Anda di halaman 1dari 9

A B C

NIM
2 1 4

Data

H (Tinggi) 150 cm 1.5


b (Lebar) 40 cm
Fc' 45 Mpa
L 25.125 m 25
Spacing Girder 180 cm
BTR 9 Kpa Untuk L ≤ 30 m
BGT 49 Kpa

Lebar Tinggi
A1 40 30 1200
A2 24 90 2160
A3 40 30 1200
A Total 4560

Y1 135 cm 1.35
Y2 75 cm 0.75
Y3 15 cm 0.15
Y rata-rata 75 cm 0.75

Input IX untuk A1 4,410,000 cm4 0.0441


Input IX untuk A2 1,458,000 cm4 0.0146
Input IX untuk A3 4,410,000 cm4 0.0441
IX 10,278,000 cm4 0.10278
SX 137,040 cm3 0.1370

Kondisi Awal

fc 27 Mpa
ft -3.35410196624968 Mpa
B balok ekuivalen (Kolom) 30.4 cm
qbs 14.2272 KN/m
Mmax 1122.6427875 KN/m
𝜎 bs 8,192.0811 KN/m2

T M
+ -
456000 137,040,000
T M
- +
456000 137,040,000

Pers (1) + Pers (2)


2T
456000

T = 5391264.75169507 N

Pers (1) - Pers (2)


2M
+
137,040,000

M rico 3213704484 M alwi 3,202,508,316

M 3,202,508,316 N 3,202.508
e 0.594 m 59.4018

Kondisi Service

Tebal pelat beton 0.25 m


Tebar aspal 0.05 m
Factor 1.8
Lebar 1.8

q pelat 14.04 KN/m


q aspal 2.772 KN/m
BTR (qL) 29.16 KN/m
q total 45.972 KN/m
P 222.264 KN/m
Mmax 5023.6636640625 KN/m
𝜎 s 36.6584 Mpa
fci 20.25 Mpa
fti -3.35410196624968 Mpa
Serat atas 33.3043 Mpa
Serat bawah - 9.6584 Mpa

Hitung release yang terjadi


Menurut Prof. Bambang Budiono

Untuk struktur
Kcr (Koefisien Rangkak 2
pratarik
fcp 23.844 Mpa
fsidl 7.667 Mpa
fpi (Mpa) 3548.398 Mpa
Fpi (Psi) 514633.191 Psi
Ep 196551.7241
Ec 31528.558482747
Creep 297.285474672156
Elastik 168.320304069849
Shrinkage 69.8850574577778
Relaxation (Fase 1) 155.373804242459
fpi 2 3393.024 Mpa
Relaxation (Fase 2) 178.40341189701 Mpa
Total loss 869.268052339252
% release 0.2450 24.50 %

Hitung release yang terjadi


Menurut Prof. Bambang Budiono

1m 39.37 in 0.03937
1 KN 224.8 tb
Teff 4,070.54 Kn
e 0.594 m
M eks 2417.97449621791 KNm
𝜎 T 8.92662449932223 Mpa
𝜎 bs 8.1921 Mpa
𝜎 e 17.6443 Mpa
𝜎 s 36.6584 Mpa
fci 20.25 Mpa
fti -3.35410196624968 Mpa

Hitung kebutuhan tendon

T 5391.265 KN
As1 126.61265 mm2
F ijin 1339.2 Mpa
As perlu 4025.73532832667 mm2
Strand perlu 31.7956801972525
Tendon perlu 2.64964001643771 3

Hitung penulangan end block

Diameter strand 0.5 in


fpe 129519.825262013 psi
fps 171544.396889011 psi
fpi 514633.191 psi
T 1211956.31618105 lb
fst 27066.6666666667 psi
h 59.0551181102362 in
Lt1 21.5866375436688 in
Lt2 25 in
Diambil Lb 25 in

Lf 21.0122858134988 in
Ld 46.0122858134988 in
Asumsi hb 100 mm ≤
T pencar 1509.55413047462 KN

Digunakan tulangan spiral

Diameter sengkang 13 mm
Selimut 50 mm
fyt 400 Mpa
fst 266.666666666667 Mpa
fsi 1.18279930333779 KN/mm2 1182.79930333779
Lt 635 mm
As 226.10826 mm2
T Pencar
S 89870.8785999913 89.8708785999913

Digunakan
Spasi (s) 75 mm
Tul. Blok angkur Spiral 013 - 75 mm
Sepanjang Lt 635 mm

Hitung Kapasitas Geser Beton

Aps. Fse = Te 4,070.54 KN


Aps. Fye 25446882.456 8482.2832 KN
As. Fy 0 Kn Karena tidak menggukan tulangan le

Aps. Fse 0,4 (Aps. Fpu + As.fy)


25446882.456 3392.91328

q total 60.1992 KN/m


P total 222.264 KN
Vu tumpuan 867.38445
Lt 635 mm 0.635
Vu setelah Lt 829.157958
Mu setelah Lt 531.67587975
bw 240 mm
e pada Lt 0.0594 m
d pada Lt 0.809413212689959 m
dp 1.3440 ≥ 0,8 H 1.2
Vc1 3353.47728237603 KN
Vc2 1656.50010044784 KN
Vc3 908.807442106838 KN
Batas Vc minimum 367.850631328958 KN
Vc1, Vc2, Vc3 ≥ Vcmin OK
q total 31.0392 KN/m
Vd tumpuan 389.92995 KN
Vd setelah Lt 370.220058 KN
Md setelah Lt 241.34762754 KN/m
Vi 458.9379 KN
Mmax 290.32825221 KNm
qd not faktor 23.724 KN/m
Md not faktor 1872.0182109375 KN/m
fd 10,819.34732 KN/m2 10.81935
fpe 35.493 Mpa
Mcre 3,840.92350 Mpa
Mct 5323.60685345486 KN/m
Vci 1 6,549.97129 KN
Vci 2 302.935814035613 KN
Vci 3 8780.67066479349 KN

y - ax2 + bx + c
x1 635 mm
x2 12.5625 m
e 0.594 m 59.402
y1 50.25 m
y2 59.402 m

a -0.00000374
b 0.0944
Vp 384.26 KN
fpc 9.92745 Mpa
Vcw 3534.284 KN

Menghitung penulagan geser beton

Vn 1105.543944 KN
Vs perlu 802.608129964387 KN
d sengkang 13 mm
Data

mm FU Strand 1860 Mpa 0.9


Diameter 12.7 mm 0.8

12.5625 FY Strand (0,9*FU Strand) 1674 Mpa


F ijin (0,8*FY Strand) 1339.2 Mpa
𝛾 Beton 24 KN/m3
𝛾 Aspal 22 KN/m3

Cm2 0.12 m2
Cm2 0.216 m3
Cm2 0.12 m4
Cm2 0.456 m5

m
m
m
m 0
1.255273
m4
m4
m4
m4
m3

Facktor 0.6
Facktor -0.5
0.304 m Facktor 1.3

8.1921 Mpa

8.1921 = 27 Pers (1)


8.1921 = -3.354102 Pers (2)

- = 23.6459

5391.265 KN

- 16.3842 = 30.3541

KNm
140 mm

Mpa

mm

k menggukan tulangan lentur

m
m

Mpa

mm

Anda mungkin juga menyukai