Div.
Proj (Fiberized)
PT. Iforte Solusi Infotek
1 WOV Copy
2 Invoice
3 Faktur Pajak
4 Purchase Order Copy
5 Berita Acara Survey (BAS) Asli
6 Bill of Quantity (BOQ) Asli
7 SPH Final Asli
8 Laporan Harian Asli
9 Berita Acara Lapangan (BALAP) Asli
10 Berita Acara Pekerjaan Selesai (BAPS) Asli
11 Berita Acara Uji Terima (BAUT) Asli
12 Berita Acara Serah Terima (BAST) Asli
13 NOD Copy
14 Drawing Handhole Asli
15 Drawing Core To Core Connection Asli
16 Data Sheet Koordinat HH Asli
17 Dokumentasi Foto Asli
18 Dokumen ATP Full Signed Asli
19 Email Konfirmasi Pekerjaan Asli
20 Packing Slip (Product Received)
21 Diagram Batang Asli
22 Perijinan Asli
23 Berita Acara Sitac Suppport Asli
24 Field Commissioning Asli
25 Dokumentasi Note Sitac
26 Bentley Asli
27 KMZ Final Asli
Medan,
Diterima tanggal : Yang Menyerahkan
Oleh :
PT. IFORTE SOLUSI INFOTEK Vend
Renggan Nugraha
Admin Quality & Acceptance Admin P
OK Finance
Copy
Asli
Asli
Copy
Copy
Copy
Copy
Copy
Copy
Copy
Copy
Copy
Copy
Copy
Copy
Copy
Copy
Copy
Copy
Asli
Copy
Copy
Copy
Copy
Copy
Copy
Menyerahkan
Vendor
Admin Project
Judul Pekerjaan disesuaikan dengan Description pada PO
Tanggal Survey
Tanggal Field Commissioning
PJ: Ms.excel A4
PJ: Ms.excel A4
PJ: Ms.excel A4
PJ: Ms.excel A4
PJ: Ms.excel A4
PJ: Ms.excel A4
sudah sistem jpg A4
PJ: AutoCAD / Visio A4
format oleh vendor AutoCAD / Visio A4
PJ: Ms.excel A4
PJ: jpg A4
format oleh vendor Otomatis dr alat A4
print email Outlook A4
sudah sistem jpg A4 Packing Slip akan Release by Finance apabila BAST & M
lampirkan BAST & MCV done Approved ke Tim AP. Finance
an melampirkan BAST & MCV done Approved ke Tim AP. Finance
e apabila BAST & MCV done Approved dilampirkan saat Submit Invoice ke Menara BCA oleh Vendor
Logo Vendor
BILL OF QUANTITY
Nomor : Nomor BOQ
Tanggal : 2 January 2023
Pekerjaan : Jasa Implementasi Backbone Site OLT 1
Lokasi : OLT 1
No. Deskripsi
II Material
1 Pipa PVC Diameter 4" Tebal 5,5 mm (tipe AW).
2 Pipa PVC Diameter 3/4"
3 Pipa Galvanis Diameter 3" tebal minmum 2,3 mm
4 Pipa Galvanis Diameter 2,0" Tebal 1,2 mm
5 Hand Hole
a. 80x80x100 Ketebalan Cover 20cm
b. 90x70x100 Ketebalan Cover 20cm
c. 60x60x100 Ketebalan Cover 20cm
d. 100x80x100 Kebebalan Cover 20cm
6 Consummable material (i.e. warning tape, socket, rambu2/sign, etc.)
7 Flexible almunium 3/4" (conduit, anaconda)
8 Sub-Duct
a. HDPE 40/33
b. HDPE 32/28
9 Riser Pipe
10 Tiang 7m Helical Deadend Serv
11 Tiang 9m Helical Deadend Serv
12 Tiang 13 m Helical Deadend Serv
13 Hanger Cable Service (Palang Kabel)
14 Sling Cable 8 mm
15 Pulling Rope (Rodding)
16 Marking Post
17 Warning Tape
III Jasa (termasuk Material)
1 Pengamanan dan Persiapan
a. Pengadaan Rambu / Pembatas Galian (per 100 meter)
b. Banner (tinggi 2 meter)
2 Trenching, back filling and reinstatement (120 cm in-depth)
a. Makadam
b. Aspal
c. Hotmix
d. Beton bertulang (Rigid)
e. Floor beton
f. Trotoar ubin/keramix
g. Rumput/Taman
h. Cone block
i. Batu Basal
3 Borring include reinstatement
a. Lobang Pit
b. Borring Manual / Rojok
I. Pipa PVC 4-inch (satu jalur)
a. Alur
b. Lintasan (Crossing Jalan)
II. Pipa HDPE 40/33 atau 32/28 satu jalur
a. Alur
b. Lintasan (Crossing Jalan)
c. Perlintasan Rel Kereta Api, Jalan Toll.
c. Borring Mesin
I. One (1) Way Pipa 5-inch
d. Duct Slump
4 Jasa Pemasangan Jembatan Galvanis
a. Jasa pemasangan galvanis
5 Penarikan Kabel Duct (12-144 Core)
a. Kabel Duct 12 - 24 - 48 cores
b. Kabel Duct 96 cores
c. Kabel Duct 144 cores
d. Kabel FO Mundur untuk Joint di HH (Pelolosan)
6 Penarikan Kabel Udara / Aerial Cable (12-48 Core)
a. Kabel Duct 12 - 24 - 48 cores FO New
b. Kabel Duct 12 - 24 - 48 cores FO Collo Pole
b. Kabel Duct 12 - 24 - 48 cores FO Collo Cable
7 Cable joint
a. Terminasi/Joint <= 12 core
b. Terminasi/Joint > 12 core
c. Splice Joint
8 Pemasangan
a. Pasang HDPE
b. Pasang Riser Pipe
c. Pasang Kondoit Spiral 1"
d. Pasang Pipa PVC (1/2", 3/4", 1")
e. Pasang Pipa PVC 4"
f. Pasang Tray Kabel
g. Pasang Marking Post
h. Penyewaan Alat Bantu Jack Hammer
9 Mobilisasi Pengambilan Material (Cables dll.)
10 Jasa Pembuatan
a. Lintasan Parit Galvanis
IV Testing, docomentation and Commisioning
1 Uji terima elektris
a. Attenuation dengan OTDR (2 Gelombang)
b. BER Test
c. Pengukuran Performance FO (Delay,Jitter,Attenuation ) Test
d. Splice loss per joint (2 arah)
e. Total loss dengan power meter (max 2 gelombang)
f. Polarization Mode Dispersion (PMD)
g. Test commisioning
I. X <= 12 core
II X > 12 core
2 Uji terima fisik (Perijinan Resmi)
a. Galian
b. Tiang/Jembatan
c. Handhole
d. Marking Pos
3 Dokumentasi Uji Terima & As built Drawing
a. As built drawing (hard copy 1 asli + 2 copy)
b. As built drawing (soft copy 3 CD)
Jumlah Unit
Meter
Lumpsum
Meter
Meter
Meter
Meter
Lumpsum
Track
Pole/Unit
Unit
Lumpsum
Lumpsum
Lumpsum
Meter
Meter
6 Meter
Meter
Unit
Unit
Unit
Unit
Lot
100 Meter
Meter
Meter
Meter
84 Pole/Unit
3 Pole/Unit
2 Pole/Unit
61 Unit
Meter
Meter
Unit
Meter
Piece
Piece
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Titik
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
9,179 Meter
7,280 Meter
Meter
Titik
Core
Core
Meter
Meter
Meter
Meter
Meter
Meter
Unit
Hari
Lumpsum
Meter
Lumpsum
Lumpsum
Lumpsum
Lumpsum
Lumpsum
Lumpsum
Lumpsum
Core
Lumpsum
Lumpsum
Set
Lumpsum
1 Set
1 Set
M. Rizaldi
Project Manager
Tanggal Field Commissioning
No Item<=24
FO FTTH New Cable Material Unit Quantity
1 Core Services Pole/Unit 9179
2 FO FTTH Collo <=24 Core Services Pole/Unit 7280
3 FO FTTH Pole 7m,Helical Deadend Serv Batang 84
4 FO FTTH Pole 9m,Helical Deadend Serv Batang 5
5 FO FTTH Pole 13m,Helical Deadend Serv Batang 2
6 FO FTTH Pole 7m,Helical Deadend Serv Unit 668
7 FO FTTH Hanger Cable Services Pole/Unit 61
Jenis Kabel
a. Jenis Kabel/Type : Kabel Fiber Optik Figur 8
b. Kapasitas : 4000 m
c. Dimensi : 12 Core
M. Rizaldi ______________________
Project Manager Nama FO Engineer
LOGO
VENDOR
*QTY BAS disesuaikan dengan QTY Balap yang sudah dikurangi slag dan Akses
*Penulisan Deskripsi Tiang 7 pada BAS disesuakan dengan Material Description Pada PO
*Penulisan Deskripsi Tiang 9 pada BAS disesuakan dengan Material Description Pada PO
er Optik Figur 8
Disetujui oleh
________________
ma FO Engineer
ag dan Akses
al Description Pada PO yang diterima Mitra. Untuk Qty tetap disesuaikan dengan Aktual di Lapangan
al Description Pada PO yang diterima Mitra. Untuk Qty tetap disesuaikan dengan Aktual di Lapangan
LAPORAN HARIAN
Trouble Ticket :
Customer : PT. Iforte
Vendor : PT. ATLANTIK INTERNASIONAL AKSES
Tanggal Mulai Pekerjaan : 19 October 2022
Tanggal Selesai Pekerjaan : 2 January 2023
Issue :
Nama Pekerjaan : Jasa Implementasi Backbone Site OLT 1
Lokasi : OLT 1
Indikasi Pekerjaan :
Jenis Pekerjaan yg dilakukan vendor :
Permintaan Material
No Material
FO FTTH New Cable <=24 QTY
1 Core Services 7280 Ha
2 FO FTTH Collo <=24 Core Services 9179 Ha
3 FO FTTH Pole 7m,Helical Deadend Serv 668 Ha
4 FO FTTH Hanger Cable Services 61 Ha
5 OTB 24 core 2 Ha
6 Closure 48 12 Ha
7 Closure 96 2 Ha
8 Tiang 7 m 84 Ha
9 Tiang 9 m 3 Ha
10 Tiang 13 m 2 Ha
11
12
13
14
15
PT. iForte Solusi Infotek PT. Atlantik Inter
Durasi
Keterangan
Finished
Keterangan
Habis Terpakai
Habis Terpakai
Habis Terpakai
Habis Terpakai
Habis Terpakai
Habis Terpakai
Habis Terpakai
Habis Terpakai
Habis Terpakai
Habis Terpakai
PT. Atlantik Internasional Akses
M. Rizaldi
Project Manager
*Penulisan Deskripsi FO New pada Laporan Harian disesuakan dengan Material Description Pada PO yang
*Penulisan Deskripsi FO Collo pada Laporan Harian disesuakan dengan Material Description Pada PO yan
*Penulisan Deskripsi Tiang 7 Meter pada Laporan Harian disesuakan dengan Material Description Pada P
*Penulisan Deskripsi Tiang 9 Meter pada Laporan Harian disesuakan dengan Material Description Pada P
aterial Description Pada PO yang diterima Mitra. Untuk Qty tetap disesuaikan dengan Aktual di Lapangan
Material Description Pada PO yang diterima Mitra. Untuk Qty tetap disesuaikan dengan Aktual di Lapangan
gan Material Description Pada PO yang diterima Mitra. Untuk Qty tetap disesuaikan dengan Aktual di Lapangan
gan Material Description Pada PO yang diterima Mitra. Untuk Qty tetap disesuaikan dengan Aktual di Lapangan
Customer
Vendor
Tanggal Mulai Pekerjaan
Tanggal Selesai Pekerjaan
Nama Pekerjaan
Lokasi
Indikasi Pekerjaan
Jenis Pekerjaan yg dilakukan vendor
Reservasi material
Ring ID Span Name Span ID
Backbone Site OLT 1
Pemakaian Material
Ring ID Span Name Span ID
Backbone Site OLT 1
Sisa Material
Ring ID Span Name Span ID
0 Backbone Site OLT 1 0
Reservasi material
Kabel 24 Core Closure 48Core Closure 96Core OTB FC Patchord FC
54,000 47 5 3
Pemakaian Material
Kabel 24 Core Slag ( 20 meter ) total Pemakain Kabel 24 Closure 48Core Closure 96Core
16,459 61 16,459 16 2
Sisa Material
Kabel 24 Core Closure 24 Core Closure 96Core OTB FC Patchord FC
37,541 31 3 1
L
Patchord SC Out
Note
OTB FC
2
Note
Patchord SC Out
Harga Satuan
No Item Pekerjaan Unit Qty
(Rp.)
1 FO FTTH New Cable <=24 Core Services Pole/Unit 9179 Rp 13,500
2 FO FTTH Collo <=24 Core Services Pole/Unit 7280 Rp 7,000
3 FO FTTH Pole 7m,Helical Deadend Serv Batang 84
4 FO FTTH Pole 9m,Helical Deadend Serv Batang 5
5 FO FTTH Pole 13m,Helical Deadend Serv Batang 2
6 FO FTTH Pole 7m,Helical Deadend Serv Unit 668 Rp 500
7 FO FTTH Hanger Cable Services Pole/Unit 61 Rp 1,050,000
Total
Alamat Vendor
PT. Atlantik Internasion
Tlp
Provinsi
Jumlah Harga (Rp.)
Rp 123,916,500
Rp 50,960,000
Rp -
Rp -
Rp -
Rp 334,000
Rp 64,050,000 *Penulisan Deskripsi Tiang 7 Meter pada Balap disesuakan den
Rp 239,260,500 *Penulisan Deskripsi Tiang 9 Meter pada Balap disesuakan den
Nama Direktur
Direktur
er pada Balap disesuakan dengan Material Description Pada PO yang diterima Mitra. Untuk Qty tetap disesuaikan dengan Aktual di La
er pada Balap disesuakan dengan Material Description Pada PO yang diterima Mitra. Untuk Qty tetap disesuaikan dengan Aktual di La
p disesuaikan dengan Aktual di Lapangan
p disesuaikan dengan Aktual di Lapangan
VENDOR
Pada hari ini ..................., Tanggal ....................bulan .........................tahun Dua Ribu Dua Puluh Tiga (Tanggal Field Commissioning)
Kami yang bertandatangan dibawah ini:
Nama :
Jabatan : Field Engineering Region
Dalam hal ini bertindak untuk dan atas nama PT.IFORTE SOLUSI INFOTEK
(yang selanjutnya disebut "IFORTE"), dan
Nama : M. Rizaldi
Project Manger : Project Manager
Dalam hal ini bertindak untuk dan atas nama PT. Atlantik Internasional Akses
(yang selanjutnya disebut "SUBCONT")
Berdasarkan Kepada :
1. Berita Acara Survey (BAS) Number :
2. Bill of Quantity (BOQ) Number :
3. Purchase Order (PO) Number :
Pada hari ini Senin Tujuh Juni Dua Ribu Dua Puluh Satu. (Tanggal Field Commissioning)
kami yang bertanda tangan dibawah ini :
2. Nama : M. Rizaldi
Jabatan : Project Manager
Dalam hal ini bertindak untuk dan atas nama PT. Atlantik Internasional Akses (yang
selanjutnya disebut sebagai "KONTRAKTOR")
Berdasarkan kepada :
1. Bill of Quantity (BOQ) No :
Menyatakan bahwa pekerjaan Jasa Penarikan Kabel FO (XL Fiberize) Lokasi: Jakarta Ring 1. No. WOV Iforte telah selesai di kerjakan
Adapun uraian status pekerjaan sebagai berikut :
No Uraian Status
1 Engineering Design & Permit Selesai
2 Jasa Selesai
3 Testing and Commisioning Selesai
Berita acara ini dibuat rangkap 2 (dua) asli, untuk kepentingan kedua belah pihak dalam
rangka penerbitan Berita Acara Uji Terima (BAUT).
Pada hari ini Jumat Tanggal Tiga Puluh Bulan Maret Tahun Dua Ribu Dua Puluh Tiga (Tanggal Field Commissioning)
kami yang bertanda tangan dibawah ini :
2. Nama : M. Rizaldi
Jabatan : Project Manager
Dalam hal ini bertindak untuk dan atas nama PT. Atalntik Internasional Akses (yang
selanjutnya disebut sebagai "KONTRAKTOR"
Berdasarkan kepada :
1. Purchase Order (PO) No 6200000873 tanggal 29 September 2022
Berita acara ini dibuat rangkap 2 (dua) asli, untuk kepentingan kedua belah pihak dalam
rangka penerbitan Berita Acara Serah Terima (BAST).
Berdasarkan pada
PROJECT NAME : XL
Purchase Order (PO) No. : 6200000873
Work Order (WO) No. : 1234/WOV-ISI/02/21
Field Commisioning (Tgl FC) : 30 Maret 2023
Berita Acara Serah Terima (BAST) No : 1234/BAST/FOR/FBR-REG/VIII/2021
Kota / Kabupaten : Binjai
RING ID customer / Operator :1
RING ID Iforte : SUM-NSM-0285-H-P
Req. Number PSS : 1234
Menginformasikan pemisahan Status Area dan dokumentasi yang didapat berdasarkan PO New Cable sepanjang 1300 meter, sebagai berikut :
NAMA KOTA/KABUPATEN STATUS AREA PANJANG KABEL (m) Type Dokumentasi Nomor Dokumentasi Tanggal Terbit PANJANG KABEL TERTERA
Dokumentasi
Binjai Jalan Nasional 1000 BPJN New) 1234/bpjn/jkt/III/2021 44632 800
Jalan Provinsi 500 Rekomtek (Eksisting) 1234/Rekomtek/jkt/III/2021 44256
Jalan Kota
Jalan Kabupaten
Jalan Desa
Lain-lain
*Type dokumentasi : Rekomtek, ijin kerja, ijin penempatan, PKS, N/A, dll
PT. Atlantik Internasional Akses
M. Rizaldi
Project Manager
*provided by vendor di setiap BAST, untuk penjabaran status area dan dokumentasi yang sudah didapatkan
PANJANG KABEL TERTERA
meter
meter
(meter / not state)
(meter / not state)
(meter / not state)
(meter / not state)
Info Jabatan
Project Project Manager Fiber database & Audit Head of Tower Fiberization
Benny
Pada hari ini __________, tanggal _________, bulan ____________, tahun Dua Ribu Delapan Belas, (Tanggal Field Commissioning)
kami yang bertanda tangan dibawah ini :
2. Nama : M Rizaldi
Jabatan : Project Manager
Dalam hal ini bertindak untuk dan atas nama PT. Atlantik Internasional Akses (yang
selanjutnya disebut sebagai "KONTRAKTOR")
Berdasarkan kepada :
1. Purchase Order (PO) No _____________ , tanggal ___________
Purchase Order (PO) No _____________ , tanggal ___________
2. Dokumen Laporan Pekerjaan
3. Berita Acara Uji Terima (BAUT) No _________________
Berita acara ini dibuat rangkap 2 (dua) asli bermaterai, dimana kedua-duanya mempunyai
kekuatan hukum yang sama setelah ditanda tangani kedua belah pihak.
Pekerjaan :
Lokasi :
Panjang FO New :
Panjang FO Collo :
Terminasi :
Pada hari ini __________, tanggal _________, bulan ____________, tahun Dua Ribu Delapan Belas, (Tanggal Field Commissioning)
kami yang bertanda tangan dibawah ini :
2. Nama :
Jabatan : Business Development Director
Dalam hal ini bertindak untuk dan atas nama Nama Vendor (yang
selanjutnya disebut sebagai "KONTRAKTOR")
Berdasarkan kepada :
1. Purchase Order (PO) No _____________ , tanggal ___________
Purchase Order (PO) No _____________ , tanggal ___________
2. Dokumen Laporan Pekerjaan
3. Berita Acara Uji Terima (BAUT) No _________________
Berita acara ini dibuat rangkap 2 (dua) asli bermaterai, dimana kedua-duanya mempunyai
kekuatan hukum yang sama setelah ditanda tangani kedua belah pihak.
Materai 10.000
Drawing Handhole
Pekerjaan : Jasa Implementasi Backbone Site OLT 1
Nama/No Handhole :
Segment :
Sub-Segment :
Alamat :
Koordinat GPS
Latitude :
Longitude :
Remark
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Foto Keterangan Foto Keterangan
Nama Site Nama Site
No Section Pole ID Longitude Latitude Position Concrete foundation Pole erection (Verticality)
(R/L)
2
3
5
6
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Nama : Ridwan
Jabatan : Project Supervisor
Tanggal : …..ttd….
e FO
Accessories
Pole erection (Verticality) Accessories LABEL TIANG
Stank Slack Helical Stopping