SOP PERSYARATAN LOAD IN

TARGET : Performance Test Tahap II (1500tph-Up 4 Jam) By : Rangga Santosa


PT Tahap III, IV, V (2000tph-up 8 Jam) Update : 29 Januari 2022
Note : PT Tahap I Done

STATUS
NO TERM DESCRIPTION START FINISH PIC TARGET DATE REMARKS EVIDENCE
OPEN CLOSED

A Kebutuhan Batubara

1 PT Tahap 2 (minimal) yaitu, 4 jam x 1500 tph = 6000 Ton •


2 PT Tahap 3 (minimal) yaitu, 8 jam x 2000 tph = 16000 Ton •
3 PT Tahap 4 (minimal) yaitu, 8 jam x 2000 tph = 16000 Ton •
4 PT Tahap 5 (minimal) yaitu, 8 jam x 2000 tph = 16000 Ton •
5
Kebutuhan minimum Total PT Load In = 54000 Ton (Saran : disiapkan
spare lebih sekitar 6000 Ton) •
6 Supply batubara (Coal Dumping) harus bisa Kontinyu dan Stabil •
7
ROM Stokpile Minimum harus di Stok sebanyak 40000 Ton, Sisanya
bisa ditambah dari FB melalui DT sebanyak 800 Rit •

B Alat Berat Supporting


Dozer d85 (blade 6,8 cum, kapasitas 9,72 ton sekali dorong) maju
1 mundur 15 detik radius 20 meter , maju+mundur 30 detik, permenit
19,44 Ton

Dozer d65 (blade 6,8 cum, kapasitas 6,7 ton sekali dorong) maju
2 mundur 15 detik radius 20 meter , maju+mundur 30 detik, permenit
13,14 Ton

3 DT batubara minimum bisa memuat Kapasitas 20 Ton Batubara •
4
speed dozer85 yaitu 5 km/h , dalam 15 detik bisa mendorong 20 meter
dengan kapasitas 10 Ton •
5 material yang di dorong dozer tidak boleh radius lebih dari 20 meter •
6 kapasitas 1FB (2 jalur x 20ton) yaitu 40 Ton •
7 40 Ton/1000tph = 0,04 Jam (atau 2,4 menit , atau 144 detik) •
8 jadi setiap 144 detik harus ada 2 DT dumping sebesar 40 Ton •
9 untuk 8 Jam butuh (8x60menit) /2,4 menit = 200 rit x 2line = 400 Rit •
10 Kalau pakai 2FB berarti 2fb x 400rit = 800 rit •
11 Untuk 3 x 8 jam butuh 24000 Rit DT @20Ton •
C Manpower Supporting

1
Susunan Ploting Manpower sesuai dengan plot pada prosedur
commissioning •
2
Dilakukan pengukuran serta pemantauan pada peralatan : Drive Unit,
Panel-panel, Beltscale, dan Equipment terkait •
Hanya PIC Commissioning yang bertugas yang boleh melaksanakan
3
pengujian (selain PIC hanya boleh mengawasi, dan menyampaikan
evaluasi setelah pengujian supaya tidak ada interupsi/ intervensi pada •
saat Operasi)

4
koordinator/supervisi Tambang untuk Retase DumpTruck dan
dorongan Dozer harus stanby mengikuti operasi •
F Supporting

1
System Test (Penyempurnaan Program CHF) sudah terselesaikan
dengan baik •
2 Persinyalan Rail Loop Sudah Teruji dan Berfungsi Baik •
3 System Dust Supression Berfungsi dan sesuai kebutuhan •
4 Beltscale sudah terkalibrasi dengan baik dan sudah tersertifikasi •
5 Radio CCR DH&TLS5 sudah terpasang dan berfungsi (include repeater) •
G SHE

1
Baricade dan Rambu-rambu untuk System Sequence CHF (Area Dump
Hopper sampai Area TLS) •
2
APD dilengkapi (sarung tangan karet, kacamata safety, Dust Masking,
Rain Coat) •
3 JSA & Permit terkait aktifitas sudah dikerjakan dan submit •
4 APAR sudah stanby di area •
SOP PERSYARATAN LOAD IN
TARGET : Performance Test Tahap III sampai XV (2000tph-Up , load out TLS 90 menit) By : Rangga Santosa
Update : 29 Januari 2022
Note : PT Tahap I & Tahap II Done

STATUS
NO TERM DESCRIPTION START FINISH PIC TARGET DATE REMARKS EVIDENCE
OPEN CLOSED

A Kebutuhan Batubara

1 PT setiap tahap (minimal) yaitu, 1,5 jam x 2000 tph = 3000 Ton •
2
PT Tahap III sampai XV (minimal) yaitu, 13 tahap x 3000 tph = 39000
Ton •
5
Kebutuhan minimum Total PT Load Out = 39000 Ton (Saran : disiapkan
spare lebih sekitar 20000 Ton) •
6 Supply batubara (Coal Dumping) harus bisa Kontinyu dan Stabil •
7
Stokpile5 Minimum harus memiliki Stok sebanyak 54000 Ton (dari Load
In) •

8
Jumlah Stok (tumpukan) pada masing-masing hole Vibrating Feeder
minimum @10000 Ton •
Jika Stok batubara pada Stokpile5 kurang dari requirement, Maka
9
Operasi Load Out harus disupport/dibarengkan dengan Operasi
Load In menyesuaikan jatuhan Beltplough & vibrating Feeder sesuai •
kebutuhan

B Alat Berat Supporting


Dozer d85 (blade 6,8 cum, kapasitas 9,72 ton sekali dorong) maju
1 mundur 15 detik radius 20 meter , maju+mundur 30 detik, permenit
19,44 Ton

Dozer d65 (blade 6,8 cum, kapasitas 6,7 ton sekali dorong) maju
2 mundur 15 detik radius 20 meter , maju+mundur 30 detik, permenit
13,14 Ton

3 Menggunakan 2 unit Dozer untuk setiap hole Vibrating Feeder •
4 Jenis Lokomotif kereta yang digunakan adalah CC205 •
5 Jenis Gerbong yang digunakan adalah kapasitas 50 Ton •
6 Maksimum Pengisian 40gerbong x 50 Ton adalah 60 Menit •
7 Maksimum Pengisian 60gerbong x 50 Ton adalah 90 Menit •
8 Persinyalan Rail Loop Sudah Teruji dan Berfungsi Baik •
9
speed Lokomotif yaitu 0,7-0,8 km/h dengan waktu isi per gerbong
rerata 1 menit 20 detik •
10
Rangkaian 60gb x 50ton dengan Lokomotif CC205 bisa menggunakan
mode operasi TLS FullAuto •
Rangkaian dengan kapasitas per gerbong 30Ton/ 40Ton/ 45Ton dengan
11 Lokomotif selain CC205 disarankan menggunakan mode operasi TLS
SemiAuto atau Manual

12
disarankan stanby satu excavator untuk mengurangi batubara jika
muatan gerbong berlebih •
13
Setiap Vibrating Feeder teruji mampu memproduksi flowrate 2000-
2200 tph •
Untuk menghasilkan flowrate pada CV502 2000-2200tph maka bisa di
14 combine menggunakan lebih dari 1 Vibrating menyesuaikan kondisi
dan ketersedian batubara

C Manpower Supporting

1
Susunan Ploting Manpower sesuai dengan plot pada prosedur
commissioning •
2
Dilakukan pengukuran serta pemantauan pada peralatan : Drive Unit,
Panel-panel, Beltscale, dan Equipment terkait •
Hanya PIC Commissioning yang bertugas yang boleh melaksanakan
3
pengujian (selain PIC hanya boleh mengawasi, dan menyampaikan
evaluasi setelah pengujian supaya tidak ada interupsi/ intervensi pada •
saat Operasi)

4
koordinator/supervisi Tambang untuk Retase DumpTruck dan
dorongan Dozer harus stanby mengikuti operasi •
F Supporting

1
System Test (Penyempurnaan Program CHF) sudah terselesaikan
dengan baik •
2 Persinyalan Rail Loop Sudah Teruji dan Berfungsi Baik •
3 System Dust Supression Berfungsi dan sesuai kebutuhan •
4 Beltscale sudah terkalibrasi dengan baik dan sudah tersertifikasi •
5 Radio CCR DH&TLS5 sudah terpasang dan berfungsi (include repeater) •
G SHE

1
Baricade dan Rambu-rambu untuk System Sequence CHF (Area Dump
Hopper sampai Area TLS) •
2
APD dilengkapi (sarung tangan karet, kacamata safety, Dust Masking,
Rain Coat) •
3 JSA & Permit terkait aktifitas sudah dikerjakan dan submit •
4 APAR sudah stanby di area •
Load Out : Kalkulasi Rate Durasi Pengisian Kereta 60 gb kapasitas 50 Ton

flow in
Gerbong Ke Waktu (menit) rate/menit (Ton) Surge Bin (Ton)
0 0 300
5 33.3 333.3
6 33.3 366.6
7 33.3 399.9
8 33.3 433.2
9 33.3 466.5
10 33.3 499.8
11 33.3 533.1
12 33.3 566.4
13 33.3 599.7
14 33.3 633
15 33.3 666.3
16 33.3 699.6
17 33.3 732.9
18 33.3 766.2
19 33.3 799.5
20 33.3 832.8
21 33.3 866.1
22 33.3 899.4
23 33.3 932.7
1 24 33.3 915.999999999999
24.5 16.65 932.649999999999
25 16.65 949.299999999999
2 25.5 16.65 915.949999999999
26 16.65 932.599999999999
26.5 16.65 949.249999999999
3 27 16.65 915.899999999999
27.5 16.65 932.549999999999
28 16.65 949.199999999999
4 28.5 16.65 915.849999999999
29 16.65 932.499999999999
29.5 16.65 949.149999999999
5 30 16.65 915.799999999999
30.5 16.65 932.449999999999
31 16.65 949.099999999999
6 31.5 16.65 915.749999999999
32 16.65 932.399999999999
32.5 16.65 949.049999999999
7 33 16.65 915.699999999999
33.5 16.65 932.349999999999
34 16.65 948.999999999999
8 34.5 16.65 915.649999999999
35 16.65 932.299999999999
35.5 16.65 948.949999999999
9 36 16.65 915.599999999999
36.5 16.65 932.249999999999
37 16.65 948.899999999999
10 37.5 16.65 915.549999999999
38 16.65 932.199999999999
38.5 16.65 948.849999999999
11 39 16.65 915.499999999999
39.5 16.65 932.149999999999
40 16.65 948.799999999999
12 40.5 16.65 915.449999999999
41 16.65 932.099999999999
41.5 16.65 948.749999999999
13 42 16.65 915.399999999999
42.5 16.65 932.049999999999
43 16.65 948.699999999999
14 43.5 16.65 915.349999999999
44 16.65 931.999999999999
44.5 16.65 948.649999999999
15 45 16.65 915.299999999999
45.5 16.65 931.949999999999
46 16.65 948.599999999998
16 46.5 16.65 915.249999999998
47 16.65 931.899999999998
47.5 16.65 948.549999999998
17 48 16.65 915.199999999998
48.5 16.65 931.849999999998
49 16.65 948.499999999998
18 49.5 16.65 915.149999999998
50 16.65 931.799999999998
50.5 16.65 948.449999999998
19 51 16.65 915.099999999998
51.5 16.65 931.749999999998
52 16.65 948.399999999998
20 52.5 16.65 915.049999999998
53 16.65 931.699999999998
53.5 16.65 948.349999999998
21 54 16.65 914.999999999998
54.5 16.65 931.649999999998
55 16.65 948.299999999998
22 55.5 16.65 914.949999999998
56 16.65 931.599999999998
56.5 16.65 948.249999999998
23 57 16.65 914.899999999998
57.5 16.65 931.549999999998
58 16.65 948.199999999998
24 58.5 16.65 914.849999999998
59 16.65 931.499999999998
59.5 16.65 948.149999999998
25 60 16.65 914.799999999998
60.5 16.65 931.449999999998
61 16.65 948.099999999998
26 61.5 16.65 914.749999999998
62 16.65 931.399999999998
62.5 16.65 948.049999999998
27 63 16.65 914.699999999998
63.5 16.65 931.349999999998
64 16.65 947.999999999998
28 64.5 16.65 914.649999999998
65 16.65 931.299999999998
65.5 16.65 947.949999999998
29 66 16.65 914.599999999998
66.5 16.65 931.249999999998
67 16.65 947.899999999998
30 67.5 16.65 914.549999999998
68 16.65 931.199999999997
68.5 16.65 947.849999999997
31 69 16.65 914.499999999997
69.5 16.65 931.149999999997
70 16.65 947.799999999997
32 70.5 16.65 914.449999999997
71 16.65 931.099999999997
71.5 16.65 947.749999999997
33 72 16.65 914.399999999997
72.5 16.65 931.049999999997
73 16.65 947.699999999997
34 73.5 16.65 914.349999999997
74 16.65 930.999999999997
74.5 16.65 947.649999999997
35 75 16.65 914.299999999997
75.5 16.65 930.949999999997
76 16.65 947.599999999997
36 76.5 16.65 914.249999999997
77 16.65 930.899999999997
77.5 16.65 947.549999999997
37 78 16.65 914.199999999997
78.5 16.65 930.849999999997
79 16.65 947.499999999997
38 79.5 16.65 914.149999999997
80 16.65 930.799999999997
80.5 16.65 947.449999999997
39 81 16.65 914.099999999997
81.5 16.65 930.749999999997
82 16.65 947.399999999997
40 82.5 16.65 914.049999999997
83 16.65 930.699999999997
83.5 16.65 947.349999999997
41 84 16.65 913.999999999997
84.5 16.65 930.649999999997
85 16.65 947.299999999997
42 85.5 16.65 913.949999999997
86 16.65 930.599999999997
86.5 16.65 947.249999999997
43 87 16.65 913.899999999997
87.5 16.65 930.549999999997
88 16.65 947.199999999997
44 88.5 16.65 913.849999999997
89 16.65 930.499999999997
89.5 16.65 947.149999999997
45 90 16.65 913.799999999996
90.5 16.65 930.449999999996
91 16.65 947.099999999996
46 91.5 16.65 913.749999999996
92 16.65 930.399999999996
92.5 16.65 947.049999999996
47 93 16.65 913.699999999996
93.5 16.65 930.349999999996
94 16.65 946.999999999996
48 94.5 16.65 913.649999999996
95 913.649999999996
95.5 913.649999999996
49 96 863.649999999996
96.5 863.649999999996
97 863.649999999996
50 97.5 813.649999999996
98 813.649999999996
98.5 813.649999999996
51 99 763.649999999996
99.5 763.649999999996
100 763.649999999996
52 100.5 713.649999999996
101 713.649999999996
101.5 713.649999999996
53 102 663.649999999996
102.5 663.649999999996
103 663.649999999996
54 103.5 613.649999999996
104 613.649999999996
104.5 613.649999999996
55 105 563.649999999996
105.5 563.649999999996
106 563.649999999996
56 106.5 513.649999999996
107 513.649999999996
107.5 513.649999999996
57 108 463.649999999996
108.5 463.649999999996
109 463.649999999996
58 109.5 413.649999999996
110 413.649999999996
110.5 413.649999999996
59 111 363.649999999996
111.5 363.649999999996
112 363.649999999996
60 112.5 313.649999999996
113 313.649999999996
113.5 313.649999999996
114
flow out
Weight Bin (Ton) Keterangan
isi surge bin
isi surge bin
isi surge bin
isi surge bin
isi surge bin
isi surge bin
isi surge bin
isi surge bin
isi surge bin
isi surge bin
isi surge bin
isi surge bin
isi surge bin
isi surge bin
isi surge bin
isi surge bin
isi surge bin
isi surge bin
isi surge bin
isi surge bin
50 Mulai Loading Gb.1

50 Loading Gb.2

50 Loading Gb.3

50 dst

50

50

50

50

50

50

50
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
50

50

50

50

50

50

50

50

50

50

50

3000
No Deskripsi
1 Kebutuhan Batubara

2 Alat Berat dan Supporting

3 Manpower
4 Supporting

5 Safety
Resume SOP Commissioning Performance Test
LOAD IN
PT Tahap 2 (minimal) yaitu, 4 jam x 1500 tph = 6000 Ton
PT Tahap 3 (minimal) yaitu, 8 jam x 2000 tph = 16000 Ton
PT Tahap 4 (minimal) yaitu, 8 jam x 2000 tph = 16000 Ton
PT Tahap 5 (minimal) yaitu, 8 jam x 2000 tph = 16000 Ton
Kebutuhan minimum Total PT Load In = 54000 Ton (Saran : disiapkan spare lebih sekitar
6000 Ton)
Supply batubara (Coal Dumping) harus bisa Kontinyu dan Stabil

ROM Stokpile Minimum harus di Stok sebanyak 40000 Ton, Sisanya bisa ditambah dari
FB melalui DT sebanyak 800 Rit

Dozer d85 (blade 6,8 cum, kapasitas 9,72 ton sekali dorong) maju mundur 15 detik radius
20 meter , maju+mundur 30 detik, permenit 19,44 Ton
Dozer d65 (blade 6,8 cum, kapasitas 6,7 ton sekali dorong) maju mundur 15 detik radius
20 meter , maju+mundur 30 detik, permenit 13,14 Ton
DT batubara minimum bisa memuat Kapasitas 20 Ton Batubara
speed dozer85 yaitu 5 km/h , dalam 15 detik bisa mendorong 20 meter dengan kapasitas
10 Ton
material yang di dorong dozer tidak boleh radius lebih dari 20 meter
kapasitas 1FB (2 jalur x 20ton) yaitu 40 Ton
40 Ton/1000tph = 0,04 Jam (atau 2,4 menit , atau 144 detik)
jadi setiap 144 detik harus ada 2 DT dumping sebesar 40 Ton
untuk 8 Jam butuh (8x60menit) /2,4 menit = 200 rit x 2line = 400 Rit

Kalau pakai 2FB berarti 2fb x 400rit = 800 rit

Untuk 3 x 8 jam butuh 24000 Rit DT @20Ton

Susunan Ploting Manpower sesuai dengan plot pada prosedur commissioning


Dilakukan pengukuran serta pemantauan pada peralatan : Drive Unit, Panel-panel,
Beltscale, dan Equipment terkait
Hanya PIC Commissioning yang bertugas yang boleh melaksanakan pengujian (selain
PIC hanya boleh mengawasi, dan menyampaikan evaluasi setelah pengujian supaya tidak
ada interupsi/ intervensi pada saat Operasi)
koordinator/supervisi Tambang untuk Retase DumpTruck dan dorongan Dozer harus
stanby mengikuti operasi
System Test (Penyempurnaan Program CHF) sudah terselesaikan dengan baik
Persinyalan Rail Loop Sudah Teruji dan Berfungsi Baik
System Dust Supression Berfungsi dan sesuai kebutuhan
Beltscale sudah terkalibrasi dengan baik dan sudah tersertifikasi
Radio CCR DH&TLS5 sudah terpasang dan berfungsi (include repeater)

Baricade dan Rambu-rambu untuk System Sequence CHF (Area Dump Hopper sampai
Area TLS)
APD dilengkapi (sarung tangan karet, kacamata safety, Dust Masking, Rain Coat)
JSA & Permit terkait aktifitas sudah dikerjakan dan submit
APAR sudah stanby di area
LOAD OUT
PT setiap tahap (minimal) yaitu, 1,5 jam x 2000 tph = 3000 Ton
PT Tahap III sampai XV (minimal) yaitu, 13 tahap x 3000 tph = 39000 Ton
Kebutuhan minimum Total PT Load Out = 39000 Ton (Saran : disiapkan spare
lebih sekitar 20000 Ton)
Supply batubara (Coal Dumping) harus bisa Kontinyu dan Stabil
Stokpile5 Minimum harus memiliki Stok sebanyak 54000 Ton (dari Load In)
Jumlah Stok (tumpukan) pada masing-masing hole Vibrating Feeder minimum
@10000 Ton
Jika Stok batubara pada Stokpile5 kurang dari requirement, Maka Operasi Load
Out harus disupport/dibarengkan dengan Operasi Load In menyesuaikan
jatuhan Beltplough & vibrating Feeder sesuai kebutuhan

Dozer d85 (blade 6,8 cum, kapasitas 9,72 ton sekali dorong) maju mundur 15 detik
radius 20 meter , maju+mundur 30 detik, permenit 19,44 Ton
Dozer d65 (blade 6,8 cum, kapasitas 6,7 ton sekali dorong) maju mundur 15 detik
radius 20 meter , maju+mundur 30 detik, permenit 13,14 Ton
Menggunakan 2 unit Dozer untuk setiap hole Vibrating Feeder
Jenis Lokomotif kereta yang digunakan adalah CC205
Jenis Gerbong yang digunakan adalah kapasitas 50 Ton
Maksimum Pengisian 40gerbong x 50 Ton adalah 60 Menit
Maksimum Pengisian 60gerbong x 50 Ton adalah 90 Menit
Persinyalan Rail Loop Sudah Teruji dan Berfungsi Baik
speed Lokomotif yaitu 0,7-0,8 km/h dengan waktu isi per gerbong rerata 1 menit
20 detik
Rangkaian 60gb x 50ton dengan Lokomotif CC205 bisa menggunakan mode
operasi TLS FullAuto
Rangkaian dengan kapasitas per gerbong 30Ton/ 40Ton/ 45Ton dengan Lokomotif
selain CC205 disarankan menggunakan mode operasi TLS SemiAuto atau
Manual
disarankan stanby satu excavator untuk mengurangi batubara jika muatan
gerbong berlebih
Setiap Vibrating Feeder teruji mampu memproduksi flowrate 2000-2200 tph

Untuk menghasilkan flowrate pada CV502 2000-2200tph maka bisa di combine


menggunakan lebih dari 1 Vibrating menyesuaikan kondisi dan ketersedian
batubara

Susunan Ploting Manpower sesuai dengan plot pada prosedur commissioning


Dilakukan pengukuran serta pemantauan pada peralatan : Drive Unit, Panel-panel,
Beltscale, dan Equipment terkait
Hanya PIC Commissioning yang bertugas yang boleh melaksanakan pengujian
(selain PIC hanya boleh mengawasi, dan menyampaikan evaluasi setelah
pengujian supaya tidak ada interupsi/ intervensi pada saat Operasi)
koordinator/supervisi Tambang untuk Retase DumpTruck dan dorongan Dozer
harus stanby mengikuti operasi
System Test (Penyempurnaan Program CHF) sudah terselesaikan dengan baik
Persinyalan Rail Loop Sudah Teruji dan Berfungsi Baik
System Dust Supression Berfungsi dan sesuai kebutuhan
Beltscale sudah terkalibrasi dengan baik dan sudah tersertifikasi
Radio CCR DH&TLS5 sudah terpasang dan berfungsi (include repeater)

Baricade dan Rambu-rambu untuk System Sequence CHF (Area Dump Hopper
sampai Area TLS)
APD dilengkapi (sarung tangan karet, kacamata safety, Dust Masking, Rain Coat)
JSA & Permit terkait aktifitas sudah dikerjakan dan submit
APAR sudah stanby di area
α 38 deg
tan α 0.78 deg

BENTUK LINGKARAN
Diameter Luas Bawah Diameter Luas Atas Tinggi Volume
Bawah (m) (m2) Atas (m) (m2) (m) (m3)
31.7 789.8 1.0 0.8 12.0 3261.8

BENTUK PERSEGI

Lebar Bawah Panjang Luas Bawah Lebar Atas Panjang Luas Atas Volume
Tinggi (m)
(m) Bawah (m) (m2) (m) Atas (m) (m2) (m3)

38.7 54.7 2118.6 8.0 24.0 434.2 12.0 10211.5


58.7 54.7 3213.0 28.0 24.0 1959.4 12.0 20689.8

Panjang Panjang Panjang

Anda mungkin juga menyukai