Anda di halaman 1dari 38

VC 191633

STRUKTUR BETON PRACETAK

DISUSUN OLEH :
NAMA : ANDRY IFFAT BHADRESWARA
NRP : 2035201005
KELAS : TRPPBS A 2020

DOSEN PENGAMPU :
Dr. Nur Ahmad Husin, S.T., M.T.

PROGRAM STUDI SARJANA TERAPAN


TEKNOLOGI REKAYASA PENGELOLAAN DAN
PEMELIHARAAN BANGUNAN SIPIL
DEPARTEMEN TEKNIK
INFRASTRUKTUR SIPIL
FAKULTAS VOKASI
2022/2023
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

DAFTAR ISI :

DAFTAR ISI : .................................................................................................................. 2


SOAL ................................................................................................................................ 3
1. PELAT .......................................................................................................................... 4
A. Tebal Pelat................................................................................................................ 4
B. Momen tahap pengangkatan, penumpukan, pengecoran dan tahan komposit ......... 5
C. Tulangan Pelat Pracetak ........................................................................................... 8
D. Tebal Pelat Overtopping ........................................................................................ 16
E. Tulangan Pelat Overtopping................................................................................... 16
2. BALOK ...................................................................................................................... 20
Gambar ........................................................................................................................... 36

2
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

SOAL

3
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

1. PELAT
A. Tebal Pelat
Persyaratan tebal pelat mengacu pada SNI 2847:2019 pasal 7.1.1 yang berisikan
:

Dari pasal tersebut, pelat pracetak yang ditinjau merupakan pelat satu arah maka
dapat digunakan syarat tebal minimum pelat yang ditentukan pada tabel 7.3.1.1 SNI
2847:2019 sebagai berikut :

• Cek jenis pelat :

y
2 ≤
x
5
2 ≤
2,5

2 ≤ 2

(Pelat termasuk kedalam Pelat Satu Arah)

• Tebal Pelat

Bentang terpanjang l = 5 m
l 5
tebal plat = = = 0,179
28 28
Maka, dari perhitungan diatas didapatkan tebal plat sebesar 0,18 m

4
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

B. Momen tahap pengangkatan, penumpukan, pengecoran dan tahan komposit


• Data Perencanaan
Tebal Pelat pracetak = 10 cm
Tebal Overtopping = 8 cm
Fc' beton = 30 Mpa
Fy baja = 400 Mpa
Diameter tulangan = 10 mm
Selimut beton = 20 mm
Lebar Pracetak = 1000 mm
a=L = 5 m
b=B = 2,5 m
Beban mati tambahan = 175 kg/m²
Beban hidup = 479 kg/m²

• Momen Pengangkat yang Terjadi

a. Momen Arah X
Mx = 0,0054 * qu * a² * b
= 0,005 * 432 * 5 ^2 * 2,5
= 1,46 kN.m
= 1458000 N.mm

b. Momen Arah X
My = 0,0027 * qu * a* b²
= 0,003 * 432 * 5* 2,5
= 0,36 kN.m

5
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

= 364500 N.mm

• Momen Penumpukan
KONTROL PENUMPUKAN UMUR 3 HARI
1. Perhitungan momen

fci = 12 Mpa
fr = 0,7 x √12
= 2,42487 Mpa
= 23,788 Kg/cm2
Penumpukan dengan 2 tumpuan

• Mx = -Mx
= 0,125 x qu x L2 + 0,25 x Pu x L
= 810 + 500
= 1310 Kg.m
• My = - My
= 0,125 x qu x L2 + 0,25 x Pu x L
= 202,5 + 250
= 452,5 Kg.m
- Faktor kejut = 1,5
Kg.
Mx = -Mx = 1310 x 1,5 = 1965 m
678, Kg.
My = -My = 452,5 x 1,5 = 8 m

2. Perhitungan Momen Tahanan


- Wx = 1/6 x (b/2) x t^2
= 0,16667 x 250 810
= 33750 kg/cm2
- Wy = 1/6 x (a/2) x t^2
= 0,16667 x 125 x 810
= 16875 kg/cm2

3. Tegangan yang Terjadi


- Mx/Wx
5,8222222 < 14,58 OKE
- MY/Wy
4,0222222 < 3,645 NOT OKE

• Momen Pengecoran

6
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

• Data Perencanaan
• Dimensi plat = 2500 mm x 5000 mm
• Tebal plat pracetak = 100 mm
• Tebal overtopping = 80 mm
• Tebal selimut beton (ts) = 20 mm
• Diameter tul rencana (D) = 10 mm
• Diameter tul susut rencana (D) = 10 mm
• Mutu beton (fc') = 30 Mpa
• Mutu baja (fy) = 400 Mpa

• Momen yang Terjadi


Berdasarkan PBI 1971, momen sebelum komposit dijelaskan sebagai berikut:

Rasio = 2
Karena terjepit sisi kanan dan sisi kiri maka perumusan momen dapat dijelaskan sebagai
berikut:
Mux = Muy
= 0,001 x qu x L² x X
= 0,001 x 678,4 x 6,25 x 40
= 169,6 kgm
= 1,696 kNm

• Momen Setelah Komposit


• Data Perencanaan :
• Dimensi plat = 2500 mm x 5000 mm
• Tebal plat pracetak = 100 mm

7
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

• Tebal overtopping = 80 mm
• Tebal selimut beton (ts) = 20 mm
• Diameter tul rencana (D) = 10 mm
• Diameter tul susut rencana (D) = 10 mm
• Mutu beton (fc') = 30 Mpa
• Mutu baja (fy) = 400 Mpa

• Momen yang Terjadi


- Momen Arah X
Mx = 0,0107 * qu * Lx²
= 0,0107 * 1494,8 * 6,25
= 1,00 kN.m
= 999647,5 N.mm

C. Tulangan Pelat Pracetak


• Penulangan Pelat Arah x
1
dx = h - t - ø
2
1
= 100 - 40 - 10
2
= 55 mm

Mu
Rn =
ø x b x dx2
1458000
=
0,9 x 1000 x 3025
= 0,54 MPa

m fy
=
0,85 x Fc'
400
=
0,85 x 30
= 15,69
ρperlu 1 2 𝑚 𝑅𝑛
= ቌ1 − ඨ1 − ቍ
𝐹𝑦
m

1 2 15,69 0,54
= 1 -ቌ 1ඨ - ቍ
15,69 400

8
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

= 0,0014

ρmin = 0,004 > 0,001


PAKAI RHO MIN
ρpakai = 0,004

As = ρpakai x b x dx
= 0,004 x 1000 x 55
= 192,5 mm2

Digunakan tulangan D 10

Jarak tulangan (s)


1000 x AD16
s =
As
= 1000 x 78,54
192,50
s = 407,999

Syarat :
s < 3h
s < 240
s < 450
Dipilih yang terkecil sehingga digunakan s = 200 mm

Aspakai = 1000 x AD16


As
= 1000 x 78,54
200,00
= 392,699

a = As x Fy
0,85 x Fc' x b
= 392,7 x 400
0,85 x 30 x 1000
= 6,16 mm

øMn = ø x As x - 1 a x Fy
dx
2

9
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

øMn = 0,9 x 392,7 x 55 - 1 6,16 x 400


2
øMn = 7340018,094 Nmm
Mu = 1458000 Nmm OK

Sehingga digunakan tulangan D 10 - 200 mm

Kontrol terhadap persyaratan geser


Kontrol pesyaratan geser ditinjau berdasarkan SNI 2847 - 2019 Pasal 9.6.3.1
Vu = −
2 1
= 432 4 - 55
2 1000
= 8,4024 kN

øVc = ø 0,17 λ 𝐹 b dx
= 0,75 0,17 1 5,48 1000 55
= 38,41 kN

0,5 øVc ≥ Vu
19,20 ≥ 8,4024 kN Kekuatan Geser Pelat Cukup

• Penulangan Pelat Arah y


1
dy = h - t - ø
2
1
= 100 - 40 - 10
2
= 55 mm

Mu
Rn =
ø x b x dy2
364500
=
0,9 x 1000 x 3025

10
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

= 0,13 MPa

m fy
=
0,85 x Fc'
400
=
0,85 x 30
= 15,69
2 𝑚 𝑅𝑛
ቌ1 − ඨ1 − ቍ
ρperlu 1 𝐹𝑦
=
m

1 2 15,69 0,13
= 1 - 1 -
15,69 400

= 0,0003
ρmin = 0,004 > 0,0000
PAKAI RHO MIN
ρpakai = 0,004

As = ρpakai x b x dy
= 0,004 x 1000 x 55
= 192,5 mm2

Digunakan tulangan D 10

Jarak tulangan (s)


s = 1000 x AD10
As
= 1000 x 78,54
192,50
= 407,999

Syarat :
s < 3h
s < 240
s < 450
Dipilih yang terkecil sehingga digunakan s = 200 mm

Aspakai = 1000 x AD16

11
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

As
= 1000 x 78,54
200,00
= 392,699

a = As x Fy
0,85 x Fc' x b
= 392,7 x 400
0,85 x 30 x 1000
= 6,16 mm
øMn = ø x As x - 1 a x Fy
dy
2
øMn = 0,9 x 392,7 x 55 - 1 6,16 x 400
2
øMn = 7340018,094 Nmm
Mu = 364500 Nmm OK

Sehingga digunakan tulangan D 10 - 200 mm


Kontrol terhadap persyaratan geser
Kontrol pesyaratan geser ditinjau berdasarkan SNI 2847 - 2019 Pasal 9.6.3.1
Vu = 𝑦 𝑦

2 1
= 432 2,5 - 55
2 1000
= 5,1624 kN

øVc = ø 0,17 λ 𝐹 b dy
= 0,75 0,17 1 5,48 1000 55
= 38,41 kN

0,5 øVc ≥ Vu
19,20 ≥ 5,1624 kN Kekuatan Geser Pelat Cukup

• Kontrol Retak

Momen batas retak yang terjadi pada pelat saat beton berumur 3 hari Sesuai dengan
Pasal 24.2.3.5 SNI 2847 - 2019
F''c = 0,46 x F'c

12
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

= 0,46 x
30
= 13,8 MPa

Fr = 0,62 λ ඥ𝐹′′
= 0,62 1 3,7148
= 2,30 MPa

I 1
= b h3
12
1
= 1000 1000000
12
= 83333333,33 mm4

c = a
0,85
= 7,2 mm

Mcr Fr x I
=
c
2,30 x 83333333,33
=
7,2
= 26484343,73 Nmm

Momen layan yang bekerja


Momen
-
Arah X
Mx = 0,0107 qDL a² b
= 0,0107 360 5 ^2 2,5
= 2,41 kN.m
= 2407500 N.mm

Momen
-
Arah X
My = 0,0107 qDL a b²
= 0,0107 360 5 2,5 ^2
= 1,20 kN.m
= 1203750 N.mm

240750
Mcr = 26484343,73 > Mx = OK
0

13
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

120375
Mcr = 26484343,73 > My = OK
0

• Kontrol Tegangan

Kontrol tegangan mengacu pada metode pengangkatan pelat yang dikeluarkan PCI ke
- 6 sesuai dengan gambar dibawah ini
b 2,5
=
2 2
= 1,25 m
a 5
=
2 2
= 2,5
15t = 1,5 m
Dipakai b = 1,5 m
= 1500 mm

s 1
= b h2
6
s 1
= 2500 10000
6
= 4166667 mm3

P a x b x t x BJbeton
=
4
5 x 2,5 x 0,1 x 2400
=
4
= 750 Kg
= 7500 N

P = P sin 𝜃1
= 7500 sin 60
= 6495,19 N

Tegmax Mx c P
= + < Fr
I b t
2407500 7,2 6495,2
= + < 2,30
83333333,3 1500 100
= 0,25 < 2,30 OK

14
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

Dimensi Angkur
d 4𝑃
= ඨ𝜋𝐹𝑦

d 4 x 6495,2
= ඨ  x 4000

= 1,44 cm
Digunakan 8 angkur diameter 20 mm

• Kontrol Lendutan

MDL = 2407500 N.mm


Mcr = 83333333 N.mm

Momen inersia bruto terhadap sumbu berat penampang tanpa memperhitungkan


tulangan baja
Ig = 1
b h3
12
= 1
1000 1000000
12
= 83333333,33 mm4

Momen inersia retak penampang, dengan tulangan baja yang ditransformasikan ke


penampang beton. Dicari nilai x terlebih dahulu
Nilai x = b x2 - n . As x - n . As . Dx
2
= 771
500 x2 - x - 42408
= 10,01 mm
x
= -8,47 mm 5027
Icr 𝑏 3
= + 𝑛 𝐴𝑠 ሺ − ሻ2
3
= 411930 mm4
Momen inersia efektif
𝑀 𝑟 3 𝑀 𝑟 3
Ie ൬ ൰ 𝐼𝑔 + ቈ1 − ൬ ൰ ቉ 𝐼 𝑟 ≤ 𝐼𝑔
= 𝑀𝑎 𝑀𝑎

= 3438935825023 ≤ 83333333,3

Ie = Ig

15
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

= 83333333

Ec = 25743 Mpa

Lendutan = 13,66 mm
Ijin = 17 mm OK

D. Tebal Pelat Overtopping


Setelah didapatkan tebal pelat dari syarat perhitungan, kemudian direncanakan
tebal pelat pracetak dengan syarat minimal tebal 80 mm. maka :
Tebal Rencana Pelat Pracetak = 100mm
Sehingga Tebal Pelat Overtopping :
Tebal Pelat Overtopping = Tebal Perhitungan Pelat – Tebal Rencana Pelat Pracetak
= 180 mm – 100 mm
= 80 mm

E. Tulangan Pelat Overtopping


• Perhitungan Penulangan
D
Tinggi efektif (d) = h - ts -
2
10
= 100 - 20 -
2
= 75 mm

Mu
Rn =
φ x b x d²
1696000
=
0,9 x 1000 x 5625
= 0,335 Mpa

fy 400
m = = = 15,69
0,85 fc' 0,85 30

2𝑚 𝑅𝑛
ቌ1 − ඨ1 − ቍ
1 𝑓𝑦
ρ perlu =
m

16
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

1
= 0,0132
15,69
= 0,0008

1,4 1,4
ρ min = = = 0,0035
fy 400

ρ pakai = 0,004

• Tulangan Utama
As = ρ pakai x b x d
= 0,004 x 1000 x 75
= 262,500 mm²

Digunakan
D 10
tulangan
As = 0,25 π x d²
= 0,25 3,142 x 100
= 78,540 mm²
Jarak tulangan (s) diambil dari nilai terkecil dibawah ini: (SNI 2847:2013 pasal
10.5.4)
a. s ≤ 3h
≤ 300 mm
b. s ≤ 450 mm
Dipakai jarak tulangan (s) = 200 mm

1000 x As 1000 x 78,540


As pakai = =
s 200
= 392,699 mm²
Dipakai tulangan utama D 10 - 200

• Kondisi saat Setelah Komposit


• Data Perencanaan
• Dimensi plat = 2500 mm x 5000 mm
• Tebal plat pracetak = 100 mm
• Tebal overtopping = 80 mm
• Tebal selimut beton (ts) = 20 mm
• Diameter tul rencana (D) = 10 mm
• Diameter tul susut rencana (D) = 10 mm
• Mutu beton (fc') = 30 Mpa
• Mutu baja (fy) = 400 Mpa

17
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

• Momen yang Terjadi


Momen Arah X
Mx = 0,0107 qu Lx²
= 0,0107 1495 6,25
= 1,00 kN.m
= 999647,5 N.mm

• Penulangan Pelat Arah x


1
dx = h - t - ø
2
1
= 180 - 20 - 10
2
= 155 mm

Mu
Rn =
ø x b x dx2
999647,5
=
0,9 x 1000 x 24025
= 0,05 MPa

m fy
=
0,85 x Fc'
400
=
0,85 x 30
= 15,69

ρperlu 1
= 2 𝑚 𝑅𝑛
m ቌ1 − ඨ1 − ቍ
𝐹𝑦
1
= 2 1 . 8 .3
0,85 ቌ1 − ඨ1 − ቍ
24

= 0,0011

ρmin = 0,0035 > 0,0011


PAKAI RHO MIN
ρpakai = 0,0035

As = ρpakai x b x dx

18
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

= 0,0035 x 1000 x 155


= 542,5 mm2

Digunakan tulangan D 10

Jarak tulangan (s)


s = 1000 x AD16
As
= 1000 x 78,54
542,50
= 144,8

Syarat :
s < 3h
s < 240
s < 450
Dipilih yang terkecil sehingga digunakan s = 200 mm
Aspakai = 1000 x AD16
As
= 1000 x 78,54
200,00
= 392,7

a = As x Fy
0,85 x Fc' x b
= 392,7 x 400
0,85 x 30 x 1000
= 6,16 mm
øMn = ø x As x - 1 a x Fy
dx
2
øMn = 0,9 x 392,7 x 155 - 1 6,16 x 400
2
øMn = 21477185,04 Nmm
Mu = 999648 Nmm OK
Sehingga digunakan
D 10 - 200 mm
tulangan

19
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

2. BALOK
• Data Perencanaan
Tebal
= 0,1 cm
plat
Tebal overtopping = 0,08 cm
Mutu beton
= 30 Mpa
(fc')
Mutu baja (fy) = 400 Mpa
Diameter tul.lentur = 19 mm
Diameter tul.geser = 10 mm
Tebal selimut beton = 40 mm
Lebar balok induk (b) = 300 mm
Tinggi balok induk (h) = 500 mm
Tinggi bersih balok (h') = 320 mm
Lebar balok anak (ba) = 200 mm
Tinggi balok anak (ha) = 400 mm
Tinggi bersih balok (ha') = 220 mm
Bentang balok = 5000 mm

• Momen yang Terjadi

h pracetak 320
Yt = Yb = = = 160 mm
2 2
Yc = Yt + 50

20
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

= 160 + 50
= 210 mm
θ = 60 °

4𝑌
1+
𝐿 𝑡𝑎𝑛𝜃
X =
𝑌𝑡 4𝑌
2 ቌ1 + ඨ1 + ൬1 + ൰ቍ
𝑌𝑏 𝐿 𝑡𝑎𝑛𝜃

1,097
=
4,896
= 0,224

4x
qu x 4Yc
M+ = L² 1 - +
8 L tan θ
414,72 x 25 0,84
= 1 - 0,9 +
8 8,66
= 260,229 kgm
= 2,602 kNm

qu x X² L²
M- =
2
414,72 x 0,0502 25
=
2
= 260,229 kgm
= 2,602 kNm

M+ = M-

• Penulangan Lentur Akibat Pengangkatan


• Data Perencanaan
Bentang balok
= 5000 mm
(L)
Lebar balok (b) = 300 mm
Tinggi bersih balok (h') = 320 mm
Tebal selimut beton (ts) = 40 mm

21
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

Diameter tul.lentur (D) = 19 mm


Diameter tul.geser (Ø) = 10 mm

D
d = h' - ts - - Ø
2
19
= 320 - 40 - - 10
2
= 261 mm

Mu
Rn =
φ x b x d²
2602290,139
=
0,9 x 300 x 67860
= 0,142 Mpa

fy 400
m = = = 15,69
0,85 fc' 0,85 30

1
ρ perlu = 2𝑚 𝑅𝑛
ቌ1 − ඨ1 − ቍ
m 𝑓𝑦
1
= 0,0056
15,69
= 0,00036
1,4 1,4
ρ min = = = 0,004
fy 400

0,85 x fc' x β1 600


ρb = x
fy 600 + fy
0,85 x 30 x 0,85 600
= x
400 600 + 400
= 0,0542 x 0,6
= 0,0325

ρmax = 0,75 x ρb
= 0,75 x 0,0325
= 0,024

22
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

ρ pakai = 0,004

• Tulangan Lentur Tarik

As = ρ pakai x b x d
= 0,004 x 300 x 261
= 273,525 mm²

Berdasarkan SNI 2847:2013 pasal 10.5.1, nilai As tidak boleh kurang dari berikut:

0,25 bw d
As min = ඥ𝑓 ′
fy
0,25 5,48 300 261
=
400
= 267,528 mm²

1,4 bw d
As min =
fy
1,4 300 261
=
400
= 273,525 mm²

As pakai = 273,525 mm²

Digunakan tulangan = D 19 mm
As = 0,25 π x d²
= 0,25 3,14 x 361
= 283,529 mm²

n As pakai 273,525
= = = 0,965 = 3 buah
tulangan As 283,529

As
850,586
pasang = mm²
Maka, digunakan tulangan lentur tarik 3 D 19

• Tulangan Lentur Tekan

Untuk tulangan lentur tekan digunakan sebesar 0.5 dari kekuatan lentur tarik, berdasarkan SNI
2847:2013 pasal 21.5.2.2.

23
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

As' = 0,5 x As lentur


= 0,5 x 850,586211
= 425,293 mm²

Digunakan tulangan = D 19 mm
As = 0,25 π x d²
= 0,25 3,14 x 361
= 283,529 mm²

n As' 425,293
= = = 1,500 = 2 buah
tulangan As 283,529

As
567,057
pasang = mm²
Maka, digunakan tulangan lentur tekan 2 D 19

• Kontrol Kapasitas

24
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

a. Tinggi blok tegangan persegi ekivalen


As x fy
a =
0,85 x fc' x b
850,586 x 400
=
0,85 x 30 x 300
= 44,475 mm

b. Jarak dari serat tekan terjauh ke sumbu netral


a 44,475
c = = = 55,59 mm
0,8 0,8

c. Regangan Tarik
d
εt = 0,003 x - 1
c
261
= 0,003 x - 1
55,59
= 0,0111

1
ØMn = Ø x As x fy x d - a
2
1
= 0,9 x 850,586211 x 400 x 261 - 44
2
= 72958592,25 Nmm
= 72,959 kNm

Cek syarat:
ØMn > Mu
72,959 > 2,602 kNm OK

• Balok Sebelum Komposit


- Data Perencanaan

Tebal plat = 0,1 cm


Tebal overtopping = 0,08 cm
Mutu beton (fc') = 30 Mpa
Mutu baja (fy) = 400 Mpa
Diameter tul.lentur = 19 mm
Diameter tul.geser = 10 mm
Tebal selimut beton = 40 mm
Lebar balok induk (b) = 300 mm
Tinggi balok induk (h) = 500 mm
Tinggi bersih balok (h') = 320 mm

25
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

Lebar balok anak (ba) = 200 mm


Tinggi balok anak (ha) = 400 mm
Tinggi bersih balok (ha') = 220 mm
Bentang balok = 5000 mm

- Momen Yang Terjadi

Berdasarkan PBI 1971, momen sebelum komposit sebagai berikut:


M 1 1
= x q x L² + x P x L
maks 11 8
1 1
= x 1822,72 x 25 + x 528 x 5
11 8
= 4142,55 + 330
= 4472,55 kgm
= 44,73 kNm

- Penulangan Lentur pada saat sebelum komposit

- Data perencanaan penulangan balok:


Bentang balok (L) = 5000 mm
Lebar balok
= 300 mm
(b)
Tinggi bersih balok (h') = 320 mm
Tebal selimut beton (ts) = 40 mm
Diameter tul.lentur (D) = 19 mm
Diameter tul.geser (Ø) = 10 mm

D
d = h' - ts - - Ø
2
19
= 320 - 40 - - 10
2
= 261 mm

Mu
Rn =
φ x b x d²
44725454,55
=
0,9 x 300 x 67860
= 2,441 Mpa

fy 400
m = = = 15,69
0,9 fc' 0,85 30

26
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

1 2𝑚 𝑅𝑛
ρ perlu = ቌ1 − ඨ1 − ቍ
𝑓𝑦
m
1
= 0,1008
15,69
= 0,006

1,4 1,4
ρ min = = = 0,004
fy 400

0,85 x fc' x β1 600


ρb = x
fy 600 + fy
0,85 x 30 x 0,85 600
= x
400 600 + 400
= 0,0542 x 0,6
= 0,0325

ρmax = 0,75 x ρb
= 0,75 x 0,0325
= 0,024

ρ pakai = 0,006

- Tulangan Lentur Tarik

As = ρ pakai x b x d
= 0,006 x 300 x 261
= 502,234 mm²
Berdasarkan SNI 2847:2013 pasal 10.5.1, nilai As tidak boleh kurang dari berikut:
0,25 ඥ𝑓 ′ bw d
As min =
fy
0,25 5,5 300 261
=
400
= 267,528 mm²

1,4 bw d
As min =
fy
= 1,4 300 261

27
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

400
= 273,525 mm²

As pakai = 502,234 mm²

Digunakan tulangan = D 19 mm
As = 0,25 π x d²
= 0,25 3,1 x 361
= 283,529 mm²

n As pakai 502,234
= = = 1,771 = 5 buah
tulangan As 283,529

As
1417,6
pasang = mm²
Maka, digunakan tulangan lentur tarik 5 D 19

- Tulangan Lentur Tekan

Untuk tulangan lentur tekan digunakan sebesar 0.5 dari kekuatan lentur tarik,
berdasarkan SNI 2847:2013 pasal 21.5.2.2.
As' = 0,5 x As lentur
= 0,5 x 1417,644
= 708,82 mm²

Digunakan tulangan = D 19 mm
As = 0,25 π x d²
= 0,25 3,1 x 361
= 283,529 mm²

n As' 708,822
tulanga = = = 2,500 = 3 buah
n As 283,529

As
850,59
pasang = mm²
Maka, digunakan tulangan lentur tekan 3 D 19

- Kontrol Kapasitas

28
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

a. Tinggi blok tegangan persegi ekivalen


As x fy
a =
0,85 x fc' x b
1417,6 x 400
=
0,85 x 30 x 300
= 74,125 mm

b. Jarak dari serat tekan terjauh ke sumbu netral


a 74,125
c = = = 92,66 mm
0,8 0,8

c. Regangan Tarik
d
εt = 0,003 x - 1
c
261
= 0,003 x - 1
92,7
= 0,0054

1
ØMn = Ø x As x fy x d - a
2
1
= 0,9 x 1417,644 x 400 x 261 - 74
2
= 114031673,1 Nmm
= 114,032 kNm

Cek syarat:
ØMn > Mu
114,032 > 44,725 kNm OK

• Balok Setelah Komposit


- Data Perencanaan
Tebal
= 0,1 cm
plat
Tebal overtopping = 0,08 cm
Mutu beton
= 30 Mpa
(fc')
Mutu baja (fy) = 400 Mpa
Diameter tul.lentur = 19 mm

29
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

Diameter tul.geser = 10 mm
Tebal selimut beton = 40 mm
Lebar balok induk (b) = 300 mm
Tinggi balok induk (h) = 500 mm
Tinggi bersih balok (h') = 320 mm
Lebar balok anak (ba) = 200 mm
Tinggi balok anak (ha) = 400 mm
Tinggi bersih balok (ha') = 220 mm
Bentang balok = 5000 mm

- Momen Yang Terjadi

Pada saat kondisi setelah komposit,

Mu tumpuan (-) = 24,36 kNm


Mu tumpuan (+) = 22,61 kNm

- Perencaan Tulangan Lentur pada saat Setelah Komposit


Perencanaan Tulangan Lentur pada
Tumpuan
Untuk mengantisipasi terjadinya gerakan bolak-balik saat dibebani beban lateral, maka untuk
tumpuan (-) digunakan Mu tumpuan (-) yang terbesar.
Mu tumpuan (-) = 24,36 kNm

Data perencanaan penulangan


balok:
Bentang balok (L) = 5000 mm
Lebar balok
= 300 mm
(b)
Tinggi bersih balok (h') = 320 mm
Tebal selimut beton (ts) = 40 mm
Diameter tul.lentur (D) = 19 mm
Diameter tul.geser (Ø) = 10 mm

D
d = h' - ts - - Ø
2
19
= 320 - 40 - - 10
2
= 261 mm

30
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

Mu
Rn =
φ x b x d²
24360000
=
0,9 x 300 x 67860
= 1,330 Mpa

fy 400
m = = = 15,69
0,9 fc' 0,85 30

1 2𝑚 𝑅𝑛
ρ perlu = ቌ1 − ඨ1 − ቍ
m 𝑓𝑦
1
= 0,0052
15,69
= 0,000

1,4 1,4
ρ min = = = 0,004
fy 400

0,85 x fc' x β1 600


ρb = x
fy 600 + fy
0,85 x 30 x 0,85 600
= x
400 600 + 400
= 0,0542 x 0,6
= 0,0325

ρmax = 0,75 x ρb
= 0,75 x 0,0325
= 0,024

ρ pakai = 0,004

- Tulangan Lentur Tarik

As = ρ pakai x b x d
= 0,004 x 300 x 261
= 273,525 mm²

31
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

Berdasarkan SNI 2847:2013 pasal 10.5.1, nilai As tidak boleh kurang dari berikut:

0,25 bw d
As min = ඥ𝑓 ′
fy
0,25 5,5 300 261
=
400
= 267,528 mm²

1,4 bw d
As min =
fy
1,4 300 261
=
400
= 273,525 mm²

As pakai = 273,525 mm²

Digunakan tulangan = D 19 mm
As = 0,25 π x d²
= 0,25 3,1 x 361
= 283,529 mm²

n As pakai 273,53
= = = 0,965 = 1 buah
tulangan As 283,529

As
283,528737
pasang = mm²
Maka, digunakan tulangan lentur tarik 1 D 19

Spesi bersih antarlapis tulangan diambil 25 mm, jadi nilai d tetap seperti di awal
a. Tinggi blok tegangan persegi ekivalen
As x fy
a =
0,85 x fc' x b
283,528737 x 400
=
0,85 x 30 x 300
= 14,83 mm
b. Jarak dari serat tekan terjauh ke sumbu netral
a 14,825
c = = = 18,53 mm
0,8 0,8

32
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

c. Regangan Tarik
d
εt = 0,003 x - 1
c
261
= 0,003 x - 1
18,5
= 0,039

1
ØMn = Ø x As x fy x d - a
2
1
= 0,9 x 283,528737 x 400 x 261 - 15
2
= 25832726,89 Nmm
= 25,833 kNm

Cek syarat:
ØMn > Mu
25,833 > 24,360 kNm OK

- Tulangan Lentur Tekan

Untuk mengantisipasi terjadinya gerakan bolak-balik saat dibebani beban lateral, maka untuk
tumpuan (+) digunakan Mu tumpuan (+) yang terbesar.
Mu tumpuan (+) = 22,61 kNm

Data perencanaan penulangan balok:


Bentang balok (L) = 5000 mm
Lebar balok
= 300 mm
(b)
Tinggi bersih balok (h') = 320 mm
Tebal selimut beton (ts) = 40 mm
Diameter tul.lentur (D) = 19 mm
Diameter tul.geser (Ø) = 10 mm
D
d = h' - ts - - Ø
2
19
= 320 - 40 - - 10
2
= 261 mm

33
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

Mu
Rn =
φ x b x d²
22610000
=
0,9 x 300 x 67860
= 1,234 Mpa

fy 400
m = = = 15,69
0,9 fc' 0,85 30

1
ρ perlu =
m
2𝑚 𝑅𝑛
ቌ1 − ඨ1 − ቍ
1 𝑓𝑦
= 0,0496
15,69
= 0,003

1,4 1,4
ρ min = = = 0,004
fy 400

0,85 x fc' x β1 600


ρb = x
fy 600 + fy
0,85 x 30 x 0,85 600
= x
400 600 + 400
= 0,0542 x 0,6
= 0,0325

ρmax = 0,75 x ρb
= 0,75 x 0,0325
= 0,024

ρ pakai = 0,004

As = ρ pakai x b x d
= 0,004 x 300 x 261
= 273,525 mm²

Berdasarkan SNI 2847:2013 pasal 10.5.1, nilai As tidak boleh kurang dari berikut:
0,25 ඥ𝑓 ′ bw d
As min =
fy

34
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

0,25 300 261


= 5,5
400
= 267,528 mm²
1,4 bw d
As min =
fy
1,4 300 261
=
400
= 273,525 mm²

As
= 273,525 mm²
pakai

Digunakan tulangan = D 19 mm
As = 0,25 π x d²
= 0,25 3,1 x 361
= 283,529 mm²

n As pakai 273,53
= = = 0,965 = 6 buah
tulangan As 283,529

As
1701,172422
pasang = mm²
Maka, digunakan tulangan lentur tekan 6 D 19

35
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

Gambar
1. Pelat

Gambar Denah Kolom, Balok, dan Pelat

Gambar pembagian Pelat Pracetak Perpias

36
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

Gambar Tulangan Pelat Pracetak

Gambar Detail Titik Pengangkatan Pelat Pracetak

37
Andry Iffat Bhadreswara
2035201005/TRPPBS A 2020
DEPRTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI

2. Balok

Gambar Detail Tulangan Balok

Gambar Detail Pengangkatan Balok