Referensi B. Rumah Egy
Referensi B. Rumah Egy
I Pekerjaan Po
1
4
5
Pekerjaan La
Lantai 1
a
b
d
II
Lantai 2
a
Lantai Atap
a
b
Pekerjaan Ko
Lantai1
Kolom Utama
a
c
III Kolom Praktis
a
Lantai 2
Kolom Utama
a
Kolom Praktis
a
Lantai 3
Kolom Utama
a
Kolom Praktis
a
Pekerjaan Di
Lantai1
IV
Lantai2
Lantai3
Pekerjaan Ba
Lantai1
Balok Utama
a
b
c
V
Balok Anak
Ring Balok
Lantai2
Balok Utama
a
Ring Balok
Lantai3
Ring Balok
c
Pekerjaan Ta
Lantai 1 ke 2
a
V c
Lantai 2 ke 3
a
b
c
Pekerjaan Pla
Lantai 1
Lantai 2
VI
Pekerjaan Pondasi
Pembersihan
Luas Area = 22.4 x 9.4
= 210.56 m2
Galian Tanah
Luas Area = 22.4 x 9.4
= 210.56 m2
Kedalaman = 210.56 x 0.3
= 63.168 m3
Bowplank
x = 22.4 x 4+ 3x 4
= 101.6 m
y = 9.4 x 6+ 2.2 x 8
= 992.64 m
Total = 1094.24 m
Pondasi Cakar Ayam
x = 6
y = 4
Total = 24 bh
b. Galian
1 bh = 1.5 x 1.5 x 1.5
3.375 m3
Total Volume 81 m3
c. Pasir Urug
1 bh = 0.1 x 1.5 x 1.5
Total Volume 5.4 m3
d. Lantai Kerja 1 bh = 0.05 x 1.5 x 1.5
= 0.1125
Total Volume 2.7 m3
e Bekisting
1bh = 1.1 x 0.3 x 4
= 1.32 m2
Total Volume 31.68 m2
f Beton
1 bh = 1.2 x 1.2 x 0.25 + 0.3
= 0.459 m3
Total Volume 11.016 m2
g Pembesian
1 bh =
Sloof
x = 22.4 x 4+ 3x 4
= 101.6 m
y = 9.4 x 6+ 2.2 x 8
= 992.64 m
Total = 1094.24 m
a Pekerjaan Beton
Luas Penampang
A = 0.35 x 0.2
= 0.07 m2
V = 76.5968 m3
b Pekerjaan Pembesian
Pekerjaan Lantai
Lantai 1
Timbunan Tanah Kembali Lantai
Luas Area = 22.4 x 9.4
= 210.56 m2
Kedalaman = 210.56 x 0.3 - 0.1 - 0.05 - 0.01
V = 29.4784 m3
Pasir Urug
Luas Area = 210.56 m2
V = 21.056 m3
Lantai Cor
Luas Area = 22.4 x 9.4
= 210.56 m2
Tebal = 0.05
Volume = 10.528 m3
Lantai Keramik
Kamar = 22.4 x 9.4 - 50.56 - 26.4
= 133.6 m2
Koridor = 1.4 x 20 + 2.4 x 9.4
50.56 m2
Wc = 1.5 x 2.2 x 8
= 26.4 m2
Lantai 2
Bekisting
Luas = 191.76 m2
Beton
Luas = 18.9 x 9.4 + 5.8 x 3.3
= 191.76 m2
Tebal = 0.12 m
V total = 23.0112 m3
Pembesian
Bekisting
Luas penampang = 3.5 x 4x 0.3 Jumlah
= 4.2 m2
Vtot = 100.8 m2
Kolom Praktis
Beton
Luas penampang = 0.12 x 0.12
= 0.0144 m2
h = 3.5 m
V tot = 1.6128 m3
Pembesian
Bekisting
Luas penampang = 3.5 x 4x 0.12 Jumlah
= 1.68 m2
Vtot = 53.76 m2
Lantai 2
Kolom Utama
Beton
Luas penampang A = 0.3 x 0.3
= 0.09 m2
Jml = 24 bh
h = 3.5 m
V tot = 7.56 m3
Pembesian
Bekisting
Luas penampang = 3.5 x 4x 0.3 Jumlah
= 4.2 m2
Vtot = 58.8 m2
Kolom Praktis
Beton
Luas penampang = 0.12 x 0.12
= 0.0144 m2
h = 3.5 m
V tot = 0.504 m3
Pembesian
Bekisting
Luas penampang = 3.5 x 4x 0.12 Jumlah
= 1.68 m2
Vtot = 16.8 m2
Lantai 3
Kolom Utama
Beton
Luas penampang = 0.2 x 0.2
= 0.04 m2
jml = 6 bh
h = 3m
V tot = 0.72 m3
Pembesian
Bekisting
Luas penampang = 3.5 x 4x 0.2 Jumlah
= 2.8 m2
Vtot = 19.6 m2
Kolom Praktis
Beton
Luas penampang = 0.12 x 0.12
= 0.0144 m2
h = 3m
V tot = 0.2592 m3
Pembesian
Bekisting
Luas penampang = 3.5 x 4x 0.12
= 1.68 m2
Vtot = 10.08 m2
Pekerjaan Dinding
Lantai1
Void
Pintu Kamar A = 2.3 x 0.9
= 2.07 m2
Pintu Wc A = 2.3 x 0.8
= 1.84 m2
Jendela 1 A = 2.2 x 2.15
= 4.73 m2
Panjang
x = 4x 2x 5+ 2.2
= 57.6 m
y = 20 x 4+ 3x 4
= 92 m
Luas Penampang Kotor
A = 523.6 m2
Luas Penampang Bersih
A = 523.6 - 2.07 x 8- 1.84
= 454.48 m2
Lantai2
Void
Pintu A = 2.3 x 0.9
= 2.07 m2
Pintu Wc A = 2.3 x 0.8
= 1.84 m2
Jendela 1 A = 2.2 x 2.15
= 4.73 m2
Panjang
x = 9.4 x 2+ 1.5 x 5
= 26.3 m
y = 18.9 x 2+ 2x 2
= 44.8 m
Luas Penampang Kotor
A = 248.85 m2
Luas Penampang Bersih
A = 248.85 - 2.07 x 6- 1.84
= 209.1 m2
Lantai3
Void
Pintu Wc A = 2.3 x 0.8
= 1.84 m2
Panjang
x = 9.5 + 1x 2
= 11.5 m
y = 3.2 x 3
= 9.6 m
Luas Penampang Kotor
A = 63.3 m2
Panjang parapet L = 18.9 x 2- 3.2 + 2.85
= 42.765 m
h = 1.2 m
A = 51.318 m2
Luas Penampang Bersih
A = 63.3 - 1.84 x 2
= 110.938 m2
Pekerjaan Balok
Lantai1
Balok Utama
x = 9.4 x 9
= 84.6 m
y = 22.4 x 4+ 3x 4
= 101.6 m
Panjang Total = 186.2 m
Beton
Luas penampang = 0.3 x 0.2
= 0.06 m2
V tot = 11.172 m3
Pembesian
Bekisting
Luas penampang = 0.3 x 2x 186.2 + 0.2
= 148.96 m2
Balok Anak
x = 9.4 x 8
= 75.2 m
y = 22.4 x 2+ 2.4
= 47.2 m
Panjang Total = 122.4 m
Beton
Luas penampang = 0.2 x 0.2
= 0.04 m2
V tot = 4.896 m3
Pembesian
Bekisting
Luas penampang = 0.2 x 2x 122.4 + 0.2
= 73.44 m2
Ring Balok
x = 1.4 x 2+ 1.8 x 2
= 6.4 m
y = 3.5 x 8+ 1.5 x 8
= 48 m
Panjang Total = 54.4 m
Beton
Luas penampang = 0.12 x 0.12
= 0.0144 m2
V tot = 0.78336 m3
Pembesian
Bekisting
Luas penampang = 0.12 x 2
= 13.056 m2
Lantai2
Balok Utama
x = 9.4 x 9
= 84.6 m
y = 22.4 x 4+ 3x 4
= 101.6 m
Panjang Total = 186.2 m
Beton
Luas penampang = 0.2 x 0.2
= 0.04 m2
V tot = 7.448 m3
Pembesian
Bekisting
Luas penampang = 0.2 x 2x 186.2 + 0.2
= 111.72 m2
Ring Balok
x = 1.5 x 2
= 3m
y = 1.5 x 2
= 3m
Panjang Total = 6m
Beton
Luas penampang = 0.12 x 0.12
= 0.0144 m2
V tot = 0.0864 m3
Pembesian
Bekisting
Luas penampang = 0.12 x 2
= 1.44 m2
Lantai3
Ring Balok
x = 9.5 x 1+ 9.5
= 19 m
y = 1.6 x 2+ 3.2 + 18.9
= 44.2 m
Panjang Total = 63.2 m
Beton
Luas penampang = 0.15 x 0.15
= 0.0225 m2
V tot = 1.422 m3
Pembesian
Bekisting
Luas penampang = 0.15 x 2
= 18.96 m2
Pekerjaan Tangga
Lantai 1 ke 2
Beton
Jml Anak Tangga = 18 bh Tinggi tiap anak tangga
Tebal plat beton = 0.12 m
Lebar = 1.1 m
Bordes = 1.1 x 1.1
= 1.21 m2
Balok p = 2.4 m Kemiringan
A = 0.12 x 0.15
= 0.018 m2
Volume Vtot = 1.769108 m3
Pembesian
Bekisting
Bordes = 1.1 x 1.1 x 2
= 2.42 m2
Balok p = 2.4 m Kemiringan
A = 0.15 x 2.4 x 2
= 0.72 m2
Luas Penampang total
Atot = 10.21857 m2
Keramik
Bordes = 1.1 x 1.1 x 2
= 2.42 m2
Jml Anak Tangga = 16 bh
Lebar = 1.1 m
Tinggi tiap anak tangga = 0.2 m
Lebar penampang tiap tangga= 0.3 m
A = 8.8 m2
Luas Penampang total
Atot = 11.22
Lantai 2 ke 3
Beton
Jml Anak Tangga = 18 bh Tinggi tiap anak tangga
Tebal plat beton = 0.12 m
Lebar = 1.1 m
Bordes = 1.1 x 1.1 x 3
= 3.63 m2
Balok p = 2.4 m Kemiringan
A = 0.12 x 0.15
= 0.018 m2
Volume Vtot = 2.433068 m3
Pembesian
Bekisting
Bordes = 1.1 x 1.1 x 3
= 3.63 m2
Balok p = 2.4 m Kemiringan
A = 0.15 x 2.4 x 2
= 0.72 m2
Luas Penampang total
Atot = 11.42857 m2
Keramik
Bordes = 1.1 x 1.1 x 2
= 2.42 m2
Jml Anak Tangga = 15 bh
Lebar = 1.1 m
Tinggi tiap anak tangga = 0.2 m
Lebar penampang tiap tangga= 0.3 m
A = 8.25 m2
Luas Penampang total
Atot = 10.67 m2
Pekerjaan Plafon
Lantai 1
Luas A = 20 x 9.4 - 28
= 160 m2
Lantai 2
Luas A = 18.9 x 9.4 - 28
= 149.66 m2
x 0.3 x 1.1
- 0.099
= 4x 8
= 32
= 5x 2+ 2x 2
= 14 bh
= 2x 5
= 10
= 5x 1+ 2
= 7 bh
= 2x 3
= 6 bh
x 8
x 8- 4.73 x 8
+ 1.5 x 2
x 2- 4.73 x 5
+ 2.315 + 3
x 186.2
x 122.4
+ 1x 8
x 186.2
x 2
Tinggi tiap anak tangga = 3.5 : 18
= 0.2 m
x = 1.75
y = 2.7
Kemiringan = 3.21753
x = 1.75
y = 2.7
Kemiringan = 3.21753
x = 1.75
y = 2.7
Kemiringan = 3.21753
x = 1.75
y = 2.7
Kemiringan = 3.21753
I Pembesian Pondasi Cakar Ayam
Per 1 Unit
Tapak Besi Ǿ 13
x
y
h
Overlaps
Panjang Total
Kolom Besi Ǿ 13
h
Jml batang
Overlaps
Panjang Total
1200
1 Unit
Sengkang Besi Ǿ 8-200
x
y
h
Jml batang
Overlaps
Panjang Total
Total
Jml Pondasi
Besi Ǿ 13
Besi Ǿ 8
II Pembesian Sloof
x
Total
Sengkang Besi Ǿ 8-200
h
b
Overlaps
Panjang Total 1 penampang
Jml
II Pembesian kolom
Lantai 1
Kolom Utama
Jml Kolom
Tulangan Utama
1 kolom Besi Ǿ 13
jml
H
Overlaps
Total
Kebutuhan Total Keseluruhan
Kolom Praktis
Jml Kolom
Tulangan Utama
1 kolom Besi Ǿ 10
jml
H
Overlaps
Total
Kebutuhan Total Keseluruhan
Lantai 2
Kolom Utama
Jml Kolom
Tulangan Utama
1 kolom Besi Ǿ 13
jml
H
Overlaps
Total
Kebutuhan Total Keseluruhan
Kolom Praktis
Jml Kolom
Tulangan Utama
1 kolom Besi Ǿ 10
jml
H
Overlaps
Total
Kebutuhan Total Keseluruhan
Kolom Praktis
Jml Kolom
Tulangan Utama
1 kolom Besi Ǿ 10
jml
H
Overlaps
Total
Kebutuhan Total Keseluruhan
Total
Besi Ǿ 13
Besi Ǿ 10
Besi Ǿ 8
III Pembesian balok
Lantai 1
Balok Utama
x
Panjang Total
Tulangan Utama
Besi Ǿ 13
jml
L
Overlaps
Kebutuhan Total Keseluruhan
Total
Sengkang Besi Ǿ 8-200
h
b
Overlaps
Panjang
Jml
Kebutuhan Total Keseluruhan
Total
Balok Anak
x
Panjang Total
Tulangan Utama
Besi Ǿ 13
jml
L
Overlaps
Kebutuhan Total Keseluruhan
Total
Sengkang Besi Ǿ 8-200
h
b
Overlaps
Panjang
Jml
Kebutuhan Total Keseluruhan
Total
Lantai 2
Balok Utama
x
Panjang Total
Tulangan Utama
Besi Ǿ 13
jml
L
Overlaps
Kebutuhan Total Keseluruhan
Total
Sengkang Besi Ǿ 8-200
h
b
Overlaps
Panjang
Jml
Kebutuhan Total Keseluruhan
Total
Lantai 2
Balok
x
Panjang Total
Tulangan Utama
Besi Ǿ 10
jml
L
Overlaps
Kebutuhan Total Keseluruhan
Total
Sengkang Besi Ǿ 8-200
h
b
Overlaps
Panjang
Jml
Kebutuhan Total Keseluruhan
Total
Total
Besi Ǿ 13
Besi Ǿ 10
Besi Ǿ 8
IV Pembesian tangga
Lantai 1 ke 2
Tebal plat beton
Lebar
Bordes
Kemiringan
Besi Ǿ 10-200
x
jml
L
Panjang Total 2 lapis
Besi Ǿ 10-100
y
jml
L
Panjang Total 2 lapis
Lantai 1 ke 2
Tebal plat beton
Lebar
Bordes
Kemiringan
Besi Ǿ 10-200
x
jml
L
Panjang Total 2 lapis
Besi Ǿ 10-100
y
jml
L
Panjang Total 2 lapis
Total
Besi Ǿ 10
IV Pembesian lantai
Lantai 2
Besi Ǿ 10-200
x
jml
Ltotal
y
jml
Ltotal
X+Y
Void
Glass block
x
jml
Ltotal
y
jml
Ltotal
jml panel
Total Void 1
Tangga
x
jml
Ltotal
y
jml
Ltotal
Total Void 2
Kebutuhan Total Keseluruhan 2 lapis
Lantai 3
Besi Ǿ 10-200
x
jml
Ltotal
y
jml
Ltotal
X+Y
Dek Atap Toilet
x
jml
Ltotal
y
jml
Ltotal
Void
Glass block
x
jml
Ltotal
y
jml
Ltotal
jml panel
Total Void 1
Kebutuhan Total Keseluruhan 2 lapis
Total
Besi Ǿ 10
= 1.14 m Jumlah = 6 batang
= 1.14 m Jumlah = 6 batang
= 0.19 m Total = 12 batang
= 7m
= 22.96 m
= 1.1 m
= 8 bh
= 10 m
= 18.8 m
= 41.76 m
= 0.24 m
= 0.24 m
= 1.1 m
= 6 bh
= 0.064 m
= 6.144 m
= 24 bh
= 1553.28 m'
= 147.456 m'
= 22.4 x 4+ 3x 4
= 101.6 m
= 9.4 x 6+ 2.2 x 8
= 992.64 m
= 1094.24 m
= 0.29 m
= 0.14 m
= 0.064 m
g Total 1 penampang
= 0.924 m'
= 1094.24 : 0.2
= 5472 bh
uhan Total Keseluruhan
= 5056.128 m
= 6 bh
= 1094.24 m
= 47.41707 m
uhan Total Keseluruhan
= 6849.942 m'
= 24 bh
= 8 bh
= 3.5 m
= 0.52 m
= 32.16 m
Keseluruhan
= 771.84 m
= 0.24 m
= 0.24 m
= 0.064 m
= 1.024 m
= 3.5 m
= 18 bh
= 18.432 m
Keseluruhan
= 442.368 m
= 14 bh
= 4 bh
= 3.5 m
= 0.04 m
= 14.16 m
Keseluruhan
= 198.24 m
= 0.08 m
= 0.08 m
= 0.064 m
= 0.384 m
= 3.5 m
= 24 bh
= 9.216 m
Keseluruhan
= 129.024 m
= 24 bh
= 8 bh
= 3.5 m
= 0.52 m
= 32.16 m
Keseluruhan
= 771.84 m
= 0.24 m
= 0.24 m
= 0.064 m
= 1.024 m
= 3.5 m
= 18 bh
= 18.432 m
Keseluruhan
= 442.368 m
= 7 bh
= 4 bh
= 3.5 m
= 0.04 m
= 14.16 m
Keseluruhan
= 99.12 m
= 0.08 m
= 0.08 m
= 0.064 m
= 0.384 m
= 3.5 m
= 24 bh
= 9.216 m
Keseluruhan
= 64.512 m
= 6 bh
= 4 bh
= 3m
= 0.52 m
= 14.08 m
Keseluruhan
= 84.48 m
= 0.14 m
= 0.14 m
= 0.064 m
= 0.624 m
= 3m
= 15 bh
= 9.36 m
Keseluruhan
= 56.16 m
= 6 bh
= 4 bh
= 3m
= 0.04 m
= 12.16 m
Keseluruhan
= 72.96 m
= 0.08 m
= 0.08 m
= 0.064 m
= 0.384 m
= 3m
= 20 bh
= 7.68 m
Keseluruhan
= 46.08 m
= 1628.16 m
= 370.32 m
= 1180.512 m
= 9.4 x 9
= 84.6 m
= 22.4 x 4+ 3x 4
= 101.6 m
= 186.2 m
= 6 bh
= 186.2 m
= 8.068667 m
Keseluruhan
= 1165.612 m
= 0.14 m
= 0.24 m
= 0.032 m
= 0.792 m
= 931 bh
Keseluruhan
= 767.144 m
= 9.4 x 8
= 75.2 m
= 22.4 x 2+ 2.4
= 47.2 m
= 122.4 m
= 6 bh
= 122.4 m
= 5.304 m
Keseluruhan
= 766.224 m
= 0.14 m
= 0.14 m
= 0.032 m
= 0.592 m
= 612 bh
Keseluruhan
= 381.888 m
= 9.4 x 9
= 84.6 m
= 22.4 x 4+ 3x 4
= 101.6 m
= 186.2 m
= 6 bh
= 186.2 m
= 8.068667 m
Keseluruhan
= 1165.612 m
= 0.14 m
= 0.14 m
= 0.032 m
= 0.592 m
= 931 bh
Keseluruhan
= 580.944 m
= 9.5 x 1+ 9.5
= 19 m
= 1.6 x 2+ 3.2 + 18.9 x 2
= 44.2 m
= 63.2 m
= 6 bh
= 63.2 m
= 2.738667 m
Keseluruhan
= 395.632 m
= 0.09 m
= 0.09 m
= 0.032 m
= 0.392 m
= 316 bh
Keseluruhan
= 133.984 m
= 3097.448 m
= 395.632 m
= 1863.96 m
= 0.12 m
= 1.1 m
= 1.1 x 2.2
= 3.2 m
= 4.3 m
= 21.5 bh
= 94.6 m
= 189.2 m
= 2.2 m
= 22 bh
= 189.2 m
= 378.4 m
= 0.12 m
= 1.1 m
= 1.1 x 2.2
= 3.2 m
= 5.4 m
= 27 bh
= 118.8 m
= 237.6 m
= 2.2 m
= 22 bh
= 237.6 m
= 475.2 m
= 1280.4 m
= 22.4 m
= 112 bh
= 1052.8 m
= 9.4 m
= 47 bh
= 1052.8 m
= 2105.6 m
= 0.6 m
= 3 bh
= 3.6 m'
= 1.2 m
= 6 bh
= 3.6 m'
= 7 panel
= 50.4 m
= 4m
= 20 bh
= 22 m'
= 1.1 m
= 5.5 bh
= 22 m'
= 44 m
Keseluruhan 2 lapis
= 4022.4 m'
= 18.9 m
= 94.5 bh
= 888.3 m
= 9.4 m
= 47 bh
= 888.3 m
= 1776.6 m
= 3.2 m
= 16 bh
= 32 m
= 2m
= 10 bh
= 32 m
= 0.6 m
= 3 bh
= 3.6 m'
= 1.2 m
= 6 bh
= 3.6 m'
= 7 panel
= 50.4 m
Keseluruhan 2 lapis
= 3516.4 m'
= 7538.8 m
ANALISA HARGA SATUAN PEKERJAAN MAKASAR
Kota : Makasar
No. URAIAN
I PEKERJAAN PERSIAPAN
1 1 M¹ PAGAR SENG GELOMBANG TINGGI : 2 M
a Tiang kayu borneo 4/6
b Semen PC (abu-abu)
c Seng gelombang
d Pasir beton
e Split (batu pecah)
f Balok kayu borneo 4/6
g Paku 5 - 10 cm
h Meni Besi
i Tukang kayu
j Pembantu tukang
II PEKERJAAN TANAH
1 1 M3 GALIAN TANAH SEDALAM 1 M
a Pembantu tukang
b Tukang gali
Jumlah
Dibulatkan
6 1 M3 PEMBUANGAN TANAH SEJAUH 150 M
a Pembantu tukang
b Tukang gali
Jumlah
Dibulatkan
7 1 M3 URUGAN TANAH KEMBALI
a Pembantu tukang
b Tukang gali
Jumlah
Dibulatkan
8 1 M3 PEMADATAN TANAH
a Pembantu tukang
b Tukang gali
Jumlah
Dibulatkan
10 1 M3 URUGAN TANAH
a Tanah urug
b Pembantu tukang
c Tukang gali
Jumlah
Dibulatkan
V PEKERJAAN DINDING
2 1 M2 PASANGAN Bata merah TEBAL 1 BATA, CAMPURAN 1 Pc : 4 Ps
a Bata merah
b Semen PC (abu-abu)
c Pasir pasang
d Pembantu tukang
e Tukang batu
Jumlah
Dibulatkan
3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 5 Ps
a Bata merah
b Semen PC (abu-abu)
c Pasir pasang
d Pembantu tukang
e Tukang batu
Jumlah
Dibulatkan
8 1 M2 PASANG DINDING GLASSBLOCK
a Glassblock ukuran 18 x 18 cm
b Semen putih
c Pembantu tukang
d Tukang batu
Jumlah
Dibulatkan
9 1 M2 PASANGAN BATACO PUTIH, CAMPURAN 1 Pc : 5 Ps
a Bataco putih
b Semen PC (abu-abu)
c Pasir pasang
d Pembantu tukang
e Tukang batu
Jumlah
Dibulatkan
11 1 M2 PASANGAN BATA RINGAN ( HEBEL/CELCON ).
a Bata Ringan ( hebel/celcon )
b Semen Instan
c Pembantu tukang
d Tukang batu
Jumlah
Dibulatkan
VI PEKERJAAN PLESTERAN/ACCI
3 1 M2 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 1,5 cm
a Semen PC (abu-abu)
b Pasir pasang
c Pembantu tukang
d Tukang batu
Jumlah
Dibulatkan
4 1 M2 PLESTERAN CAMPURAN 1 Pc : 5 Ps TEBAL 1,5 cm
a Semen PC (abu-abu)
b Pasir pasang
c Pembantu tukang
d Tukang batu
Jumlah
8 1 M2 PASANG LANTAI KERAMIK POLOS 30 x 30 cm
a Keramik polos 30 x 30 cm
b Semen PC (abu-abu)
c Pasir pasang
d Semen warna
e Pembantu tukang
f Tukang batu
Jumlah
Dibulatkan
IX PEKERJAAN KUSEN, PINTU, JENDELA, PARTISI
1 1 M3 PASANG KUSEN PINTU & JENDELA KAYU KAMPER SAMARINDA
a Balok kayu kamper samarinda
b Pembantu tukang
c Tukang kayu
Jumlah
Dibulatkan
4 1 M2 PASANG PINTU PANEL KAYU KAMPER SAMARINDA
a Papan kayu kamper samarinda
b Pembantu tukang
c Tukang kayu
Jumlah
Dibulatkan
17 1 BH PASANG PINTU ALUMINIUM / PINTU PVC
a Pintu Aluminium / Pintu PVC
b Alat bantu 10 % harga material
c Tukang kayu
Jumlah
Dibulatkan
18 1 M2 PASANG KUSEN PARTISI DOUBLE TRIPLEK
a Balok kayu borneo super
b Triplek 0,4 cm ukuran pintu
c Paku 1 s/d 3 cm
d Ampelas
e Engsel
f Grendel / slot
g Pembantu tukang
h Tukang kayu terampil
Jumlah
Dibulatkan
19 1 M2 PASANG KUSEN PARTISI DOUBLE GYPSUM + RANGKA KAYU
a Balok kayu borneo super
b Gypsum board ( 120 x 240 x 9 ) mm
c Paku 1 s/d 3 cm
d Ampelas
e Engsel
f Grendel / Slot
g Pembantu tukang
h Tukang kayu
Jumlah
Dibulatkan
20 1 M2 PASANG DINDING PARTISI GYPSUM BOARD + RANGKA BESI HOLLOW
a Hollow 4/4 Zincromate
b Hollow 2/4 Zincromate
c Gypsum board ( 120 x 240 x 9 ) mm
d Paku sekrup
e Ramset / dina bolt
f Cotton plaster
g Compoun
h Pembantu tukang
i Tukang kayu
Jumlah
Dibulatkan
X PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
A PEKERJAAN RANGKA ATAP
16 1 M2 PASANG ATAP POLYCARBONATE
a Polycarbonate
b Besi Hollow
c Alat bantu 20 % harga material
d Pembantu tukang
e Tukang kayu
Jumlah
Dibulatkan
17 1 M2 PASANG ALUMINIUM FOIL
a Aluminium foil
b Alat bantu 20 % harga material
c Pembantu tukang
d Tukang kayu
Jumlah
Dibulatkan
XI PEKERJAAN PENUTUP PLAFON
1 1 M2 PASANG RANGKA PLAFON ( UKRN 0,50 X 1,00 ) M, KAYU BORNEO SUPER
a Balok kayu borneo super 4 x 6 cm
b Paku 5 - 12 cm
c Pembantu tukang
d Tukang kayu
Jumlah
Dibulatkan
2 1 M2 PLAFON GRC ( 60 X 1,20 ) M, TEBAL 4 MM
a Pelat GRC tebal 4 mm
b Paku 1 cm
c Pembantu tukang
d Tukang kayu
Jumlah
Dibulatkan
6 1 M¹ LIST PLAFON PROFIL KAYU
a Listp profil kayu
b Paku 2 cm
c Pembantu tukang
d Tukang kayu
Jumlah
Dibulatkan
7 1 M¹ LIST PLAFON KAYU 1/4
a List kayu 1/4
b Paku 2 cm
c Pembantu tukang
d Tukang kayu
Jumlah
Dibulatkan
8 1 M2 PLAFON TRIPLEK 4 MM + RANGKA KAYU BORNEO SUPER
a Balok kayu borneo super
b Paku 1- 12 cm
c Triplek 120 cm x 240 cm x 0,4 cm
d Pembantu tukang
e Tukang kayu
Jumlah
Dibulatkan
3 Ps : 5 Splt
4.36 sak 42,000.00 183,120.00
0.52 m3 72,000.00 37,440.00
0.87 m3 210,000.00 182,700.00
2.00 org 40,000.00 80,000.00
0.35 org 55,000.00 19,250.00
502,510.00
502,500.00
Splt
4.64 sak 42,000.00 194,880.00
0.52 m3 72,000.00 37,440.00
0.78 m3 210,000.00 163,800.00
2.00 org 40,000.00 80,000.00
0.35 org 55,000.00 19,250.00
495,370.00
495,300.00
Splt
6.72 sak 42,000.00 282,240.00
0.54 m3 72,000.00 38,880.00
0.81 m3 210,000.00 170,100.00
2.00 org 40,000.00 80,000.00
0.35 org 55,000.00 19,250.00
590,470.00
590,400.00
UTU K 225
7.76 sak 42,000.00 325,920.00
0.65 m3 72,000.00 46,800.00
0.65 m3 210,000.00 136,500.00
2.00 org 40,000.00 80,000.00
0.35 org 55,000.00 19,250.00
608,470.00
608,400.00
UTU K 275
8.00 sak 42,000.00 336,000.00
0.55 m3 72,000.00 39,600.00
0.70 m3 210,000.00 147,000.00
2.02 org 40,000.00 80,800.00
0.40 org 55,000.00 22,000.00
625,400.00
625,400.00
S
1.05 kg 8,800.00 9,240.00
0.02 kg 19,000.00 380.00
0.01 org 40,000.00 400.00
0.01 org 55,000.00 550.00
10,570.00
10,500.00
MPURAN 1 Pc : 4 Ps
140.00 bh 600.00 84,000.00
0.55 sak 42,000.00 23,100.00
0.09 m3 68,000.00 6,120.00
0.65 org 40,000.00 26,000.00
0.20 org 55,000.00 11,000.00
150,220.00
150,200.00
CAMPURAN 1 Pc : 5 Ps
140.00 bh 600.00 84,000.00
0.45 sak 42,000.00 18,900.00
0.10 m3 68,000.00 6,800.00
0.65 org 40,000.00 26,000.00
0.20 org 55,000.00 11,000.00
146,700.00
146,700.00
1,5 cm
0.10 sak 42,000.00 4,200.00
0.02 m3 68,000.00 1,360.00
0.20 org 40,000.00 8,000.00
0.15 org 55,000.00 8,250.00
21,810.00
21,800.00
1,5 cm
0.09 sak 42,000.00 3,780.00
0.02 m3 68,000.00 1,360.00
0.20 org 40,000.00 8,000.00
0.15 org 55,000.00 8,250.00
21,390.00
cm
1.00 m2 38,500.00 38,500.00
0.16 sak 42,000.00 6,720.00
0.02 m3 68,000.00 1,360.00
0.02 kg 12,700.00 254.00
0.25 org 40,000.00 10,000.00
0.12 org 55,000.00 6,600.00
63,434.00
63,430.00
KAMPER SAMARINDA
1.20 m3 5,766,800.00 6,920,160.00
6.00 org 40,000.00 240,000.00
15.00 org 55,000.00 825,000.00
7,985,160.00
7,985,160.00
MARINDA
0.04 m3 5,000,000.00 200,000.00
1.00 org 40,000.00 40,000.00
2.50 org 55,000.00 137,500.00
377,500.00
377,500.00
LOK
1.00 bh 2,350,000.00 2,350,000.00
235,000.00 235,000.00
3.30 org 40,000.00 132,000.00
1.10 org 55,000.00 60,500.00
2,777,500.00
2,777,500.00
UM
1.00 m2 680,000.00 680,000.00
1.50 org 55,000.00 82,500.00
1.05 org 40,000.00 42,000.00
804,500.00
804,500.00
E Pekerjaan Langit-Langit
Langit-langit GRC 120 x 240 +
1 rangka hollow m2 83284
2 List Gypsum m' 7505
F Pekerjaan Lantai
Lantai Keramik, luar & dalam,
1 40 x 40 cm m2 98983
Lantai Keramik, lkamar mandi,
2 30 x 30 cm m2 88983
3 Plint Keramik 10 x 40, dalam 46473
G Pekerjaan Kayu
I Pekerjaan Sanitasi
1 Pasang closet Duduk bh
2 Pasang closet wastafel bh 645200
J Pekerjaan Pengecatan
Pengecatan kusen , dengan cat
1 kayu m2 1274334
Pengecatan pintu dan jendela,
2 dengan cat kayu m2 557751
pengecatan plafon 3 x, dengan
3 cat tembok vinilex m2 4257330
pengecatan tembok 3 x dengan
4 cat Vinilex m2 8735485
Jumlah (Rp) Sub Total (Rp)
Total
Dibulatkan
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01 OH 1.5000 75,000 112,500.00
Tukang Batu L.02 OH 0.7500 95,000 71,250.00
Kepala Tukang L.03 OH 0.0750 - -
Mandor L.04 OH 0.0750 - -
JUMLAH TENAGA KERJA 183,750.00
B BAHAN - -
Batu belah m3 1.2000 -
Semen portland Kg 202.0000 -
Pasir Pasang m3 0.4850 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 183,750.00
E Overhead & Profit 10% 10% 18,375.00
F Harga Satuan Pekerjaan (D+E) - 202,125.00
A.4.1.1.8. Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.6500 75,000 123,750.00
Tukang Batu L.02 OH 0.2750 95,000 26,125.00
Kepala Tukang L.03 OH 0.0280 - -
Mandor L.04 OH 0.0830 - -
JUMLAH TENAGA KERJA 149,875.00
B BAHAN
Semen portland kg 384.0000 -
Pasir Beton kg 692.0000 -
Kerikil (Maks 30 mm) kg 1039.0000 -
Air Liter 215.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 149,875.00
E Overhead & Profit 10% 10% 14,987.50
F Harga Satuan Pekerjaan (D+E) - 164,862.00
A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.0500 75,000 78,750.00
Tukang Las L.02.11 OH 1.0500 #N/A #N/A
Kepala tukang L.03 OH 0.1050 - -
Mandor L.04 OH 0.0520 - -
JUMLAH TENAGA KERJA #N/A
B BAHAN
Besi siku L 30.30.3 Kg 15.0000 -
Besi plat baja Kg 32.8000 -
Kawat las Kg 0.0500 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 10% 10% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.2000 75,000 15,000.00
Tukang L.02 OH 0.2000 95,000 19,000.00
Kepala tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0010 - -
JUMLAH TENAGA KERJA 34,000.00
B BAHAN
Jendela nako (rangka + kaca 5 mm) m2 1.1000 -
Paku skrup buah 10.0000 -
Besi strip m 7.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 34,000.00
E Overhead & Profit 10% 10% 3,400.00
F Harga Satuan Pekerjaan (D+E) - 37,400.00
A.4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.3000 75,000 22,500.00
Tukang Batu L.02 OH 0.1000 95,000 9,500.00
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA 32,000.00
B BAHAN
Bata merah m3 70.0000 -
Semen portland Kg 18.9500 -
Pasir Pasang m3 0.0380 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 32,000.00
E Overhead & Profit 10% 10% 3,200.00
F Harga Satuan Pekerjaan (D+E) - 35,200.00
A.4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.3000 75,000 22,500.00
Tukang Batu L.02 OH 0.1000 95,000 9,500.00
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA 32,000.00
B BAHAN
Bata merah m3 70.0000 -
Semen Merah Kg 0.0140 -
Kapur m3 0.0140 -
Pasir Pasang m3 0.0280 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 32,000.00
E Overhead & Profit 10% 10% 3,200.00
F Harga Satuan Pekerjaan (D+E) - 35,200.00
A.4.4.1.26 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.350 75,000 26,250.00
Tukang Batu L.02 OH 0.130 95,000 12,350.00
Kepala Tukang L.03 OH 0.013 - -
Mandor L.04 OH 0.003 - -
JUMLAH TENAGA KERJA 38,600.00
B BAHAN
Bata ringan tebal 7,5 cm m3 0.1 -
Mortar siap pakai Kg 4.4 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan Pasang Dinding Bata Ringan Ls 0.1000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 38,600.00
E Overhead & Profit 10% 10% 3,860.00
F Harga Satuan Pekerjaan (D+E) - 42,460.00
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.3000 75,000 22,500.00
Tukang Batu L.02 OH 0.1500 95,000 14,250.00
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA 36,750.00
B BAHAN
Semen portland Kg 6.3400 -
Pasir Pasang m3 0.0120 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 36,750.00
E Overhead & Profit 10% 10% 3,675.00
F Harga Satuan Pekerjaan (D+E) - 40,425.00
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.1000 75,000 7,500.00
Tukang kayu L.02 OH 0.1000 95,000 9,500.00
Kepala tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA 17,000.00
B BAHAN
Tripleks Lembar 0.3750 -
Paku tripleks kg 0.0300 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 17,000.00
E Overhead & Profit 10% 10% 1,700.00
F Harga Satuan Pekerjaan (D+E) - 18,700.00
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.0000 75,000 75,000.00
Tukang kayu L.02 OH 3.0000 95,000 285,000.00
Kepala tukang L.03 OH 0.3000 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA 360,000.00
B BAHAN
kayu Papan m3 0.0400 -
Lem Kayu/Karet Kg 0.5000 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 360,000.00
E Overhead & Profit 10% 10% 36,000.00
F Harga Satuan Pekerjaan (D+E) - 396,000.00
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.8000 75,000 60,000.00
Tukang kayu L.02 OH 2.4000 95,000 228,000.00
Kepala tukang L.03 OH 0.2400 - -
Mandor L.04 OH 0.0400 - -
JUMLAH TENAGA KERJA 288,000.00
B BAHAN
kayu Papan m3 0.0240 -
Lem Kayu/Karet Kg 0.3000 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 288,000.00
E Overhead & Profit 10% 10% 28,800.00
F Harga Satuan Pekerjaan (D+E) - 316,800.00
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.7000 75,000 52,500.00
Tukang kayu L.02 OH 2.1000 95,000 199,500.00
Kepala tukang L.03 OH 0.2100 - -
Mandor L.04 OH 0.0350 - -
JUMLAH TENAGA KERJA 252,000.00
B BAHAN
kayu Papan m3 0.0250 -
Paku Biasa kg 0.0300 -
Lem Kayu/Karet kg 0.5000 -
Plywood 4 mm Lembar 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 252,000.00
E Overhead & Profit 10% 10% 25,200.00
F Harga Satuan Pekerjaan (D+E) - 277,200.00
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 75,000 11,250.00
Tukang kayu L.02 OH 0.3 95,000 28,500.00
Kepala tukang L.03 OH 0.03 - -
Mandor L.04 OH 0.075 - -
JUMLAH TENAGA KERJA 39,750.00
B BAHAN
Kayu 5/7 m3 0.0154 -
Paku Biasa kg 0.2 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 39,750.00
E Overhead & Profit 10% 10% 3,975.00
F Harga Satuan Pekerjaan (D+E) - 43,725.00
A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.0500 75,000 78,750.00
Tukang Las L.02.11 OH 1.0500 #N/A #N/A
Kepala tukang L.03 OH 0.1050 - -
Mandor L.04 OH 0.0520 - -
JUMLAH TENAGA KERJA #N/A
B BAHAN
Besi siku L 30.30.3 Kg 15.0000 -
Besi plat baja Kg 32.8000 -
Kawat las Kg 0.0500 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 10% 10% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.6000 75,000 45,000.00
Tukang Batu L.02 OH 0.2000 95,000 19,000.00
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0300 - -
JUMLAH TENAGA KERJA 64,000.00
B BAHAN
Bata merah Bh 140.0000 -
Semen portland Kg 26.5500 -
Pasir Pasang m3 0.0930 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 64,000.00
E Overhead & Profit 10% 10% 6,400.00
F Harga Satuan Pekerjaan (D+E) - 70,400.00
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.3000 75,000 22,500.00
Tukang Batu L.02 OH 0.1000 95,000 9,500.00
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA 32,000.00
B BAHAN
Bata merah m3 70.0000 -
Semen portland Kg 11.5000 -
Pasir Pasang m3 0.0430 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 32,000.00
E Overhead & Profit 10% 10% 3,200.00
F Harga Satuan Pekerjaan (D+E) - 35,200.00
A.4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.3000 75,000 22,500.00
Tukang Batu L.02 OH 0.1000 95,000 9,500.00
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA 32,000.00
B BAHAN
Bata merah m3 70.0000 -
Semen Merah Kg 0.0180 -
Kapur m3 0.0180 -
Pasir Pasang m3 0.0180 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 32,000.00
E Overhead & Profit 10% 10% 3,200.00
F Harga Satuan Pekerjaan (D+E) - 35,200.00
A.4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.3000 75,000 22,500.00
Tukang Batu L.02 OH 0.1000 95,000 9,500.00
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA 32,000.00
B BAHAN
Bata merah m3 70.0000 -
Semen Merah Kg 0.0140 -
Kapur m3 0.0140 -
Pasir Pasang m3 0.0280 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 32,000.00
E Overhead & Profit 10% 10% 3,200.00
F Harga Satuan Pekerjaan (D+E) - 35,200.00
A.4.4.1.26 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.350 75,000 26,250.00
Tukang Batu L.02 OH 0.130 95,000 12,350.00
Kepala Tukang L.03 OH 0.013 - -
Mandor L.04 OH 0.003 - -
JUMLAH TENAGA KERJA 38,600.00
B BAHAN
Bata ringan tebal 7,5 cm m3 0.1 -
Mortar siap pakai Kg 4.4 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan Pasang Dinding Bata Ringan Ls 0.1000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 38,600.00
E Overhead & Profit 10% 10% 3,860.00
F Harga Satuan Pekerjaan (D+E) - 42,460.00
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.3000 75,000 22,500.00
Tukang Batu L.02 OH 0.1500 95,000 14,250.00
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA 36,750.00
B BAHAN
Semen portland Kg 6.3400 -
Pasir Pasang m3 0.0120 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 36,750.00
E Overhead & Profit 10% 10% 3,675.00
F Harga Satuan Pekerjaan (D+E) - 40,425.00
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.1000 75,000 7,500.00
Tukang kayu L.02 OH 0.1000 95,000 9,500.00
Kepala tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA 17,000.00
B BAHAN
Tripleks Lembar 0.3750 -
Paku tripleks kg 0.0300 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 17,000.00
E Overhead & Profit 10% 10% 1,700.00
F Harga Satuan Pekerjaan (D+E) - 18,700.00
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.0000 75,000 75,000.00
Tukang kayu L.02 OH 3.0000 95,000 285,000.00
Kepala tukang L.03 OH 0.3000 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA 360,000.00
B BAHAN
kayu Papan m3 0.0400 -
Lem Kayu/Karet Kg 0.5000 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 360,000.00
E Overhead & Profit 10% 10% 36,000.00
F Harga Satuan Pekerjaan (D+E) - 396,000.00
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.8000 75,000 60,000.00
Tukang kayu L.02 OH 2.4000 95,000 228,000.00
Kepala tukang L.03 OH 0.2400 - -
Mandor L.04 OH 0.0400 - -
JUMLAH TENAGA KERJA 288,000.00
B BAHAN
kayu Papan m3 0.0240 -
Lem Kayu/Karet Kg 0.3000 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 288,000.00
E Overhead & Profit 10% 10% 28,800.00
F Harga Satuan Pekerjaan (D+E) - 316,800.00
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 4.000 75,000 300,000.00
Tukang kayu L.02 OH 12.000 95,000 1,140,000.00
Kepala tukang L.03 OH 1.200 - -
Mandor L.04 OH 0.2 - -
JUMLAH TENAGA KERJA 1,440,000.00
B BAHAN
Balok kayu m3 1.100 -
Besi strip kg 15.000 -
Paku Biasa kg 5.600 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,440,000.00
E Overhead & Profit 10% 10% 144,000.00
F Harga Satuan Pekerjaan (D+E) - 1,584,000.00
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 75,000 11,250.00
Tukang kayu L.02 OH 0.45 95,000 42,750.00
Kepala tukang L.03 OH 0.045 - -
Mandor L.04 OH 0.008 - -
JUMLAH TENAGA KERJA 54,000.00
B BAHAN
Balok kayu m3 0.028 -
Paku Biasa kg 0.15 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 54,000.00
E Overhead & Profit 10% 10% 5,400.00
F Harga Satuan Pekerjaan (D+E) - 59,400.00
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.010 75,000 750.00
Tukang kayu L.02 OH 0.500 95,000 47,500.00
Kepala tukang L.03 OH 0.050 - -
Mandor L.04 OH 0.005 - -
JUMLAH TENAGA KERJA 48,250.00
B BAHAN
Kunci tanam biasa Bh 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 48,250.00
E Overhead & Profit 10% 10% 4,825.00
F Harga Satuan Pekerjaan (D+E) - 53,075.00
A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Sat. (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.020 75,000 1,500.00
Tukang cat L.02 OH 0.063 95,000 5,985.00
Kepala tukang L.03 OH 0.006 - -
Mandor L.04 OH 0.003 - -
JUMLAH TENAGA KERJA 7,485.00
B BAHAN
Plamuur Kg 0.100 7,500 750.00
Cat dasar Tembok Kg 0.100 20,000 2,000.00
Cat Penutup Tembok Kg 0.260 20,000 5,200.00
JUMLAH HARGA BAHAN 7,950.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 15,435.00
E Overhead & Profit 10% 0% -
F Harga Satuan Pekerjaan (D+E) - 15,435.00