RENCANA ANGGARAN BIAYA

#REF!
#REF!

HARGA SATUAN TOTAL


NO. URAIAN PEKERJAAN VOLUME ANALISA
(Rp.) HARGA (Rp.)

### #REF!
1 Brak / direksi keet 1.00 unit LS 1,000,000.00 1,000,000.00
2 Uietzet / Bouwplank - LS 500,000.00 500,000.00
3 IMB - LS 2,000,000.00 2,000,000.00
4 Mobilisasi alat 1.00 set LS 2,000,000.00 2,000,000.00
SUB JUMLAH A 5,500,000.00
B PEKERJAAN KONSTRUKSI BAJA
I RANGKA BAJA I / WF
1 Kolom I / WF 350 x 175 x 7 x 11 3,571.20 kg Bs.2.a 24,862.00 88,787,174.40
Tinggi 6m
2 Rafter I / WF 250 x 175 x 7 x 11 4,762.80 kg Bs.2.a 24,862.00 118,412,733.60
Panjang 18m
3 Knee Connection, 2m 529.20 kg Bs.2.a 24,862.00 13,156,970.40
1/2 WF 250 x 175 x 7 x 11 (pinggul)
4 Ridge Connection, 1,5m 264.60 kg Bs.2.a 24,862.00 6,578,485.20
1/2 WF 250 x 175 x 7 x 11 (puncak)
5 Penyangga tritisan, 0,50m, 132.30 kg Bs.2.a 24,862.00 3,289,242.60
1/2 WF 250 x 175 x 7 x 11 (tritisan)
6 Pinned Base plate dudukan kolom 146.76 kg Bs.1 17,949.50 2,634,268.62
BPW - 05, tebal 20mm
Panjang380mm, Lbr.205mm
7 Angkur untuk base plate f 25mm 183.69 kg LS 14,000.00 2,571,660.00
AB - 03, panjang 100cm, mur M-24
8 Stiffener pengaku I / WF 495.60 kg Bs.1 17,949.50 8,895,772.20
SPI - 11, tebal 10mm, jarak 1.5m
Tinggi 324mm, dipasang 2 sisi
9 End Plate pjg.727mm, lbr.175mm 167.78 kg Bs.1 17,949.50 3,011,638.91
Struktur utama (pelat tebal 14mm)
- Tritisan (pelat tebal 14mm) 167.78 kg Bs.1 17,949.50 3,011,638.91
10 Baut untuk end plate f 16mm 38.40 kg LS 14,000.00 537,600.00
Baut M16 pjg.75mm+mur
- Baut end plate tritisan 38.40 kg LS 14,000.00 537,600.00
Baut M16 pjg.75mm+mur
11 Ridge Plate pjg.515mm, lbr.175mm 118.10 kg Bs.1 17,949.50 2,119,832.36
(puncak kap) 2 sisi
12 Baut untuk Ridge Plate 19.20 kg LS 14,000.00 268,800.00
Baut M16 pjg.75mm+mur
13 Tulangan untuk menyambung 38.09 kg LS 14,000.00 533,259.42
dengan dinding bata f 12mm
SUB JUMLAH B-I 254,346,676.61
II GORDING / PURLIN C
1 Gording C 150 x 75 x 20 x 4.5 4,435.20 kg Bs.1 17,949.50 79,609,622.40
Panjang 31.50m,
Jarak rata-rata 125cm
2 Cleat Plate penyangga Gording 128.00 kg Bs.1 17,949.50 2,297,536.00
CPP - 150 - 02
Tinggi.135mm, Lbr.120mm,
dengan baut 4 f 14mm
SUB JUMLAH B-II 81,907,158.40
III ATAP
1 Atap Galvalum tebal 0.4mm 519.75 m2 LS 190,000.00 98,752,500.00
2 Nok Galvalum tebal 0.4mm 31.50 m' LS 190,000.00 5,985,000.00
3 Sagrod f 12mm, pjg. 1.3m 30.09 kg LS 14,000.00 421,237.91
4 Trekstang f 16mm, pjg. 6.5m 203.77 kg LS 14,000.00 2,852,828.16
(Rod bracing + turn buckle)
5 Talang/Gutter seng BJLS
Talang pinggir (eave gutter) 63.00 m' Bs.18 146,414.50 9,224,113.50
6 Lisplank Galvalum
Lembar Galvalum tbl. 0.4mm 48.50 m2 LS 190,000.00 9,215,000.00
7 Pengelasan & Finishing - LS 95,485.42 95,485.42
SUB JUMLAH B-III 126,546,164.99
SUB JUMLAH B 462,800,000.00
HARGA SATUAN TOTAL
NO. URAIAN PEKERJAAN VOLUME ANALISA
(Rp.) HARGA (Rp.)
C PEKERJAAN NON KONSTRUKSI BAJA
I PEKERJAAN TANAH
1 Galian tanah 119.12 m3 Tn.2 32,085.00 3,821,820.82
2 Urugan tanah 270.06 m3 A.16+A.15 47,155.00 12,734,797.19
3 Pemadatan tanah 270.06 m3 Tn.10 18,900.00 5,104,181.25
SUB JUMLAH C-I 21,660,799.26
II PEKERJAAN PONDASI
1 Urugan pasir pondasi 6.93 m3 Tn.11 116,980.00 810,876.11
2 Pek. Pondasi Batu Kali 1 : 3 : 10 41.04 m3 Pn.7 397,372.50 16,307,173.97
3 Pek. Pondasi footplate 11.21 m3 Bt.28 2,818,096.00 31,590,856.16
4 Pek. Sloof Pondasi 9.58 m3 Bt.29 3,485,203.00 33,405,670.75
5 Pek. Aaanstampeng Pondasi 12.31 m3 Pn.9 227,034.00 2,795,072.33
6 Pek. Beton rabat 4.96 m3 Bt.37 584,915.00 2,901,178.40
SUB JUMLAH C-II 87,810,827.73
III PEKERJAAN STRUKTUR BETON
1 Kolom (300 kg besi + bekisting) 9.38 m3 Bt.30 5,558,783.00 52,130,266.97
2 Balok beton bertulang 7.82 m3 Bt.31 4,243,688.00 33,180,335.55
3 Pelat lantai rabat beton 22.50 m3 Bt.37 584,915.00 13,160,587.50
SUB JUMLAH C-III 98,471,190.02
IV PEKERJAAN DINDING DAN LANTAI
1 Dinding 1/2 bata 630.94 m2 Dd.8 63,819.00 40,265,800.31
2 Plesteran 1 : 3 1,261.88 m2 Pl.3 29,568.70 37,312,003.31
3 Pasang keramik lantai polos 512.50 m2 Ld.35.a 94,631.50 48,498,643.75
4 Pasang keramik Kamar Mandi 9.75 m2 Ld.36 104,144.50 1,015,408.88
5 Pasang keramik dinding K.M. 17.10 m2 Ld.54.a 86,067.00 1,471,745.70
SUB JUMLAH C-IV 128,563,601.95
V PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu & jendela ky. Jati 4.33 m2 Ky.2.a 14,057,825.00 60,891,750.14
2 Inep Pintu & Jendela ky. Jati 133.93 m2 Ky.6.a 463,160.00 62,031,481.96
3 Pasang Kaca rayban 3mm 33.76 m3 Ku.Ka.16 73,629.75 2,485,504.74
4 Pasang Kunci tanam biasa 9.00 bh. Ku.Ka.2 112,480.00 1,012,320.00
5 Pasang slood pintu 9.00 bh. Ku.Ka.11 70,173.00 631,557.00
6 Pasang kait angin jendela 122.00 bh. Ku.Ka.9 10,029.75 1,223,629.50
7 Pasang engsel pintu 42.00 bh. Ku.Ka.5 14,629.75 614,449.50
8 Pasang engsel jendela kupu-kupu 122.00 bh. Ku.Ka.6 11,086.50 1,352,553.00
SUB JUMLAH C-V 130,243,245.85
VI PEKERJAAN ATAP BANGUNAN TAMBAHAN
1 Rangka atap kayu 1.42 m3 Ky.2.a 14,057,825.00 19,946,366.74
2 Usuk & reng Kayu jati 161.75 m2 Ky.16.a 184,720.00 29,878,460.00
3 Genteng press 161.75 m2 Pa.2.a 33,938.00 5,489,471.50
4 Nok / bubungan atap 16.25 m' Pa.5.a 63,786.00 1,036,522.50
SUB JUMLAH C-VI 56,350,820.74
VII PEKERJAAN SANITASI
1 Buis beton saluran 96.25 m' Kb.15 66,420.40 6,392,963.50
2 Pipa PVC sal. hujan bang, utama 90.00 m' Sn.32 86,855.30 7,816,977.00
3 Septictank 1.00 unit LS 1,000,000.00 1,000,000.00
4 Peresapan 1.00 unit LS 800,000.00 800,000.00
5 Bak mandi 2.00 bh. LS 750,000.00 1,500,000.00
6 Kloset jongkok 2.00 bh. Sn.2 215,855.00 431,710.00
7 Keran air 5.00 bh. Sn.35 16,940.00 84,700.00
8 Floor drain 3.00 bh. Sn.36 28,880.00 86,640.00
SUB JUMLAH C-VII 18,112,990.50
VIII PEKERJAAN LANGIT-LANGIT
1 Langit-langit Plywood 4mm 692.75 m2 Ll.21.c 304,105.40 210,669,015.85
SUB JUMLAH C-VIII 210,669,015.85
IX PENGECATAN
1 Cat tembok baru 1,261.88 m2 Pc.14 11,409.40 14,397,236.63
2 Cat kayu baru 412.94 m2 Pc.8 28,021.50 11,571,119.75
SUB JUMLAH C-IX 25,968,356.37
X PEKERJAAN LISTRIK
1 Lampu Neon + box 70.00 ttk LS 100,000.00 7,000,000.00
2 Pasang Exhaust Fan 11.00 bh. LS 1,500,000.00 16,500,000.00
3 Pasang stop kontak 13.00 bh. LS 50,000.00 650,000.00
4 Pasang saklar 13.00 bh. LS 50,000.00 650,000.00
5 Sponengan listrik - LS 350,000.00 350,000.00
6 Pasang sekring box 3.00 bh. LS 500,000.00 1,500,000.00
7 Pasang Daya 2 x 900/1300W 3.00 unit LS 1,500,000.00 4,500,000.00
8 Pembersihan lokasi - LS 99,151.73 99,151.73
SUB JUMLAH C-X 31,249,151.73
SUB JUMLAH C 809,100,000.00
HARGA SATUAN TOTAL
NO. URAIAN PEKERJAAN VOLUME ANALISA
(Rp.) HARGA (Rp.)

REKAPITULASI :
A PEKERJAAN PERSIAPAN 5,500,000.00
B PEKERJAAN KONSTRUKSI BAJA 462,800,000.00
C PEKERJAAN NON KONSTRUKSI BAJA 809,100,000.00
Jumlah 1,277,400,000.00

Terbilang : ( Satu milyar dua ratus tujuh puluh tujuh juta empat ratus ribu rupiah )