 1749,9 17,5 10,29%
39 58-23 303,0 295,9 7,1 10000,0 100,0 7,10%
40 24-58 303,6 303,0 0,6 3375,1 33,8 1,78%
41 59-25 264,7 260,2 4,5 10000,0 100,0 4,50%
42 60-59 269,9 264,7 5,2 5000,0 50,0 10,40%
43 26-60 274,7 269,9 4,8 5813,1 58,1 8,26%
44 27-26 277,5 274,7 2,8 3491,1 34,9 8,02%
45 28-27 282,3 277,5 4,8 7250,0 72,5 6,62%
46 29-28 284,5 282,3 2,2 1950,0 19,5 11,28%
47 61-29 294,0 284,5 9,5 10000,0 100,0 9,50%
48 62-61 301,7 294,0 7,7 10000,0 100,0 7,70%
49 30-62 305,0 301,7 3,3 3131,7 31,3 10,54%
50 30-31 305,0 303,0 2,0 6493,3 64,9 3,08%
51 69-32 275,7 271,5 4,2 10000,0 100,0 4,20%
52 70-69 278,9 275,7 3,2 5000,0 50,0 6,40%
53 33-70 282,5 278,9 3,6 5813,1 58,1 6,19%
54 34-33 284,4 282,5 1,9 3491,1 34,911 5,44%
55 35-34 290,6 284,4 6,2 7250,0 72,5004 8,55%
56 36-35 292,7 290,6 2,1 1950,0 19,5 10,77%
57 37-36 305 292,7 12,3 7590,37 75,9037 16,20%
58 37-71 305 303,2 1,8 2409,63 24,0963 7,47%
59 71-72 303,2 296,4 6,8 10000 100 6,80%
60 72-38 296,4 296 0,4 9625 96,25 0,42%
61 7-1 248,1 246,2 1,9 7250,04 72,5004 3%
62 8-2 265,2 262,2 3,0 7250,04 72,5004 4,14%
63 9-3 267,3 263,7 3,6 7250,04 72,5004 4,97%
64 10-4 286 276,1 9,9 7250,04 72,5004 13,66%
65 11-5 287,5 277 10,5 7250,04 72,5004 14,48%
66 12-6 293,3 283,8 9,5 7250,04 72,5004 13,10%
67 19-13 257 250 7,0 8750,04 87,5004 8,00%
68 20-14 273,1 267,5 5,6 8750,04 87,5004 6,40%
69 21-15 274,7 269,8 4,9 8750,04 87,5004 5,60%
70 22-16 294,1 288,1 6,0 8750,04 87,5004 6,86%
71 23-17 295,9 290,3 5,6 8750,04 87,5004 6,40%
72 24-18 303,6 297,5 6,1 8750,04 87,5004 6,97%
73 63-25 265,4 260,2 5,2 5000 50 10,40%
74 32-63 271,5 265,4 6,1 7314,8 73,148 8,34%
75 64-26 278,1 271,5 6,6 5000 50 13,20%
76 33-64 282,5 278,1 4,4 7314,8 73,148 6,02%
77 65-27 280 277,5 2,5 5000 50 5,00%
78 34-65 284,4 280 4,4 7314,8 73,148 6,02%
79 66-28 285,3 282,3 3,0 5000 50 6,00%
80 35-66 290,6 285,3 5,3 7314,8 73,148 7,25%
81 67-29 288 284,5 3,5 5000 50 7,00%
82 36-67 292,7 288 4,7 7314,8 73,148 6,43%
83 31-68 303 298,9 4,1 5000 50 8,20%
84 68-38 298,9 296 2,9 7314,8 73,148 3,96%

63