Boq &R RAB
Boq &R RAB
I Pekerjaan Po
1
4
5
II Pekerjaan La
Lantai 1
a
b
Lantai 2
a
Lantai Atap
a
b
III Pekerjaan Ko
Lantai1
Kolom Utama
a
c
Kolom Praktis
a
Lantai 2
Kolom Utama
a
Kolom Praktis
a
Lantai 3
Kolom Utama
a
b
Kolom Praktis
a
IV Pekerjaan Di
Lantai1
Lantai2
Lantai3
V Pekerjaan Ba
Lantai1
Balok Utama
Balok Anak
Ring Balok
b
c
Lantai2
Balok Utama
Ring Balok
Lantai3
Ring Balok
a
V Pekerjaan Ta
Lantai 1 ke 2
a
Lantai 2 ke 3
a
b
VI Pekerjaan Pla
Lantai 1
Lantai 2
Pekerjaan Pondasi
Pembersihan
Luas Area = 23.4 x 9
= 210.6 m2
Galian Tanah
Luas Area = 23.4 x 9
= 210.6 m2
Kedalaman = 210.6 x 0.3
= 63.18 m3
Bowplank
x = 23.4 x 4+ 3.4 x 3
= 103.8 m
y = 9x 5+ 2.2 x 6
= 594 m
Total = 697.8 m
Pondasi Cakar Ayam
x = 6
y = 4
Total = 24 bh
b. Galian
1 bh = 1.5 x 1.5 x 1.5
3.375 m3
Total Volume 81 m3
c. Pasir Urug
1 bh = 0.1 x 1.5 x 1.5
Total Volume 5.4 m3
d. Lantai Kerja 1 bh = 0.05 x 1.5 x 1.5
= 0.1125
Total Volume 2.7 m3
e Bekisting
1bh = 1.1 x 0.3 x 4
= 1.32 m2
Total Volume 31.68 m2
f Beton
1 bh = 1.2 x 1.2 x 0.25 + 0.3
= 0.459 m3
Total Volume 11.016 m3
g Pembesian
1 bh =
Sloof
x = 23.4 x 4+ 3.4 x 3
= 103.8 m
y = 9x 5+ 2.2 x 6
= 594 m
Total = 697.8 m
a Pekerjaan Beton
Luas Penampang
A = 0.35 x 0.2
= 0.07 m2
V = 48.846 m3
b Pekerjaan Pembesian
Pekerjaan Lantai
Lantai 1
Timbunan Tanah Kembali Lantai
Luas Area = 23.4 x 9
= 210.6 m2
Kedalaman = 210.6 x 0.3 - 0.1 - 0.05 - 0.01
V = 29.484 m3
Pasir Urug
Luas Area = 210.6 m2
V = 21.06 m3
Lantai Cor
Luas Area = 23.4 x 9
= 210.6 m2
Tebal = 0.05
Volume = 10.53 m3
Lantai Keramik
Kamar = 23.4 x 9- 63.6 - 22.44
= 124.56 m2
Koridor = 2x 21 + 2.4 x 9
63.6 m2
Wc = 1.7 x 2.2 x 6
= 22.44 m2
Lantai 2
Bekisting
Luas = 198.36 m2
Beton
Luas = 21 x 9+ 6x 2.4
= 198.36 m2
Tebal = 0.12 m
V total = 23.8032 m3
Pembesian
Bekisting
Luas penampang = 3.5 x 4x 0.3 Jumlah
= 4.2 m2
Vtot = 100.8 m2
Kolom Praktis
Beton
Luas penampang = 0.12 x 0.12
= 0.0144 m2
h = 3.5 m
V tot = 1.6128 m3
Pembesian
Bekisting
Luas penampang = 3.5 x 4x 0.12 Jumlah
= 1.68 m2
Vtot = 53.76 m2
Lantai 2
Kolom Utama
Beton
Luas penampang A = 0.3 x 0.3
= 0.09 m2
Jml = 24 bh
h = 3.5 m
V tot = 7.56 m3
Pembesian
Bekisting
Luas penampang = 3.5 x 4x 0.3 Jumlah
= 4.2 m2
Vtot = 58.8 m2
Kolom Praktis
Beton
Luas penampang = 0.12 x 0.12
= 0.0144 m2
h = 3.5 m
V tot = 0.504 m3
Pembesian
Bekisting
Luas penampang = 3.5 x 4x 0.12 Jumlah
= 1.68 m2
Vtot = 16.8 m2
Lantai 3
Kolom Utama
Beton
Luas penampang = 0.2 x 0.2
= 0.04 m2
jml = 6 bh
h = 3m
V tot = 0.72 m3
Pembesian
Bekisting
Luas penampang = 3.5 x 4x 0.2 Jumlah
= 2.8 m2
Vtot = 19.6 m2
Kolom Praktis
Beton
KP 1 kp1
Luas penampang = 0.12 x 0.12 Jumlah
= 0.0144 m2
h = 3m
V tot = 0.2592 m3
KP2 kp2
Luas penampang = 0.12 x 0.12 Jumlah
= 0.0144 m2
h = 1.2 m
V tot = 0.20736 m3
Pembesian
Bekisting
KP 1
Luas penampang = 3x 4x 0.12
= 1.44 m2
Vtot = 8.64 m2
KP2
Luas penampang = 1.2 x 2x 0.12
= 0.288 m2
Vtot = 3.456 m2
Pekerjaan Dinding
Lantai1
Void
Pintu Kamar A = 2.3 x 0.9
= 2.07 m2
Pintu Wc A = 2.3 x 0.8
= 1.84 m2
Jendela 1 A = 2.2 x 2.15
= 4.73 m2
Panjang
x = 4x 2x 5+ 2.2
= 57.6 m
y = 20 x 4+ 3x 4
= 92 m
Luas Penampang Kotor
A = 523.6 m2
Luas Penampang Bersih
A = 523.6 - 2.07 x 8- 1.84
= 454.48 m2
Lantai2
Void
Pintu A = 2.3 x 0.9
= 2.07 m2
Pintu Wc A = 2.3 x 0.8
= 1.84 m2
Jendela 1 A = 2.2 x 2.15
= 4.73 m2
Panjang
x = 9.4 x 2+ 1.5 x 5
= 26.3 m
y = 18.9 x 2+ 2x 2
= 44.8 m
Luas Penampang Kotor
A = 248.85 m2
Luas Penampang Bersih
A = 248.85 - 2.07 x 6- 1.84
= 209.1 m2
Lantai3
Void
Pintu Wc A = 2.3 x 0.8
= 1.84 m2
Panjang
x = 9.5 + 1x 2
= 11.5 m
y = 3.2 x 3
= 9.6 m
Luas Penampang Kotor
A = 63.3 m2
Panjang parapet L = 18.9 x 2- 3.2 + 2.85
= 42.765 m
h = 1.2 m
A = 51.318 m2
Luas Penampang Bersih
A = 63.3 - 1.84 x 2
= 110.938 m2
Pekerjaan Balok
Lantai1
Balok Utama
x = 9x 9
= 81 m
y = 23.4 x 4+ 3x 4
= 105.6 m
Panjang Total = 186.6 m
Beton
Luas penampang = 0.3 x 0.2
= 0.06 m2
V tot = 11.196 m3
Pembesian
Bekisting
Luas penampang = 0.3 x 2x 186.6 + 0.2
= 149.28 m2
Balok Anak
x = 9x 8
= 72 m
y = 23.4 x 2+ 2.4
= 49.2 m
Panjang Total = 121.2 m
Beton
Luas penampang = 0.2 x 0.2
= 0.04 m2
V tot = 4.848 m3
Pembesian
Bekisting
Luas penampang = 0.2 x 2x 121.2 + 0.2
= 72.72 m2
Ring Balok
x = 1.4 x 2+ 1.8 x 2
= 6.4 m
y = 3.5 x 8+ 1.5 x 8
= 48 m
Panjang Total = 54.4 m
Beton
Luas penampang = 0.12 x 0.12
= 0.0144 m2
V tot = 0.78336 m3
Pembesian
Bekisting
Luas penampang = 0.12 x 2
= 13.056 m2
Lantai2
Balok Utama
x = 9x 9
= 81 m
y = 23.4 x 4+ 3x 4
= 105.6 m
Panjang Total = 186.6 m
Beton
Luas penampang = 0.2 x 0.2
= 0.04 m2
V tot = 7.464 m3
Pembesian
Bekisting
Luas penampang = 0.2 x 2x 186.6 + 0.2
= 111.96 m2
Ring Balok
x = 1.5 x 2
= 3m
y = 1.5 x 2
= 3m
Panjang Total = 6m
Beton
Luas penampang = 0.12 x 0.12
= 0.0144 m2
V tot = 0.0864 m3
Pembesian
Bekisting
Luas penampang = 0.12 x 2
= 1.44 m2
Lantai3
Ring Balok
x = 9.5 x 1+ 9.5
= 19 m
y = 1.6 x 2+ 3.2 + 18.9
= 44.2 m
Panjang Total = 63.2 m
Beton
Luas penampang = 0.15 x 0.15
= 0.0225 m2
V tot = 1.422 m3
Pembesian
Bekisting
Luas penampang = 0.15 x 2
= 18.96 m2
Pekerjaan Tangga
Lantai 1 ke 2
Beton
Jml Anak Tangga = 18 bh Tinggi tiap anak tangga
Tebal plat beton = 0.12 m
Lebar = 1.1 m
Bordes = 1.1 x 1.1
= 1.21 m2
Balok p = 2.4 m Kemiringan
A = 0.12 x 0.15
= 0.018 m2
Volume Vtot = 1.769108 m3
Pembesian
Bekisting
Bordes = 1.1 x 1.1 x 2
= 2.42 m2
Balok p = 2.4 m Kemiringan
A = 0.15 x 2.4 x 2
= 0.72 m2
Luas Penampang total
Atot = 10.21857 m2
Keramik
Bordes = 1.1 x 1.1 x 2
= 2.42 m2
Jml Anak Tangga = 16 bh
Lebar = 1.1 m
Tinggi tiap anak tangga = 0.2 m
Lebar penampang tiap tangga= 0.3 m
A = 8.8 m2
Luas Penampang total
Atot = 11.22
Lantai 2 ke 3
Beton
Jml Anak Tangga = 18 bh Tinggi tiap anak tangga
Tebal plat beton = 0.12 m
Lebar = 1.1 m
Bordes = 1.1 x 1.1 x 3
= 3.63 m2
Balok p = 2.4 m Kemiringan
A = 0.12 x 0.15
= 0.018 m2
Volume Vtot = 2.433068 m3
Pembesian
Bekisting
Bordes = 1.1 x 1.1 x 3
= 3.63 m2
Balok p = 2.4 m Kemiringan
A = 0.15 x 2.4 x 2
= 0.72 m2
Luas Penampang total
Atot = 11.42857 m2
Keramik
Bordes = 1.1 x 1.1 x 2
= 2.42 m2
Jml Anak Tangga = 15 bh
Lebar = 1.1 m
Tinggi tiap anak tangga = 0.2 m
Lebar penampang tiap tangga= 0.3 m
A = 8.25 m2
Luas Penampang total
Atot = 10.67 m2
Pekerjaan Plafon
Lantai 1
Luas A = 21 x 9- 42
= 147 m2
Lantai 2
Luas A = 21 x 9- 42
= 147 m2
x 0.3 x 1.1
- 0.099
= 4x 8
= 32
= 5x 2+ 2x 2
= 14 bh
= 2x 5
= 10
= 5x 1+ 2
= 7 bh
= 2x 3
= 6 bh
= 2x 3
= 6 bh
= 18.9 : 3+ 15.7 : 3
= 12 bh
x 8
x 8- 4.73 x 8
+ 1.5 x 2
x 2- 4.73 x 5
+ 2.315 + 3
x 186.6
x 121.2
+ 1x 8
x 186.6
x 2
Tinggi tiap anak tangga = 3.5 : 18
= 0.2 m
x = 1.75
y = 2.7
Kemiringan = 3.21753
x = 1.75
y = 2.7
Kemiringan = 3.21753
x = 1.75
y = 2.7
Kemiringan = 3.21753
x = 1.75
y = 2.7
Kemiringan = 3.21753
I Pembesian Pondasi Cakar Ayam
Per 1 Unit
Tapak Besi Ǿ 13
x
y
h
Overlaps
Panjang Total
Kolom Besi Ǿ 13
h
Jml batang
Overlaps
Panjang Total
1200
1 Unit
Sengkang Besi Ǿ 8-200
x
y
h
Jml batang
Overlaps
Panjang Total
Total
Jml Pondasi
Besi Ǿ 13
Besi Ǿ 8
II Pembesian Sloof
x
Total
Sengkang Besi Ǿ 8-200
h
b
Overlaps
Panjang Total 1 penampang
Jml
II Pembesian kolom
Lantai 1
Kolom Utama
Jml Kolom
Tulangan Utama
1 kolom Besi Ǿ 13
jml
H
Overlaps
Total
Kebutuhan Total Keseluruhan
Kolom Praktis
Jml Kolom
Tulangan Utama
1 kolom Besi Ǿ 10
jml
H
Overlaps
Total
Kebutuhan Total Keseluruhan
Lantai 2
Kolom Utama
Jml Kolom
Tulangan Utama
1 kolom Besi Ǿ 13
jml
H
Overlaps
Total
Kebutuhan Total Keseluruhan
Kolom Praktis
Jml Kolom
Tulangan Utama
1 kolom Besi Ǿ 10
jml
H
Overlaps
Total
Kebutuhan Total Keseluruhan
Kolom Praktis
KP1
Jml Kolom
Tulangan Utama
1 kolom Besi Ǿ 10
jml
H
Overlaps
Total
Kebutuhan Total Keseluruhan
Total
Besi Ǿ 13
Besi Ǿ 10
Besi Ǿ 8
Panjang Total
Tulangan Utama
Besi Ǿ 13
jml
L
Overlaps
Kebutuhan Total Keseluruhan
Total
Sengkang Besi Ǿ 8-200
h
b
Overlaps
Panjang
Jml
Kebutuhan Total Keseluruhan
Total
Balok Anak
x
Panjang Total
Tulangan Utama
Besi Ǿ 13
jml
L
Overlaps
Kebutuhan Total Keseluruhan
Total
Sengkang Besi Ǿ 8-200
h
b
Overlaps
Panjang
Jml
Kebutuhan Total Keseluruhan
Total
Lantai 2
Balok Utama
x
Panjang Total
Tulangan Utama
Besi Ǿ 13
jml
L
Overlaps
Kebutuhan Total Keseluruhan
Total
Sengkang Besi Ǿ 8-200
h
b
Overlaps
Panjang
Jml
Kebutuhan Total Keseluruhan
Total
Lantai 2
Balok
x
Panjang Total
Tulangan Utama
Besi Ǿ 10
jml
L
Overlaps
Kebutuhan Total Keseluruhan
Total
Sengkang Besi Ǿ 8-200
h
b
Overlaps
Panjang
Jml
Kebutuhan Total Keseluruhan
Total
Total
Besi Ǿ 13
Besi Ǿ 10
Besi Ǿ 8
IV Pembesian tangga
Lantai 1 ke 2
Tebal plat beton
Lebar
Bordes
Kemiringan
Besi Ǿ 10-200
x
jml
L
Panjang Total 2 lapis
Besi Ǿ 10-100
y
jml
L
Panjang Total 2 lapis
Lantai 1 ke 2
Tebal plat beton
Lebar
Bordes
Kemiringan
Besi Ǿ 10-200
x
jml
L
Panjang Total 2 lapis
Besi Ǿ 10-100
y
jml
L
Panjang Total 2 lapis
Total
Besi Ǿ 10
IV Pembesian lantai
Lantai 2
Besi Ǿ 10-200
x
jml
Ltotal
y
jml
Ltotal
X+Y
Void
Glass block
x
jml
Ltotal
y
jml
Ltotal
jml panel
Total Void 1
Tangga
x
jml
Ltotal
y
jml
Ltotal
Total Void 2
Kebutuhan Total Keseluruhan 2 lapis
Lantai 3
Besi Ǿ 10-200
x
jml
Ltotal
y
jml
Ltotal
X+Y
Dek Atap Toilet
x
jml
Ltotal
y
jml
Ltotal
Void
Glass block
x
jml
Ltotal
y
jml
Ltotal
jml panel
Total Void 1
Kebutuhan Total Keseluruhan 2 lapis
Total
Besi Ǿ 10
= 1.14 m Jumlah = 6 batang
= 1.14 m Jumlah = 6 batang
= 0.19 m Total = 12 batang
= 7m
= 22.96 m
= 1.1 m
= 8 bh
= 10 m
= 18.8 m
= 41.76 m
= 0.24 m
= 0.24 m
= 1.1 m
= 6 bh
= 0.064 m
= 6.144 m
= 24 bh
= 1553.28 m'
= 147.456 m'
= 22.4 x 4+ 3x 4
= 101.6 m
= 9.4 x 6+ 2.2 x 8
= 992.64 m
= 1094.24 m
= 0.29 m
= 0.14 m
= 0.064 m
g Total 1 penampang
= 0.924 m'
= 1094.24 : 0.2
= 5472 bh
uhan Total Keseluruhan
= 5056.128 m
= 6 bh
= 1094.24 m
= 47.41707 m
uhan Total Keseluruhan
= 6849.942 m'
= 24 bh
= 8 bh
= 3.5 m
= 0.52 m
= 32.16 m
Keseluruhan
= 771.84 m
= 0.24 m
= 0.24 m
= 0.064 m
= 1.024 m
= 3.5 m
= 18 bh
= 18.432 m
Keseluruhan
= 442.368 m
= 14 bh
= 4 bh
= 3.5 m
= 0.04 m
= 14.16 m
Keseluruhan
= 198.24 m
= 0.08 m
= 0.08 m
= 0.064 m
= 0.384 m
= 3.5 m
= 24 bh
= 9.216 m
Keseluruhan
= 129.024 m
= 24 bh
= 8 bh
= 3.5 m
= 0.52 m
= 32.16 m
Keseluruhan
= 771.84 m
= 0.24 m
= 0.24 m
= 0.064 m
= 1.024 m
= 3.5 m
= 18 bh
= 18.432 m
Keseluruhan
= 442.368 m
= 7 bh
= 4 bh
= 3.5 m
= 0.04 m
= 14.16 m
Keseluruhan
= 99.12 m
= 0.08 m
= 0.08 m
= 0.064 m
= 0.384 m
= 3.5 m
= 24 bh
= 9.216 m
Keseluruhan
= 64.512 m
= 6 bh
= 4 bh
= 3m
= 0.52 m
= 14.08 m
Keseluruhan
= 84.48 m
= 0.14 m
= 0.14 m
= 0.064 m
= 0.624 m
= 3m
= 15 bh
= 9.36 m
Keseluruhan
= 56.16 m
= 6 bh
= 4 bh
= 3m
= 0.04 m
= 12.16 m
Keseluruhan
= 72.96 m
= 0.08 m
= 0.08 m
= 0.064 m
= 0.384 m
= 3m
= 20 bh
= 7.68 m
Keseluruhan
= 46.08 m
= 12 bh
= 4 bh
= 1.2 m
= 0.04 m
= 4.96 m
Keseluruhan
= 59.52 m
= 0.08 m
= 0.08 m
= 0.064 m
= 0.384 m
= 1.2 m
= 8 bh
= 3.072 m
Keseluruhan
= 36.864 m
= 1628.16 m
= 429.84 m
= 1217.376 m
= 9.4 x 9
= 84.6 m
= 22.4 x 4+ 3x 4
= 101.6 m
= 186.2 m
= 6 bh
= 186.2 m
= 8.068667 m
Keseluruhan
= 1165.612 m
= 0.14 m
= 0.24 m
= 0.032 m
= 0.792 m
= 931 bh
Keseluruhan
= 767.144 m
= 9.4 x 8
= 75.2 m
= 22.4 x 2+ 2.4
= 47.2 m
= 122.4 m
= 6 bh
= 122.4 m
= 5.304 m
Keseluruhan
= 766.224 m
= 0.14 m
= 0.14 m
= 0.032 m
= 0.592 m
= 612 bh
Keseluruhan
= 381.888 m
= 9.4 x 9
= 84.6 m
= 22.4 x 4+ 3x 4
= 101.6 m
= 186.2 m
= 6 bh
= 186.2 m
= 8.068667 m
Keseluruhan
= 1165.612 m
= 0.14 m
= 0.14 m
= 0.032 m
= 0.592 m
= 931 bh
Keseluruhan
= 580.944 m
= 9.5 x 1+ 9.5
= 19 m
= 1.6 x 2+ 3.2 + 18.9 x 2
= 44.2 m
= 63.2 m
= 6 bh
= 63.2 m
= 2.738667 m
Keseluruhan
= 395.632 m
= 0.09 m
= 0.09 m
= 0.032 m
= 0.392 m
= 316 bh
Keseluruhan
= 133.984 m
= 3097.448 m
= 395.632 m
= 1863.96 m
= 0.12 m
= 1.1 m
= 1.1 x 2.2
= 3.2 m
= 4.3 m
= 21.5 bh
= 94.6 m
= 189.2 m
= 2.2 m
= 22 bh
= 189.2 m
= 378.4 m
= 0.12 m
= 1.1 m
= 1.1 x 2.2
= 3.2 m
= 5.4 m
= 27 bh
= 118.8 m
= 237.6 m
= 2.2 m
= 22 bh
= 237.6 m
= 475.2 m
= 1280.4 m
= 22.4 m
= 112 bh
= 1052.8 m
= 9.4 m
= 47 bh
= 1052.8 m
= 2105.6 m
= 0.6 m
= 3 bh
= 3.6 m'
= 1.2 m
= 6 bh
= 3.6 m'
= 7 panel
= 50.4 m
= 4m
= 20 bh
= 22 m'
= 1.1 m
= 5.5 bh
= 22 m'
= 44 m
Keseluruhan 2 lapis
= 4022.4 m'
= 18.9 m
= 94.5 bh
= 888.3 m
= 9.4 m
= 47 bh
= 888.3 m
= 1776.6 m
= 3.2 m
= 16 bh
= 32 m
= 2m
= 10 bh
= 32 m
= 0.6 m
= 3 bh
= 3.6 m'
= 1.2 m
= 6 bh
= 3.6 m'
= 7 panel
= 50.4 m
Keseluruhan 2 lapis
= 3516.4 m'
= 7538.8 m
Rekap Pembesian 1
Jenis L(m) Konversi Kg 2
Besi Ǿ 13 = 13128.8304 m 1.04 13653.98 3
Besi Ǿ 10 = 9644.672 m 0.62 5979.697 4
Besi Ǿ 8 = 8284.92 m 0.39 3231.119 5
Total 22864.8 kg 6
7
Beton k-100 = 27.963 m3 8
Beton k-175 = 4.87512 m3 9
Beton k-225 = 48.719775897 m3
beton k-250 = 99.21 m3
Pondasi Tapak, beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56 m3
Sloof, beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56 m3
Kolom Utama, beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56 m3
Kolom Praktis, beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66 m3
Balok Utama, beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56 m3
Balok Anak, beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56 m3
Ring Balk, beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66 m3
Tangga, beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58 m3
Plat Lantai 12 cm, beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58 m3
0
0
ANALISA HARGA SATUAN PEKERJAAN MAKASAR
Kota : Makasar
No. URAIAN
I PEKERJAAN PERSIAPAN
1 1 M¹ PAGAR SENG GELOMBANG TINGGI : 2 M
a Tiang kayu borneo 4/6
b Semen PC (abu-abu)
c Seng gelombang
d Pasir beton
e Split (batu pecah)
f Balok kayu borneo 4/6
g Paku 5 - 10 cm
h Meni Besi
i Tukang kayu
j Pembantu tukang
II PEKERJAAN TANAH
1 1 M3 GALIAN TANAH SEDALAM 1 M
a Pembantu tukang
b Tukang gali
Jumlah
Dibulatkan
6 1 M3 PEMBUANGAN TANAH SEJAUH 150 M
a Pembantu tukang
b Tukang gali
Jumlah
Dibulatkan
7 1 M3 URUGAN TANAH KEMBALI
a Pembantu tukang
b Tukang gali
Jumlah
Dibulatkan
8 1 M3 PEMADATAN TANAH
a Pembantu tukang
b Tukang gali
Jumlah
Dibulatkan
10 1 M3 URUGAN TANAH
a Tanah urug
b Pembantu tukang
c Tukang gali
Jumlah
Dibulatkan
V PEKERJAAN DINDING
2 1 M2 PASANGAN Bata merah TEBAL 1 BATA, CAMPURAN 1 Pc : 4 Ps
a Bata merah
b Semen PC (abu-abu)
c Pasir pasang
d Pembantu tukang
e Tukang batu
Jumlah
Dibulatkan
3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 5 Ps
a Bata merah
b Semen PC (abu-abu)
c Pasir pasang
d Pembantu tukang
e Tukang batu
Jumlah
Dibulatkan
8 1 M2 PASANG DINDING GLASSBLOCK
a Glassblock ukuran 18 x 18 cm
b Semen putih
c Pembantu tukang
d Tukang batu
Jumlah
Dibulatkan
9 1 M2 PASANGAN BATACO PUTIH, CAMPURAN 1 Pc : 5 Ps
a Bataco putih
b Semen PC (abu-abu)
c Pasir pasang
d Pembantu tukang
e Tukang batu
Jumlah
Dibulatkan
11 1 M2 PASANGAN BATA RINGAN ( HEBEL/CELCON ).
a Bata Ringan ( hebel/celcon )
b Semen Instan
c Pembantu tukang
d Tukang batu
Jumlah
Dibulatkan
VI PEKERJAAN PLESTERAN/ACCI
3 1 M2 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 1,5 cm
a Semen PC (abu-abu)
b Pasir pasang
c Pembantu tukang
d Tukang batu
Jumlah
Dibulatkan
4 1 M2 PLESTERAN CAMPURAN 1 Pc : 5 Ps TEBAL 1,5 cm
a Semen PC (abu-abu)
b Pasir pasang
c Pembantu tukang
d Tukang batu
Jumlah
8 1 M2 PASANG LANTAI KERAMIK POLOS 30 x 30 cm
a Keramik polos 30 x 30 cm
b Semen PC (abu-abu)
c Pasir pasang
d Semen warna
e Pembantu tukang
f Tukang batu
Jumlah
Dibulatkan
IX PEKERJAAN KUSEN, PINTU, JENDELA, PARTISI
1 1 M3 PASANG KUSEN PINTU & JENDELA KAYU KAMPER SAMARINDA
a Balok kayu kamper samarinda
b Pembantu tukang
c Tukang kayu
Jumlah
Dibulatkan
4 1 M2 PASANG PINTU PANEL KAYU KAMPER SAMARINDA
a Papan kayu kamper samarinda
b Pembantu tukang
c Tukang kayu
Jumlah
Dibulatkan
17 1 BH PASANG PINTU ALUMINIUM / PINTU PVC
a Pintu Aluminium / Pintu PVC
b Alat bantu 10 % harga material
c Tukang kayu
Jumlah
Dibulatkan
18 1 M2 PASANG KUSEN PARTISI DOUBLE TRIPLEK
a Balok kayu borneo super
b Triplek 0,4 cm ukuran pintu
c Paku 1 s/d 3 cm
d Ampelas
e Engsel
f Grendel / slot
g Pembantu tukang
h Tukang kayu terampil
Jumlah
Dibulatkan
19 1 M2 PASANG KUSEN PARTISI DOUBLE GYPSUM + RANGKA KAYU
a Balok kayu borneo super
b Gypsum board ( 120 x 240 x 9 ) mm
c Paku 1 s/d 3 cm
d Ampelas
e Engsel
f Grendel / Slot
g Pembantu tukang
h Tukang kayu
Jumlah
Dibulatkan
20 1 M2 PASANG DINDING PARTISI GYPSUM BOARD + RANGKA BESI HOLLOW
a Hollow 4/4 Zincromate
b Hollow 2/4 Zincromate
c Gypsum board ( 120 x 240 x 9 ) mm
d Paku sekrup
e Ramset / dina bolt
f Cotton plaster
g Compoun
h Pembantu tukang
i Tukang kayu
Jumlah
Dibulatkan
X PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
A PEKERJAAN RANGKA ATAP
16 1 M2 PASANG ATAP POLYCARBONATE
a Polycarbonate
b Besi Hollow
c Alat bantu 20 % harga material
d Pembantu tukang
e Tukang kayu
Jumlah
Dibulatkan
17 1 M2 PASANG ALUMINIUM FOIL
a Aluminium foil
b Alat bantu 20 % harga material
c Pembantu tukang
d Tukang kayu
Jumlah
Dibulatkan
XI PEKERJAAN PENUTUP PLAFON
1 1 M2 PASANG RANGKA PLAFON ( UKRN 0,50 X 1,00 ) M, KAYU BORNEO SUPER
a Balok kayu borneo super 4 x 6 cm
b Paku 5 - 12 cm
c Pembantu tukang
d Tukang kayu
Jumlah
Dibulatkan
2 1 M2 PLAFON GRC ( 60 X 1,20 ) M, TEBAL 4 MM
a Pelat GRC tebal 4 mm
b Paku 1 cm
c Pembantu tukang
d Tukang kayu
Jumlah
Dibulatkan
6 1 M¹ LIST PLAFON PROFIL KAYU
a Listp profil kayu
b Paku 2 cm
c Pembantu tukang
d Tukang kayu
Jumlah
Dibulatkan
7 1 M¹ LIST PLAFON KAYU 1/4
a List kayu 1/4
b Paku 2 cm
c Pembantu tukang
d Tukang kayu
Jumlah
Dibulatkan
8 1 M2 PLAFON TRIPLEK 4 MM + RANGKA KAYU BORNEO SUPER
a Balok kayu borneo super
b Paku 1- 12 cm
c Triplek 120 cm x 240 cm x 0,4 cm
d Pembantu tukang
e Tukang kayu
Jumlah
Dibulatkan
No Uraian
A TENAGA
Pekerja
Tukang Batu
B BAHAN
Semen portland
Pasir Beton
Kerikil (Maks 30 mm)
Air
C PERALATAN
D Jumlah (A+B+C)
A.4.1.1.5. Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
No Uraian
A TENAGA
Pekerja
Tukang Batu
B BAHAN
Semen portland
Pasir Beton
Kerikil (Maks 30 mm)
Air
C PERALATAN
D Jumlah (A+B+C)
KOEFISIEN SAT HARGA SATUAN JUMLAH (RP)
3 Ps : 5 Splt
4.36 sak 42,000.00 183,120.00
0.52 m3 72,000.00 37,440.00
0.87 m3 210,000.00 182,700.00
2.00 org 40,000.00 80,000.00
0.35 org 55,000.00 19,250.00
502,510.00
502,500.00
Splt
4.64 sak 42,000.00 194,880.00
0.52 m3 72,000.00 37,440.00
0.78 m3 210,000.00 163,800.00
2.00 org 40,000.00 80,000.00
0.35 org 55,000.00 19,250.00
495,370.00
495,300.00
Splt
6.72 sak 42,000.00 282,240.00
0.54 m3 72,000.00 38,880.00
0.81 m3 210,000.00 170,100.00
2.00 org 40,000.00 80,000.00
0.35 org 55,000.00 19,250.00
590,470.00
590,400.00
UTU K 225
7.76 sak 42,000.00 325,920.00
0.65 m3 72,000.00 46,800.00
0.65 m3 210,000.00 136,500.00
2.00 org 40,000.00 80,000.00
0.35 org 55,000.00 19,250.00
608,470.00
608,400.00
UTU K 275
8.00 sak 42,000.00 336,000.00
0.55 m3 72,000.00 39,600.00
0.70 m3 210,000.00 147,000.00
2.02 org 40,000.00 80,800.00
0.40 org 55,000.00 22,000.00
625,400.00
625,400.00
S
1.05 kg 8,800.00 9,240.00
0.02 kg 19,000.00 380.00
0.01 org 40,000.00 400.00
0.01 org 55,000.00 550.00
10,570.00
10,500.00
MPURAN 1 Pc : 4 Ps
140.00 bh 600.00 84,000.00
0.55 sak 42,000.00 23,100.00
0.09 m3 68,000.00 6,120.00
0.65 org 40,000.00 26,000.00
0.20 org 55,000.00 11,000.00
150,220.00
150,200.00
CAMPURAN 1 Pc : 5 Ps
140.00 bh 600.00 84,000.00
0.45 sak 42,000.00 18,900.00
0.10 m3 68,000.00 6,800.00
0.65 org 40,000.00 26,000.00
0.20 org 55,000.00 11,000.00
146,700.00
146,700.00
1,5 cm
0.10 sak 42,000.00 4,200.00
0.02 m3 68,000.00 1,360.00
0.20 org 40,000.00 8,000.00
0.15 org 55,000.00 8,250.00
21,810.00
21,800.00
1,5 cm
0.09 sak 42,000.00 3,780.00
0.02 m3 68,000.00 1,360.00
0.20 org 40,000.00 8,000.00
0.15 org 55,000.00 8,250.00
21,390.00
cm
1.00 m2 38,500.00 38,500.00
0.16 sak 42,000.00 6,720.00
0.02 m3 68,000.00 1,360.00
0.02 kg 12,700.00 254.00
0.25 org 40,000.00 10,000.00
0.12 org 55,000.00 6,600.00
63,434.00
63,430.00
KAMPER SAMARINDA
1.20 m3 5,766,800.00 6,920,160.00
6.00 org 40,000.00 240,000.00
15.00 org 55,000.00 825,000.00
7,985,160.00
7,985,160.00
MARINDA
0.04 m3 5,000,000.00 200,000.00
1.00 org 40,000.00 40,000.00
2.50 org 55,000.00 137,500.00
377,500.00
377,500.00
LOK
1.00 bh 2,350,000.00 2,350,000.00
235,000.00 235,000.00
3.30 org 40,000.00 132,000.00
1.10 org 55,000.00 60,500.00
2,777,500.00
2,777,500.00
UM
1.00 m2 680,000.00 680,000.00
1.50 org 55,000.00 82,500.00
1.05 org 40,000.00 42,000.00
804,500.00
804,500.00
L.01 OH 1.650
L.02 OH 0.275
JUMLAH TENAGA KERJA
kg 384.000
kg 692.000
kg 1,039.000
Liter 215.000
JUMLAH HARGA BAHAN
L.01 OH 1.650
L.02 OH 0.275
JUMLAH TENAGA KERJA
kg 326.000
kg 760.000
kg 1,029.000
Liter 215.000
JUMLAH HARGA BAHAN
40,000 66,000.00
55,000 15,125.00
81,125.00
40,000 66,000.00
55,000 15,125.00
81,125.00
840 273,840.00
72 54,720.00
185 190,365.00
1,000 215,000.00
733,925.00
- -
-
- 815,050.00
Rencana Anggaran Biaya (RAB)
Renovasi Rumah KPR-BTN Type 21/60 (2lantai)
Daerah : Bogor
2 Pekerjaan Atap
1
2
3
4
5
3 Pekerjaan Langit-Langit
1
3
4 Pekerjaan Lantai
1
2
3
5 Pekerjaan Kayu
1
2
3
4
5
1
2
3
4
5
6
7
7 Pekerjaan Pengecatan
1
2
3
4
E Pekerjaan MEP
A Pekerjaan Sanitasi
1
2
3
4
5
6
7
ncana Anggaran Biaya (RAB)
novasi Rumah KPR-BTN Type 21/60 (2lantai)
aerah : Bogor
Beton k-100 m3
Beton k-175 m3
Beton k-225 m3
beton k-250 m3
Pekerjaan Pembesian kg
Pekerjaan Bekisting
Pondasi Tapak m2
Sloof m2
Kolom Utama m2
Kolom Praktis m2
Balok Utama m2
Balok Anak m2
Ring Balok m2
Tangga m2
Pekerjaan Arsitektur
Pekerjaan Pasangan Dinding
Pasang bata ringan (Hebel/ Celcon) m2
Plesteran + Aci tebal 2 cm 1cm : 5 psr m2
Pasangan keramik roman dinding km.mandi 20 x25 m2
Pasangan Keramik Roman dinding dapur 20 x 25 m2
Pekerjaan Atap
Rangka atap baja ringan m2
Tutup atap genting plentong m2
genting bubung plentong m'
Listplang kayu kamper medan 2/20 m'
talang sudut (seng) m'
Pekerjaan Langit-Langit
Plafon Triplek 4 mm + rangka kayu borneo super m2
List Gypsum m'
Pekerjaan Lantai
Lantai Keramik, luar & dalam, 40 x 40 cm m2
Lantai Keramik, lkamar mandi, 30 x 30 cm m2
Plint Keramik 10 x 40, dalam m'
Pekerjaan Kayu
Kusen pintu dan jendela, kayu balok kamper samarinda m3
Pekerjaan MEP
Pekerjaan Sanitasi
Pasang closet Duduk bh
Pasang closet wastafel bh
Pasang Bak Cuci Piring stainless bh
Septictank uk 2 x 1,5 x 1,5 + rembesan unit
keran air bh
Pipa PVC 1/2" instalasi air m'
Pipa PVC 4" AW saluran air hujan dan air limbah m'
Volume Harga Satuan (Rp) Jumlah (Rp)
81 Rp 16,900.00 Rp 1,368,900.00
0.1125 Rp 502,510.00 Rp 56,532.38
614.064 Rp 16,900.00 Rp 10,377,681.60
251.208 Rp 158,800.00 Rp 39,891,830.40
111.648 Rp 323,430.00 Rp 36,110,312.64
289.668 Rp 8,500.00 Rp 2,462,178.00
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Total Rp 830,718,314.61