LAPORAN ANALISA KERUSAKAN

DILAKUKAN SENDIRI HANYA SEBAGAI INFORMASI


DATA - DATA*
CABANG DIVISI STATUS
RMP OPERATIONS-WORKSHOP BREAKDOWN

MODEL TIPE UNIT NOMOR UNIT NAMA KOMPONEN KERUSAKAN NOMOR SPK
HITACHI ZAXIS200 HIT-26 HYDRAULIC SYSTEM

(HOURS METER / KM) UMUR PAKAI (LIFE TIME) UMUR STANDART PEMAKAIAN TANGGAL MASUK (ddmmyy)
15005,7 13-Nov-23

PROBLEM * :
1. SWITCH SENSOR SWING BOCOR 3 PISTON BUCKET & LINER SILINDER BUCKET TERJADI LUKA

2. SEAL BUCKET BOCOR


(PART NUMBER) NAMA SPAREPART KOMPONEN BRAND
4436535 SENSOR, PRESSURE HYDRAULIC SYSTEM

SEAL BUCKET HYDRAULIC SYSTEM

9312272 CYLINDER BUCKET HYDRAULIC SYSTEM

PENYEBAB KERUSAKAN **
√ BENT (AUS) BROKEN (RUSAK) CRACKED (RETAK) √ LEAKING (KEBOCORAN) SHORTED (KORESLETING) √ (KEAUSAN ABNORMAL)

BLOCKED (BUNTU) BURNT (TERBAKAR) DIRTY (KOTOR) (KURANG TENAGA) TWISTED (MELINTIR) (KEAUSAN NORMAL)

ANALISA ** (Uraikan Detail Kerusakan, Data Pendukung, Lampirkan Foto atau Gambar)
DESKRIPSI ANALISA KERUSAKAN (HARAP DIISI DENGAN KETERANGAN YANG JELAS DAN RINCI)
1. SENSOR SWING BOCOR DARI SELA BAUT
2. SEAL BUCKET BOCOR DISEBABKAN OLEH LUKA PADA
LINER BUCKET SILINDER & PISTON BUCKET SILINDER

ANALISA KERUSAKAN **
MISS ASSEMBLY (SALAH PEMASANGAN) √ BAD MATERIAL (MATERIAL BURUK) MISS APLICATION ( KESALAHAN APLIKASI) (INFTRASTRUKTUR BURUK)
POOR TORQUE (TORSI LEMAH) MISS MAINTENANCE (SALAH PERAWATAN) MISS OPERATION ( KESALAHAN OPERASI) FATIGUE FRACTURE (PATAH LELAH)
BAD WELDING (PENGELASAN BURUK) MISS ADJUSMENT (SALAH PENYETELAN) OVER LOADED (KELEBIHAN BEBAN) (KURANG PENYETELAN)
POOR DURABILITY (DAYA TAHAN LEMAH) SUBSTANDARD (KUALITAS DIBAWAH STANDAR) DIRTY FUEL (BAHAN BAHAN KOTOR) √ OTHER : ..................................................
AUS PEMAKAIAN

RENCANA PERBAIKAN **
REPAIR (PERBAIKAN) PENGENCANGAN ULANG REPLACE COMP ASSY CALIBRATION (KALIBRASI) WARANTY CLAIM REINFORCE (PENAMBAHAN MATERIAL)
ADJUST (PENYETELAN) √ REPLACE PART (GANTI PART) MEMBANGUN ULANG (PERBAIKAN EXTERNAL) SITE MODIF (MODIF INTERNAL) CLEAN UP
KETERSEDIAAN SPAREPART PROGRESS KATEGORI PERBAIKAN OPERATOR

√ PERSEDIAAN √ SEDANG DIKERJAKAN MENUNGGU MEKANIK PREVENTIVE √ CORRECTIVE


√ NON PERSEDIAAN √ MENUNGGU SPAREPART MENUNGGU MEKANIK LUAR PREDICTIVE

REMAKS ** EFFECTIVE REPAIR DURATION ** MEKANIK

PR :
1.
JAM
DTG. PRG (JAM/TGL) :
2.

EST. PERBAIKAN(TGL) : 15/11/2023


3.

START : HARI

FINISH :

DISETUJUI, DISETUJUI, DISETUJUI, DIPERIKSA, PIC/INSPEKTUR DIBUAT,


TGL: TGL: TGL: TGL: TGL: TGL:

I.R. ABDUL RONI RUSLAN MUHAMAD SOLEH DEDI AMIN WAHYU APANDI GANDHI WISNU
KEPALA DIVISI OPERASIONAL MANAGER ENGINEERING KEPALA BAGIAN WORKSHOP SPV WORKSHOP FOREMAN SPV WORKSHOP