Anda di halaman 1dari 1

X.

BAHAN BAKU BANGUNAN EKSPLOITASI MINERAL BUKAN LOGAM DAN BATUAN

D. KECAMATAN ENDE TIMUR

HARGA JUMLAH
NO JENIS MATERIAL SATUAN PAJAK 20 %
(Rp) HARGA
1 2 3 4 5 = 4 x 20 % 6=4+5
1 Pasir Urug M³ 72,600 14,520 87,120
2 Pasir Kuarsa Ton 88,000 17,600 105,600
3 Batu Kali M³ 110,000 22,000 132,000
4 Timbunan Biasa M³ 72,600 14,520 87,120
5 Batu Pecah :
* Ukuran 10 - 15 cm M³ 166,100 33,220 199,320
* Ukuran 7 - 10 cm M³ 324,500 64,900 389,400
* Ukuran 5 - 7 cm M³ 353,100 70,620 423,720
* Ukuran 3 - 5 cm M³ 136,400 27,280 163,680
* Ukuran 2 - 3 cm M³ 377,143 75,429 452,571
* Ukuran 1 - 2 cm M³ 440,000 88,000 528,000
* Ukuran 0,5 - 1 cm M³ 440,000 88,000 528,000
6 Pasir Pasang/Beton M³ 110,000 22,000 132,000
7 Kerikil :
* Kerikil Koral 5/7 cm M³ 113,300 22,660 135,960
* Kerikil Koral 3/5 cm M³ 144,100 28,820 172,920
* Kerikil Koral 2/3 cm M³ 157,143 31,429 188,571
* Kerikil Koral 1/2 cm M³ 360,800 72,160 432,960
* Kerikil Koral dari galian bukit M³ 79,200 15,840 95,040
* Kerikil Koral sungai (tidak tersaring) M³ 67,100 13,420 80,520
* Kerikil Koral sungai (tersaring) M³ 111,100 22,220 133,320
* Kerikil pecah tersaring M³ 210,100 42,020 252,120
8 Sirtu M³ 67,100 13,420 80,520
9 Timbunan Pilihan M³ 68,200 13,640 81,840
10 Gamping M³ 33,000 6,600 39,600
11 Tanah Liat/Lempung M³ 27,500 5,500 33,000

Anda mungkin juga menyukai