Anda di halaman 1dari 1

INITIAL INSPECTION

Tanggal (date): ...............................................

PERSIAPAN OPERASI RIGGING (Prepare of Rigging Operations)


Kondisi (Condition)
Alat Bantu yang digunakan Kapasitas Keterangan
No Sebelum Sesudah
(Lifting Gear Used) (Capacity) (Note)
(Before) (After)

PESAWAT ANGKAT YANG DIGUNAKAN (Crane Used)


Kondisi (Condition)
Bagian Crane yang diperiksa Kapasitas Keterangan
No Sebelum Sesudah
(Crane Section Inspected) (Capacity) (Note)
(Before) (After)

KONDISI CUACA DAN ANGIN (Conditions of Weather and Wind) Diperiksa Oleh (Prepared by)
Rigger/Operator
Kecepatan Angin (wind velicity) : Knot Nama (Name) : ......................................................
Cuaca (Weather) : ............................

Tanda Tangan (Sign) : ________________________

Anda mungkin juga menyukai