BLOK A 7
JUMLAH BOBOT A7
NO URAIAN PEKERJAAN SAT. VOL.
Rp (%) (%)
PEKERJAAN TAMBAHAN
PEKERJAAN TAMBAHAN
Nat dinding Bata m2 54.65 546,500 5.79% 5.21%
Coating Dinding m2 142.15 710,750 7.52% 0.00%
Pengecatan Plafond m2 54.50 545,000 5.77% 0.00%
Pengecatan Dinding m2 39.20 411,600 4.36% 0.00%
Pembersihan Lahan (incl. Buang tanah Tandon) m2 16.88 255,000 2.70% 0.00%
Pasang Pipa Air Bersih m' 12.00 150,000 1.59% 1.59%
Pasang Pipa Air Kotor m' 9.00 175,000 1.85% 1.67%
Rabat Carport m2 14.88 375,000 3.97% 0.00%
Pembuatan Bak Kontrol bh 1.00 100,000 1.06% 0.00%
Finishing Tandon bh 1.00 85,000 0.90% 0.00%
Pasang Taman Teras Depan Rumah ls 1.00 150,000 1.59% 0.00%
PEKERJAAN TAMBAHAN
Nat dinding Bata m2 142.63 1,426,300 13.23% 13.21%
Coating Dinding m2 142.63 713,150 6.61% 0.00%
Pengecatan Plafond m2 61.25 612,500 5.68% 0.00%
Pengecatan Dinding m2 39.20 411,600 3.82% 0.00%
Pembersihan Lahan (incl. Buang tanah Tandon) m2 16.88 255,000 2.36% 0.00%
Pasang Pipa Air Bersih m' 24.00 150,000 1.39% 0.42%
Pasang Pipa Air Kotor m' 9.00 175,000 1.62% 0.49%
Rabat Carport m2 14.88 375,000 3.48% 0.00%
Pembuatan Bak Kontrol bh 1.00 100,000 0.93% 0.28%
Finishing Tandon bh 1.00 85,000 0.79% 0.00%
Pasang Taman Teras Depan Rumah ls 1.00 150,000 1.39% 0.00%
PEKERJAAN TAMBAHAN
Nat dinding Bata m2 143.35 1,433,500 13.89% 12.89%
Coating Dinding m2 143.35 716,750 6.94% 4.19%
Pengecatan Plafond m2 54.50 545,000 5.28% 5.19%
Pengecatan Dinding m2 39.20 411,600 3.99% 2.41%
Pembersihan Lahan (incl. Buang tanah Tandon) m2 16.88 255,000 2.47% 2.47%
Pasang Pipa Air Bersih m' 12.00 150,000 1.45% 1.45%
Pasang Pipa Air Kotor m' 9.00 175,000 1.70% 1.70%
Rabat Carport m2 14.88 375,000 3.63% 3.63%
Pembuatan Bak Kontrol bh 1.00 100,000 0.97% 0.97%
Finishing Tandon bh 1.00 85,000 0.82% 0.74%
Pasang Taman Teras Depan Rumah ls 1.00 150,000 1.45% 1.45%
PEKERJAAN TAMBAHAN
Nat dinding Bata m2 146.32 1,463,200 14.09% 13.95%
Coating Dinding m2 146.32 731,600 7.05% 0.00%
Pengecatan Plafond m2 54.50 545,000 5.25% 3.17%
Pengecatan Dinding m2 39.20 411,600 3.96% 1.22%
Pembersihan Lahan (incl. Buang tanah Tandon) m2 16.88 255,000 2.46% 1.47%
Pasang Pipa Air Bersih m' 12.00 150,000 1.44% 1.44%
Pasang Pipa Air Kotor m' 9.00 175,000 1.69% 1.69%
Rabat Carport m2 14.88 375,000 3.61% 1.10%
Pembuatan Bak Kontrol bh 1.00 100,000 0.96% 0.75%
Finishing Tandon bh 1.00 85,000 0.82% 0.00%
Pasang Taman Teras Depan Rumah ls 1.00 150,000 1.44% 1.31%
PEKERJAAN TAMBAHAN
Nat dinding Bata m2 146.44 1,464,400 14.10% 14.00%
Coating Dinding m2 146.44 732,200 7.05% 4.26%
Pengecatan Plafond m2 54.50 545,000 5.25% 0.00%
Pengecatan Dinding m2 39.20 411,600 3.96% 0.00%
Pembersihan Lahan (incl. Buang tanah Tandon) m2 16.88 255,000 2.46% 1.72%
Pasang Pipa Air Bersih m' 12.00 150,000 1.44% 1.44%
Pasang Pipa Air Kotor m' 9.00 175,000 1.69% 1.69%
Rabat Carport m2 14.88 375,000 3.61% 0.55%
Pembuatan Bak Kontrol bh 1.00 100,000 0.96% 0.39%
Finishing Tandon bh 1.00 85,000 0.82% 0.00%
Pasang Taman Teras Depan Rumah ls 1.00 150,000 1.44% 0.00%
PEKERJAAN TAMBAHAN
Nat dinding Bata m2 139.30 1,393,000 13.57% 13.57%
Coating Dinding m2 139.30 696,500 6.79% 5.47%
Pengecatan Plafond m2 54.50 545,000 5.31% 3.49%
Pengecatan Dinding m2 39.20 411,600 4.01% 0.42%
Pembersihan Lahan (incl. Buang tanah Tandon) m2 16.88 255,000 2.48% 2.48%
Pasang Pipa Air Bersih m' 12.00 150,000 1.46% 1.46%
Pasang Pipa Air Kotor m' 9.00 175,000 1.71% 1.71%
Rabat Carport m2 14.88 375,000 3.65% 3.65%
Pembuatan Bak Kontrol bh 1.00 100,000 0.97% 0.97%
Finishing Tandon bh 1.00 85,000 0.83% 0.83%
Pasang Taman Teras Depan Rumah ls 1.00 150,000 1.46% 1.46%
PEKERJAAN TAMBAHAN
Nat dinding Bata m2 141.00 1,410,000 13.68% 13.68%
Coating Dinding m2 141.00 705,000 6.84% 6.84%
Pengecatan Plafond m2 54.50 545,000 5.29% 4.57%
Pengecatan Dinding m2 39.20 411,600 3.99% 1.87%
Pembersihan Lahan (incl. Buang tanah Tandon) m2 16.88 255,000 2.47% 2.47%
Pasang Pipa Air Bersih m' 12.00 150,000 1.46% 1.46%
Pasang Pipa Air Kotor m' 9.00 175,000 1.70% 1.70%
Rabat Carport m2 14.88 375,000 3.64% 3.64%
Pembuatan Bak Kontrol bh 1.00 100,000 0.97% 0.97%
Finishing Tandon bh 1.00 85,000 0.82% 0.82%
Pasang Taman Teras Depan Rumah ls 1.00 150,000 1.46% 1.46%
PEKERJAAN TAMBAHAN
Nat dinding Bata m2 51.75 517,500 5.55% 5.55%
Coating Dinding m2 133.00 665,000 7.13% 7.13%
Pengecatan Plafond m2 54.50 545,000 5.85% 5.85%
Pengecatan Dinding m2 39.20 411,600 4.41% 4.41%
Pembersihan Lahan (incl. Buang tanah Tandon) m2 16.88 255,000 2.74% 2.74%
Pasang Pipa Air Bersih m' 12.00 150,000 1.61% 1.61%
Pasang Pipa Air Kotor m' 9.00 175,000 1.88% 1.88%
Rabat Carport m2 14.88 375,000 4.02% 4.02%
Pembuatan Bak Kontrol bh 1.00 100,000 1.07% 1.07%
Finishing Tandon bh 1.00 85,000 0.91% 0.91%
Pasang Taman Teras Depan Rumah ls 1.00 150,000 1.61% 1.61%
Sloof Beton m3
Urugan Tanah dalam rumah + 40 cm (incl. Teras) m2 2.75 96,390 1.80% 1.80%
Rabat Beton Lantai 1:3:5 ( 5 cm ) m2 2.25 331,370 6.19% 0.00%
Pasang Pipa Pembuangan m2 2.70 33,750 0.63% 0.00%
Sloof Beton m3
Urugan Tanah dalam rumah + 40 cm (incl. Teras) m2 2.30 80,325 1.23% 1.23%
Rabat Beton Lantai 1:3:5 ( 5 cm ) m2 2.25 331,370 5.05% 0.00%
Pasang Pipa Pembuangan m2 24.30 303,750 4.63% 0.00%
AC 4
JUMLAH BOBOT AC4
NO URAIAN PEKERJAAN SAT. VOL.
Rp (%) (%)
PEKERJAAN PERSIAPAN
Pengukuran & Bouwplank m3 78.88 315,500 1.58% 1.58%
Urugan Tanah dalam rumah + 40 cm (incl. Teras) m3 15.30 535,500 2.69% 1.08%
Rabat Beton Lantai 1:3:5 ( 5 cm ) m3 2.55 331,370 1.66% 0.00%
Pasang Pipa Pembuangan m3 27.00 337,500 1.69% 0.00%
AC 5
JUMLAH BOBOT AC5
NO URAIAN PEKERJAAN VOL.
Rp (%) (%)
PEKERJAAN PERSIAPAN
Pengukuran & Bouwplank 78.88 315,500 1.59% 1.59%
Urugan Tanah dalam rumah + 40 cm (incl. Teras) 15.30 535,500 2.71% 1.08%
Rabat Beton Lantai 1:3:5 ( 5 cm ) 2.55 331,370 1.67% 0.00%
Pasang Pipa Pembuangan 27.00 337,500 1.71% 0.00%
AC 6
JUMLAH BOBOT AC6
NO URAIAN PEKERJAAN VOL.
Rp (%) (%)
PEKERJAAN PERSIAPAN
Pengukuran & Bouwplank 78.88 315,500 1.60% 1.60%
Urugan Tanah dalam rumah + 40 cm (incl. Teras) 15.30 535,500 2.72% 1.09%
Rabat Beton Lantai 1:3:5 ( 5 cm ) 2.55 331,370 1.68% 0.00%
Pasang Pipa Pembuangan 27.00 337,500 1.71% 0.00%
AC 7
JUMLAH BOBOT AC7
NO URAIAN PEKERJAAN VOL.
Rp (%) (%)
PEKERJAAN PERSIAPAN
Pengukuran & Bouwplank 78.88 315,500 1.60% 1.60%
Urugan Tanah dalam rumah + 40 cm (incl. Teras) 15.30 535,500 2.72% 1.09%
Rabat Beton Lantai 1:3:5 ( 5 cm ) 2.55 331,370 1.68% 0.00%
Pasang Pipa Pembuangan 27.00 337,500 1.71% 0.00%
AC 8
JUMLAH BOBOT AC8
NO URAIAN PEKERJAAN SAT. VOL.
Rp (%) (%)
PEKERJAAN PERSIAPAN
Pengukuran & Bouwplank m3 78.88 315,500 1.60% 1.60%
Urugan Tanah dalam rumah + 40 cm (incl. Teras) m3 15.30 535,500 2.72% 1.09%
Rabat Beton Lantai 1:3:5 ( 5 cm ) m3 2.55 331,370 1.68% 0.00%
Pasang Pipa Pembuangan m3 27.00 337,500 1.71% 0.00%
AC 9
JUMLAH BOBOT AC9
NO URAIAN PEKERJAAN VOL.
Rp (%) (%)
PEKERJAAN PERSIAPAN
Pengukuran & Bouwplank 78.88 315,500 1.60% 1.60%
Urugan Tanah dalam rumah + 40 cm (incl. Teras) 15.30 535,500 2.72% 1.09%
Rabat Beton Lantai 1:3:5 ( 5 cm ) 2.55 331,370 1.68% 0.00%
Pasang Pipa Pembuangan 27.00 337,500 1.71% 0.00%
Pembersihan Lahan (incl. Buang tanah Tandon) m2 1.00 255,000 1.10% 0.00%
Pasang Pipa Air Bersih ls 1.00 150,000 0.65% 0.26%
Pasang Pipa Air Kotor ls 1.00 175,000 0.76% 0.46%
Rabat Carport m2 13.50 337,500 1.46% 0.00%
Pembuatan Bak Kontrol bh 2.00 200,000 0.86% 0.00%
Finishing Tandon bh 1.00 85,000 0.37% 0.00%
Pasang Biofil bh 1.00 200,000 0.86% 0.00%
Pasang Taman Teras Depan Rumah ls 1.00 150,000 0.65% 0.00%
Pembersihan Lahan (incl. Buang tanah Tandon) m2 1.00 255,000 1.10% 0.00%
Pasang Pipa Air Bersih ls 1.00 150,000 0.65% 0.00%
Pasang Pipa Air Kotor ls 1.00 175,000 0.76% 0.00%
Rabat Carport m2 13.50 337,500 1.46% 0.00%
Pembuatan Bak Kontrol bh 2.00 200,000 0.86% 0.00%
Finishing Tandon bh 1.00 85,000 0.37% 0.00%
Pasang Biofil bh 1.00 200,000 0.86% 0.00%
Pasang Taman Teras Depan Rumah ls 1.00 150,000 0.65% 0.00%
Pembersihan Lahan (incl. Buang tanah Tandon) m2 1.00 255,000 0.94% 0.00%
Pasang Pipa Air Bersih ls 1.00 150,000 0.56% 0.00%
Pasang Pipa Air Kotor ls 1.00 175,000 0.65% 0.00%
Rabat Carport m2 22.50 562,500 2.08% 0.00%
Pembuatan Bak Kontrol bh 2.00 200,000 0.74% 0.00%
Finishing Tandon bh 1.00 85,000 0.31% 0.00%
Pasang Biofil bh 1.00 200,000 0.74% 0.00%
Pasang Taman Teras Depan Rumah ls 1.00 150,000 0.56% 0.00%