No Description Qty Unit Unit Price

I Preliminary Wokrs
- Mobilisasi dan Demobiliasi alat 1.00 ls 2,000,000
- Koordinasi Keamanan 1.00 ls 500,000
- Pembersihan lahan 1.00 ls 500,000
- Pekerjaan Stek out 1.00 ls 500,000
Sub Total Preliminary
II Foundation Works
a Galian
- Pondasi Setempat 1.80 m3 85,800
- Sloof 3.48 m3 55,000
b Pemadatan Tanah bekas galian
- Pondasi Setempat 1.80 m2 42,900
- Sloof 11.60 m2 27,500
c Buang tanah bekas galian 1.80 m3 50,000
d Pondasi Setempat K-175
- Bekisting bata 24.00 m2 91,012
- Pembesian 213.70 kg 16,348
- Beton 1.80 m3 721,889
f Sloof 200x300 K-175
- Bekisting bata 34.81 m2 91,012
- Pembesian 293.43 kg 16,348
- Beton 3.48 m3 721,889
Sub Total Foundation Works
III Gate Cluster
a - Pekerjaan Pagar area Gerbang fin. 58.01 m' 1,660,584
Zincromate
Sub Total Gate Cluster

Total
PPn 11%
Grand Total
1
OE NEGOSIASI
Amount Unit Price Amount

2,000,000 1,800,000 1,800,000


500,000 450,000 450,000
500,000 450,000 450,000
500,000 450,000 450,000
3,500,000 3,150,000
Panjang Pagar
58.01
154,440 77,220 138,996
191,433 49,500 172,290 1 78000
0.3 23400
77,220 38,610 69,498
319,055 24,750 287,150
90,000 45,000 81,000

2,184,276 81,910 1,965,848


3,493,581 14,713 3,144,223 Ratio Besi (kg/m3)
1,299,399 649,700 1,169,459 118.72 Pembesian
utama
3,167,746 81,910 2,850,972
4,797,076 14,713 4,317,368
2,512,605 649,700 2,261,345 sengkang
18,286,832 16,458,149

96,330,496 1,494,526 86,697,447

96,330,496 86,697,447 Pembersian Sloof


Atas
118,117,328 Total 106,305,595 Bawah
12,992,906 PPn 11% 11,693,615
131,110,234 Grand Total 117,999,211
Sengkang

Analisa Harga Satuan OE

Item
Bekisting Bata
Pembesian

Beton

Pekerjaan pagar

Analisa Harga Satuan Nego

Item
Bekisting Bata

Pembesian

Beton

Pekerjaan pagar
Pondasi Setempat
Jumlah pondasi setempat Lebar Tinggi Tebal Beton
20.00 0.3 1.00 0.3 1.8

Pondasi Setempat

Lebar Tinggi Panjang Beton


58.01 0.2 0.3 58.01 3.48

Panjang besi Jumlah Panjang besi panjang besi /btg Qty (Btg)
4D10 2.25 9.00 12 0.75

Panjang Sengkang Jumlah sengkang/pondasi Total panjang sen Panjang besi/btg


Ø8-200 2.60 5.00 13 12

mbersian Sloof Panjang besi Jumlah Panjang besi panjang besi /btg Qty (Btg)
3D10 58.01 174.03 12 14.50
2D10 58.01 116.02 12 9.67

Panjang Sengkang Jumlah sengkang/pondasi Total panjang sen Panjang besi/btg


Ø8-200 1.00 290.05 290.05 12

alisa Harga Satuan OE

Description Koef Sat Har Sat Total


bata merah 4.725 pcs 700 3,307.50
pasir 0.024 m3 253,500 6,084.00
semen 0.372 zak 85,000 31,620.00
Upah 1.00 m2 50,000.00 50,000.00
91,011.50
Besi 1.05 kg 14,000.00 14,700.00
Kawat bendrat 0.02 kg 15,750.00 248.06
Upah Pasang 1.00 kg 1,400.00 1,400.00
16,348.06

K-175 1.05 m3 510,000 535,500.00


Plastik cor 0.01 roll 55,000 721.88
Stop Cor 0.17 roll 34,000 5,666.67
Upah Cor 1.00 m3 180,000 180,000.00
721,888.54
erjaan pagar
Hollow 20 x 40 x 1,7 3.28 btg 150,000 492,187.50
Hollow 40 x 40 x 1,7 0.35 btg 321,000 112,350.00
Hollow 50 x 100 x 2 0.26 btg 525,000 136,899.83
Finish cat zincromate 38.10 Kg 11,000 419,146.98
Upah pekerjaan pagar 1.00 m 500,000 500,000.00
1,660,584.32

alisa Harga Satuan Nego

Description Koef Sat Har Sat Total


bata merah 4.50 pcs 700 3,150.00
pasir 0.024 m3 253,500 6,084.00
semen 0.372 zak 85,000 31,620.00
Upah 1.00 m2 50,000.00 50,000.00
90,854.00

Besi 1.00 kg 14,000.00 14,000.00


Kawat bendrat 0.02 kg 15,750.00 236.25
Upah Pasang 1.00 kg 1,400.00 1,400.00
15,636.25

K-175 1.00 m3 510,000 510,000.00


Plastik cor 0.01 roll 55,000 687.50
Stop Cor 0.16 roll 34,000 5,396.83
Upah Cor 1.00 m3 180,000 180,000.00
696,084.33
erjaan pagar
Hollow 20 x 40 x 1,7 3.13 btg 150,000 468,750.00
Hollow 40 x 40 x 1,7 0.33 btg 321,000 107,000.00
Hollow 50 x 100 x 2 0.25 btg 525,000 130,380.79
Finish cat zincromate 36.29 Kg 11,000 399,187.60
Upah pekerjaan pagar 1.00 m 500,000 500,000.00
1,605,318.40
Bekisting Galian Pemadatan
24.00 1.8 1.80

Bekisting Galian Pemadatan


34.81 3.48 11.60

Berat Besi /btg Qty Besi / unit pondasi Jumlah Pondasi Total Besi
7.4 5.55 20.00 111

Qty (Btg) Berat Besi /btg Qty Besi / unit pondasi Jumlah Pondasi Total Besi
1.08 4.74 5.14 20 102.70 213.70

Berat Besi /btg Qty Besi / unit pondasi Total Besi Total Besi Sloof
7.4 107.32 178.86 293.43
7.4 71.55

Qty (Btg) Berat Besi /btg Total Besi


24.17 4.74 114.57

Ukuran bata merah


P : 20 cm , l :10 cm, t : 5cm
Jumlah bata
Jumlah bata panja 1 0.2 5
jumlah bata tinggi 1 0.1 10
15