No Uraian Pekerjaan

I PEKERJAAN PONDASI
A PEKERJAAN PERSIAPAN
1 Pembersihan lapangan

Ukuran = 10.00 x 12.00 m

12.00 m

9.00
= 9.00 m
= 6.00 m

Luas = 54 m2

2 Pemasangan Bowplank

Pasangan Bowplank
Panjang = 9.00 m
Lebar = 6.00 m
Keliling = 30 m2
3 los kerja
panjang = 4.00 m
Lebar = 2.00 m

Luas = 8.00 m2

B PEKERJAAN TANAH DAN PASIR

1 Galian Tanah Pondasi


Type I
1 m

0.8 m

0.6 m

sumbu X = 3+3+3+4+1+5+2.5+2+3+1.5 = 25.5

sumbu Y = 12+13 = 30
55.5

Panjang Pondasi = 55.50 m


Volume = 35.52 m3
2 Timbunan Tanah Kembali

Volume Galian = 35.52 m3


Volume Timbunan = 1/4 x Vol. Galian
= 8.88 m3

3 Timbunan Tanah Bawah Lantai


Kamar Tidur 3.00 x 3.00 = 9
Kamar Utama 3.00 x 4.50 = 13.5
R. Tamu 3.00 x 2.50 = 7.5
R. Keluarga 3.00 x 2.50 = 7.5
1.50 x 1.50 = 2.25
R Makan 2.00 x 3.00 = 6
Tempat Cuci 1.00 x 2.00 = 2
Dapur 2.00 x 3.00 = 6
53.75 x 0.30
WC/ KM 1 1.50 x 1.50 = 2.25
WC/ KM 2 1.50 x 1.50 = 2.25
4.5 x 0.23

Teras Depan 1.00 x 3.00 = 3


3 x 0.30

Volume Timbunan = 18.060 m3

4 Urugan Pasir Dibawah Pondasi

Type I 1.12 m

0.10
0.60 m

Panjang Pondasi = 55.50 m


Volume = 4.773 m3
5 Urugan Pasir Di Bawah Lantai

Kamar Tidur 3.00 x 3.00 = 9


Kamar Utama 3.00 x 4.50 = 13.5
R. Tamu 3.00 x 2.50 = 7.5
R. Keluarga 3.00 x 2.50 = 7.5
1.50 x 1.50 = 2.25
R Makan 2.00 x 3.00 = 6
Tempat Cuci 1.00 x 2.00 = 2
Dapur 2.00 x 3.00 = 6
WC/ KM 1 1.50 x 1.50 = 2.25
WC/ KM 2 1.50 x 1.50 = 2.25
Teras Depan 1.00 x 3.00 = 3

61.25
Luas Lantai = 61.25 m
Tebal pasir = 0.10 m
Volume = 6.125 m3
Total Urugan Pasir Bawah Pondasi = 6.125 m3

C PEKERJAAN PONDASI
1 Pas. Pondasi Batu Gunung 1:5
Type I
0.26 m

0.70 m

0.54 m
Panjang Pondasi = 55.50 m
Volume = 15.54 m3
2 Pas. Batu Kosong
Type I

0.68

0.20 m

1.12 m

Panjang Pondasi = 55.50 m


Volume = 9.99 m3

II PEKERJAAN BETON
1 Pek. Sloef

0.2 m

0.15 m

Panjang Sloef
Sumbu X = 25.50
Sumbu Y = 30.00
55.5 m
Volume = 1.665 m3

2 Pek. Kolom
15 x 15

0.15 m

0.15 m
Panjang Kolom jumlah tinggi
Kolom Praktis = 20.00 x 4.000 =

Volume Kolom
0.15 x 0.15 x 80.00 = 1.80

Total Volume Kolom = 1.80 m3

3 Pek. Ring Balk

0.2 m

0.15 m
Panjang Ring Balk = 39.5 m
Volume = 0.2 x 0.15
= 1.19 m3
4 Pek. Rabat Beton Bawah Lantai
Luas Lantai Rumah = 61.25 m2
Tebal Rabat Beton = 0.05 m
Volume Rabat Beton = 61.25 x 0.05
= 3.0625 m3

III PEKERJAAN TEMBOK & LANTAI


1 Pek. Dinding 1:5

Luas Dinding Tanpa Pintu dan Jendela =


Luas Pintu dan Jendela
Type P1
1.2

2.11 jumlah 1
= 1.2 x 2.11 x 1
= 2.5320 m2

Type P2
0.82

2.11 jumlah 3

= 0.82 x 2.11 x 3
= 5.1906 m2

Type P3
0.72

2.11
jumlah 2

= 0.72 x 2.11 x 2
= 3.0384 m2

Type J1
0.72

1.42 jumlah 4

= 0.72 x 1.42 x 4
= 4.0896 m2

Type J2
0.62

1.42 jumlah 6

= 0.62 x 1.42 x 6
= 5.28 m2

Type J3
0.52

1.42 jumlah 4
= 0.52 x 1.42 x 4
= 2.95 m2
Roster 1
0.9

0.4 jumlah 2.00 0.72 m2


Roster 2
0.2

0.3 jumlah 21.00 1.26 m2

= 1.98 m2

Luas Pintu dan Jendela Keseluruhan


= p1 p2 p3 j1 j2 j3 roster 1 roster 2
= 2.53 5.19 3.04 4.09 5.28 2.95 0.72 1.26
= 25.07

Luas Dinding Keseluruhan


= 222 - 25.07
= 196.93 m
2
x 0.15
m3
Volume = 196.93 m3
= 29.54001
Volume pek.dinding 1:5 = 24.34
2 Trasram 1:3

V.T Kamar Mandi 1 = 6 x


= 0.9 m3

V.T Kamar Mandi 2 = 6.00 x


= 0.9
T. cuci = 6.8 x
= 3.4
V.T Kamar Mandi 5.2 m3

3 Plesteran 1 : 3

WC 1 1.50 x 1.5 = m2 x
WC 2 1.50 x 1.5 x

4 Plesteran 1 : 5

Luas = 196.93
= 187.93 x 2
= 375.87
=

5 Acian
Luas Dinding Yang Diaci = 196.9 x
= 393.9

6 Pek. Dinding Keramik WC dan tempat cuci (20 x 20)


WC 1 Keliling = 6
Tinggi Tegel = 1.6
Luas = 9.60
Luas Pintu = 0.80 m
= 1.28 m2
Luas - Luas Pintu = 8.32 m2

WC 2 Keliling = 6
Tinggi Tegel = 1.6
Luas = 9.60
Luas Pintu = 0.80 m
= 1.28 m2
Luas - Luas Pintu = 8.32 m2

Tempat Cuci Keliling = 6


Tinggi Tegel = 0.8
Luas = 4.80
Luas Pintu = 0.80 m
= 0.64 m2
Luas - Luas Pintu = 4.16 m2

Luas Total = 20.80 m2

7 Pek. Lantai Keramik 40 x 40 cm

Kamar Tidur 3.00 x 3.00 = 9


Kamar Utama 3.00 x 4.50 = 13.5
R. Tamu 3.00 x 2.50 = 7.5
R. Keluarga 3.00 x 2.50 = 7.5
1.50 x 1.50 = 2.25
R Makan 2.00 x 3.00 = 6
Dapur = 2.00 x 3.00 = 6
luas 51.75

Jadi Luas Secara Keseluruhan Lantai Keramik


= 51.75
8 Luas lantai teras 30 x 30 cm
Luas teras depan = 1.00 x 3
= 3.00

Luas total = 3.00 m2

9 Lantai Keramik WC 20 X 20 cm =

Luas Wc/ KM = 1.50 x 1.50 + 1.50 x


T. cuci = 1.00 x 2.00

TOTAL = 6.50 m2

IV PEKERJAAN PINTU DAN JENDELA


1 Pek. Kusen Pintu dan Jendela
P1 5 / 15 ( 1.00 Buah )
Panjang Balok vertikal = 2.11 x 2m
= 4.22
Panjang Balok horizontal = 1.40 x 1
= 1.40
Luas = 0.05 x 0.15
Volume = 5.62 x 0.0075
P2 5 / 15 ( 3.00 Buah )
Panjang Balok vertikal = 2.11 x 2m
= 12.66
Panjang Balok horizontal = 1.02 x 4
= 4.08
Luas = 0.05 x 0.15
Volume = 16.74 x 0.0075
P3 5 / 15 ( 2.00 Buah )
Panjang Balok vertikal = 2.11 x 2m
= 8.44
Panjang Balok horizontal = 0.92 x 2.00
= 1.84
Luas = 0.05 x 0.15
Volume = 10.28 x 0.0075

J1 5/15 ( 4.00 Buah )


Panjang Balok vertikal = 1.42 x 2m
= 11.36
Panjang Balok horizontal = 0.92 x 2m
= 7.36
Luas = 0.05 x 0.15
Volume = 18.72 x 0.0075

J2 5 / 15 ( 6.00 Buah )
Panjang Balok vertikal = 1.42 x 3m
= 25.56
Panjang Balok horizontal = 0.82 x 2m
= 9.84
Luas = 0.05 x 0.12
Volume = 35.40 x 0.0060

J3 5 / 15 ( 4.00 Buah )
Panjang Balok vertikal = 1.42 x 2m
= 11.36
Panjang Balok horizontal = 0.72 x 2m
= 5.76
Luas = 0.05 x 0.12
Volume = 17.12 x 0.0060

Jadi Total Volume


= P1 + P2 + P3 + J1 + J2
= 0.04215 + 0.13 + 0.08 + 0.1404 + 0.21
= 0.7003 m3

2 Pek. Daun Pintu


P1 ( 1.00 Buah )
Tebal = 3.00 cm
Lebar = 1.10 m
Panjang = 2.11 m
Luas = 1.10 x 2.11 =
=

P2 ( 3.00 Buah )
Tebal = 3.00 cm
Lebar = 0.72 m
Panjang = 2.11 m
Luas = 0.72 x 2.11 =
=

P3 ( 2.00 Buah )
Tebal = 3.00 cm
Lebar = 0.62 m
Panjang = 2.11 m
Luas = 0.62 x 2.11 =
=
Jadi Total Luas
= 2.321 + 4.56 + 2.616
= 9.495 m2
3 Pek. Jendela Jungkit
J1
Jumlah = 4.00 Bh
Luas = 0.62 x 1.72
= 1.07
= 4.27 m2

J2
Jumlah = 6.00 Bh
Luas = 0.62 x 1.42
= 0.88
= 5.28 m2

J3
Jumlah = 4.00 Bh
Luas = 0.62 x 1.42
= 0.88
= 3.52 m2

4 Pas. Kaca Tebal 5mm


J1
Jumlah = 4.00 Bh
Luas = 0.74 x 1.34 x 0.005
= 0.005
= 0.005 m2

J2
Jumlah = 6.00 Bh
Luas = 0.64 x 1.34 x 0.005
= 0.004
= 0.004 m2

J3
Jumlah = 4.00 Bh
Luas = 0.62 x 1.42 x 0.005
= 0.004
= 0.004 m2

5 Pas. Kunci Tanam


= 12 Bh

6 Pas. Engsel Pintu


= 24 Bh

7 Pas. Grendel Pintu


= 6 Bh

8 Pas. Engsel Jendela


= 28 Bh

9 Pas. Grendel Jendela


= 28 Bh
10 Hak Angin
= 12 Bh

V PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda-Kuda 6/12

Panjang Balok Kuda-Kuda tyepe 1


= 13 m

Volume
= 0.06 x 0.12 x 13
= m3
= 0.09 m3
Panjang Balok Kuda-kuda type 11

= 13

2 Pek. Balok Nok 8/12


Panjang Balok = 3.00 m
Volume = 0.08 x 0.12

= 0.03 m3

3 Pek. Gording 5/7


Panjang Balok = 8.94 x 8
= 71.52
Volume = 0.05 x 0.07
= 0.25 m3

4 Pek. Kasau 5/7


Panjang balok = 8.00 x 2.18
= 17.44
Volume = 0.05 x 0.07 x 17.44
= 0.06 m3

5 Pek.Reng 2/3
Panjang Balok = 31.00 x 9.00
= 279.00 m
2

Volume = 0.02 x 0.03 x 279


= 0.17 m3

6 Pek. Atap Genteng


Luas = 88.87 m2

7 Pek. Bubungan / Nok Atap


Luas = 9.00 m1

8 Pek. Rangka Plafond 5/7


Kamar Tidur 3.00 x 3.00 = 9
Kamar Utama 3.00 x 4.50 = 13.5
R. Tamu 3.00 x 2.50 = 7.5
R. Keluarga 3.00 x 2.50 = 7.5
1.50 x 1.50 = 2.25
R Makan 2.00 x 3.00 = 6
Tempat Cuci 1.00 x 2.00 = 2
Dapur 2.00 x 3.00 = 6
WC/ KM 1 1.50 x 1.50 = 2.25
WC/ KM 2 1.50 x 1.50 = 2.25
Teras Depan 1.00 x 3.00 = 3

61.25

Rangka Plafond = Luas : ukuran plafond


61.25 : 1.00
61.25

Volume = 0.05 x 0.07 x


= 0.21 m
3

9 Pek. Plafond
Kamar Tidur 3.00 x 3.00 = 9
Kamar Utama 3.00 x 4.50 = 13.5
R. Tamu 3.00 x 2.50 = 7.5
R. Keluarga 3.00 x 2.50 = 7.5
1.50 x 1.50 = 2.25
R Makan 2.00 x 3.00 = 6
Tempat Cuci 1.00 x 2.00 = 2
Dapur 2.00 x 3.00 = 6
WC/ KM 1 1.50 x 1.50 = 2.25
WC/ KM 2 1.50 x 1.50 = 2.25
Teras Depan 1.00 x 3.00 = 3

61.25

Luas Total Plafond = 61.25 m2

10 Pek. List Plafond 5/7

Kamar Tidur 3.00 x 3.00 = 9


Kamar Utama 3.00 x 4.50 = 13.5
R. Tamu 3.00 x 2.50 = 7.5
R. Keluarga 3.00 x 2.50 = 7.5
1.50 x 1.50 = 2.25
R Makan 2.00 x 3.00 = 6
Tempat Cuci 1.00 x 2.00 = 2
Dapur 2.00 x 3.00 = 6
WC/ KM 1 1.50 x 1.50 = 2.25
WC/ KM 2 1.50 x 1.50 = 2.25
Teras Depan 1.00 x 3.00 = 3

61.25
43.75

12 Pek. Lisplank
Panjang Total Lisplank = 24.00 m

VI PEKERJAAN PENGECETAN
1 Pek. Pengecetan Tembok
Luas Total Dinding Yang Di Cet 196.93 x 2.00 -
393.87

2 Pek. Kusen, Pintu dan Jendela

P1 5 / 15 ( 1.00 Buah )
Panjang Balok vertikal = 2.25 x 2
= 4.50
Panjang Balok horizontal = 1.20 x 1.00
= 1.20
Luas = 0.05 x 0.15
Volume = 5.70 x 0.0075

P2 5 / 15 ( 3.00 Buah )
Panjang Balok vertikal = 2.11 x 2
= 12.66
Panjang Balok horizontal = 0.82 x 3.00
= 2.46
Luas = 0.05 x 0.15
Volume = 15.12 x 0.0075

P3 5 / 15 ( 2.00 Buah )
Panjang Balok vertikal = 2.11 x 2m
= 8.44
Panjang Balok horizontal = 0.72 x 2.00
= 1.44
Luas = 0.05 x 0.15
Volume = 9.88 x 0.0075

J1 5/15 ( 4.00 Buah )


Panjang Balok vertikal = 1.42 x 2m
= 11.36
Panjang Balok horizontal = 0.72 x 2m
= 5.76
Luas = 0.05 x 0.15
Volume = 17.12 x 0.0075

J2 5 / 15 ( 6.00 Buah )
Panjang Balok vertikal = 1.42 x 3m
= 25.56
Panjang Balok horizontal = 0.62 x 2m
= 1.24
Luas = 0.05 x 0.15
Volume = 26.80 x 0.0075

J3 5 / 15 ( 4.00 Buah )
Panjang Balok vertikal = 1.42 x 2m
= 11.36
Panjang Balok horizontal = 0.52 x 2m
= 4.16
Luas = 0.05 x 0.15
Volume = 15.52 x 0.0075

Jadi Total Volume


= P1 + P2 + P3 + J1 + J2
= 0.04275 + 0.11 + 0.07 + 0.078 + 0.20
= 0.6257 m3

3 Pek. Pengecetan Plafond


Luas Pengecetan Plafond = 61

4 Pek. Pengecetan Lisplank


Luas Pengecetan Lisplank = 24
VII PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik
R.T Utama = 0.70
R.T kedua = 0.50
R. Tamu = 0.70
Dapur = 1.60
R. Makan = 0.50
lorong = 1.30
WC/ KM 1 = 0.80
WC/ KM 2 = 0.70
Teras Belakang = 1.00
Teras Depan = 1.50
9.30

2 Pas. Saklar Ganda


Volume Saklar Ganda = 4.00

3 Pas. Saklar Tunggal


Volume Saklar Tunggal = 5.00

4 Pas. Stop Kontak


Volume Stop Kontak = 8.00
5 Pas. Lampu Hias
Volume Lampu Susu = 2.00

6 Pas. Lampu Pijar 15 watt


Volume Lampu Pijar 35 watt = 5.00

7 Pas. Lampu Pijar 12 watt


Volume Lampu Pijar 12 watt = 3.00

VIII PEKERJAAN SANITASI


1 Pek. Stop kran
Volume Stop Kran = 6.00

2 Pek. Pipa 3/4'


Panjang Pipa 3/4' = 25.00

3 Pek. Pipa PVC 4'


Panjang Pipa PVC 4' = 24.00

4 Pas. Klosed Duduk


Volume Klosed Duduk = 2.00
5 Pek. Bak Cuci Piring
Volume Bak Cuci Piring = 1.00

6 Bak Air Viber


Volume Bak Air Viber = 3.00

7 Pek. Septic Tank = 1.00


Volume Satuan

54.00 m2

30.00 m2
8 m2
35.52 m3

8.88 m3

= 16.125
= 1.035

= 0.9

18.06 m3

0.10 m
4.773 m3
6.125 m3

15.54 m3
9.99 m3
1.665 m3

80.00 m
80.00 m

m3

1.80 m3

0.15 x 39.5
1.19 m3
0.05
3.06 m3

222 m2
24.34 m3
1 0.15

1 0.15

1 0.50

5.2 m3

2 sisi = 4.5
2 sisi = 4.5
9.0 9.00 m2

376 m2

2
393.9 m2
m
20.80 m2

51.75 m2
3.00 m2

1.50 = 4.50
= 2

6.50 m2

= 0.0075 m2
= 0.04215 m3
= 0.04215 m3

= 0.0075 m2
= 0.12555 m3
= 0.12555 m3
= 0.0075 m2
= 0.0771 m3
= 0.0771 m3

= 0.0075 m2
= 0.140 m3
= 0.140 m3

= 0.0060 m2
= 0.212 m3
= 0.212 m3
= 0.0060 m2
= 0.103 m3
= 0.103 m3

+ J3
0.10272
0.7003 m3

2.321 m2
2.321 m2

1.519 m2
4.558 m2

1.308 m2
2.616 m2

9.495 m2
13.07 m2
0.013648 m2

12 Bh

24 Bh

6 Bh

28 Bh

28 Bh
12 Bh
26.0000 m3

x 3

0.0288 m3
x 71.52
0.25032 m3

0.06104 m3

0.1674 m3

88.870 m2

9 m1
61.25
0.214375 m3
61.25 m2
44 m2

24.00 m

m2
393.9 m2

= 0.0075 m2
= 0.04 m3
= 0.04 m3
= 0.0075 m2
= 0.11 m3
= 0.1134 m3

= 0.0075 m2
= 0.07 m3
= 0.07 m3

= 0.0075 m2
= 0.13 m3
= 0.078 m3
= 0.0075 m2
= 0.20 m3
= 0.20 m3

= 0.0075 m2
= 0.12 m3
= 0.12 m3

+ J3
0.1164
0.6257 m2

m2 61 m2
m 24 m
9.30 0

Bh 4 Bh

Bh 5 Bh

Bh 8 Bh
Bh 2 Bh

Bh 5 Bh

Bh 3 Bh

Unit 6 Unit

m 25 m

m 24 m

Pas 2 Pas
Pas 1 Pas

Pas 3 Pas

pas 1 pas
DAFTAR ANALISA BIAYA
KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

No Uraian Koef Sat Harga Satuan Jumlah

1 An. 1. 1 M 2 Membersihkan Lapangan dan Pemerataan


Upah :
Pekerja 0.100 Hr @ Rp. 96,000.00 Rp.
Mandor 0.050 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

An. . 1 M' Pengukuran & Pemasangan Bowplank


Upah :
Kayu 5/7 0.001 M³ @ Rp. 1,850,000.00 Rp.
Paku Biasa 2"-5" 0.020 Kg @ Rp. 15,500.00 Rp.
Kayu papan 3/20 Kls IV 0.007 M³ @ Rp. 1,850,000.00 Rp.
Tenaga :
Tukang Kayu 0.100 Hr @ Rp. 120,000.00 Rp.
Pekerja 0.100 Hr @ Rp. 96,000.00 Rp.
Kepala Tukang 0.010 Hr @ Rp. 130,000.00 Rp.
Mandor 0.005 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

Pembuatan direksi keet dan los kerja


Upah :
Kayu 5/7 Kls III 0.001 M³ @ Rp. 3,850,000.00 Rp.
Paku Biasa 2"-5" 0.020 Kg @ Rp. 15,500.00 Rp.
Kayu papan 3/20 Kls III 0.004 M³ @ Rp. 3,125,000.00 Rp.
Seng Gelombang BJLS 20 (7 Kaki) 1.500 Lbr @ Rp. 52,500.00 Rp.
Tenaga :
Tukang Kayu 2.000 Hr @ Rp. 120,000.00 Rp.
Pekerja 1.000 Hr @ Rp. 96,000.00 Rp.
Kepala Tukang 0.200 Hr @ Rp. 130,000.00 Rp.
Mandor 0.050 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

2 An. 2. 1 M 3 Galian Tanah biasa poondasi


Upah :
Pekerja 0.400 Hr @ Rp. 96,000.00 Rp.
Mandor 0.040 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

3 An. 3. 1 M 3 Urugan Kembali


Upah :
Pekerja 0.192 Hr @ Rp. 96,000.00 Rp.
Mandor 0.019 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.
4 An. 4. 1 M 3 Pemadatan Tanah
Upah :
Pekerja 0.500 Hr @ Rp. 96,000.00 Rp.
Mandor 0.050 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

5 An. 5. 1 M 3 Urugan Pasir


Bahan :
Pasir Urug 1.200 M3 @ Rp. 151,600.00 Rp.
Upah :
Pekerja 0.300 Hr @ Rp. 96,000.00 Rp.
Mandor 0.010 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.
6 An. 6. 1 M 3 Urugan Sirtu
Bahan :
Sirtu 1.200 M3 @ Rp. 177,000.00 Rp.
Upah :
Pekerja 0.250 Hr @ Rp. 96,000.00 Rp.
Mandor 0.025 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

7 An. 7. 1 M 3 Urugan Tanah


Bahan :
Tanah Urug 1.200 M3 @ Rp. 85,000.00 Rp.
Upah :
Pekerja 0.250 Hr @ Rp. 96,000.00 Rp.
Mandor 0.025 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

8 An. 8. 1 M 3 Pasang Pondasi Batu Kosong


Bahan :
Batu Kali 1.100 M3 @ Rp. 266,500.00 Rp.
Pasir Urug 0.300 M3 @ Rp. 105,000.00 Rp.
Upah :
Pekerja 0.780 Hr @ Rp. 96,000.00 Rp.
Tukang Batu 0.390 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.039 Hr @ Rp. 130,000.00 Rp.
Mandor 0.039 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

9 An. 9. 1 M 3 Pasang Pondasi Batu Kali 1 Pc : 3 Ps


Bahan :
Batu Kali 1.100 M3 @ Rp. 266,500.00 Rp.
Semen Portland 202.000 Kg @ Rp. 1,346.00 Rp.
Pasir Pasangan 0.485 M3 @ Rp. 235,000.00 Rp.
Upah :
Pekerja 1.500 Hr @ Rp. 96,000.00 Rp.
Tukang Batu 0.600 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.060 Hr @ Rp. 130,000.00 Rp.
Mandor 0.075 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.
10 An. 10. 1 M 2 Pasang Bata Merah 1/2 Bata, 1 Pc : 3 Ps
Bahan :
Bata Merah 50.000 Bh @ Rp. 600.00 Rp.
Semen Portland 14,730.000 Kg @ Rp. 1,346.00 Rp.
Pasir Pasangan 0.040 M3 @ Rp. 235,000.00 Rp.
Upah :
Pekerja 0.320 Hr @ Rp. 96,000.00 Rp.
Tukang Batu 0.100 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.010 Hr @ Rp. 130,000.00 Rp.
Mandor 0.015 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

11 An. 11. 1 M 3 Pasang Bata Merah 1/2 Bata, 1 Pc : 5 Ps


Bahan :
Bata Merah 50.000 Bh @ Rp. 600.00 Rp.
Semen Portland 11.500 Kg @ Rp. 1,346.00 Rp.
Pasir Pasangan 0.043 M3 @ Rp. 235,000.00 Rp.
Upah :
Pekerja 0.320 Hr @ Rp. 96,000.00 Rp.
Tukang Batu 0.100 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.010 Hr @ Rp. 130,000.00 Rp.
Mandor 0.015 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

12 An. 12. 1 M 2 Plesteran 1 Pc : 3 Ps, tebal 1,5 cm


Bahan :
Semen Portland 6.480 Kg @ Rp. 1,346.00 Rp.
Pasir Pasangan 0.019 M3 @ Rp. 235,000.00 Rp.
Upah :
Pekerja 0.200 Hr @ Rp. 96,000.00 Rp.
Tukang Batu 0.150 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.015 Hr @ Rp. 130,000.00 Rp.
Mandor 0.010 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.
13 An. 13. 1 M 2 Plesteran 1 Pc : 5 Ps, tebal 1,5 cm
Bahan :
Semen Portland 5.200 Kg @ Rp. 1,346.00 Rp.
Pasir Pasangan 0.020 M3 @ Rp. 235,000.00 Rp.
Upah :
Pekerja 0.200 Hr @ Rp. 96,000.00 Rp.
Tukang Batu 0.150 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.015 Hr @ Rp. 130,000.00 Rp.
Mandor 0.010 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

13 An. 13. 1 M 2 Acian Plesteran


Bahan :
Semen Portland 5.670 Kg @ Rp. 1,346.00 Rp.
Kapur Pasangan 0.050 Kg @ Rp. 1,675.00 Rp.
Upah :
Pekerja 0.150 Hr @ Rp. 96,000.00 Rp.
Tukang Batu 0.070 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.007 Hr @ Rp. 130,000.00 Rp.
Mandor 0.008 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

14 An. 14. 1 M 3 Membuat Beton K 300


Bahan :
Semen Portland 40 kg 10.325 zak @ Rp. 52,700.00 Rp.
Pasir Beton 0.436 M3 @ Rp. 121,000.00 Rp.
Batu Pecah 1/2 0.537 M3 @ Rp. 475,900.00 Rp.
Air 215.000 L @ Rp. 40.00 Rp.
Tenaga :
Pekerja 1.650 Hr @ Rp. 96,000.00 Rp.
Tukang Batu 0.275 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.028 Hr @ Rp. 130,000.00 Rp.
Mandor 0.083 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.
15 An. 15. 1 Kg Pembesian dengan Besi Ulir 39
Bahan :
Besi Beton Ulir 1.050 Kg @ Rp. 9,600.00 Rp.
kawat Beton (bnedrat) 0.015 kg @ Rp. 15,295.00 Rp.
Tenaga :
Pekerja 0.007 Hr @ Rp. 96,000.00 Rp.
Tukang Batu 0.007 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.001 Hr @ Rp. 130,000.00 Rp.
Mandor 0.001 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

16 An. 22 1 Kg Pembesian dengan Besi Polos U-24


Bahan :
Besi Beton Polos 1.050 Kg @ Rp. 9,400.00 Rp.
Kawat Beton 0.015 Kg @ Rp. 15,295.00 Rp.
Tenaga :
Pekerja 0.007 Hr @ Rp. 96,000.00 Rp.
Tukang Besi 0.007 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.001 Hr @ Rp. 130,000.00 Rp.
Mandor 0.001 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

17 An. 17. 1 M 2 Pasangan Bekisting


Bahan :
Papan Kayu Klas III 0.045 M3 @ Rp. 2,926,000.00 Rp.
Paku Biasa 2" - 5" 0.300 Kg @ Rp. 15,700.00 Rp.
Minyak Bekisting 0.100 Ltr @ Rp. 9,500.00 Rp.
Tenaga :
Pekerja 0.300 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 0.260 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.026 Hr @ Rp. 130,000.00 Rp.
Mandor 0.005 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

18 An. 18. 1 M 3 Membuat Beton Sloof 20/35


Analisa :
An. 15. Beton K300 1.000 M3 @ Rp. 1,068,531.80 Rp.
An. 22 Bekisting 13.330 M @ Rp.
2
201,460.00 Rp.
Besi beton Polos U24 252.947 Kg @ Rp. 11,807.43
Harga Satuan Rp.

1 M 3 Membuat Beton Kolom Praktis 15/15

Beton K300 1.000 M3 @ Rp. 1,068,531.80 Rp.


Bekisting 13.330 M @ Rp.
2
201,460.00 Rp.
Besi beton Polos U24 191.483 Kg @ Rp. 11,807.43
Harga Satuan Rp.
19 An. 19. 1 M 3 Pasang Konstruksi Kuda-kuda
Bahan :
Balok Kayu Klas I 1.100 M3 @ Rp. 8,882,500.00 Rp.
Balok Kayu Klas II 1.100 M3 @ Rp. 3,657,000.00 Rp.
Balok Kayu Klas III 1.100 M3 @ Rp. 1,672,000.00 Rp.
Besi Strip 15.000 Kg @ Rp. 9,250.00 Rp.
Paku Biasa 2" - 5" 0.800 Kg @ Rp. 24,000.00 Rp.
Tenaga :
Pekerja 4.000 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 12.000 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 1.200 Hr @ Rp. 130,000.00 Rp.
Mandor 0.200 Hr @ Rp. 150,000.00 Rp.
Balok Kayu Klas I Rp.
Balok Kayu Klas II Rp.
Balok Kayu Klas III Rp.
20 An. 20. 1 M 3 Pasang Gurding
Bahan :
Balok Kayu Klas I 1.100 M3 @ Rp. 8,882,500.00 Rp.
Balok Kayu Klas II 1.100 M3 @ Rp. 3,657,000.00 Rp.
Balok Kayu Klas III 1.100 M3 @ Rp. 1,672,000.00 Rp.
Paku Biasa 2" - 5" 0.800 Kg @ Rp. 24,000.00 Rp.
Tenaga :
Pekerja 6.000 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 12.000 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 1.800 Hr @ Rp. 130,000.00 Rp.
Mandor 0.300 Hr @ Rp. 150,000.00 Rp.
Balok Kayu Klas I Rp.
Balok Kayu Klas II Rp.
Balok Kayu Klas III Rp.

21 An. 21. 1 M 2 Pasang Kaso + Reng Atap Genteng


Bahan :
Balok Kayu Klas I 0.012 M3 @ Rp. 8,882,500.00 Rp.
Balok Kayu Klas II 0.012 M3 @ Rp. 3,657,000.00 Rp.
Balok Kayu Klas III 0.014 M3 @ Rp. 1,672,000.00 Rp.
Paku Biasa 2" - 5" 0.150 Kg @ Rp. 15,700.00 Rp.
Tenaga :
Pekerja 0.100 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 0.100 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.010 Hr @ Rp. 130,000.00 Rp.
Mandor 0.005 Hr @ Rp. 150,000.00 Rp.
Balok Kayu Klas I Rp.
Balok Kayu Klas II Rp.
Balok Kayu Klas III Rp.

22 An. 22. 1 M 2 Pasang Karet Pelapis Atap Genteng


Bahan :
Karet Pelapis 1.200 M2 @ Rp. 20,500.00 Rp.
Paku Biasa 2" - 5" 0.500 Kg @ Rp. 15,700.00 Rp.
Tenaga :
Pekerja 0.150 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 0.100 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.010 Hr @ Rp. 130,000.00 Rp.
Mandor 0.010 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

23 An. 23. 1 M 2 Pasang Atap Genteng


Bahan :
Genteng 11.000 Lbr @ Rp. 46,000.00 Rp.
Paku Biasa 2" - 5" 0.030 Kg @ Rp. 15,700.00 Rp.
Tenaga :
Pekerja 0.200 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 0.100 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.010 Hr @ Rp. 130,000.00 Rp.
Mandor 0.010 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.
24 An. 24. 1 M 1 Pasang Nok Atap Genteng
Bahan :
Nok Genteng Beton 3.000 Lbr @ Rp. 43,000.00 Rp.
Semen Portland 5.000 Kg @ Rp. 1,346.00 Rp.
Pasir Pasangan 0.020 M3 @ Rp. 235,000.00 Rp.
Tenaga :
Pekerja 0.150 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 0.075 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.008 Hr @ Rp. 130,000.00 Rp.
Mandor 0.008 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

25 An. 25. 1 M 2 Pasang Listplank 3/20


Bahan :
Balok Kayu Klas I 0.011 M3 @ Rp. 8,882,500.00 Rp.
Balok Kayu Klas II 0.011 M3 @ Rp. 3,657,000.00 Rp.
Balok Kayu Klas III 0.011 M3 @ Rp. 1,672,000.00 Rp.
Paku Biasa 2" - 5" 0.050 Kg @ Rp. 24,000.00 Rp.
Tenaga :
Pekerja 0.110 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 0.220 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.022 Hr @ Rp. 130,000.00 Rp.
Mandor 0.005 Hr @ Rp. 150,000.00 Rp.
Balok Kayu Klas I Rp.
Balok Kayu Klas II Rp.
Balok Kayu Klas III Rp.

26 An. 26. 1 M 2 Pasang Listplank 3/30


Bahan :
Balok Kayu Klas I 0.011 M3 @ Rp. 8,882,500.00 Rp.
Balok Kayu Klas II 0.011 M3 @ Rp. 3,657,000.00 Rp.
Balok Kayu Klas III 0.011 M3 @ Rp. 1,672,000.00 Rp.
Paku Biasa 2" - 5" 0.050 Kg @ Rp. 15,700.00 Rp.
Tenaga :
Pekerja 0.110 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 0.220 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.022 Hr @ Rp. 130,000.00 Rp.
Mandor 0.005 Hr @ Rp. 150,000.00 Rp.
Balok Kayu Klas I Rp.
Balok Kayu Klas II Rp.
Balok Kayu Klas III Rp.

27 An. 27. 1 M 2 Pasang Listplank 2x3/20


Bahan :
Balok Kayu Klas I 0.011 M3 @ Rp. 8,882,500.00 Rp.
Balok Kayu Klas II 0.011 M3 @ Rp. 3,657,000.00 Rp.
Balok Kayu Klas III 0.011 M3 @ Rp. 1,672,000.00 Rp.
Paku Biasa 2" - 5" 0.050 Kg @ Rp. 15,700.00 Rp.
Tenaga :
Pekerja 0.110 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 0.220 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.022 Hr @ Rp. 130,000.00 Rp.
Mandor 0.005 Hr @ Rp. 150,000.00 Rp.
Balok Kayu Klas I Rp.
Balok Kayu Klas II Rp.
Balok Kayu Klas III Rp.
28 An. 28. 1 M 1 Pasang Listplank 2x2/20
Bahan :
Balok Kayu Klas I 0.011 M3 @ Rp. 8,882,500.00 Rp.
Balok Kayu Klas II 0.011 M3 @ Rp. 3,657,000.00 Rp.
Balok Kayu Klas III 0.011 M3 @ Rp. 1,672,000.00 Rp.
Paku Biasa 2" - 5" 0.050 Kg @ Rp. 15,700.00 Rp.
Tenaga :
Pekerja 0.110 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 0.220 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.022 Hr @ Rp. 130,000.00 Rp.
Mandor 0.005 Hr @ Rp. 150,000.00 Rp.
Balok Kayu Klas I Rp.
Balok Kayu Klas II Rp.
Balok Kayu Klas III Rp.

29 An. 29. 1 M 2 Pasang Atap Genteng


Bahan :
Genteng 11.000 Lbr @ Rp. 46,000.00 Rp.
Paku 0.030 Kg @ Rp. 29,150.00 Rp.
Tenaga :
Pekerja 0.200 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 0.100 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.010 Hr @ Rp. 130,000.00 Rp.
Mandor 0.010 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

30 An. 30. 1 M 2 Pasang Nok Genteng


Bahan :
Nok Genteng 3.500 Lbr @ Rp. 43,000.00 Rp.
Paku 0.050 Kg @ Rp. 15,700.00 Rp.
Tenaga :
Pekerja 0.400 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 0.200 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.020 Hr @ Rp. 130,000.00 Rp.
Mandor 0.020 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

31 An. 31. 1 M 2 Pasang Rangka Langit-langit 100x100 cm


Bahan :
Balok Kayu Klas I 0.012 M3 @ Rp. 8,882,500.00 Rp.
Balok Kayu Klas II 0.012 M3 @ Rp. 3,657,000.00 Rp.
Balok Kayu Klas III 0.012 M3 @ Rp. 1,672,000.00 Rp.
Paku Biasa 2" - 5" 2.000 Kg @ Rp. 20,900.00 Rp.
Tenaga :
Pekerja 0.600 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 1.800 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.180 Hr @ Rp. 130,000.00 Rp.
Mandor 0.030 Hr @ Rp. 150,000.00 Rp.
Balok Kayu Klas I Rp.
Balok Kayu Klas II Rp.
Balok Kayu Klas III Rp.
32 An. 32. 1 M 2 Pasang Langit-langit 100x100 cm
Bahan :
Etermit 1.000 Lbr @ Rp. 25,000.00 Rp.
Tripleks 0.390 Lbr @ Rp. 135,900.00 Rp.
Paku 0.020 Kg @ Rp. 15,700.00 Rp.
Tenaga :
Pekerja 0.300 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 0.500 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.050 Hr @ Rp. 130,000.00 Rp.
Mandor 0.020 Hr @ Rp. 150,000.00 Rp.
Plafond Eternit Rp.
Plafond Tripleks Rp.

33 An. 33. 1 M 1 Pasang List Plafound Kayu Profil


Bahan :
Kayu Profil 1.100 M1 @ Rp. 8,500.00 Rp.
Tenaga :
Pekerja 0.050 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 0.050 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.005 Hr @ Rp. 130,000.00 Rp.
Mandor 0.003 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

34 An. 34. 1 M 3 Pasang Kusen Pintu dan Jendela Klas I


Bahan :
Balok Kayu Klas I 1.100 M3 @ Rp. 8,882,500.00 Rp.
Tenaga :
Pekerja 6.000 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 20.000 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 2.000 Hr @ Rp. 130,000.00 Rp.
Mandor 0.300 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

35 An. 35. 1 M 2 Pasang Jalusi Pintu dan Jendela Kayu Klas I


Bahan :
Papan Kayu Klas I (kayu bangkirei) 0.064 M3 @ Rp. 19,855,000.00 Rp.
Tenaga :
Pekerja 1.000 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 3.000 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.300 Hr @ Rp. 130,000.00 Rp.
Mandor 0.300 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

36 An. 36. 1 M 2 Pasang Jalusi Mati Kusen Kayu Klas I


Bahan :
Papan Kayu Klas I (kayu bangkirei) 0.060 M3 @ Rp. 19,855,000.00 Rp.
Paku Biasa 1/2"-1" 0.150 Kg @ Rp. 18,300.00 Rp.
Tenaga :
Pekerja 0.500 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 2.000 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.200 Hr @ Rp. 130,000.00 Rp.
Mandor 0.025 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.
37 An. 37. 1 M 2 Pasang Pintu dan Jendela Panil Kayu Klas I
Bahan :
Papan Kayu Klas I (kayu bangkirei) 0.040 M3 @ Rp. 19,855,000.00 Rp.
Tenaga :
Pekerja 1.544 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 4.633 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.463 Hr @ Rp. 130,000.00 Rp.
Mandor 0.463 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

38 An. 38. 1 M 2 Pasang Pintu dan Jendela Panil Kaca Klas I


Bahan :
Papan Kayu Klas I (kayu bangkirei) 0.035 M3 @ Rp. 19,855,000.00 Rp.
Kaca Bening 5 mm 1.100 M2 @ Rp. 125,400.00 Rp.
Tenaga :
Pekerja 0.800 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 2.000 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.200 Hr @ Rp. 130,000.00 Rp.
Mandor 0.040 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

39 An. 39. 1 M 2 Pasang Kaca 5mm


Bahan :
Kaca Bening 5 mm 1.000 M2 @ Rp. 125,400.00 Rp.
Kayu Les Klas II 0.005 M3 @ Rp. 3,135,000.00 Rp.
Tenaga :
Pekerja 0.150 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 0.500 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.050 Hr @ Rp. 130,000.00 Rp.
Mandor 0.010 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

40 An. 40. 1 M 2 Pasang Lantai Keramik


Bahan :
Keramik 20x20 1.000 M2 @ Rp. 50,200.00 Rp.
Keramik 20x25 1.000 M2 @ Rp. 39,650.00 Rp.
Keramik 30x30 1.000 M2 @ Rp. 52,000.00 Rp.
Keramik 60x60 1.000 M2 @ Rp. 145,000.00 Rp.
Semen Portland 11.380 Kg @ Rp. 1,346.00 Rp.
Pasir Pasangan 0.042 M3 @ Rp. 235,000.00 Rp.
Semen Warna 1.500 Kg @ Rp. 15,000.00 Rp.
Tenaga :
Pekerja 0.620 Hr @ Rp. 96,000.00 Rp.
Tukang Batu 0.350 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.035 Hr @ Rp. 130,000.00 Rp.
Mandor 0.030 Hr @ Rp. 150,000.00 Rp.
Keramik 20x20 Rp.
Keramik 20x25 Rp.
Keramik 30x30 Rp.
Keramik 60x60 Rp.
41 An. 41. 1 M 2 Pasang Dinding Keramik
Bahan :
Keramik 10/20 1.000 M2 @ Rp. - Rp.
Keramik 20x20 1.000 M2 @ Rp. 50,200.00 Rp.
Keramik 20x25 1.000 M2 @ Rp. - Rp.
Keramik 30x30 1.000 M2 @ Rp. 52,000.00 Rp.
Batu Tempel 1.000 M2 @ Rp. - Rp.
Semen Portland 9.300 Kg @ Rp. 1,346.00 Rp.
Pasir Pasangan 0.018 M3 @ Rp. 235,000.00 Rp.
Semen Warna 1.500 Kg @ Rp. 15,000.00 Rp.
Tenaga :
Pekerja 0.600 Hr @ Rp. 96,000.00 Rp.
Tukang Batu 0.450 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.045 Hr @ Rp. 130,000.00 Rp.
Mandor 0.030 Hr @ Rp. 150,000.00 Rp.
Keramik 10/20 Rp.
Keramik 20x20 Rp.
Keramik 20x25 Rp.
Keramik 30x30 Rp.
Batu Tempel Rp.

42 An. 42. 1 M 2 Pengecatan Tembok/Eternit Baru


( 1 Lps Plamir, 1 Lps Cat Dasar, 2 Lps Cat Penutup )
Bahan :
Plamir 1 x 0.100 Kg @ Rp. 31,500.00 Rp.
Cat Dasar 1 x 0.100 Kg @ Rp. 130,700.00 Rp.
Cat Penutup 2 x 0.200 Kg @ Rp. 112,000.00 Rp.
Tenaga :
Pekerja 0.200 Hr @ Rp. 96,000.00 Rp.
Tukang Cat 0.100 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.009 Hr @ Rp. 130,000.00 Rp.
Mandor 0.030 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

43 An. 43. 1 M 2 Pengecatan Kayu Baru ( 1 Lps Plamir, 1 Lps Cat Dasar, 2 Lps Cat Penutup )
Bahan :
Cat Meni 0.200 Kg @ Rp. 11,428.57 Rp.
Plamir 1 x 0.150 Kg @ Rp. 41,800.00 Rp.
Cat Dasar 1 x 0.170 Kg @ Rp. 40,000.00 Rp.
Cat Penutup 2 x 0.350 Kg @ Rp. 80,000.00 Rp.
Tenaga :
Pekerja 0.070 Hr @ Rp. 96,000.00 Rp.
Tukang Cat 0.105 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.004 Hr @ Rp. 130,000.00 Rp.
Mandor 0.003 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

44 An. 44. 1 M 2 Pengecatan Atap Seng Baru ( 1 Lps Cat Dasar, 2 Lps Cat Penutup )
Bahan :
Cat Dasar 1 x 0.170 Kg @ Rp. 40,000.00 Rp.
Cat Penutup 2 x 0.260 Kg @ Rp. 80,000.00 Rp.
Tenaga :
Pekerja 0.070 Hr @ Rp. 96,000.00 Rp.
Tukang Cat 0.009 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.006 Hr @ Rp. 130,000.00 Rp.
Mandor 0.003 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.
45 An. 45. 1 Bh Kunci Tanam 2 x Putar
Bahan :
Kunci Tanam 2 x Putar SES 1.000 Bh @ Rp. 292,600.00 Rp.
Tenaga :
Pekerja 0.010 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 0.500 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.010 Hr @ Rp. 130,000.00 Rp.
Mandor 0.005 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

46 An. 46. 1 Bh Engsel Pintu Kuningan


Bahan :
Engsel Pintu Kuningan SES 1.000 Bh @ Rp. 28,300.00 Rp.
Tenaga :
Pekerja 0.015 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 0.150 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.015 Hr @ Rp. 130,000.00 Rp.
Mandor 0.001 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

47 An. 47. 1 Bh Engsel Jendela Kuningan


Bahan :
Engsel Jendela Kuningan 1.000 Bh @ Rp. 31,350.00 Rp.
Tenaga :
Pekerja 0.020 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 0.200 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.020 Hr @ Rp. 130,000.00 Rp.
Mandor 0.010 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

48 An. 48. 1 Bh Grendel Pintu


Bahan :
Grendel Pintu Kuningan 1.000 Bh @ Rp. 109,800.00 Rp.
Tenaga :
Pekerja 0.010 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 0.100 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.010 Hr @ Rp. 130,000.00 Rp.
Mandor 0.005 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

49 An. 49. 1 Bh Grendel Jendela


Bahan :
Grendel Jendela Kuningan 1.000 Bh @ Rp. 36,600.00 Rp.
Tenaga :
Pekerja 0.012 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 0.120 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.012 Hr @ Rp. 130,000.00 Rp.
Mandor 0.006 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.
50 An. 50. 1 Bh Kait Angin Jendela
Bahan :
Kair Angin 1.000 Bh @ Rp. 26,200.00 Rp.
Tenaga :
Pekerja 0.015 Hr @ Rp. 96,000.00 Rp.
Tukang Kayu 0.150 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.015 Hr @ Rp. 130,000.00 Rp.
Mandor 0.001 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

51 An. 51. 1 Bh Kloset Jongkok Porselain


Bahan :
Kloset Jongkok 1.000 Bh @ Rp. 275,500.00 Rp.
Semen Portland 6.000 Kg @ Rp. 1,346.00 Rp.
Pasir Pasangan 0.010 M3 @ Rp. 235,000.00 Rp.
Tenaga :
Pekerja 1.000 Hr @ Rp. 96,000.00 Rp.
Tukang Batu 1.500 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 1.500 Hr @ Rp. 130,000.00 Rp.
Mandor 0.160 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

52 An. 52. 1 Bh Kloset Duduk


Bahan :
Kloset Duduk Lengkap 1.000 Bh @ Rp. 2,948,500.00 Rp.
Perlengkapan Rp.
Tenaga :
Pekerja 3.300 Hr @ Rp. 96,000.00 Rp.
Tukang Batu 1.100 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.001 Hr @ Rp. 130,000.00 Rp.
Mandor 0.160 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

53 An. 53. 1 Bh Urinoir


Bahan :
Urinoir 1.000 Bh @ Rp. 580,000.00 Rp.
Perlengkapan Rp.
Semen Portland 6.000 Kg @ Rp. 1,346.00 Rp.
Pasir Pasangan 0.010 M3 @ Rp. 235,000.00 Rp.
Tenaga :
Pekerja 1.000 Hr @ Rp. 96,000.00 Rp.
Tukang Batu 1.000 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.100 Hr @ Rp. 130,000.00 Rp.
Mandor 0.100 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

54 An. 54. 1 Bh Wastafel


Bahan :
Wastafel 1.000 Bh @ Rp. 783,800.00 Rp.
Perlengkapan Rp.
Semen Portland 6.000 Kg @ Rp. 1,346.00 Rp.
Pasir Pasangan 0.010 M3 @ Rp. 235,000.00 Rp.
Tenaga :
Pekerja 1.200 Hr @ Rp. 96,000.00 Rp.
Tukang Batu 1.450 Hr @ Rp. 120,000.00 Rp.
Kepala Tukang 0.150 Hr @ Rp. 130,000.00 Rp.
Mandor 0.100 Hr @ Rp. 150,000.00 Rp.
Harga Satuan Rp.

55 An. 55. 1 Bh Wastafel


Bahan :
Wastafel 1.000 Bh @ Rp. 783,800.00 Rp.
Perlengkapan Rp.
Semen Portland 6.000 Kg @ Rp. 1,346.00 Rp.
Pasir Pasangan 0.010 M3 @ Rp. 235,000.00 Rp.
Tenaga :
Pekerja 1.200 Hr @ Rp. 96,000.00 Rp.
Tukang Batu 1.450 Hr @ Rp. 120,000.00 Rp.
BIAYA
G DAN PERUMAHAN

Jumlah

9,600.00
7,500.00
17,100.00

2,220.00
310.00
12,950.00

12,000.00
9,600.00
1,300.00
750.00
39,130.00

3,850.00
310.00
12,500.00
78,750.00

240,000.00
96,000.00
26,000.00
7,500.00
464,910.00

38,400.00
6,000.00
44,400.00

18,432.00
2,850.00
21,282.00
48,000.00
7,500.00
55,500.00

181,920.00

28,800.00
1,500.00
212,220.00
212,400.00

24,000.00
3,750.00
240,150.00

102,000.00

24,000.00
3,750.00
129,750.00

293,150.00
31,500.00

74,880.00
46,800.00
5,070.00
5,850.00
457,250.00

293,150.00
271,892.00
113,975.00

144,000.00
72,000.00
7,800.00
11,250.00
914,067.00
30,000.00
19,826,580.00
9,400.00

30,720.00
12,000.00
1,300.00
2,250.00
19,912,250.00

30,000.00
15,479.00
10,105.00

30,720.00
12,000.00
1,300.00
2,250.00
101,854.00

8,722.08
4,465.00

19,200.00
18,000.00
1,950.00
1,500.00
53,837.08
6,999.20
4,700.00

19,200.00
18,000.00
1,950.00
1,500.00
52,349.20

7,631.82
83.75

14,400.00
8,400.00
910.00
1,200.00
32,625.57

544,127.50
52,756.00
255,558.30
8,600.00

158,400.00
33,000.00
3,640.00
12,450.00
1,068,531.80
10,080.00
229.43

672.00
840.00
130.00
150.00
12,101.43

9,870.000
229.425

672.000
840.000
91.000
105.000
11,807.43

131,670.000
4,710.000
950.000

28,800.000
31,200.000
3,380.000
750.000
201,460.00

1,068,531.800
2,685,461.800
2,986,652.731
6,740,646.33

1,068,531.800
2,685,461.800
2,260,921.161
6,014,914.76

9,770,750.000
4,022,700.000
1,839,200.000
138,750.000
19,200.000

384,000.000
1,440,000.000
156,000.000
30,000.000
11,938,700.00
6,190,650.00
4,007,150.00
9,770,750.000
4,022,700.000
1,839,200.000
19,200.000

576,000.000
1,440,000.000
234,000.000
45,000.000
12,084,950.00
6,336,900.00
4,153,400.00

106,590.000
43,884.000
23,408.000
2,355.000

9,600.000
12,000.000
1,300.000
750.000
132,595.00
69,889.00
49,413.00

24,600.000
7,850.000

14,400.000
12,000.000
1,300.000
1,500.000
61,650.00

506,000.000
471.000

19,200.000
12,000.000
1,300.000
1,500.000
540,471.00
129,000.000
6,730.000
4,700.000

14,400.000
9,000.000
975.000
1,125.000
165,930.00

97,707.500
40,227.000
18,392.000
1,200.000

10,560.000
26,400.000
2,860.000
750.000
139,477.50
81,997.00
60,162.00

97,707.500
40,227.000
18,392.000
785.000

10,560.000
26,400.000
2,860.000
750.000
139,062.50
81,582.00
59,747.00

97,707.500
40,227.000
18,392.000
785.000

10,560.000
26,400.000
2,860.000
750.000
139,062.50
81,582.00
59,747.00
97,707.500
40,227.000
18,392.000
785.000

10,560.000
26,400.000
2,860.000
750.000
139,062.50
81,582.00
59,747.00

506,000.000
874.500

19,200.000
12,000.000
1,300.000
1,500.000
540,874.50

150,500.000
785.000

38,400.000
24,000.000
2,600.000
3,000.000
219,285.00

106,590.000
43,884.000
20,064.000
41,800.000

57,600.000
216,000.000
23,400.000
4,500.000
449,890.00
387,184.00
363,364.00
25,000.000
53,001.000
314.000

28,800.000
60,000.000
6,500.000
3,000.000
123,614.00
151,615.00

9,350.000

4,800.000
6,000.000
650.000
450.000
21,250.00

9,770,750.000

576,000.000
2,400,000.000
260,000.000
45,000.000
13,051,750.00

1,270,720.000

96,000.000
360,000.000
39,000.000
45,000.000
1,810,720.00

1,191,300.000
2,745.000

48,000.000
240,000.000
26,000.000
3,750.000
1,511,795.00
794,200.000

148,224.000
555,960.000
60,190.000
69,450.000
1,628,024.00

694,925.000
137,940.000

76,800.000
240,000.000
26,000.000
6,000.000
1,181,665.00

125,400.000
15,675.000

14,400.000
60,000.000
6,500.000
1,500.000
223,475.00

50,200.000
39,650.000
52,000.000
145,000.000
15,317.480
9,870.000
22,500.000

59,520.000
42,000.000
4,550.000
4,500.000
208,457.48
-
210,257.48
303,257.48
-
50,200.000
-
52,000.000
-
12,517.800
4,230.000
22,500.000

57,600.000
54,000.000
5,850.000
4,500.000
-
211,397.80
-
-
-

3,150.000
13,070.000
22,400.000

19,200.000
12,000.000
1,170.000
4,500.000
75,490.00

2,285.714
6,270.000
6,800.000
28,000.000

6,720.000
12,600.000
520.000
375.000
61,285.00

6,800.000
20,800.000
6,720.000
1,080.000
780.000
375.000
36,555.00
292,600.000

960.000
60,000.000
1,300.000
750.000
355,610.00

28,300.000

1,440.000
18,000.000
1,950.000
112.500
49,802.50

31,350.000

1,920.000
24,000.000
2,600.000
1,500.000
61,370.00

109,800.000

960.000
12,000.000
1,300.000
750.000
124,810.00

36,600.000

1,152.000
14,400.000
1,560.000
900.000
54,612.00
26,200.000

1,440.000
18,000.000
1,950.000
112.500
47,702.50

275,500.000
8,076.000
2,350.000

96,000.000
180,000.000
195,000.000
24,000.000
780,926.00

2,948,500.000
-

316,800.000
132,000.000
130.000
24,000.000
3,421,430.00

580,000.000
174,000.000
8,076.000
2,350.000

96,000.000
120,000.000
13,000.000
15,000.000
1,008,426.00

783,800.000
94,056.000
8,076.000
2,350.000
115,200.000
174,000.000
19,500.000
15,000.000
1,211,982.00

783,800.000
94,056.000
8,076.000
2,350.000

115,200.000
174,000.000
Balai Pengembangan sumber Daya Lokal UPT Dinas Tarkim
Daftar Harga bahan bangunan dan Upah Kerja
Standar Harga Pemerintah Prov. Sul- Sel, Januari - Maret Tahun 2009

a. Kabupaten/Kota : MAKASSAR
JENIS BAHAN Sat HARGA
BAHAN DASAR
1 Batu Kali
Utuh M3 Rp 135,000
Batu pecah 7-10 cm M3 Rp 160,000
Batu pecah 5-7 cm M3 Rp 170,000
Batu pecah 3-5 cm M3 Rp 190,000
Batu pecah 2-3 cm M3 Rp 230,000
Batu pecah 1-2 cm M3 Rp 250,000
Batu pecah 0.51-1 cm M3 Rp 275,000
2 Batu Gunung M2 Rp 150,000
Batu alam
Andesit Biasa M2 Rp 145,000
Andesit Susun Sirih M2 Rp 140,000
Andesit Halus M2 Rp 185,000
Andesit Gelombang M2 Rp 185,000
Batu Candi Permukaan Rata M2 Rp 140,000
Batu Palimanan Kuning M2 Rp 85,000
Batu Hijau Sukabumi M2 Rp 100,000
Batu Bali Green M2 Rp 185,000
Batu Bali Napoli M2 Rp 185,000
Paras Jokja Besar M2 Rp 120,000
Batu Cirebon Beraturan M2 Rp 120,000
Batu Cirebon Tidak Beraturan M2 Rp 90,000
3 Tanah Timbunan M3 Rp 80,000
4 Pasir
Timbunan / Urug M3 Rp 80,000
Pasangan M3 Rp 100,000
Beton M3 Rp 120,000
5 Kerikil M3 Rp 115,000
6 Sirtu M3 Rp 122,000
7 Kapur Pasangan Zak Rp 78,000
8 Semen PC (40 kg) Zak Rp 39,500
9 Semen Putih (50 kg) Zak Rp 48,000
10 Semen warna (5 kg) Zak Rp 15,000
11 Batu Merah Buah Rp 500
12 Paving Blok Mutu (K 175)
Tebal 6 cm M2 Rp 38,000
Tebal 8 cm M2 Rp 42,000
Berlian M2 Rp 45,000
13 Paving Blok Mutu (K 225)
Tebal 6 cm M2 Rp 44,500
Tebal 8 cm M2 Rp 46,000
14 Paving Blok Mutu (K 300)
Tebal 6 cm M2 Rp 48,000
Tebal 8 cm M2 Rp 50,000
15 Paving Blok Mutu (K 400) M2 Rp 60,000
Toppluskup (K 225) Biji Rp 3,500
Kanstin 10 x 25 x 50 Biji Rp 18,500
16 Buis Beton
d = 20 cm Biji Rp 50,000
d = 30 cm Biji Rp 75,000
d = 40 cm Biji Rp 150,000
d = 50 cm Biji Rp 200,000
d = 60 cm Biji Rp 250,000
BAHAN KAYU
Kayu Kelas I
Balok Gergaji Sawmil M3 Rp 7,300,000
Papan Gergaji Sawmil M3 Rp 7,400,000
Balok Gergaji Sansaw M3 Rp 6,300,000
Papan Gergaji Sansaw M3 Rp 6,400,000
Kayu Kelas II
Balok M3 Rp 3,300,000
Papan M3 Rp 3,600,000
Kayu Kelas III
Balok M3 Rp 1,850,000
Dolken/balok 5/7,4m btg Rp 28,000
Papan M3 Rp 2,100,000
BAHAN LANTAI
1 Tegel PC
PC abu-abu 20 x 20 cm Buah Rp 1,400
PC abu-abu 30 x 30 cm Buah Rp 2,500
PC warna 20 x 20 cm Buah Rp 2,600
PC Badak 20 x 20 cm Buah Rp 2,100
PC badak 30 x 30 cm Buah Rp 2,400
PC Wafel 20 x 20 cm Buah Rp 2,600
PC Wafel 30 x 30 cm Buah Rp 2,700
Plint PC 15 x 20 cm Buah Rp 2,000
Plint PC 15 x 30 cm Buah Rp 2,300
Tegel Mozaik 30 x 30 cm Buah Rp 3,200

2 Tegel Keramik
Putih 10 x 20 cm Dos Rp 42,000
Warna 10 x 20 cm Dos Rp 45,000
Putih 20 x 20 cm Dos Rp 42,500
Warna 20 x 20 cm Dos Rp 47,500
Putih 20 x 25 cm Dos Rp 43,000
Warna 20 x 25 cm Dos Rp 48,000
Putih 30 x 30 cm Dos Rp 45,000
Warna 30 x 30 cm Dos Rp 50,000
Putih 40 x 40 cm Dos Rp 48,000
Warna 40 x 40 cm Dos Rp 51,000
Warna 50 x 50 cm Dos Rp 53,000
Warna 60 x 50 cm Dos Rp 140,000
BAHAN KACA
Kaca Bening 3 mm M2 Rp 63,000
Kaca Buram 3 mm M2 Rp 130,000
Kaca Buram 5 mm M2 Rp 160,000
Kaca Ryben 3 mm M2 Rp 100,000
Kaca Ryben 5 mm M2 Rp 130,000
Rangka Nako Lengkap Terali Set / Daun Rp 52,000
BAHAN BESI
1 Besi Beton
d = 4 mm Btg Rp 16,300
d = 6 mm Btg Rp 20,900
d = 8 mm Btg Rp 38,000
d = 10 mm Btg Rp 57,500
d = 12 mm Btg Rp 77,000
d = 14 mm Btg Rp 105,000
d = 16 mm Btg Rp 138,000
d = 19 mm Btg Rp 195,000
d = 20 mm Btg Rp 224,000
2 Besi Ulir
d = 12 mm Btg Rp 75,000
d = 16 mm Btg Rp 135,000
d = 19 mm Btg Rp 275,000
3 Paku
Paku biasa Kg Rp 17,000
Paku Asbes Kg Rp 20,000
Paku Seng ( Payung ) RRT Kg Rp 18,000
Paku Scrub 3 1/2 inchi Kg Rp 17,000
Paku Scrub 4 inchi Kg Rp 19,000
Paku Payung Berulir 75 mm Kg Rp 25,000
Paku Sirap Kg Rp 18,500
Paku Beton Hitam Dos Rp 24,000
Paku Beton Putih Dos Rp 15,000
4 Kawat
Beton Kg Rp 19,000
Nyamuk M Rp 8,000
Ayakan Kecil M Rp 9,500
Duri Roll Rp 110,000
5 Besi Plat
2 mm = 120 x 240 mm Lmbr Rp 690,000
3 mm = 120 x 240 mm Lmbr Rp 750,000
Besi H 15 cm Panjang 12 m Btg Rp 3,700,000
6 Besi Strep
30.3 mm Btg Rp 17,500
35.4 mm Btg Rp 25,800
46.4 mm Btg Rp 27,800
40.6 mm Btg Rp 29,000
50.6 mm Btg Rp 37,000
7 Besi Siku
30. 30 .3 Btg Rp 43,000
40. 40. 4 Btg Rp 135,000
40. 40. 3 Btg Rp 60,000
50. 50. 4 Btg Rp 83,000
50. 50. 5 Btg Rp 95,000
60. 60. 6 Btg Rp 100,000
70. 70. 7 Btg Rp 140,000
8 Besi 6 mm M Rp 20,000
9 Besi type C (Rangka Baja Ringan
6 Meter)
Lebar 10, Tebal 1.8-2.00 mm Btg Rp 156,000
Lebar 12.5, Tebal 1.8-2.00 mm Btg Rp 131,000
Lebar 15, Tebal 1.8-2.00 mm Btg Rp 210,000
BAHAN PIPA
1 Pipa Besi GIP
∅ 1/2 inci - 6 m Btg Rp 95,000
∅ 3/4 inci - 6 m Btg Rp 120,000
∅ 1 inci - 6 m Btg Rp 185,000
∅ 2 inci - 6 m Btg Rp 395,000
∅ 2 1/2 inci - 6 m Btg Rp 475,000
∅ 3 inci - 6 m Btg Rp 575,000
2 Pipa PVC Air Bersih
∅ 1/2 inci - 4 m Btg Rp 11,500
∅ 3/4 inci - 6 m Btg Rp 22,500
∅ 1 inci - 6 m Btg Rp 28,900
∅ 1 1/2 inci - 6 m Btg Rp 59,500
∅ 2 inci - 6 m Btg Rp 95,000
∅ 2 1/2 inci - 6 m Btg Rp 130,000
∅ 3 inci - 6 m Btg Rp 190,000
∅ 4 inci - 6 m Btg Rp 245,000
∅ 6 inci - 6 m Btg Rp 595,000
∅ 8 inci - 6 m Btg Rp 900,000
∅ 10 inci - 6 m Btg Rp 1,400,000
3 Pipa Untuk Saluran Pembuangan Air
∅ 1/2 inci - 4 m Btg Rp 8,500
∅ 3/4 inci - 4 m Btg Rp 13,000
∅ 1 inci - 4 m Btg Rp 18,500
∅ 1 1/2 inci - 4 m Btg Rp 22,500
∅ 2 inci - 4 m Btg Rp 27,500
∅ 2 1/2 inci - 4 m Btg Rp 36,000
∅ 3 inci - 4 m Btg Rp 45,000
∅ 4 inci - 4 m Btg Rp 68,500
∅ 5 inci - 4 m Btg Rp 110,000
∅ 6 inci - 4 m Btg Rp 160,000
∅ 10 inci - 4 m Btg Rp 450,000
4 Pipa Untuk Instalasi Listrik
∅ 5/8 inci - 4 m Btg Rp 7,000
Ø3/4 inci - 4 m Btg Rp 22,000
Ø1 inci - 4 m Btg Rp 25,000
Ø1 1/2 inci - 4 m Btg Rp 44,500
BAHAN LANGIT-LANGIT
1 Eternit 100×100 Set Rp 15,000
2 Tripleks
122 × 244 ×0.2 cm Lmbr Rp 37,500
122 × 244 ×0.3 cm Lmbr Rp 47,500
122 × 244 ×0.6 cm Lmbr Rp 80,000
122 × 244 ×0.9 cm Lmbr Rp 125,000
3 Tripleks Melamin
122 × 244 ×0.3 cm Lmbr Rp 78,000
4 Accoustic 40 × 60 Lmbr Rp 45,000
5 Teakwood
80 × 224 × 0.3 cm Lmbr Rp 96,000
122 × 224 × 0.3 cm Lmbr Rp 80,000
6 Karsiboard Lmbr Rp 49,000
7 Gypsum Lmbr Rp 54,000
Les Gipsum Lmbr Rp 15,000
8 Hard Board 122 × 224 cm Lmbr Rp 75,000
9 Asbes Plat Harfeks
200 × 100 × 0.3 Lmbr Rp 42,000
10 List Profil
2 × 3 cm M' Rp 9,000
3 × 3 cm M' Rp 12,000
4 × 4 cm M' Rp 16,000
4 × 5 cm M' Rp 20,000
BAHAN ATAP
1 Genteng
Beton Biji Rp 2,700
Keramik Buah Rp 9,000
Asbes Gelombang 7 kaki Lmbr Rp 43,000
Harfles (115 × 85 × 0.5 cm) Lmbr Rp 51,000
2 Atap Metal Lmbr Rp 72,300
3 Asbes Genteng Lmbr Rp 19,000
4 Sirap Ikat Rp 24,000
5 Seng Gelombang kecil
BJLS 0.20 mm Kaki Rp 5,200
BJLS 0.22 mm Kaki Rp 5,300
BJLS 0.30 mm Kaki Rp 11,000
BJLS 0.35 mm Kaki Rp 12,000
6 Bitumen Gelombang (200 × 95 × 0.3 cm Lmbr Rp 134,000
Bitumen Genteng (106 × 40 × 0.3 cm) Lmbr Rp 64,200
Nok Bitumen (50x90x0.3 cm) Lmbr Rp 81,200
7 Seng Plat
BJLS 0.30 mm Lmbr Rp 40,000
BJLS 0.35 mm Lmbr Rp 52,000
8 Seng Super Deck
180 x 70 cm - 10 kaki Kaki Rp 12,000
9 Seng Alumunium Gelombang
SWG 32" 0.27 mm Kaki Rp 7,000
SWG 30" 0.31 mm Kaki Rp 8,000
SWG 28" 0.38 mm Kaki Rp 9,000
10 Seng Plastik (Fiber) Kaki Rp 7,500
11 Fiber Semen (Harflex)
Super 240 x 108 x 0.6 cm Kaki Rp 63,000
Super 180 x 108 x 0.6 cm Kaki Rp 44,000
Ekonomi 240 x 92 x 0.5 cm Kaki Rp 49,000
Ekonomi 180 x 92 x 0.4 cm Kaki Rp 42,700
Mini 240 x 105 x 0.4 cm Kaki Rp 42,000
Mini 180 x 92 x 0.5 cm Kaki Rp 40,000
Super 240 x 105 x 0.4 cm Kaki Rp 50,500
Super 180 x 105 x 0.4 cm Kaki Rp 44,500
12 Nok/Bubungan
Genteng Beton Buah Rp 18,000
Genteng Asbes Buah Rp 20,000
Genteng Keramik Buah Rp 19,000
Alm. SWG 28" - 180 cm Lmbr Rp 46,500
Alm. SWG 28" - 105 cm Lmbr Rp 38,000
13 Nok Steel Gelombang
Super - 180 cm Buah Rp 32,000
Mini - 105 cm Buah Rp 24,000
Ekonomi - 95 cm Buah Rp 18,000
14 Nok Steel Gelombangteel Rata
Super - 180 cm Buah Rp 27,000
Mini - 105 cm Buah Rp 22,500
Ekonomi - 95 cm Buah Rp 22,500
15 Nok 1/2 Lingkaran Buah Rp 38,500
16 Karet Pelapis Genteng
Ukuran 55 M Rp 4,500
Ukuran 90 M Rp 6,500
BAHAN PENGGANTUNG
1 Kunci Tanam
1 Slag Buah Rp 126,500
Double Slag Buah Rp 227,000
2 Penggantung
Hak angin Kecil Buah Rp 9,000
Hak Angin Besar Buah Rp 14,000
Grendel Kecil Buah Rp 21,000
Grendel Besar Buah Rp 28,000
Engsel Pintu Buah Rp 28,000
Engsel Jendela Buah Rp 25,000
Expanyolet Buah Rp 110,000
BAHAN SANTER
1 Closet duduk Buah Rp 230,000
2 Closet Jongkok Buah Rp 429,000
3 Wasthafel Warna Buah Rp 260,000
4 Wasthafel CucI Piring Logam Buah Rp 180,000
5 Pompa Mesin Buah Rp 1,300,000
6 Urinoir Lengkap Buah Rp 1,900,000
7 Bak Mandi Fiber Buah Rp 260,000
8 Reservoir Fiber = 1 m3 Buah Rp 900,000
9 Reservoir Stainless stell = 1 m3 Buah Rp 2,750,000
10 Stop Kran Buah Rp 45,000
11 Kran Air Buah Rp 35,000
12 Seal Tape Buah Rp 2,500
BAHAN FINISHING/CAT
1 Cat Tembok
Cat Dasar ( kimex ) 5 kg Rp 35,000
plamur 5 kg Rp 26,000
Cat Kilap 5 kg Rp 75,000
2 Cat Kayu
Cat Dasar Kg Rp 30,000
Cat Kilap Kg Rp 33,000
Palatone Kg Rp 32,000
ICI Kg Rp 30,000
Politur Kg Rp 31,000
Meni 4 kg Rp 36,000
Minyak Cat Ltr Rp 18,000
3 Cat Atap
Cat Dasar Kg Rp 70,000
Cat Kilap
Lem Seng M Rp 13,000
Amplas/ Kertas Gosok Lmbr Rp 2,500
Dempul Kg Rp 20,000
Residu 10 ltr Rp 43,000
BAHAN INSTALASI LISTRIK
1 Kabel Listrik
Type NYA (full)
1 1/2 mm Roll Rp 220,000
2 1/2 mm Roll Rp 350,000
Type NYY
2x 1 1/2 mm Roll Rp 473,000
2x 2 1/2 mm Roll Rp 717,000
2x 4 mm Roll Rp 110,000
2 Lampu TL
1x20W Buah Rp 70,000
2x20W Buah Rp 85,000
1x40W Buah Rp 93,000
2x40W Buah Rp 120,000
3 Lampu pijar
25W Buah Rp 5,000
40W Buah Rp 6,000
60W Buah Rp 9,000
100W Buah Rp 9,500
4 Lampu Taman Mercury Buah Rp 320,000
5 Saklar Phase
Tunggal Putih Buah Rp 20,000
Tunggal Hitam Buah Rp 15,000
Double putih Buah Rp 13,000
Double Hitam Buah Rp 20,000
6 Stop kontak
Hitam Buah Rp 25,000
Putih Buah Rp 27,000
7 Zekering Kast Lokal Biasa
Lokal 2 Group Automat Buah Rp 75,000
Lokal 3 Group Biasa Buah Rp 85,000
Fitting Buah Rp 10,000
BAHAN JALAN
Aspal Kg Rp 10,000
1 Minyak Tanah Ltr Rp 4,500
2 Minyak Solar Ltr Rp 5,500
3 Minyak Pelumas Ltr Rp 25,000
UPAH KERJA
Pekerja Org/hr Rp 35,000
Buruh Org/hr Rp 35,000
1 Pembantu Masinis Org/hr Rp 35,000
2 Penjaga Gudang Org/hr Rp 35,000
3 Penjaga Malam Org/hr Rp 35,000
Tukang :
1 Tukang Kayu Org/hr Rp 50,000
2 Tukang Batu Org/hr Rp 50,000
3 Tukang Cat Org/hr Rp 50,000
4 Tukang Listrik Org/hr Rp 50,000
5 Tukang Pipa Org/hr Rp 50,000
6 Tukang Besi Org/hr Rp 50,000
Kepala Tukang
1 Kepala Tukang Kayu Org/hr Rp 55,000
2 Kepala Tukang Batu Org/hr Rp 55,000
3 Kepala Tukang Listrik Org/hr Rp 55,000
4 Kepala Tukang Cat Org/hr Rp 55,000
5 Kepala Tukang Pipa Org/hr Rp 55,000
6 Kepala Tukang Besi Org/hr Rp 55,000
7 Mandor Org/hr Rp 60,000
JADWAL WAKTU PELAKSANAAN ( TIME SCHEDULE )

NILAI WAKTU PELAKSANAAN


NO. URAIAN PEKERJAAN BOBOT BULAN I BULAN II BULAN III
(%) 1 2 3 4 5 6 7 8 9 10 11 12

I. PEKERJAAN PERSIAPAN 1.29 0.64 0.64

II. PEKERJAAN TANAH DAN PASIR 1.42 1.42

III. PEKERJAAN PONDASI 4.16 1.39 1.39 1.39

IV. PEKERJAAN BETON 7.38 1.85 1.85 1.85 1.85

V. PEKERJAAN TEMBOK DAN LANTAI 12.82 2.56 2.56 2.56 2.56 2.56

VI. PEKERJAAN PINTU DAN JENDELA 12.05 4.02 4.02 4.02

VII. PEKERJAAN ATAP DAN PLAFOND 49.72 16.57 16.57

VIII. PEKERJAAN PENGECATAN 7.95

IX. PEKERJAAN INSTALASI LISTRIK 0.31

X. PEKERJAAN SANITASI 2.89

JUMLAH BOBOT 100.00


RENCANA KEMAJUAN PEKERJAAN (%) 0.64 3.45 1.39 3.23 1.85 1.85 4.41 2.56 6.58 6.58 23.16 16.57
KOMULATIF KEMAJUAN PEKERJAAN (%) 0.64 4.10 5.49 8.72 10.56 12.41 16.82 19.38 25.97 32.55 55.70 72.28
HEDULE )

NILAI
BULAN IV KURVA KET.
13 14 15 16 (%)

100% 90 Hari
Masa Pelaksanaan

120 Hari
Masa Pemeliharaan
75%

50%

16.57

3.97 3.97 25%

0.16 0.16

1.44 1.44 0%

20.55 4.13 1.60 1.44


92.83 96.96 98.56 100
Bobot
Kegiatan pekerjaan bagian
1 Pekerjaan Persiapan
a 1 Pembersihan lapangan
2 Memasang bouwplank
3 Los kerja
Pekerjaan Tanah dan pasir
b 1 Galian tanah pondasi
2 Urugan Kembali galian 6.87 1.42
3 timbunan tanah bawah lantai
4 Pasir urug bawah lantai
5 Pasir urug bawah pondasi
Pasangan Pondasi Batu kali
c 1 Pas.pondasi batu kali 4.16
2 pek.pas batu kosong
2 Pekerjaan Beton
a 1 Beton sloef
2 pek.kolom 7.38
3 pek. Ring balk
4 pek. Rabat beton bawah lantai
3 Pekerjaan Tembok dan lantai
a 1 Pek. Dinding 1 : 5
2 pek. Plesteran 1 : 3
3 pek. Plesteran 1 : 5
4 pek. Acian 12.82
5 pek. Dinding keramik wc 20X20
6 pek. Lantai keramik 40x 40
7 pek. Lantai Teras 30 x 30
8 pek. Lantai keramik 20x20
9 Pek. Trasram
4 pekerjaan Pintu Dan Jendela
a 1 pek. Kusen pintu dan jendela
2 pek. Daun pintu
3 pek. Jendela Jungkit
5 pas. Kunci tanam 12.05
6 pas. Engsel pintu
7 pas. Grandel pintu
8 Pas. Engsel jendela
9 pas. Grandel jendela
10 pas. Hak angin
5 Pekerjaan Atap dan plafon
a 1 pek. Kuda-kuda
2 pek. Gording dan Balok nok
3 pek. Kaso + reng
4 pek. Atap genteng 49.77
5 pek. Nok atap genteng
6 pek. Rangka plafond
7 pek. Plafond
8 pek. Les pinggir plafond
9 pek. Listplank
6 Pekerjaan Pengecetan
a 1 pek.pengecetan tembok
2 pek. Cat kusen, pintu dan jendela
3 pek. Pengecetan plafond 7.95
4 pek. Pengecetan listplank
7 Pekerjaan instalasi listrik
a 1 Pas. Instalasi Listrik dalam
2 Pas. Saklar Ganda
3 Pas. Saklar Tunggal
4 Pas. Stop Kontak 0.31
5 Pas. Lampu Hias
6 Pas. Lampu TL 1 x 35 Watt
7 Pas.Lampu TL 2 x 12 watt
8 Pekerjaan Sanitasi
a 1 Pek. Stop Kran
2 Pek. Pipa 3/4 '
3 Pek. Pipa PVC 4"
4 Pas. Kloset Duduk 2.89
5 Pek. Bak Cuci Piring
6 Bak Air Fiber
7 Pek. Septiktank
JUMLAH 100.0
sub. Bagian

0.205
0.260
0.824

0.35
0.04
0.52
0.22
0.29

3.15
1.01

2.49
2.40
1.77
0.73

0.55
0.11
4.36
2.85
0.97
3.48
0.14
0.30
0.06

2.03
3.43
4.38
0.95
0.26
0.17
0.38
0.34
0.13

35.67
0.40
0.004
10.65
0.33
0.02
2.06
0.21
0.43

6.59
0.01
1.02
0.33

0.00
0.03
0.04
0.06
0.01
0.09
0.08

0.03
0.17
0.28
1.52
0.06
0.17
0.66
PERHITUNGAN BOBOT PEKERJAAN

No. URAIAN
I.1a Pembersihan Lapangan
Volume = 54.00 m3
Harga Satuan = 17,100.00
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 54.00 x
451208644.11
= 0.00204650 x

1b Memasang Bowplank
Volume = 30.00 m3
Harga Satuan = 39,130.00
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 30.0 x
451208644.11
= 0.00260168 x

1c Los Kerja
Volume = 8 m3
Harga Satuan = 464,910.00
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 8 x
451208644.11
= 0.00824293 x

I.2a Galian Tanah Pondasi


Volume = 35.52 m3
Harga Satuan = 44,400.00
Harga Bangunan = 451,208,644.11
PBP = Volume x
Harga Bangunan
= 35.520 x
451208644.11
= 0.00349525 x

2b Urugan Kembali 1/4 galian


Volume = 8.880 m3
Harga Satuan = 21,282.00
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 8.880 x
451208644.11
2c Urugan Tanah bawah lantai
Volume = 18.06 m3
Harga Satuan = 129,750
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 18.060 x
451208644.11
= 0.00519335 x

2d Urugan Pasir Bawah lantai


Volume = 4.77 m3
Harga Satuan = 212,220
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 4.773 x
451208644.11
= 0.00224492 x

= 0.00041884 x

2e Urugan Pasir bawah Pondasi


Volume = 6.125 m3
Harga Satuan = 212,220.00
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 6.125 x
451208644.11
= 0.00288081 x

I.3a Pasangan Batu Kosong


Volume = 9.990 m3
Harga Satuan = 457,250.00
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 9.990 x
451208644.11
= 0.01012376 x

3b Pasangan Pondasi Batu Kali 1:5


Volume = 15.540 m3
Harga Satuan = 914,067.00
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 15.540 x
451208644.11
= 0.03148 x

II.1a Beton Sloof 1 : 2 : 3


Volume = 1.665 m3
Harga Satuan = 6,740,646
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan

= 1.665 x
451208644.11
= 0.02487358 x

1b Kolom 15 x 15
Volume = 1.800 m3
Harga Satuan = 6,014,915
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan

= 1.800 x
451208644.11
= 0.02399521 x

1c Reng Balok 1:2:3


Volume = 1.185 m3
Harga Satuan = 6,740,646.33
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 1.185 x
451208644.11
= 0.01770282 x

1d Beton Cor bawah lantai 1 : 2 : 3


Volume = 3.063 m3
Harga Satuan = 1,068,532
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 3.063 x
451208644.11
= 0.00725247 x

1e Beton Cor Carport


Volume = Err:509 m3
Harga Satuan = Err:509
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= Err:509 x
451208644.11
= Err:509 x

III.1a Pas. Dinding 1:5


Volume = 24.340 m3
Harga Satuan = 101,854
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 24.340 x
451208644.11
= 0.00549441 x

1b Pek. Trasram
Volume = 5.20 m3
Harga Satuan = 53,837
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 5.200 x
451208644.11
= 0.00062045 x

1c Plesteran Dinding 1:3


Volume = 9 m3
Harga Satuan = 53,837
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 9.000 x
451208644.11
= 0.00107386 x

1d Plesteran Dinding 1:5


Volume = 375.87 m3
Harga Satuan = 52,349
Harga Bangunan = 451,208,644.11
PBP = Volume x
Harga Bangunan
= 375.867 x
451208644.11
= 0.04360804 x

1e pek. Acian
Volume = 393.867 m3
Harga Satuan = 32,626
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 393.867 x
451208644.11
= 0.02847935 x

1f Pas.Dinding Keramik 20 X 20 cm (KM/WC)


Volume = 20.80 m3
Harga Satuan = 211,398
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 20.800 x
451208644.11
= 0.00974510 x

1g Pas.Lantai Keramik 40X40 cm


Volume = 51.75 m3
Harga Satuan = 303,257
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 51.750 x
451208644.11
= 0.03478119 x

1h Pas.Lantai Teras 30 x 30 cm
Volume = 3.00 m3
Harga Satuan = 210,257
Harga Bangunan = 451,208,644.11
PBP = Volume x
Harga Bangunan
= 3.000 x
451208644.11
= 0.00139796 x

1i Pas.Lantai Keramik 20 X 20 cm
Volume = 6.50 m3
Harga Satuan = 208,457
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 6.500 x
451208644.11
= 0.00300299 x

IV.1a Kusen Pintu dan Jendela


Volume = 0.700 m3
Harga Satuan = 13,051,750
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 0.700 x
451208644.11
= 0.02025759 x

1b Pintu Panel Kayu Kelas I


Volume = 9.50 m3
Harga Satuan = 1,628,024
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 9.495 x
451208644.11
= 0.03425929 x

1c Pek. Jendela Jungkit


Volume = 13.07 m3
Harga Satuan = 1,511,795
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 13.070 x
451208644.11
= 0.04379029 x

1d Pek. Kaca Tebal 5mm


Volume = 0.01 m3
Harga Satuan = 223,475
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 0.014 x
451208644.11
= 0.00000676 x

1e Pas. Kunci tanam


Volume = 12 buah
Harga Satuan = 355,610
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 12.000 x
451208644.11
= 0.00945753 x

1f Pas. Engsel Pintu


Volume = 24 buah
Harga Satuan = 49,803
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 24.000 x
451208644.11
= 0.00264902 x
1g Pas. Grendel Pintu
Volume = 6 buah
Harga Satuan = 124,810
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 6.000 x
451208644.11
= 0.00165968 x

1h Pas. Engsel Jendela


Volume = 28 buah
Harga Satuan = 61,370
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 28.000 x
451208644.11
= 0.00380835 x

1i Pas. Grendel Jendela


Volume = 28 buah
Harga Satuan = 54,612
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 28.000 x
451208644.11
= 0.00338898 x

1j Pas. Hak angin


Volume = 12 buah
Harga Satuan = 47,703
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 12.000 x
451208644.11
= 0.00126866 x
V.1a Pas. Kuda-kuda 6/12
Volume = 26.000 m3
Harga Satuan = 6,190,650
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 26.000 x
451208644.11
= 0.35672388 x

1b Pas. Gording dan Balok Nok 6/12


Volume = 0.279 m3
Harga Satuan = 6,502,830
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 0.279 x
451208644.11
= 0.00402268 x

1c Pas. Rangka Atap Kaso 5/7 dan Reng 3/4


Volume = 0.228 m3
Harga Satuan = 69,889
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 0.228 x
451208644.11
= 0.00003538 x

1d Pas. Atap Genteng


Volume = 88.870 m3
Harga Satuan = 540,471
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 88.870 x
451208644.11
= 0.10645110 x

1e Pas. Nok Genteng


Volume = 9.0 m3
Harga Satuan = 165,930
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 9.000 x
451208644.11
= 0.00330971 x

1f Rangka Plafond
Volume = 0.21 m3
Harga Satuan = 387,184
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 0.214 x
451208644.11
= 0.00018396 x

1g Pek.Plafond
Volume = 61.25 m3
Harga Satuan = 151,615
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 61.250 x
451208644.11
= 0.02058121 x

1h Pek.les Pinggir Plafond


Volume = 43.75 m3
Harga Satuan = 21,250
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 43.750 x
451208644.11
= 0.00206044 x

1i Pas. Lisplank Kayu 3/30


Volume = 24.000 m3
Harga Satuan = 81,582

Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 24.000 x
451208644.11
= 0.00433938 x

VI.1a Pengecetan Dinding Dengan Cat Tembok


Volume = 393.867 m2
Harga Satuan = 75,490
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 393.867 x
451208644.11
= 0.06589635 x

1b Pengecetan Kusen,pintu dan jendela Dengan Cat Minyak


Volume = 0.626 m3
Harga Satuan = 61,285
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 0.626 x
451208644.11
= 0.00008498 x

1c PengecetanPlafond
Volume = 61.250 m3
Harga Satuan = 75,490
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 61.250 x
451208644.11
= 0.01024750 x

1d Pengecetan Lisplank Dengan Cat Minyak


Volume = 24.000 m3
Harga Satuan = 61,285
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 24.000 x
451208644.11
= 0.00325978 x

VII.1a Pas. Instalasi listrik Dalam


Volume = 9 m
Harga Satuan = 2,000
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 9.300 x
451208644.11
= 0.00004122 x

1b Sakelar ganda
Volume = 4 ttk
Harga Satuan = 39,200.00
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 4.000 x
451208644.11
= 0.00034751 x

1c Sakelar tunggal
Volume = 5 ttk
Harga Satuan = 32,675.00
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 5.000 x
451208644.11
= 0.00036208 x
1d
Stop Kontak
Volume = 8 ttk
Harga Satuan = 32,500
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 8.000 x
451208644.11
= 0.00057623 x

1e Pas. Lampu kapsul susu


Volume = 2 ttk
Harga Satuan = 30,000
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 2.000 x
451208644.11
= 0.00013298 x

1f Pas.lampu TL 1 x 40 watt
Volume = 5 ttk
Harga Satuan = 80,000.00
Harga Bangunan = 451,208,644.11
PBP = Volume x
Harga Bangunan
= 5.000 x
451208644.11
= 0.00088651 x

1g pas.lampu TL 2 x 40 watt
Volume = 3 ttk
Harga Satuan = 120,000.00
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 3.000 x
451208644.11
= 0.00079786 x

VIII.1a Kran
Volume = 6 bh
Harga Satuan = 26,000.00
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 6.000 x
451208644.11
= 0.00034574 x

1b Pemasangan Instalasi Air Bersih (pipa galvanis)


Volume = 25.000 m3
Harga Satuan = 29,833.33
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 25.000 x
451208644.11
= 0.00165297 x

1c Pemasangan Instalasi Air Kotor (pvc)


Volume = 24.000 m3
Harga Satuan = 51,833.00
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 24.000 x
451208644.11
= 0.00275702 x

1d Kloset Duduk
Volume = 2 bh
Harga Satuan = 3,421,430.00
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 2.000 x
451208644.11
= 0.01516562 x

1e Pek.bak Cuci piring


Volume = 1 bh
Harga Satuan = 280,000.00
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 1.000 x
451208644.11
= 0.00062056 x

1f Bak Mandi Fiber


Volume = 3 bh
Harga Satuan = 250,000.00
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 3.000 x
451208644.11
= 0.00166220 x
1g Septick Tank
Volume = 2 bh
Harga Satuan = 1,500,000.00
Harga Bangunan = 451,208,644.11

PBP = Volume x
Harga Bangunan
= 2.000 x
451208644.11
= 0.00664881 x
JAAN

Persentase
Bobot Pekerjaan (%)

Harga satuan
x 100%
angunan
17,100
x 100%
8644.11
100 % = 0.205

Harga satuan
x 100%
angunan
39,130
x 100%
8644.11
100 % = 0.260

Harga satuan
x 100%
angunan
464,910
x 100%
8644.11
100 % = 0.824
Harga satuan
x 100%
angunan
44,400
x 100%
8644.11
100 % = 0.35

Harga satuan x 100%

21,282 x 100%

Harga satuan x 100%

129,750 x 100%

100 % = 0.52

Harga satuan x 100%

212,220 x 100%

100 % = 0.22

100 % = 0.04
Harga satuan x 100%

212,220 x 100%

100 % = 0.29

Harga satuan x 100%

457,250 x 100%

100 % = 1.01

Harga satuan x 100%

914,067 x 100%

100 % = 3.15

6.87

Harga satuan x 100%

6,740,646 x 100%
100 % = 2.49

Harga satuan x 100%

6,014,915 x 100%

100 % = 2.40

Harga satuan x 100%

6,740,646 x 100%

100 % = 1.77 ---------

Harga satuan x 100%

1,068,532 x 100%

100 % = 0.725

Harga satuan x 100%


Err:509 x 100%

100 % = Err:509

Err:509

Harga satuan x 100%

101,854 x 100%

100 % = 0.55

Harga satuan x 100%

53,837 x 100%

100 % = 0.06

Harga satuan x 100%

53,837 x 100%

100 % = 0.11
Harga satuan x 100%

52,349 x 100%

100 % = 4.36

Harga satuan x 100%

32,626 x 100%

100 % = 2.85

Harga satuan x 100%

211,398 x 100%

100 % = 0.97

Harga satuan x 100%

303,257 x 100%

100 % = 3.48
Harga satuan x 100%

210,257 x 100%

100 % = 0.14

Harga satuan x 100%

208,457 x 100%

100 % = 0.30

12.82

Harga satuan x 100%

13,051,750 x 100%

100 % = 2.03

Harga satuan x 100%

1,628,024 x 100%

100 % = 3.43
Harga satuan x 100%

1,511,795 x 100%

100 % = 4.38

Harga satuan x 100%

223,475 x 100%

100 % = 0.00

Harga satuan x 100%

355,610 x 100%

100 % = 0.95

Harga satuan x 100%

49,803 x 100%

100 % = 0.26
Harga satuan x 100%

124,810 x 100%

100 % = 0.17

Harga satuan x 100%

61,370 x 100%

100 % = 0.38

Harga satuan x 100%

54,612 x 100%

100 % = 0.34

Harga satuan x 100%

47,703 x 100%

100 % = 0.13
12.05

Harga satuan x 100%

6,190,650 x 100%

100 % = 35.67

Harga satuan x 100%

6,502,830 x 100%

100 % = 0.40

Harga satuan x 100%

69,889 x 100%

100 % = 0.004

Harga satuan x 100%


540,471 x 100%

100 % = 10.65

Harga satuan x 100%

165,930 x 100%

100 % = 0.33

Harga satuan x 100%

387,184 x 100%

100 % = 0.02

Harga satuan x 100%

151,615 x 100%

100 % = 2.06

Harga satuan x 100%


21,250 x 100%

100 % = 0.21

Harga satuan x 100%

81,582 x 100%

100 % = 0.43
49.77

Harga satuan x 100%

75,490 x 100%

100 % = 6.59

Harga satuan x 100%

61,285 x 100%

100 % = 0.01
Harga satuan x 100%

75,490 x 100%

100 % = 1.02

Harga satuan x 100%

61,285 x 100%

100 % = 0.33

7.95

Harga satuan x 100%

2,000 x 100%

100 % = 0.00

Harga satuan x 100%

39,200 x 100%
100 % = 0.03

Harga satuan x 100%

32,675 x 100%

100 % = 0.04

Harga satuan x 100%

32,500 x 100%

100 % = 0.06

Harga satuan x 100%

30,000 x 100%

100 % = 0.01
Harga satuan x 100%

80,000 x 100%

100 % = 0.09

Harga satuan x 100%

120,000 x 100%

100 % = 0.08
0.31

Harga satuan x 100%

26,000 x 100%

100 % = 0.03

Harga satuan x 100%

29,833 x 100%

100 % = 0.17
Harga satuan x 100%

51,833 x 100%

100 % = 0.28

Harga satuan x 100%

3,421,430 x 100%

100 % = 1.52

Harga satuan x 100%

280,000 x 100%

100 % = 0.06

Harga satuan x 100%

250,000 x 100%

100 % = 0.17
Harga satuan x 100%

1,500,000 x 100%

100 % = 0.66
2.89
RENCANA ANGGARAN BIAYA

NO. JENIS PEKERJAAN VOLUME SAT. HARGA SATUAN

a b c d e

I PONDASI

A PEKERJAAN PERSIAPAN

1 Pek. Pengukuran/Pasangan Bowuplank 30.00 M' Rp. 39,130.00


2 Pek. Pembersihan Lokasi 54.00 M2 Rp. 17,100.00
3 Pek. Los kerja 8.00 M2 Rp. 464,910.00

Jumlah Untuk Pekerjaan Persiapan

B PEKERJAAN TANAH DAN PASIR

1 Pek. Galian Tanah Pondasi 35.52 M3 Rp. 44,400.00


2 Pek. Timbunan Tanah Kembali 8.88 M3 Rp. 21,282.00
3 Pek. Timbunan Tanah Bawah Lantai 18.06 M3 Rp. 129,750.00
4 Urugan Pasir Dibawah Pondasi 4.77 M3 Rp. 212,220.00
5 Urugan Pasir Bawah Lantai 6.13 M3 Rp. 212,220.00

Jumlah Untuk Pekerjaan Tanah dan Pasir

C PEKERJAAN PONDASI

1 Pas. Pondasi Batu Gunung /Batu kali 1:5 15.54 M3 Rp. 914,067.00
2 Pek. Pas Batu Kosong 9.99 M3 Rp. 457,250.00

Jumlah Untuk Pekerjaan Pondasi

II PEKERJAAN BETON

1 Pek. Sloef 1.67 M3 Rp. 6,740,646.33


2 Pek. Kolom 1.80 M4 Rp. 6,014,914.76
3 Pek. Ring Balk 1.19 M3 Rp. 6,740,646.33
4 Pek. Rabat Beton Bawah Lantai 3.06 M3 Rp. 1,068,531.80

Jumlah Untuk Pekerjaan Beton

III PEKERJAAN TEMBOK DAN LANTAI

1 Pek. Dinding 1 : 5 24.34 M2 Rp. 101,854.00


2 Pek.Trasram 5.20 M3 Rp. 53,837.08
3 Pek. Plesteran 1 : 3 9.00 M2 Rp. 53,837.08
4 Pek. Plesteran 1 : 5 375.87 M2 Rp. 52,349.20
5 Pek. Acian 393.87 M2 Rp. 32,625.57
6 Pek. Dinding Keramik Wc 20x20 20.80 M2 Rp. 211,397.80
7 Pek. Lantai Keramik 60 x 60 51.75 M2 Rp. 303,257.48
8 Pek. Lanta Teras 30 x 30 3.00 M2 Rp. 210,257.48
9 Pek. Lantai Keramik 20 x 20 6.50 M2 Rp. 208,457.48

Jumlah Untuk Pekerjaan Tembok dan Lantai

IV PEKERJAAN PINTU DAN JENDELA


IV PEKERJAAN PINTU DAN JENDELA

1 Pek. Kusen Pintu dan Jendela Kls 1 0.70 M3 Rp. 13,051,750.00


2 Pek. Daun Pintu Kls 1 9.50 M2 Rp. 1,628,024.00
3 Pek. Jendela Jungkit 13.07 M3 Rp. 1,511,795.00
4 Pek. Kaca Tebal 5mm 0.01 M4 Rp. 223,475.00
5 Pas. Kunci Tanam 12.00 buah Rp. 355,610.00
6 Pas. Engsel Pintu 24.00 Pas Rp. 49,802.50
7 Pas. Grendel Pintu 6.00 buah Rp. 124,810.00
8 Pas. Engsel Jendela 28.00 buah Rp. 61,370.00
9 Pas. Grendel Jendela 28.00 Pas Rp. 54,612.00
10 Pas. Hak Angin 12.00 Pas Rp. 47,702.50

Jumlah Untuk Pekerjaan Pintu dan Jendela

V PEKERJAAN ATAP DAN PLAFOND

1 Pek. Kuda-kuda 26.00 M3 Rp. 6,190,650.00


2 Pek. Balok Nok 0.03 M3 Rp. 165,930.00
3 Pek. Gording 0.25 M3 Rp. 6,336,900.00
4 Pek. Kaso + Reng 0.23 M2 Rp. 69,889.00
5 Pek. Atap Genteng 88.87 M2 Rp. 540,471.00
6 Pek. Nok Atap Genteng 9.00 M Rp. 165,930.00
7 Pek. Rangka Plafond 0.21 M3 Rp. 387,184.00
8 Pek. Plafond 61.25 M2 Rp. 151,615.00
9 Pek. Les pinggir Plafond 43.75 M Rp. 21,250.00
10 Pek. Listplank 24.00 M Rp. 81,582.00

Jumlah Untuk Pekerjaan Atap dan Plafond

VI PEKERJAAN PENGECATAN

1 Pek. Pengecatan Tembok 393.87 M2 Rp. 75,490.00


2 Pek. Cat Kusen, Pintu & Jendela 0.63 M2 Rp. 61,285.00
3 Pek. Pengecatan Plafond 61.25 M2 Rp. 75,490.00
4 Pek. Pengecatan Listplank 24.00 M Rp. 61,285.00

Jumlah Untuk Pekerjaan Pengecatan

VII PEKERJAAN INSTALASI LISTRIK

1 Pas. Instalasi Listrik dalam 9.30 m Rp. 2,000.00


2 Pas. Saklar Ganda 4.00 bh Rp. 39,200.00
3 Pas. Saklar Tunggal 5.00 bh Rp. 32,675.00
4 Pas. Stop Kontak 8.00 bh Rp. 32,500.00
5 Pas. Lampu Kapsul susu 2.00 bh Rp. 30,000.00
6 Pas. Lampu TL 1 x 15 Watt 5.00 bh Rp. 80,000.00
7 Pas.Lampu TL 2 x 12 watt 3.00 bh Rp. 120,000.00
Jumlah Untuk Pekerjaan Instalasi Listrik

VIII PEKERJAAN SANITASI

1 Pek. Stop Kran 6.00 Unit Rp. 26,000.00


2 Pek. Pipa 3/4 ' 25.00 btg Rp. 29,833.33
3 Pek. Pipa PVC 4" 24.00 btg Rp. 51,833.00
4 Pas. Kloset Duduk 2.00 Pas Rp. 3,421,430.00
5 Pek. Bak Cuci Piring 1.00 Pas Rp. 280,000.00
6 Bak Air Fiber 3.00 Pas Rp. 250,000.00
7 Pek. Septiktank 2.00 Pas Rp. 1,500,000.00

Jumlah Untuk Pekerjaan Sanitasi


` Rp.
bobot pekerjaan
JUMLAH HARGA

Rp. 1,173,900.00 0.26


Rp. 923,400.00 2.05
Rp. 3,719,280.00 0.75

Rp. 5,816,580.00

Rp. 1,577,088.00 0.30


Rp. 188,984.16 0.04
Rp. 2,343,285.00 0.52
Rp. 1,012,926.06 0.22
Rp. 1,299,847.50 0.29

Rp. 6,422,130.72

Rp. 14,204,601.18
Rp. 4,567,927.50

Rp. 18,772,528.68

Rp. 11,223,176.14
Rp. 10,826,846.57
Rp. 7,987,665.90
Rp. 3,272,378.64

Rp. 33,310,067.25

Rp. 2,479,127.38
Rp. 279,952.82
Rp. 484,533.72
Rp. 19,676,326.29
Rp. 12,850,128.85
Rp. 4,397,074.24
Rp. 15,693,574.59
Rp. 630,772.44
Rp. 1,354,973.62

Rp. 57,846,463.95
Rp. 9,140,401.56
Rp. 15,458,087.88
Rp. 19,758,555.93
Rp. 3,049.99
Rp. 4,267,320.00
Rp. 1,195,260.00
Rp. 748,860.00
Rp. 1,718,360.00
Rp. 1,529,136.00
Rp. 572,430.00

Rp. 54,391,461.36

Rp. 160,956,900.00
Rp. 4,778.78
Rp. 1,586,252.81
Rp. 15,965.44
Rp. 48,031,657.77
Rp. 1,493,370.00
Rp. 83,002.57
Rp. 9,286,418.75
Rp. 929,687.50
Rp. 1,957,968.00

Rp. 224,346,001.63

Rp. 29,733,004.73
Rp. 38,342.96
Rp. 4,623,762.50
Rp. 1,470,840.00

Rp. 35,865,950.19

Rp. 18,600.00
Rp. 156,800.00
Rp. 163,375.00
Rp. 260,000.00
Rp. 60,000.00
Rp. 400,000.00
Rp. 360,000.00
Rp. 1,418,775.00

Rp. 156,000.00
Rp. 745,833.33
Rp. 1,243,992.00
Rp. 6,842,860.00
Rp. 280,000.00
Rp. 750,000.00
Rp. 3,000,000.00

Rp. 13,018,685.33
Rp. 451,208,644.11
REKAPITULASI RENCANA ANGGARAN BIAYA
URAIAN
NO. JENIS PEKERJAAN JUMLAH HARGA

(a) (b) (c)

I PEKERJAAN PERSIAPAN Rp 5,816,580.00


II PEKERJAAN TANAH DAN PASIR Rp 6,422,130.72
III PEKERJAAN PONDASI Rp 18,772,528.68
IV PEKERJAAN BETON Rp 33,310,067.25
V PEKERJAAN TEMBOK DAN LANTAI Rp 57,846,463.95
VI PEKERJAAN PINTU DAN JENDELA Rp 54,391,461.36
VII PEKERJAAN ATAP DAN PLAFOND Rp 224,346,001.63
VIII PEKERJAAN PENGECATAN Rp 35,865,950.19
IX PEKERJAAN INSTALASI LISTRIK Rp 1,418,775.00
X PEKERJAAN SANITASI Rp 13,018,685.33

REAL COST Rp 451,208,644.11


PPN 10% Rp 45,120,864.41
JUMLAH Rp 496,329,508.52
DIBULATKAN Rp 527,933,000.00
Terbilang :

LIMA RATUS DUA PULUH JUTA SEMBILAN RATUS TIGA PULUH TIGA RIBU
201 Pipa Galvanis Dia 1.5 " M' 47,190
202 Pipa Galvanis Dia 3 " M' 79,860
203 Pipa Galvanis Dia 4 " M' 87,120
204 Pipa PVC 1/2" M' 4,688
205 Pipa PVC 3/4" M' 5,650
206 Pipa PVC 1" M' 7,655
207 Pipa PVC 1,5" ( Abu - abu ) M' 9,315
208 Pipa PVC 2" M' 11,650
209 Pipa PVC 2,5" M' 14,975
210 Pipa PVC 3" M' 18,300
211 Pipa PVC 4" M' 22,960
212 Pipa PVC dia 6" M' 125,000
213 Plamir Kg 13,310
214 Plywood uk 12 mm Lbr 169,365
215 Plywood uk 9 mm Lbr 135,515
216 Plywood uk 5 mm Lbr 90,165
217 Plywood uk 2,5 mm Lbr 50,000
218 Residu / Teer Ltr 7,190
219 Roster Keramik Uk. 25x25 Cm Bh 35,000
220 Roster Keramik Uk. 30x30 Cm Bh 45,000
221 Rolling Door M2 650,000
222 Saklar Ganda Bh 39,200
223 Saklar Tunggal Bh 32,675
224 Sekop Bh 65,000
225 Semen PC (50) kg Kg 1,007
226 Semen PC ( 40 ) kg Zak 43,000
227 Semen PC ( 50 ) kg Zak 55,000
228 Semen warna Kg 2,665
229 Seal Tape Bh 3,500
230 Seng Plat Lbr 68,500
231 Seng gelombang Bjls 20 ( 7 kaki ) Lbr 52,500
232 Solar Ltr 4,950
233 Sirtu M3 190,000
234 Sirtu tak diayak - royalti M3 210,000
235 Stop kontak Bh 32,500
236 Tanah Timbunan M3 85,000
237 Teakwood Lbr 139,390
238 Tegel Abu-abu uk 20x20 cm Bh 1,500
239 Tegel Abu-abu uk 30x30 cm Bh 3,600
240 Tegel plint Abu-abu uk 10x20 cm Bh 700
241 Tegel plint Abu-abu uk 10x30 cm Bh 1,200
242 Tegel plint traso uk 10x20 cm Bh 3,350
243 Tegel plint traso uk 10x30 cm Bh 3,650
244 Tegel Wafel 20x20 cm Bh 1,450
245 Thiner Ltr 21,500
246 Terpentin Botol 9,375
247 Timbunan pilihan M3 80,100
248 Urinoir Bh 1,575,000
249 Wastafel Bh 350,000
250 Wall plasing metal M' 87,750
251 Rangka atap baja ringan + Penutup Atap G. Metal M2 220,000
252 Plafond Gypsum + Rangka besi hollow M2 156,250
analisa estimasi biaya berdasakan perhitungan kotor

NO Biaya ketentuan dari Dinas PU(Pekerjaan Umum ) No Tenaga Kerja


1 Lantai 1 =@Rp.3000,000
2 Lantai 2= @Rp.3500,000

NO Type Rumah tinggal 48


1 Lebar = 6m
2 Panjang=12

Perhitungan Luas keliling Denah


Tenaga Kerja Upah /Hari
KOTA MAKASSAR
TAHUN 2017

NO BAHAN DASAR SPESIFIKASI SATUAN


1 2 3 4
BAHAN KAYU

1 Kayu Kelas 1 bayam (balok) chain saw m3

2 Kayu kelas 1 bayam (balok) sawmill m3


3 Kayu kelas 1 Ulin (papan) m3
4 Kayu Kelas 1 ulin (tiang) m3

5 Kayu Kelas 1 bayam ( Papan) shain saw m3

6 Kayu Kelas 1 bayam ( Papan) sawmill m3

7 Kayu kelas II samarinda (balok)/lokal m3

8 Kayu kelas II samarinda (papan)/lokal m3

9 Kayu Kelas III kapur (balok)/kemiri m3


10 Kayu kelas III (papan) m3
11 Kayu Perancah m3
12 Kayu Mangga/Kemiri papan m3
13 Kayu kumea balok m3
14 Kayu kumea papan m3
15 Papan kelas 1 m3
16 papan kelas 11 m3

17 Kayu lapis Tripleks Lapis Kayu lainnya Lembar

18 Kayu lapis Tripleks Lapis Kayu lainnya Lembar

19 Kayu lapis Tripleks Lapis Kayu lainnya Lembar

20 Dolken Kayu Ø 8-10/400 cm Btg


21 Minyak Bekisting ltr
Bahan Besi
22 Paku Campuran 5-10 cm kg
23 Paku asbes dan karet kg
24 Paku kg
25 Paku 1 1/2 - 2 1/2 cm 2-3 cm kg
26 Paku 4 cm kg
27 paku 2-3 cm kg
28 Paku sirap 2-3 cm kg
29 Paku seng 1kg/dos kg
30 Paku skrup Biji

31 Paku skrup besi hollow 1000 biji per d Bariling 450 bj = 4,5 cm Dos/bungkus

32 Paku skrup gypsum-500 biji perbungkus Dos/bungkus

33 Paku jembatan kg
34 Paku Beton 5 cm Dos
35 Paku Beton 6 cm Dos
36 Paku Beton 7-10 cm Dos
37 Paku Payung Berulir 1 kg/ dos kg
38 Paku asbes berulir dos
39 Paku asbes biasa dos
40 Paku Triplex setara paku 2-3 cm kh
41 Paku eternit setara paku 2-3 cm kg
42 Paku ripet Biji
43 Besi Streep 30 x 3 mm m'
44 Kawat ikat beton kg
45 Besi Beton Polos ( campuran) kg
Bahan Dasar
46 Agregat Kasar m3
47 Agregat Halus m3
48 Batu kali m3
49 Batu Kali Bela m3
50 Batu Gunung m3
51 Batu Belah 10-15 cm m3
52 Batu Pecah 7-10 cm m3
53 Batu Pecah 5-7 cm m3
54 Batu Pecah 3-5 cm m3
55 Batu Pecah 2-3 cm m3
56 Batu Pecah 1- 2 cm m3
57 Batu Pecah 0,5 - 1 cm m3
58 Batu merah standar BIji
59 Bata Ringan m3
60 Bata block 21x10,5x6cm -60 Bh/M2 m3
61 Bata block 21x10,5x6cm -60 Bh/M3 Buah
62 Batako 21x10,5x6cm -60 Bh/M4 m3
63 Roster 15 x 30 cm m3
64 Glass Block m3
65 Gravel m3
66 Material Pilihan m3
67 Urugan Pilihan m3
68 Pasirkasar/pasir beton/pasir pasangan m3

69 Sirtu A m3
70 Sirtu B m3
71 Sirtu C m3
72 Pasir Timbunan m3
73 Tanah timbunan m3
74 Kerikil Sungai m3
75 Semen 50 kg P,C (Tonasa) sak
76 Semen 40 kg P,C (Tonasa) sak
77 Semen Putih 40 Kg per sak sak
78 Semen tonasa kg
79 Pigmen warana kg
80 Semen nat tegel sak
Bahan Atap
81 Seng BWG BWG 33 BJLS 0,20 MM Kaki
82 Seng BWG BWG 28 BJLS 0,35 MM Lembar
Gelombang bjls 0,35 (6
83 Seng Lembar
Kaki)
Gelombang bjls 0,25 (6
84 Seng Lembar
Kaki)

85 Seng Gelombang bjls 0,20 (7 Lembar


Kaki)
Gelombang bjls 0,20 (10
86 Seng Lembar
Kaki)
87 Seng Gelombang bjls 0,20 Lembar
88 Seng plat bjls Plat bjls 0,35 (6 KK) Lembar
89 Seng plat bjls Plat bjls 0,30 (6 KK) Lembar
90 Seng plat bjls Plat bjls 0,20 (6 KK) Lembar
91 Seng Fiber Fiber Lembar
Bahan Kaca
92 Kaca bening 3 mm m2
93 Kaca bening 5 mm m2
94 Kaca bening 6 mm m2
95 Kaca bening 8 mm m2
96 Kaca bening 10 mm m2
Bahan Penggantung
97 Engsel Baja Biji
98 Engsel Kuningan pasang
99 Engsel Stainless steel pasang
100 Engsel H-3 lubang pasang
101 Engsel Kupu-Kupu pasang
102 Engsel antik jendela pasang
103 Engsel pintu Biasa merk 777 pasang
104 Engsel pintu lemari biasa pasang
105 Engsel jendela biasa merk 777 pasang
106 Engsel Jendela Kuningan pasang
107 Engsel Pintu 4" (SES) Bh
108 Engsel Jendela 5" (SES) Bh
109 Engsel pintu kuningan SES Pasang
110 Gagang Pintu lemari Bh
111 Grendel jendela kuningan Bh
112 Grendel Pintu biasa Royalty Bh
113 Grendel pintu kuningan/vertikal Bh
114 Grendel pintu besar Buah
115 Grendel pintu tanam ( expanyolet) Buah
116 Kunci tanam yale 1xputar Buah
117 Kunci tanam yale 2xputqr Buah
118 Kunci tanam pintu 2xputar besar biasa Buah
119 Kunci tanam pintu 2 x putar kecil biasa Buah
120 Kunci tanam pintu 2 x putas SES Buah
121 Hak angin kecil antik Buah
122 Hak angin besar Buah
123 Hak angin kecil Buah
Bahan langit-langit
124 Pinyu fiberglass KM/WC Lembar
Pintu KM/WCBahan PVC Lengkap
125 Unit
asesoris ex MASPION
126 Teakwood 120 x 240 cm t. 3mm Lembar
127 Triplex 3 mm 120 x 240 cm Lembar
128 Triplex 4 mm 120 x 240 cm Lembar
129 Triplex 5 mm Lembar
130 Triplex 6 mm 120 x 240 cm Lembar
131 Triplex 7 mm Lembar
132 Triplex 9 mm Lembar
133 Triplex 10 mm Lembar
134 Triplex 15 mm Lembar
135 Triplex 20 mm Lembar
136 Triplex ukuran pintu Lembar
137 Triplex melamin 120 x 240 cm 3 mm Lembar
138 Teakwood 120 x 240 cm 4 mm Lembar
139 Multiplex 120 x 240 cm 6 mm Lembar
140 Multiplex 120 x 240 cm 9 mm Lembar
141 Multiplex 120 x 240 cm 12 mm Lembar
142 Multiplex 120 x 240 cm 18 mm Lembar
143 Gypsum board 122 x 244 cm 9 mm Lembar
144 Kalsiboard 4 m' Lembar
145 Lambrizing Lembar
146 HPL Lebar 5 cm ( 4 m') Lembar
147 Les kayu Profil Lebar 3 cm ( 4 m') batang
148 Les kayu Profil Lebar 1 1/2 cm ( 4 m') batang
149 Les kayu Profil 1 x 10 x 400 cm batang
150 Les kayu 4 x 4 x 400 cm batang
151 Les Kayu Profil 0,5 x 3 cm batang
152 Les kayu Biasa batang
Bahan lantai
153 Tegel pc 30 x 30 cm Dos
154 tegel motif 30 x 30 cm Dos
155 Tegel keramik putih 10 x 20 cm Dos
156 Tegel keramik putih 20 x 20 cm Dos
157 Tegel keramik putih 20 x 25 cm Dos
158 Tegel keramik putih 30 x 30 cm Dos
159 Tegel keramik putih 40 x 40 cm Dos
160 Tegel keramik putih 50 x 50 cm Dos
161 Tegel keramik putih 60 x 60 cm Ex granito Dos
162 Tegel keramik putih 60 x 60 cm Ex garuda Dos
163 Tegel keramik putih 30 x 60 cm Ex granito Dos
164 Tegel keramik putih 60 x 60 cm Ex granito Dos
165 Tegel Keramik Warna 60 x 60 cm Ex garuda Dos
166 Tegel Keramik Warna 30 x 60 cm Ex garuda Dos
167 Tegel keramik putih 30 x 60 cm Dos
168 Tegel Keramik Warna 20 x 20 cm Dos
169 Tegel Keramik Warna 30 x 30 cm Dos
170 Tegel Keramik Warna 20 x 25 cm m2
171 Tegel Keramik Warna 40 x 40 cm m2
172 Tegel Keramik Warna 50 x 50 cm (Platinum) Dos
173 Tegel Keramik Warna 60 x 60 cm (Enem polos) Dos
174 Tegel Keramik Warna 30 x 60 cm Dos
175 Keramik WC 20 x 20 cm Dos
176 Keramik WC 20 x 25 cm Dos
177 Keramik WC 30 x 30 cm Dos
178 Keramik 30 x 30 cm Dos
179 Keramik 40 x 40 cm Dos
Bahan Finishing
180 Cat dasar 3,5 kg /kaleng KG
181 Cat Dasar meni 3,5 kg /kaleng kaleng
182 Cat meni glatik 3,5 kg /kaleng kaleng
183 Cat meni kg
184 Plamur tembok Boyo dan setara 5kg Kaleng
185 Palmur Kg
186 Cat dasar Tembok Kg
187 Cat tembok dulux 2,5 kg kaleng
188 Cat tembok dulux Kg
189 Cat seng Nippon 2,5 kg kaleng
190 Cat seng Nippon kg
Bahan instalasi listrik
191 Kabel NYM Eterna 3 x 2,5 mm M
192 Saklar Tunggal Panasonic buah
193 Saklar Ganda Panasonic Buah
194 Stop kontak Broco Bh
195 Stop kontak Clipsal Bh
196 lampu Hias IKEA HEMMA buah
Bohlam (lampu penerangan) PCC
197 pcs
23 Watt Ecuat
Bohlam (lampu penerangan) Philips
198 buah
pijar 40 watt
Bahan pipa
199 Pipa jenis C untuk instalasi listrik 5/8" -4 m Batang
200 Pipa jenis C untuk instalasi listrik 5/8" m
201 Pipa PVC 3/4" - 4 m Batang
202 Pipa PVC 3/4" m
203 Pipa PVC 4" - 4 m batang
204 Pipa PVC 4" m
205 PIPA GIP ( Galvanis) 1 1/2" - 6m Batang
206 PIPA GIP ( Galvanis) 1 1/2" m
Bahan saniter/saluran air
Kloset Duduk Ex KIA lengkap
207 unit
(putih) tangki batu
Kloset Duduk Ex KIA lengkap
208 unit
(warna) tangki batu
Kloset duduk ex Toto lengkap
209 unit
accessories warna putih
Kloset duduk ex Toto lengkap
210 unit
accessories warna gelap
211 Kloset jongkok ex KIA Buah
212 Kloset jongkok biasa Buah
213 Kran air kuningan DIA 3/4 Biasa Buah
214 Kran air vernekel DIA 1/2 biasa DIA 1/2 Biasa Buah
215 Kran air vernekel DIA 3/4 biasa DIA 3/4 Biasa Buah
216 Kran air antik DIA 1/2 DIA 1/2 Biasa Buah
217 Seal tape Buah
218 Bak Cuci Piring Stain Steel Buah
219 Bak tube fiber biasa Buah
220 Bak tube fiber ex toto Buah
Saringan kotoran Kamar Mandi
221 Buah
Bahan Besi/Kuningan (Floor Drain)
Saringan kotoran Kamar Mandi
222 Buah
Bahan Plastik (Floor Drain)
223 ijuk resapan kg
UPAH KERJA
1 Mandor Lapangan Orang/Hari
2 Kepala Tukang Orang/Hari
3 Kepala Tukang Listrik Orang/Hari
4 Tukang Batu / Cat Orang/Hari
5 Tukang Kayu / Besi Orang/Hari
6 Tukang Pasang Paving Orang/Hari
7 Pembantu Sopir Orang/Hari
8 Pembantu Mekanik Orang/Hari
9 Pembantu Tukang Listrik Orang/Hari
10 Pembantu Operator Orang/Hari
11 Mekanik Orang/Hari
12 Operator Terlatih Orang/Hari
13 Pekerja Orang/Hari
14 Sopir Terampil Orang/Hari
15 Biaya pasang Canstein /M'
16 Biaya pasang Paving /M2
Dalam Rupiah (Rp)
HARGA HARGA
5 5

Rp 8,882,500 8,882,500

Rp 8,882,500 8,882,500
Rp 25,500,000 25,500,000
Rp 23,460,000 23,460,000

Rp 19,855,000 19,855,000

Rp 19,855,000 19,855,000

Rp 3,657,000 3,657,000

Rp 3,135,000 3,135,000

Rp 1,672,000 1,672,000
Rp 2,926,000 2,926,000
Rp 3,657,000 3,657,000
Rp 2,990,000 2,990,000
Rp 5,747,000 5,747,000
Rp 6,792,500 6,792,500
Rp 19,855,000 19,855,000
Rp 3,657,500 3,657,500

Rp 62,700 62,700

Rp 52,250 52,250

Rp 78,400 78,400

Rp 20,500 20,500
Rp 20,000 20,000
-
Rp 15,700 15,700
Rp 25,000 25,000
Rp 15,700 15,700
Rp 18,300 18,300
Rp 15,700 15,700
Rp 20,900 20,900
Rp 20,900 20,900
Rp 16,000 16,000
Rp 700 700

Rp 65,000 65,000

Rp 45,000 45,000

Rp 42,200 42,200
Rp 12,500 12,500
Rp 12,500 12,500
Rp 12,500 12,500
Rp 31,400 31,400
Rp 31,400 31,400
Rp 19,200 19,200
Rp 20,900 20,900
Rp 20,900 20,900
Rp 200 200
Rp 54,200 54,200
Rp 20,900 20,900
Rp 14,800 14,800

Rp 266,500 266,500
Rp 324,000 324,000
Rp 266,500 266,500
Rp 179,200 179,200
Rp 363,700 363,700
Rp 388,800 388,800
Rp 316,200 316,200
Rp 376,200 376,200
Rp 412,800 412,800
Rp 424,300 424,300
Rp 438,900 438,900
Rp 475,900 475,900
Rp 600 600
Rp 1,141,200 1,141,200
Rp 33,400 33,400
Rp 37,900 37,900
Rp 68,600 68,600
Rp 51,800 51,800
Rp 26,200 26,200
Rp 148,400 148,400
Rp 136,600 136,600
Rp 162,200 162,200
Rp 235,000 235,000

Rp 210,000 210,000
Rp 195,500 195,500
Rp 177,000 177,000
Rp 151,600 151,600
Rp 168,500 168,500
Rp 237,400 237,400
Rp 67,300 67,300
Rp 52,700 52,700
Rp 130,700 130,700
Rp 1,346 1,346
Rp 300,200 300,200
Rp 20,900 20,900

Rp 61,000 61,000
Rp 75,000 75,000

Rp 88,400 88,400

Rp 80,600 80,600

Rp 72,200 72,200

Rp 42,000 42,000

Rp 60,000 60,000
Rp 83,600 83,600
Rp 73,200 73,200
Rp 47,100 47,100
Rp 16,500 16,500

Rp 109,800 109,800
Rp 125,400 125,400
Rp 229,900 229,900
Rp 313,500 313,500
Rp 438,900 438,900

Rp 21,800 21,800
Rp 78,400 78,400
Rp 138,000 138,000
Rp 63,800 63,800
Rp 25,200 25,200
Rp 201,700 201,700
Rp 53,300 53,300
Rp 10,450 10,450
Rp 36,600 36,600
Rp 31,350 31,350
Rp 25,000 25,000
Rp 20,000 20,000
Rp 28,300 28,300
Rp 15,000 15,000
Rp 36,600 36,600
Rp 10,450 10,450
Rp 109,800 109,800
Rp 36,600 36,600

Rp 209,000 209,000

Rp 119,100 119,100
Rp 136,600 136,600
Rp 120,200 120,200
Rp 94,100 94,100
Rp 292,600 292,600
Rp 15,700 15,700
Rp 26,200 26,200
Rp 15,700 15,700

Rp 261,300 261,300

Rp 940,500 940,500

Rp 114,300 114,300
Rp 45,000 45,000
Rp 68,000 68,000
Rp 55,000 55,000
Rp 65,000 65,000
Rp 135,900 135,900
Rp 140,000 140,000
Rp 188,100 188,100
Rp 214,300 214,300
Rp 255,400 255,400
Rp 101,900 101,900
Rp 114,800 114,800
Rp 204,900 204,900
Rp 85,000 85,000
Rp 95,000 95,000
Rp 145,000 145,000
Rp 285,000 285,000
Rp 68,000 68,000
Rp 55,000 55,000
Rp 41,000 41,000
Rp 210,000 210,000
Rp 17,000 17,000
Rp 36,000 36,000
Rp 18,000 18,000
Rp 57,000 57,000
Rp 31,000 31,000
Rp 71,000 71,000

Rp 68,000 68,000
Rp 180,000 180,000
Rp 52,700 52,700
Rp 50,200 50,200
Rp - -
Rp 65,000 65,000
Rp 44,000 44,000
Rp 62,700 62,700
Rp 360,000 360,000
Rp 400,800 400,800
Rp 263,900 263,900
Rp 343,500 343,500
Rp 162,000 162,000
Rp 234,000 234,000
Rp 107,900 107,900
Rp 58,000 58,000
Rp 52,000 52,000
Rp 58,000 58,000
Rp 56,000 56,000
Rp 97,000 97,000

Rp 145,000 145,000

Rp 174,300 174,300
Rp 56,000 56,000
Rp 60,000 60,000
Rp 65,000 65,000
Rp 50,100 50,100
Rp 47,100 47,100

Rp 40,000 40,000
Rp 83,600 83,600
Rp 106,200 106,200
Rp 11,429 11,429
Rp 41,800 41,800
Rp 8,360 8,360
Rp 130,700 130,700
Rp 280,000 280,000
Rp 112,000 112,000
Rp 167,200 167,200
Rp 66,880 66,880

Rp 8,540 8,540
Rp 8,500 8,500
Rp 21,000 21,000
Rp 12,500 12,500
Rp 33,400 33,400
Rp 174,000 174,000

Rp 34,500 34,500

Rp 7,300 7,300

Rp 12,500 12,500
Rp 3,125 3,125
Rp 31,400 31,400
Rp 7,850 7,850
Rp 137,300 137,300
Rp 34,325 34,325
Rp 261,300 261,300
Rp 43,550 43,550

Rp 2,162,300 2,162,300

Rp 2,948,500 2,948,500

Rp 2,612,500 2,612,500

Rp 2,455,800 2,455,800

Rp 275,500 275,500
Rp 90,000 90,000
Rp 47,100 47,100
Rp 31,400 31,400
Rp 41,800 41,800
Rp 130,700 130,700
Rp 2,500 2,500
Rp 783,800 783,800
Rp 679,300 679,300
Rp 24,000 961,400

Rp 34,000 34,000

Rp 15,000 15,000

Rp 4,200 4,200

Rp 150,000 150,000
Rp 130,000 130,000
Rp 130,000 130,000
Rp 120,000 120,000
Rp 120,000 120,000
Rp 120,000 120,000
Rp 100,000 100,000
Rp 128,000 128,000
Rp 100,000 100,000
Rp 140,000 140,000
Rp 120,000 120,000
Rp 152,000 152,000
Rp 96,000 96,000
Rp 130,000 130,000
Rp 100,000 100,000
Rp 130,000 130,000

Anda mungkin juga menyukai