KELOMPOK 4
A= 1;B=8;C=7
108 m
71 m
Data :
𝑒 0,65
Porositas tanah (p) : = = 39 %
1+𝑒 1+0,65
k : 30 mm/jam
𝑘
𝐿 = 2 × √ (𝑏 2 − 𝑎2 )
𝑣
30
𝐿 = 2 × √ (4,52 − 4,22 )
80
𝐿 = 1,98 𝑚
Digunakan jarak pipa subdrain (L) = 2 m
108 m
1. Mencari besarnya α
𝐿𝑎𝑗𝑢 𝑖𝑛𝑓𝑖𝑙𝑡𝑟𝑎𝑠𝑖 (𝑞1 ) = 𝑝 × 𝑣
𝑞1 = 0,39 × 80
𝑞1 = 31 𝑚𝑚/𝑗𝑎𝑚
𝐻
∝ = arctan
0,5 × 𝐿
0,8
∝ = arctan
0,5 × 2
∝ = 38,66°
2. Menghitung Qmaks
Diasumsikan air 80% meresap.
𝐾𝑒𝑚𝑎𝑚𝑝𝑢𝑎𝑛 𝑝𝑖𝑝𝑎 𝑑𝑟𝑎𝑖𝑛𝑎𝑠𝑒 (𝑞2 ) = 0,8 × 𝑝 × 𝑣 × sin2 ∝
𝑞2 = 0,8 × 0,39 × 80 × sin2 38,66
𝑞2 = 16,77 𝑚𝑚/𝑗𝑎𝑚
𝑄𝑚𝑎𝑘𝑠 = 𝑞2 × 𝐿 × 𝑃
𝑄𝑚𝑎𝑘𝑠 = (16,771 × 10−3 ) × 2 × 71
𝑄𝑚𝑎𝑘𝑠 = 2,381 𝑚 3 ⁄𝑗𝑎𝑚 = 0,00066 𝑚 3 /𝑑𝑒𝑡𝑖𝑘
3. Menghitung Qpenuh dan Diameter Pipa
Direncanakan tinggi muka air di pipa = 1/3 diameter pipa.
𝑄𝑚𝑎𝑘𝑠 = 23% × 𝑄𝑝𝑒𝑛𝑢ℎ
𝑄𝑝𝑒𝑛𝑢ℎ = 4,35 × 𝑄𝑚𝑎𝑘𝑠
𝑄𝑝𝑒𝑛𝑢ℎ = 4,35 × 0,00066
𝑄𝑝𝑒𝑛𝑢ℎ = 0,00287 𝑚 3 /𝑑𝑒𝑡𝑖𝑘
Direncanakan slope saluran (S) = 0,001 dan n manning = 0,02
1
𝑄𝑝𝑒𝑛𝑢ℎ = × 𝑅2/3 × 𝑆1/2 × 𝐹
𝑛
1 𝐷 1
0,00279 = × ( )2/3 × 0,0011/2 × 𝜋𝐷 2
0,02 4 4
𝐷 = 0,1451 𝑚 = 14,51 𝑐𝑚
Digunakan D = 15 cm
71 m
NAMA KELOMPOK
ICHLASUL ALWI A
(21010120140214)
NATANAEL RIO CHRISTIAN
(21010120130171)
FITO ARYA NUGRAHA
(21010120140209)
RADHEVIO IZZA AGHNA
(21010120130187)
108 m DOSEN PEMBIMBING
Pipa Ø 15 Cm
DESYTA ULFIANA, ST., MT.
SKALA GAMBAR
1 : 75