2 Perhitungan Ldisplacement
Ldisplacement = 1/2 (Lwl + Lpp)
Ldisplacement = 107.5896 meter
1 meter = 3.28084 feet
Ldisplacement = 352.984263264 feet
Vrumus = 7060.11562368 m3
Vsimpson =
Dimana:
hdisp = Ldisp/20 = 5.37948 m
Vsimpson = 7037.92201947408 m3
LCBdisplacement =
Koreksi LCB =
Note: Jika pada tahap ini koreksi sudah terpenuhi, anda dapat langsung menggambar CSA menggunakan ta
(lewati proses nomor 5)
5
Menggambar diagram CSA (Curve of Sectional Area) displacement dan Koreksi ulang Volume Displacem
Tabel 2
No station Luas Station (A) m 2
s A.s
0 0.000 1 0
1 9.875 4 39.500076
2 29.625 2 59.250114
3 47.580 4 190.318548
4 64.636 2 129.272976
5 77.205 4 308.818776
6 83.489 2 166.977594
7 87.977 4 351.909768
8 89.773 2 179.5458
9 89.773 4 359.0916
10 89.773 2 179.5458
11 89.773 4 359.0916
12 89.773 2 179.5458
13 89.773 4 359.0916
14 88.875 2 177.750342
15 85.284 4 341.13702
16 77.205 2 154.409388
17 61.943 4 247.773204
18 39.500 2 79.000152
19 15.710 4 62.84103
20 0.000 1 0
∑ A.s = 3924.871188
Vrumus = 7060.11562368 m3
Vsimpson =
Dimana:
hdisp = Ldisp/20 = 5.37948 m
Vsimpson = 7037.92201947408 m3
LCBNSP = e% x Ldisplacement
LCBNSP = 1.614 meter
LCBdisplacement =
Koreksi LCB =
6 Transformasi (Merubah) diagram CSA (Curve of Sectional Area) displacement Menjadi CSA Lwl dan Lp
δwl = 0.706
LCBWL = LCBsimpson =
a. Pembuatan A/2T
Tabel A/2T
No station Luas Station (A) m2 A/2T (/2)
-2 0 0 0.000
-1 6.485 0.498 0.249
0 13.367 1.027 0.513
1 39.28 3.017 1.508
2 77.451 5.949 2.974
3 109.786 8.432 4.216
4 137.713 10.577 5.289
5 152.437 11.708 5.854
6 160.576 12.333 6.167
7 165.316 12.697 6.349
8 167.226 12.844 6.422
9 167.226 12.844 6.422
10 167.226 12.844 6.422
11 167.226 12.844 6.422
12 167.226 12.844 6.422
13 167.226 12.844 6.422
14 166.133 12.760 6.380
15 160.838 12.353 6.177
16 143.851 11.048 5.524
17 115.121 8.842 4.421
18 71.414 5.485 2.742
19 28.513 2.190 1.095
20 0 0 0.000
φf
Cwl = 0.248+(0.778Cbwl)
Cwl = 0.787
Sehingga:
AWL= 1208.0750976 m2
Sehingga
AWL simpson = 1191.3966
Garis air
Sekat tubrukan
(collision bulkhead) Ceruk depan ± 150
FP
8 Linggi Buritan
a = ± 0,33 T
> ( 0 ~, 60 ,7 ) T
e = ± 0,12 T
T b = ± 0,35 T
e
AP
>(
a
AP
Lebar (B) 14 m
Sarat air (T) 6.51 m
9 Pembuatan Bdeck/2
A1 = ¼. π. R2
A2 = ½. { (BxT) – Am } dan A2 = R2 – A1
maka : ½. { (BxT) – Am } = R2 - ¼. π. R2
= R2 ( 1 – ¼ π )
R
R A1
Jadi R = √ ½. { (BxT) – Am } / ( 1 – ¼ π )
A2
R= 1.785
A1 = 2.502
A2 = 0.684
Lebar (B) 14 m
Tinggi geladak (H) 8.13 m
Sarat air (T) 6.51 m
Luas Midship (Am) 89.7729 m2
11 Menggambar Waterline
Bagi WL menjadi beberapa bagian, misalnya:
WL 0m
WL 0.5m
WL 1m
WL 2m
WL 3m
WL 4m
WL 5m
WL 6,51m (Draft/Sarat Air)
a0 = 0.69096 meter
690 mm
1. AP ke 0.35T
Panjang Awal, 0.35T = 2.2785 m
Jarak gading = 600 mm
Jumlah jarak gading = 3.7975
Pembulatan, menjadi = 4 Jarak gading
Sehingga, panjang sebenarnya menjadi 2400 meter
Nomor gading = 4
placement)
Terpenuhi
SAdisplacement)
N A.S.N
-10 0
-9 -355.500684
-8 -474.000912
-7 -1332.229836
-6 -775.637856
-5 -1544.09388
-4 -667.910376
-3 -1055.729304
-2 -359.0916
-1 -359.0916
0 0
1 359.0916
2 359.0916
3 1077.2748
4 711.001368
5 1705.6851
6 926.456328
7 1734.412428
8 632.001216
9 565.56927
10 0
∑ A.s.N = 1147.297662
100.000
90.000
80.000
70.000
60.000
50.000
40.000
30.000
20.000
Terpenuhi 10.000
0.000
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
20.000
10.000
0.000
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
N A.S.N
-10.8 0
-10.4 -26.1248
-10 -44.38
-9 -754.56
-8 -723.68
-7 -1681.4
-6 -854.76
-5 -1601.2
-4 -689.68
-3 -1065.12
-2 -359.52
-1 -359.52
0 0
1 359.52
2 359.52
3 1078.56
4 705.28
5 1669.8
6 882.84
7 1608.6
8 641.76
9 719.28
10 0
∑ A.s.N = -134.784800000001
100
90
80
70
60
Column C
50
A/2T
40 B/2
30
20
10
0
-5 0 5 10 15 20 25
166.1
V, untuk Cb kecil
U, untuk Cb besar
V, untuk Cb kecil
U, untuk Cb besar
peller:
7 ) T
5.6
3.5
HIP
tung besar
A2 = R2 – A1
R2 - ¼. π. R2
R2 ( 1 – ¼ π )
} / ( 1– ¼π)
% Selisih
#DIV/0!
#DIV/0!
#DIV/0!
0.00570874008106348
0.0240775296454557
0.0234000234000208
0.0174978127734014
0.0714370758423675
0.0503947589450828
0.0153139356814685
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0
0.0198333994446626
0.019569471624264
0.0100210441928038
0.00572540936676909
0.0111043251346387
#DIV/0!
WL 3m WL 4m WL 5m WL 6,51
1.57
1.97
1.22 1.62 2.03 3.11
2.83 3.22 3.58 3.99
4.19 4.36 4.52 4.75
5.3 5.41 5.54 5.61
5.87 6.01 6.09 6.15
6.19 6.29 6.38 6.55
6.37 6.46 6.58 6.9
7 7 7 7
7 7 7 7
7 7 7 7
7 7 7 7
7 7 7 7
7 7 7 7
6.34 6.42 6.52 6.84
6.13 6.23 6.34 6.38
5.46 5.59 5.68 5.82
4.32 4.5 4.74 5
2.48 2.84 3.23 4.28
0.82 1.15 1.56 3.21
0 0 0 0
mm
145
5-8
8 - 34
34 - 170
a
b
Ceruk
haluan Garis air
Sekat tubrukan
(collision bulkhead) Jarak gading
di ceruk ≤
600 mm
Jarak gading di ruang muat ≤ 1000 mm
Garis dasar
Lunas (keel) FP
(0,05 – 0,08) Lc
Lc = Lpp
15 16 17 18 19 20
15 16 17 18 19 20