Anda di halaman 1dari 1

KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

DIREKTORAT BINA MARGA


BALAI PELAKSANAAN JALAN NASIONAL KEPULAUAN RIAU

JOB MIX FORMULA


SUMBER MATERIAL
I. MATERIAL
1. Semen Portland produksi Chonch (Type 1)
2. Aggregat Kasar produksi Stone Crusher EX Telang TANJUNG PINANG
3. Pasir dari Quary EX Pontianak Sungai Mahakam
4. Admixture
5. Air (bebas dari kadar lanau) sumur bor

JMF PROPORSI CAMPURAN BETON 1 M3


NO MUTU BETON SLUMP TEST SEMEN SAK AIR SPLITE PASIR ADIFTIF KET

1 fc 10 12 ± 2 cm 276.12 5.52 161.230 1,158.51 821.14 0.00

2 fc 30 10 ± 2 cm 440.48 8.81 167.280 1,159.24 650.00 0.00

3 fc 25 mpa/fs 3.5 2 - 5 cm 407.93 8.16 179.000 1,025.92 767.15 0.00

4 fc 30 mpa /fs 3.8 2 - 5 cm 458.97 9.18 179.000 2,380.00 716.10 0.00

PROPORSI CAMPURAN BETON DI LAP ( Bachintplong )


NO MUTU BETON SLUMP TEST SEMEN SAK AIR SPLITE PASIR ADIFTIF SEMEN DI LAP

1 fc 10 12 ± 2 cm 276.12 7.00 161.230 1,158.51 821.14 0.00 333.33

2 fc 30 10 ± 2 cm 440.48 11.00 167.280 1,159.24 650.00 0.00 1000

3 fc 25 mpa/fs 3.5 2 - 5 cm 407.93 8.16 179.000 1,025.92 767.15 0.00

4 fc 30 mpa /fs 3.8 2 - 5 cm 458.97 9.18 179.000 2,380.00 716.10 0.00

Anda mungkin juga menyukai