Backup Pekerjaan Pasangan Batu
Backup Pekerjaan Pasangan Batu
JARAK AREA PASANGAN VOLUME AREA Bongkar VOLUME BONGKARAN VOLUME PASANGAN BATU
NO NO PATOK PASANGAN BATU DARI HASIL BONGKARAN KETERANGAN
BATU PASANGAN BATU pasangan batu PLESTERAN SIARAN
1 P.148
- - -
2 P.149 1.35 1.35
25.00 11.81 33.75 21.94 60.00 56.90
3 P.150 1.35 1.35
25.00 11.81 33.75 21.94 60.00 56.90
4 P.151 1.35 1.35
- - -
5 P.152 1.26 1.26
16.00 7.06 20.16 13.10 33.60 33.29
6 P.153 1.26 1.26
- - -
7 P154 1.07 0.93
25.00 11.64 23.25 15.11 42.50 35.00
8 P155 1.07 0.93
25.00 11.64 23.25 15.11 42.50 35.00
9 P156 1.07 0.93
25.00 11.64 23.25 15.11 42.50 35.00
10 P157 1.07 0.93
25.00 11.64 23.25 15.11 42.50 35.00
11 P158 1.07 0.93
25.00 11.64 23.25 15.11 42.50 35.00
12 P159 1.07 0.93
23.00 10.71 21.39 13.90 39.10 32.20
13 P160 1.07 0.93
- - - - -
14 P161 1.07 0.93
25.00 11.64 23.25 15.11 42.50 35.00
15 P162 1.07 0.93
25.00 10.63 25.38 16.49 42.50 35.00
16 P163 1.10 1.10
25.00 9.63 27.50 17.88 42.50 35.00
17 P164 1.10 1.10
29.50 10.92 32.45 21.09 50.15 41.30
18 P165 1.07 1.10
3.00 1.07 3.30 2.15 5.10 4.20
19 P166 1.07 1.10
10.00 3.55 11.00 7.15 17.00 14.00
20 P167 1.07 1.10
10.00 3.55 11.00 7.15 17.00 14.00
21 P168 1.07 1.10
25.00 8.88 27.50 17.88 42.50 35.00
22 P169 1.07 1.10
32.00 11.36 35.20 22.88 54.40 44.80
23 P170 1.07 1.10
25.00 8.88 27.50 17.88 42.50 35.00
24 P171 1.07 1.10
25.00 8.88 27.50 17.88 42.50 35.00
25 P172 1.07 1.10
35.00 12.43 38.50 25.03 59.50 49.00
26 P173 1.07 1.10
- - - - -
27 P174 1.26 0.91
25.00 16.71 22.75 14.79 38.75 22.50
28 P175 1.26 0.91
25.00 16.71 22.75 14.79 35.00 55.00
29 P176 1.26 0.91
25.00 16.71 22.75 14.79 35.00 55.00
30 P177 1.26 0.91
25.00 16.71 22.75 14.79 35.00 55.00
31 P178 1.26 0.91
26.50 17.72 24.12 15.67 37.10 58.30
32 P179 1.26 0.91
REKAPITULASI PERHITUNGAN VOLUME PEKERJAAN SALURAN
Pasangan Batu mortar tipe N (setara campuran1 Pc 4 Pp)
Kegiatan : Pengembangan Dan Pengelolaan Sistem Irigasi Primer Dan Sekunder Pada Daerah Irigasi Yang Luasnya 1000 Ha - 3000 Ha Dan Daerah
Irigasi Lintas Daerah Kabupaten/Kota
Pekerjaan : Rehabilitasi Jaringan Irigasi DI. Latonda Pekat (DAK)
Kontrak,Tanggal : 610/008/KONTRAK/DAK/DPUPR/2023, 10 Maret 2023
Tahun Anggaran : 2023
Kontraktor : CV. NK UTAMA
JARAK AREA PASANGAN VOLUME AREA Bongkar VOLUME BONGKARAN VOLUME PASANGAN BATU
NO NO PATOK PASANGAN BATU DARI HASIL BONGKARAN KETERANGAN
BATU PASANGAN BATU pasangan batu PLESTERAN SIARAN
35 P182
- - - - -
36 P183
37 P184
38 P185
39 P186
40 P187
41 P188
42 P189
43
47 P.225
48 P.226
- - -
49 P.227 0.84 0.84
25.00 7.35 21.00 13.65 35.00 35.00
50 P.228 0.84 0.84
31.00 9.11 26.04 16.93 43.40 43.40
51 P.231 0.84 0.84
52
53 P.142
54 P.154
302.99
55
ASEP TEJA SAMPURNA, ST. SIGIT PURWANTO, ST. AANK PUJUT RAHMAT ALMUSSIYAM HERRY SATRIADI
NIP: 19841002 201001 1 007 NIP: 19750803 200801 1 014 Team Leader
Bongkar 1 m³ Pasangan Batu (manual)
0.30
0.90
0.40 0.40
Bongkar 1 m³ Pasangan Batu (manual)
0.30
0.90
0.40 0.40
Bongkar 1 m³ Pasangan Batu (manual)
0.30
0.90
0.40 0.40
Bongkar 1 m³ Pasangan Batu (manual)
0.30
0.90
0.40 0.40
Bongkar 1 m³ Pasangan Batu (manual)
0.30
0.90
0.40 0.40
Bongkar 1 m³ Pasangan Batu (manual)
0.30
0.90
0.40 0.40
Bongkar 1 m³ Pasangan Batu (manual)
0.30
0.90
0.40 0.40
Bongkar 1 m³ Pasangan Batu (manual)
Analisa Perhitungan
0.300 0.30 Perhitungan Luas Penampang
A1 = ((0.30+0.40)/2 x 0.60 x 2)+(0.40 x 0.30 x 2) + (0.30 x 0.90) = 0.930 m2
A2 = ((0.30+0.40)/2 x 0.60 x 2)+(0.40 x 0.30 x 2) + (0.30 x 0.90) = 1.100 m2
0.80 - Volume Bongkaran Pasangan Batu
V = (0.930 + 1.100)/2 x 25.00 = 25.38 m3
0.30
1.00
0.40 0.40
Pasangan Batu
Analisa Perhitungan
0.300 0.30 Perhitungan Luas Penampang
A1 = ((0.30+0.40)/2 x 0.80 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.00) = 1.100 m2
A2 = ((0.30+0.40)/2 x 0.80 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.00) = 1.100 m2
0.80 - Volume Pasangan Batu
V = (1.100 + 1.100)/2 x 25.00 = 27.50 m3
0.30
1.00
0.40 0.40
Bongkar 1 m³ Pasangan Batu (manual)
Analisa Perhitungan
0.30 0.30 Perhitungan Luas Penampang
A1 = ((0.30+0.40)/2 x 0.80 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.00) = 1.100 m2
A2 = ((0.30+0.40)/2 x 0.80 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.00) = 1.100 m2
0.80 - Volume Pasangan Batu
V = (1.100 + 1.100)/2 x 29.50 = 32.45 m3
0.30
1.00
0.40 0.40
Bongkar 1 m³ Pasangan Batu (manual)
Analisa Perhitungan
0.30 0.30 Perhitungan Luas Penampang
A1 = ((0.30+0.40)/2 x 0.80 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.00) = 1.100 m2
A2 = ((0.30+0.40)/2 x 0.80 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.00) = 1.100 m2
0.80 - Volume Pasangan Batu
V = (1.100 + 1.100)/2 x 3.00 = 3.30 m3
0.30
1.00
0.40 0.40
Bongkar 1 m³ Pasangan Batu (manual)
Analisa Perhitungan
0.30 0.30 Perhitungan Luas Penampang
A1 = ((0.30+0.40)/2 x 0.80 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.00) = 1.100 m2
A2 = ((0.30+0.40)/2 x 0.80 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.00) = 1.100 m2
0.80 - Volume Pasangan Batu
V = (1.100 + 1.100)/2 x 10.00 = 11.00 m3
0.30
1.00
0.40 0.40
Bongkar 1 m³ Pasangan Batu (manual)
Analisa Perhitungan
0.30 0.30 Perhitungan Luas Penampang
A1 = ((0.30+0.40)/2 x 0.80 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.00) = 1.100 m2
A2 = ((0.30+0.40)/2 x 0.80 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.00) = 1.100 m2
0.80 - Volume Pasangan Batu
V = (1.100 + 1.100)/2 x 10.00 = 11.00 m3
0.30
1.00
0.40 0.40
Bongkar 1 m³ Pasangan Batu (manual)
Analisa Perhitungan
0.30 0.30 Perhitungan Luas Penampang
A1 = ((0.30+0.40)/2 x 0.80 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.00) = 1.100 m2
A2 = ((0.30+0.40)/2 x 0.80 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.00) = 1.100 m2
0.80 - Volume Pasangan Batu
V = (1.100 + 1.100)/2 x 25.00 = 27.50 m3
0.30
1.00
0.40 0.40
Bongkar 1 m³ Pasangan Batu (manual)
Analisa Perhitungan
0.30 0.30 Perhitungan Luas Penampang
A1 = ((0.30+0.40)/2 x 0.80 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.00) = 1.100 m2
A2 = ((0.30+0.40)/2 x 0.80 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.00) = 1.100 m2
0.80 - Volume Pasangan Batu
V = (1.100 + 1.100)/2 x 32.00 = 35.20 m3
0.30
1.00
0.40 0.40
Bongkar 1 m³ Pasangan Batu (manual)
Analisa Perhitungan
0.30 0.30 Perhitungan Luas Penampang
A1 = ((0.30+0.40)/2 x 0.80 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.00) = 1.100 m2
A2 = ((0.30+0.40)/2 x 0.80 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.00) = 1.100 m2
0.80 - Volume Pasangan Batu
V = (1.100 + 1.100)/2 x 25.00 = 27.50 m3
0.30
1.00
0.40 0.40
Bongkar 1 m³ Pasangan Batu (manual)
Analisa Perhitungan
0.30 0.30 Perhitungan Luas Penampang
A1 = ((0.30+0.40)/2 x 0.80 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.00) = 1.100 m2
A2 = ((0.30+0.40)/2 x 0.80 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.00) = 1.100 m2
0.80 - Volume Pasangan Batu
V = (1.100 + 1.100)/2 x 25.00 = 27.50 m3
0.30
1.00
0.40 0.40
Bongkar 1 m³ Pasangan Batu (manual)
Analisa Perhitungan
0.30 0.30 Perhitungan Luas Penampang
A1 = ((0.30+0.40)/2 x 0.80 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.00) = 1.100 m2
A2 = ((0.30+0.40)/2 x 0.80 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.00) = 1.100 m2
0.80 - Volume Pasangan Batu
V = (1.100 + 1.100)/2 x 35.00 = 38.50 m3
0.30
1.00
0.40 0.40
Pasangan Batu
0.30
0.60
0.40 0.40
No Gambar Skets Data dan Perhitungan
0.30
0.60
0.40 0.40
Bongkar 1 m³ Pasangan Batu (manual)
0.30
0.60
0.40 0.40
No Gambar Skets Data dan Perhitungan
0.30
0.60
0.40 0.40
Bongkar 1 m³ Pasangan Batu (manual)
0.30
0.60
0.40 0.40
Pasangan Batu
0.30
0.60
0.40
Bongkar 1 m³ Pasangan Batu (manual)
0.30
0.60
0.40
Pasangan Batu
0.20
0.60
0.40 0.40
0.20
0.60
0.40 0.40
Pasangan Batu
Analisa Perhitungan
0.300 0.30 Perhitungan Luas Penampang
A1 = ((0.30+0.40)/2 x 0.90 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.60) = 1.35 m2
A2 = ((0.30+0.40)/2 x 0.90 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.60) = 1.35 m2
0.90 - Volume Pasangan Batu
V = (1.350 + 1.350)/2 x 25.00 = 33.75 m3
0.30
1.60
0.40 0.40
Bongkar 1 m³ Pasangan Batu (manual)
Analisa Perhitungan
0.30 0.30 Perhitungan Luas Penampang
A1 = ((0.30+0.40)/2 x 0.90 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.60) = 1.35 m2
A2 = ((0.30+0.40)/2 x 0.90 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.60) = 1.35 m2
0.90 - Volume Pasangan Batu
V = (1.350 + 1.350)/2 x 25.00 = 33.75 m3
0.30
1.60
0.40 0.40
Pasangan Batu
Analisa Perhitungan
0.30 0.30 Perhitungan Luas Penampang
A1 = ((0.30+0.40)/2 x 0.90 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.60) = 1.35 m2
A2 = ((0.30+0.40)/2 x 0.90 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.60) = 1.35 m2
1.24 0.90 - Volume Pasangan Batu
V = (1.350 + 1.350)/2 x 25.00 - 21.94 = 11.81 m3
- Plesteran Acian Halus Top Lining Dan Plesteran Lantai
0.30 Pl = ((0.30 + 0.10)x 2) + 1.60 x 25.00 = 60.00 m2
- Siaran Dinding
Si = [(1.24 - 0.10)+(1.24 - 0.10)] x 25.00 = 56.90 m2
0.40 1.60 0.40 VOLUME PASANGAN BATU DARI HASIL BONGKARAN
volume bongkaran x 65% 33.75 x 65% = 21.94 m3
Pasangan Batu
Analisa Perhitungan
0.30 0.30 Perhitungan Luas Penampang
A1 = ((0.30+0.40)/2 x 0.90 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.60) = 1.35 m2
A2 = ((0.30+0.40)/2 x 0.90 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.60) = 1.35 m2
1.24 0.90 - Volume Pasangan Batu
V = (1.350 + 1.350)/2 x 25.00 - 21.94 = 11.81 m3
- Plesteran Acian Halus Top Lining Dan Plesteran Lantai
0.30 Pl = ((0.30 + 0.10)x 2) + 1.60 x 25.00 = 60.00 m2
- Siaran Dinding
Si = [(1.24 - 0.10)+(1.24 - 0.10)] x 25.00 = 56.90 m2
0.40 1.60 0.40 VOLUME PASANGAN BATU DARI HASIL BONGKARAN
volume bongkaran x 65% 33.75 x 65% = 21.94 m3
Bongkar 1 m³ Pasangan Batu (manual)
Analisa Perhitungan
0.300 0.30 Perhitungan Luas Penampang
A1 = ((0.30+0.40)/2 x 0.90 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.30) = 1.26 m2
A2 = ((0.30+0.40)/2 x 0.90 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.30) = 1.26 m2
0.90 - Volume Pasangan Batu
V = (1.260 + 1.260)/2 x 16.00 = 20.16 m3
0.30
1.30
0.40 0.40
Pasangan Batu
Analisa Perhitungan
0.30 0.30 Perhitungan Luas Penampang
A1 = ((0.30+0.40)/2 x 0.90 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.30) = 1.26 m2
A2 = ((0.30+0.40)/2 x 0.90 x 2)+(0.40 x 0.30 x 2) + (0.30 x 1.30) = 1.26 m2
1.14 0.90 - Volume Pasangan Batu
V = (1.260 + 1.260)/2 x 16.00 - 13.10 = 7.06 m3
- Plesteran Acian Halus Top Lining Dan Plesteran Lantai
0.30 Pl = ((0.30 + 0.10)x 2) + 1.30 x 16.00 = 33.60 m2
- Siaran Dinding
Si = [(1.14 - 0.10)+(1.14 - 0.10)] x 16.00 = 33.29 m2
0.40 1.30 0.40 VOLUME PASANGAN BATU DARI HASIL BONGKARAN
volume bongkaran x 65% 20.16 x 65% = 13.10 m3
Pasangan Batu
0.20
0.50
0.30 0.30
Pasangan Batu