L= Bentang Jembatan m
2
K 500 K 350 9m 5 cm
33 & 34 40,5
K 450 K 325 9m 5 cm
1. Soal Perhitungan
Tegangan Izin
Fc = 50 Mpa → fci = 0,9 x 50 = 𝑓𝑐𝑖 = 0,9 × 50 = 45 𝑀𝑝𝑎
a. Tegangan Awal
𝑓𝑐𝑖 = 0,6 × 𝑓𝑐𝑖
= 0,6 × 45 = 27 𝑀𝑝𝑎
b. Tegangan Akhir
𝑓𝑐𝑖 = 0,45 × 𝑓𝑐
= 0,45 × 50 = 22,5 𝑀𝑝𝑎
1
ℎ= × 4050 = 162 𝑐𝑚
25
Lebar Atas
𝑏𝑎 = 0,7 × ℎ
𝑏𝑎 = 0,7 × 162 = 113,4 𝑐𝑚 𝑑𝑖𝑏𝑢𝑙𝑎𝑡𝑘𝑎𝑛 𝑚𝑒𝑛𝑗𝑎𝑑𝑖 110 𝑐𝑚
Tebal Flens
𝑡 = 0,1 × ℎ
𝑡 = 0,1 × 162 = 16,2 𝑐𝑚 𝑑𝑖𝑏𝑢𝑙𝑎𝑡𝑘𝑎𝑛 20 𝑐𝑚
Tebal Badan
𝑡𝑏 = 0,3 × ℎ
𝑡𝑏 = 0,3 × 162 = 48,6 𝑐𝑚 𝑑𝑖𝑏𝑢𝑙𝑎𝑡𝑘𝑎𝑛 50 𝑐𝑚
2. Analisa Penampang balok
I 68,4
1 × 110 × 203 + (110 × 20 × (𝑎 1)2) 10366165,3
12
II 7,4
1 × 50 × 1023 + (50 × 102 × (𝑎2 )2) 4700976
12
III 63,6
1 × 80 × 403 + (80 × 40 × (𝑎 3)2 13370538,6
12
1
IV 53,4 { × 30 × 153 + (0,5 × 30 × 15(𝑎4)2} × 2 1288827
36
1
V 38,6 { × 15 × 153 + (0,5 × 15 × 15(𝑎5)2} × 2 338053,5
36
Total 30064560,4
𝐼𝑥 30064560,4
𝑊= = = 359580,9 𝑐𝑚3
𝑎
𝑌𝑏 83,61
PERENCANAAN BALOK PRATEKAN (SESUDAH KOMPOSIT)
Be = ¼ x L = 1125 cm
Bef = b+16t = 200 cm
Bef = 1/3 x Ba = 36,66 ~ 3 = (35 x 2)+110 = 180 cm
Bef antara 180 -255 cm diambil 200 cm
𝐴 1139575
𝑦𝑎 = = = 75,1 𝑐𝑚
𝐵 15175
I 65,1
1 × 250 × 203 + (250 × 20 × (𝑎 1)2) 16952040
12
II 45,1
1 × 110 × 203 + (110 × 20 × (𝑎 2)2) 4548155,3
12
III 15,9
1 × 50 × 1023 + (50 × 102 × (𝑎3 )2) 5711031
12
IV 86,9
1 × 80 × 403 + (80 × 40 × (𝑎 4)2 24591818,6
12
1
V 30,09 { × 30 × 153 + (0,5 × 30 × 15(𝑎5)2} × 2 413058,6
36
1
VI 61,9 { × 15 × 153 + (0,5 × 15 × 15(𝑎6)2} × 2 864924,7
36
Total 53081028,2
𝐼𝑥 53081028,2
𝑊 = = = 496548,4 𝑐𝑚3
𝑏
𝑌𝑏 106,9
Tabel Resume Analisa Penampang
A Ya Yb Ix Wa Wb
Uraian (cm2) (cm) (cm) (cm4) (cm3) (cm3)
Balok
Pratekan
11175 78,39 83,61 30064560,4 383476,5 359580,9
(Sebelum
Komposit)
Balok
Pratekan
15175 75,09 106,91 53081028,2 706804,6 496548,4
(Sesudah
Komposit)
𝑞1 = 1 × 𝑞𝐷 = 0,69629 t/𝑚2
𝑞 = 𝑞1 × 𝑏𝑒𝑓 = 0,69629 × 2 = 1,3925 t⁄𝑚2
Beban P
𝑃 = (100% + 30%)4,4 × 8 = 11,28 𝑡𝑜𝑛
M Max (Mp)
Beban q1 q2 Σq
( 1/8 ql² + ¼ PL)
Mati
(DL) 3,4866 4,1466
0,66 t/m 519,95 ton.m
t/m t/m
MT Mp Mc = MT- MP
1948,499 519,95
ton.m
ton.m ton.m
1 1
𝑀𝐺 = 𝑞𝐿2 = × 3,4866 × 92 = 714,86 𝑡𝑜𝑛. 𝑚𝑒𝑡𝑒𝑟
8 8
𝑀𝐺 714,86
= × 100 = 36,68 % > 30
𝑀𝑇 1948,499
𝑀𝑇 1948,499
𝐹= = = 18,5042 𝑡𝑜𝑛
0,65ℎ 0,65 × 162
𝐹 18,5042
𝐹0 = = = 23,13 𝑡𝑜𝑛
0,80 0,8
𝑀𝐺 714,86
𝑒2 = = = 30,9
𝐹0 23,13
𝐼𝑥 30064560,4
𝐾𝑏 = = = 32,17
𝐴 𝑏 × 𝑌𝑏 11175 × 83,61
𝐼𝑥 × 𝑌 𝑏 30064560,4 × 83,61
𝑀𝑏 = = = 0,4429
𝐼𝑋𝑘 ×𝑌𝑏𝑘 53081028,2 × 106,91
𝑓𝑝𝑢 = 19 𝑡𝑜𝑛/𝑐𝑚2
𝐴 = 7 𝑐𝑚2
𝐹0 371,01 371,01
𝑛= = = = 3,985 ~ 4 𝑏𝑢𝑎ℎ
0,7 × 𝐹𝑝𝑢 0,7 × 133 93,1