HARGA
No. URAIAN PEKERJAAN SPESIFIKASI SAT. VOLUME TOTAL HARGA KETERANGAN
SATUAN
HARGA
No. URAIAN PEKERJAAN SPESIFIKASI SAT. VOLUME TOTAL HARGA KETERANGAN
SATUAN
- Bekisting papan m2 50.00 243.810.00 12.190.500.00
- Pembesian U-24 + U-39 U-42 kg 2.146.27 17.531.10 37.626.426.78
RENCANA ANGGARAN BIAYA
PEKERJAAN STRUKTUR TOWER 1
PROYEK : TOWER 1 DIBUAT : Hari
LOKASI : SERANG - BANTEN DIPERIKSA : Agus
PEMILIK : 0 TGL : 15/04/2022
SUBJECT : RENCANA ANGGARAN BIAYA REVISI : 1
HARGA
No. URAIAN PEKERJAAN SPESIFIKASI SAT. VOLUME TOTAL HARGA KETERANGAN
SATUAN
HARGA
No. URAIAN PEKERJAAN SPESIFIKASI SAT. VOLUME TOTAL HARGA KETERANGAN
SATUAN
HARGA
No. URAIAN PEKERJAAN SPESIFIKASI SAT. VOLUME TOTAL HARGA KETERANGAN
SATUAN
- Pembesian u-42 (Utama) U-42 kg 6.399.32 17.531.10 112.187.110.09
- Pembesian u-42 (sengkang) U-42 kg 1.581.74 17.531.10 27.729.712.24
V.12 Pekerjaan pelat beton lantai t:12cm
- Adukan Beton K-300 m3 77.26 1.684.611.00 130.159.730.40
- Bekisting papan m2 15.60 243.810.00 3.804.021.14
- Pembesian M8@150 (2 lapis) U-42 kg 7.246.72 17.531.10 127.042.916.19
V.13 Pekerjaan Tangga beton
- Adukan Beton K-300 m3 3.11 1.684.611.00 5.237.657.75
- Bekisting papan m2 16.87 243.810.00 4.113.952.42
- Pembesian D8 U-42 kg 87.77 17.531.10 1.538.664.33
- Pembesian D12 U-42 kg 202.92 17.531.10 3.557.410.81
HARGA
No. URAIAN PEKERJAAN SPESIFIKASI SAT. VOLUME TOTAL HARGA KETERANGAN
SATUAN
- Bekisting papan m2 80.73 243.810.00 19.682.781.30
- Pembesian u-42 (Utama) U-42 kg 1.107.86 17.531.10 19.422.074.57
- Pembesian u-42 (sengkang) U-42 kg 308.02 17.531.10 5.399.859.30
VI.10 Pekerjaan Balok 250X400
- Adukan Beton K-300 m3 2.83 1.684.611.00 4.765.343.37
- Bekisting papan m2 36.77 243.810.00 8.965.807.99
- Pembesian u-42 (Utama) U-42 kg 504.65 17.531.10 8.847.052.08
- Pembesian u-42 (sengkang) U-42 kg 140.62 17.531.10 2.465.153.16
VI.11 Pekerjaan Balok 250X500
- Adukan Beton K-300 m3 28.70 1.684.611.00 48.342.439.56
- Bekisting papan m2 414.51 243.810.00 101.060.464.05
- Pembesian u-42 (Utama) U-42 kg 6.399.32 17.531.10 112.187.110.09
- Pembesian u-42 (sengkang) U-42 kg 1.581.74 17.531.10 27.729.712.24
VI.12 Pekerjaan pelat beton lantai t:12cm
- Adukan Beton K-300 m3 77.26 1.684.611.00 130.159.730.40
- Bekisting papan m2 15.60 243.810.00 3.804.021.14
- Pembesian M8@150 (2 lapis) U-42 kg 7.246.72 17.531.10 127.042.916.19
VI.13 Pekerjaan Tangga beton
- Adukan Beton K-300 m3 3.11 1.684.611.00 5.237.657.75
- Bekisting papan m2 16.87 243.810.00 4.113.952.42
- Pembesian D8 U-42 kg 87.77 17.531.10 1.538.664.33
- Pembesian D12 U-42 kg 202.92 17.531.10 3.557.410.81
HARGA
No. URAIAN PEKERJAAN SPESIFIKASI SAT. VOLUME TOTAL HARGA KETERANGAN
SATUAN
- Adukan Beton K-300 m3 3.26 1.684.611.00 5.483.408.81
- Bekisting papan m2 51.15 243.810.00 12.470.881.50
- Pembesian u-42 (Utama) U-42 kg 829.56 17.531.10 14.543.099.32
- Pembesian u-42 (sengkang) U-42 kg 192.20 17.531.10 3.369.477.42
VII.08 Pekerjaan Balok 200X400
- Adukan Beton K-300 m3 0.52 1.684.611.00 877.682.33
- Bekisting papan m2 7.82 243.810.00 1.905.375.15
- Pembesian u-42 (Utama) U-42 kg 82.32 17.531.10 1.443.125.09
- Pembesian u-42 (sengkang) U-42 kg 30.01 17.531.10 526.073.25
VII.09 Pekerjaan Balok 200X450
- Adukan Beton K-300 m3 5.59 1.684.611.00 9.415.290.88
- Bekisting papan m2 80.73 243.810.00 19.682.781.30
- Pembesian u-42 (Utama) U-42 kg 1.107.86 17.531.10 19.422.074.57
- Pembesian u-42 (sengkang) U-42 kg 308.02 17.531.10 5.399.859.30
VII.10 Pekerjaan Balok 250X400
- Adukan Beton K-300 m3 2.83 1.684.611.00 4.765.343.37
- Bekisting papan m2 36.77 243.810.00 8.965.807.99
- Pembesian u-42 (Utama) U-42 kg 504.65 17.531.10 8.847.052.08
- Pembesian u-42 (sengkang) U-42 kg 140.62 17.531.10 2.465.153.16
VII.11 Pekerjaan Balok 250X500
- Adukan Beton K-300 m3 28.70 1.684.611.00 48.342.439.56
- Bekisting papan m2 414.51 243.810.00 101.060.464.05
- Pembesian u-42 (Utama) U-42 kg 5.688.28 17.531.10 99.721.875.63
- Pembesian u-42 (sengkang) U-42 kg 1.581.74 17.531.10 27.729.712.24
VII.12 Pekerjaan pelat beton lantai t:12cm
- Adukan Beton K-300 m3 77.26 1.684.611.00 130.159.730.40
- Bekisting papan m2 15.60 243.810.00 3.804.021.14
- Pembesian M8@150 (2 lapis) U-42 kg 7.246.72 17.531.10 127.042.916.19
VII.13 Pekerjaan Tangga beton
- Adukan Beton K-300 m3 3.11 1.684.611.00 5.237.657.75
- Bekisting papan m2 16.87 243.810.00 4.113.952.42
- Pembesian D8 U-42 kg 87.77 17.531.10 1.538.664.33
- Pembesian D12 U-42 kg 202.92 17.531.10 3.557.410.81
HARGA
No. URAIAN PEKERJAAN SPESIFIKASI SAT. VOLUME TOTAL HARGA KETERANGAN
SATUAN
HARGA
No. URAIAN PEKERJAAN SPESIFIKASI SAT. VOLUME TOTAL HARGA KETERANGAN
SATUAN
- Pembesian u-42 (sengkang) U-42 kg 290.90 17.531.10 5.099.867.11
VIII.03 Pekerjaan kolom beton K3 (400X400)
- Adukan Beton K-300 m3 8.70 1.684.611.00 14.662.854.14
- Bekisting papan m2 87.04 243.810.00 21.221.222.40
- Pembesian u-42 (Utama) U-42 kg 970.50 17.531.10 17.013.862.43
- Pembesian u-42 (sengkang) U-42 kg 387.87 17.531.10 6.799.822.82
VIII.04 Pekerjaan kolom beton KL (200X400X2)
- Adukan Beton K-300 m3 1.63 1.684.611.00 2.749.285.15
- Bekisting papan m2 16.32 243.810.00 3.978.979.20
- Pembesian u-42 (Utama) U-42 kg 272.95 17.531.10 4.785.148.81
- Pembesian u-42 (sengkang) U-42 kg 64.17 17.531.10 1.124.970.69
VIII.05 Pekerjaan Balok 180X250
- Adukan Beton K-300 m3 2.84 1.684.611.00 4.788.190.90
- Bekisting papan m2 54.32 243.810.00 13.243.698.25
- Pembesian u-42 (Utama) U-42 kg 399.19 17.531.10 6.998.187.22
- Pembesian u-42 (sengkang) U-42 kg 118.67 17.531.10 2.080.352.53
VIII.06 Pekerjaan Balok 180X300
- Adukan Beton K-300 m3 9.79 1.684.611.00 16.485.855.94
- Bekisting papan m2 173.98 243.810.00 42.417.088.56
- Pembesian u-42 (Utama) U-42 kg 1.145.34 17.531.10 20.079.105.14
- Pembesian u-42 (sengkang) U-42 kg 384.70 17.531.10 6.744.280.79
VIII.07 Pekerjaan Balok 200X350
- Adukan Beton K-300 m3 3.26 1.684.611.00 5.483.408.81
- Bekisting papan m2 51.15 243.810.00 12.470.881.50
- Pembesian u-42 (Utama) U-42 kg 829.56 17.531.10 14.543.099.32
- Pembesian u-42 (sengkang) U-42 kg 192.20 17.531.10 3.369.477.42
VIII.08 Pekerjaan Balok 200X400
- Adukan Beton K-300 m3 0.52 1.684.611.00 877.682.33
- Bekisting papan m2 7.82 243.810.00 1.905.375.15
- Pembesian u-42 (Utama) U-42 kg 82.32 17.531.10 1.443.125.09
- Pembesian u-42 (sengkang) U-42 kg 30.01 17.531.10 526.073.25
VIII.09 Pekerjaan Balok 200X450
- Adukan Beton K-300 m3 5.59 1.684.611.00 9.415.290.88
- Bekisting papan m2 80.73 243.810.00 19.682.781.30
- Pembesian u-42 (Utama) U-42 kg 1.107.86 17.531.10 19.422.074.57
- Pembesian u-42 (sengkang) U-42 kg 308.02 17.531.10 5.399.859.30
VIII.10 Pekerjaan Balok 250X400
- Adukan Beton K-300 m3 2.83 1.684.611.00 4.765.343.37
- Bekisting papan m2 36.77 243.810.00 8.965.807.99
- Pembesian u-42 (Utama) U-42 kg 504.65 17.531.10 8.847.052.08
- Pembesian u-42 (sengkang) U-42 kg 140.62 17.531.10 2.465.153.16
VIII.11 Pekerjaan Balok 250X500
- Adukan Beton K-300 m3 28.70 1.684.611.00 48.342.439.56
- Bekisting papan m2 414.51 243.810.00 101.060.464.05
- Pembesian u-42 (Utama) U-42 kg 5.688.28 17.531.10 99.721.875.63
- Pembesian u-42 (sengkang) U-42 kg 1.581.74 17.531.10 27.729.712.24
VIII.12 Pekerjaan pelat beton lantai t:12cm
- Adukan Beton K-300 m3 77.26 1.684.611.00 130.159.730.40
- Bekisting papan m2 15.60 243.810.00 3.804.021.14
- Pembesian M8@150 (2 lapis) U-42 kg 7.246.72 17.531.10 127.042.916.19
HARGA
No. URAIAN PEKERJAAN SPESIFIKASI SAT. VOLUME TOTAL HARGA KETERANGAN
SATUAN
- Adukan Beton K-300 m3 0.47 1.684.611.00 788.397.95
- Bekisting papan m2 6.24 243.810.00 1.521.374.40
- Pembesian u-42 (Utama) U-42 kg 69.58 17.531.10 1.219.743.81
- Pembesian u-42 (sengkang) U-42 kg 38.69 17.531.10 678.243.20
IX.03 Pekerjaan Balok 200X300
- Adukan Beton K-300 m3 1.27 1.684.611.00 2.145.857.49
- Bekisting papan m2 21.23 243.810.00 5.176.086.30
- Pembesian u-42 (Utama) U-42 kg 189.37 17.531.10 3.319.892.46
- Pembesian u-42 (sengkang) U-42 kg 105.65 17.531.10 1.852.125.65
IX.04 Pekerjaan pelat beton lantai t:12cm
- Adukan Beton K-300 m3 2.16 1.684.611.00 3.638.759.76
- Bekisting papan m2 18.00 243.810.00 4.388.580.00
- Pembesian M8@150 (2 lapis) U-42 kg 196.20 17.531.10 3.439.601.82
IX.05 Pekerjaan pelat beton lantai t:12cm
- Adukan Beton K-300 m3 1.89 1.684.611.00 3.178.492.03
- Bekisting papan m2 15.72 243.810.00 3.833.467.30
- Pembesian M8@150 (2 lapis) U-42 kg 171.38 17.531.10 3.004.525.63
IX.06 Pekerjaan kolom beton KLA (200X400X2)
- Adukan Beton U-42 m3 1.20 1.684.611.00 2.021.533.20
- Bekisting papan m2 24.00 243.810.00 5.851.440.00
- Pembesian u-42 (Utama) 0 kg 267.60 17.531.10 4.691.322.36
- Pembesian u-42 (sengkang) K-300 kg 63.24 17.531.10 1.108.666.76
IX.07 Pekerjaan kolom beton KLB (200X400)
- Adukan Beton U-42 m3 1.20 1.684.611.00 2.021.533.20
- Bekisting papan m2 24.00 243.810.00 5.851.440.00
- Pembesian u-42 (Utama) U-42 kg 267.60 17.531.10 4.691.322.36
- Pembesian u-42 (sengkang) 0 kg 94.86 17.531.10 1.663.000.15
IX.07 Pekerjaan Water Profing membrane m2 587.70 225.000.00 132.232.500.00
Pekerjan Tiang Borepile 55 titik
BJ BESI POLOS
1 Pekerjaan Sloof beton 25x40 318.12 m' DIAMETER PANJANG BERAT BERAT
No.
2 Pekerjaan Sloof beton 20x40 98.681 m' mm m kg/btg kg/m'
1. 6 12 2.66 0.22
2. 8 12 4.47 0.37
lantai 1-2 3. 9 12 6 0.50
1 Pekerjaan kolom beton K1 (450X450) 8 titik 4. 10 12 7.4 0.62
2 Pekerjaan kolom beton K2 (450X450) 12 titik 5. 12 12 10.66 0.89
3 Pekerjaan kolom beton K3 (400X400) 16 titik 6. 13 12 12.48 1.04
4 Pekerjaan kolom beton KL (200X400X2) 3 titik 7. 16 12 18.96 1.58
8. 19 12 26.76 2.23
lantai 3-5 9. 22 12 35.76 2.98
1 Pekerjaan kolom beton K1 (400X400) 8 titik 10. 25 12 46.2 3.85
2 Pekerjaan kolom beton K2 (400X400) 12 titik 11. 28 12 57.96 4.83
3 Pekerjaan kolom beton K3 (400X400) 16 titik 12. 32 12 75.72 6.31
4 Pekerjaan kolom beton KL (200X400X2) 3 titik 13. 36 12 95.88 7.99
1.25
1 Pekerjaan Balok 180X250 63.1625 BJ BESI ULIR/DEFORM
2 Pekerjaan Balok 180X300 181.225 m' DIAMETER PANJANG BERAT BERAT
No.
3 Pekerjaan Balok 200X350 46.5 m' mm m kg/btg kg/m'
4 Pekerjaan Balok 200X400 6.5125 m' 1. 10 12 7.4 0.62
5 Pekerjaan Balok 200X450 62.1 m' 2. 13 12 12.48 1.04
6 Pekerjaan Balok 250X400 28.2875 m' 3. 16 12 18.96 1.58
7 Pekerjaan Balok 250X500 318.85 m' 4. 19 12 26.76 2.23
706.6375 m' 5. 22 12 35.76 2.98
6. 25 12 46.2 3.85
7. 29 12 62.28 5.19
8. 32 12 75.72 6.31
9. 36 12 95.88 7.99