GARIS AWAL
GUNAKAN DATA f'c rencana
DARI TABEL 2 = 30 MPa
f'c target
= 42 MPa
__________________
Hal. 1 / 33
RENCANA CAMPURAN BETON NORMAL MUTU BETON f'c 30 MPa
No Uraian Tabel / Grafik / Perhitungan
*poin 14 *poin 8
W = 2 × 225 + 1 × 250
3 3
= 233.33 kg/m3
__________________
Hal. 2 / 33
RENCANA CAMPURAN BETON NORMAL MUTU BETON f'c 30 MPa
No Uraian Tabel / Grafik / Perhitungan
* seandainya kadar semen yang diperoleh dari perhitungan 12 belum mencapai syarat minimum yang
ditetapkan, maka harga minimum ini harus dipakai dan faktor air semen yang baru perlu disesuaikan.
73.6842105263158
70
60
54.7117794486215
50
40
30 31.4285714285714
20
14.2606516290727
10
0 2.83208020050124
0.0750000000000001 0.75 7.5
__________________
Hal. 3 / 33
RENCANA CAMPURAN BETON NORMAL MUTU BETON f'c 30 MPa
No Uraian Tabel / Grafik / Perhitungan
Ukuran mata ayakan (mm)
Grafik 3
Batas gradasi pasir (Kasar) No. 1
__________________
Hal. 4 / 33
RENCANA CAMPURAN BETON NORMAL MUTU BETON f'c 30 MPa
No Uraian Tabel / Grafik / Perhitungan
Ukuran mata ayakan (mm)
Grafik 6
Batas gradasi pasir dalam daerah No.4
17 Susunan agrega kasar atau gabungan Grafik 7, 8, 9 atau Tabel 7, Grafik 10, 11, 12
__________________
Hal. 5 / 33
RENCANA CAMPURAN BETON NORMAL MUTU BETON f'c 30 MPa
No Uraian Tabel / Grafik / Perhitungan
__________________
Hal. 6 / 33
RENCANA CAMPURAN BETON NORMAL MUTU BETON f'c 30 MPa
No Uraian Tabel / Grafik / Perhitungan
80
70
60
45 2
Proporsi Agregat Halus (%)
50
3
40 4
30
20
3
10
0.2 0.4 0.6 0.8
F.A.S. __________________
Hal. 7 / 33
Pr
30
20
3
10 RENCANA CAMPURAN BETON NORMAL MUTU BETON f'c 30 MPa
0.2 0.4 0.6 0.8
No Uraian Tabel / Grafik / Perhitungan
F.A.S.
* Persen bahan yang lebih halus dari 4,8 mm:
Ini dicari dalam Grafik 15 untuk kelompok ukuran butir agregat maksimum 10 mm
pada nilai slump 60 - 180 mm
dan nilai faktor air semen 0.47
Bagi agregat halus (pasir) yang termasuk daerah susunan butir no. 2 diperoleh harga antara
45.00 ≈ 45 %
* Berat jenis beton : diperoleh dari Grafik 16 dengan jalan membuat grafik baru yang sesuai dengan
nilai berat jenis agregat gabungan, yaitu 2.42
Titik potong grafik baru tadi dengan tegak yang menunjukan kadar air bebas (dalam hal ini
233.333333 kg/m3), menunjukan nilai berat jenis beton yang direncanakan.
Berat isi beton diperoleh angka 2,195.23 kg/m3 ≈ 2,195 kg/m3
2700
2600
2500
Berat Isi Beton (kg/m3)
2,9
2400
2,8
2,7
2300
2,6
2,5
2200 2195.23
2,42
2,4
2100
100 120 140 160 180 200 220 240 260
Kadar Air Bebas (kg/m3)
__________________
Hal. 9 / 33
RENCANA CAMPURAN BETON NORMAL MUTU BETON f'c 30 MPa
No Uraian Tabel / Grafik / Perhitungan
* Kadar agregat gabungan = berat jenis beton dikurangi jumlah kadar semen dan kadar air
24 Proporsi campuran
a Air = 233.33 liter
b Semen = 496.76 kg
c Agregat halus = 659.21 kg
d Agregat kasar = 805.70 kg +
2,195.00 kg
Air = 24.a - (((25.b - 25.a) × 24.c / 100) - ((25.d - 25.c) × 24.d / 100)) = 231.69 liter
Semen = TETAP = 496.76 kg
Agregat halus = 24.c - ((25.b - 25.a) × 24.c / 100) = 658.32 kg
Agregat kasar = 24.d - ((25.d - 25.c) × 24.d / 100) = 804.94 kg +
2,191.71 kg
Hasil
0 Silinder (10 cm x 20 cm) = 0.00000 m3
0 Silinder (15 cm x 30 cm) = 0.00000 m3
0 Kubus (15 x 15 x 15 cm) = 0.00000 m3
42 Balok ( 60 x 15 x 15 cm) = 0.56700 m3
Proposi Campuran Uji = 0.56700 m3
Agregat
Semen Air
Halus Kasar
(kg) (kg) (kg) (kg)
Komposisi 1.00 0.47 1.33 1.62
Setiap m3 496.76 233.33 659.21 805.70
Setiap Campuran uji 0.56700 m3 281.662 132.300 373.771 456.831
Faktor Sefty
Faktor Kemanan Praktikum 10%
Setiap Campuran uji 0.56700 m3 281.762 132.400 373.871 456.931
__________________
Hal. 11 / 33
2189
0.017663 0.2 0.003533
0.0135
0.027
0.075
0.021195
0.486
0.162
0.669195
GRAFIK PERBANDINGAN PROPORSI CAMPURAN BETON
SESUAI SNI 03-2834-2000
100.00% 0.70
8.23% 8.23% 8.21% 8.20% 8.17% 8.14% 8.14% 8.11% 8.08%
0.54
0.50
70.00% 0.50
0.46
50.00% 0.37
0.30
40.00%
30.00%
0.20
49.73% 49.73% 50.25% 49.52% 49.52% 49.46% 48.58% 48.35% 48.00%
20.00%
0.10
10.00%
0.00% 0.00
f'c 10 Mpa f'c 15 Mpa f'c 20 Mpa f'c 25 Mpa f'c 30 Mpa f'c 35 Mpa f'c 40 Mpa f'c 45 Mpa f'c 50 Mpa
MUTU BETON
AGREGAT KASAR AGREGAT HALUS SEMEN AIR FAKTOR AIR SEMEN
Slump = 60 - 180 mm
Ukuran agregat maksimum = 10 mm
Jenis pasir = Kasar (Daerah gradasi No. 1)
AYAKAN KASAR SEDANG AGAK HALUS HALUS
0.075
0.15 0 10 0 10 0 10 0
0.3 5 20 8 30 12 40 15
0.6 15 34 35 59 60 79 80
1.2 30 70 55 90 75 100 90
2.4 60 95 75 100 85 100 95
4.8 90 100 90 100 90 100 95
9.6 100 100 100 100 100 100 100
19
38
BATAS BAWAH ATAS BAWAH ATAS BAWAH ATAS BAWAH
90 88
80
74
70
Kumulatif Lolos (%)
60
50
40
34.4
30
20
12.4
10
2
0
0.0750000000000001 0.75 7.5
90 88
80
74
70
los (%)
60
90 88
80
74
70
50
40
34.4
30
20
12.4
10
2
0
0.0750000000000001 0.75 7.5
90 88
80
74
70
Kumulatif Lolos (%)
60
50
40
34.4
30
20
12.4
10
2
0
0.0750000000000001 0.75 7.5
90 88
80
74
70
Batas Gradasi Pasir (Agak Halus / No. 3)
100 99.6
90 88
80
74
70
50
40
34.4
30
20
12.4
10
2
0
0.0750000000000001 0.75 7.5
90 88
80
74
70
Kumulatif Lolos (%)
60
50
40
34.4
30
20
12.4
10
2
0
0.0750000000000001 0.75 7.5
15 0.15 2
50 0.3 12.4
100 0.6 34.4
100 1.18 74
100 2.36 88
100 4.75 99.6
100 9.5 100
ATAS
99.6 100
88
7.5
m)
/ No. 1)
99.6 100
88
88
7.5
m)
g / No. 2)
99.6 100
88
7.5
m)
us / No. 3)
99.6 100
88
us / No. 3)
99.6 100
88
7.5
m)
/ No. 4)
99.6 100
88
7.5
m)
↓ MASUKKAN HASIL ANALISIS SARIN
AYAKAN MAX 10 MM MAX 20 MM MAX 40 MM AYAKAN % LOLOS
0
4.8 0 10 0 10 0 5 4.75 3.8
9.6 50 85 30 60 10 40 9.5 16.3
19 100 100 95 100 35 70 19 52.7
38 100 100 95 100 37.5 99.9
76 100 100 75 100
90
80
70
Kumulatif Lolos (%)
60
50
40
30
20
10
0
2.4 24
90
80
70
%)
100
90
80
70
50
40
30
20
10
0
2.4 24
90
80
70
Kumulatif Lolos (%)
60
50
40
30
20
10
0
2.4 24
90
80
70
Kumulatif Lolos (%)
60
50
40
30
20
10
0
2.4 24
m 10 mm
m 20 mm
m 40 mm
m 40 mm
MAX AGG.
1 1 1 1 1
15 40 60 80 100
1|15 1|40 1|60 1|80 1|100
SLUMP 3 0.2 3|0,2 28.00 33.00 40.00 48.00 60.50
3 0.4 3|0,4 30.67 36.00 43.33 52.67 66.33
3 0.6 3|0,6 33.33 39.00 46.67 57.33 72.17
3 0.8 3|0,8 36.00 42.00 50.00 62.00 78.00
MAX AGG. 10 MM
1 1 1 1 1
15 40 60 80 100
1|15 1|40 1|60 1|80 1|100
2 3 4 5 6
SLUMP 10-30 1 0.2 1|0,2 23.50 27.50 32.50 38.00 49.50
1 0.4 1|0,4 25.83 30.17 36.17 43.33 55.17
1 0.6 1|0,6 28.17 32.83 39.83 48.67 60.83
1 0.8 1|0,8 30.50 35.50 43.50 54.00 66.50
SLUMP 30-60 2 0.2 2|0,2 25.00 30.00 36.00 42.00 54.50
2 0.4 2|0,4 27.67 32.67 39.17 46.33 59.67
2 0.6 2|0,6 30.33 35.33 42.33 50.67 64.83
2 0.8 2|0,8 33.00 38.00 45.50 55.00 70.00
SLUMP 60-180 3 0.2 3|0,2 28.00 33.00 40.00 48.00 60.50
3 0.4 3|0,4 30.67 36.00 43.33 52.67 66.33
3 0.6 3|0,6 33.33 39.00 46.67 57.33 72.17
3 0.8 3|0,8 36.00 42.00 50.00 62.00 78.00
JENIS PASIR F.A.S.
Persen Pasir Terhadap
1 0.47
Kadar Total Agregat
80
1
54.25 0.20 61.33 70
59.50 0.47 61.33
64.75 0.47 10.00
60 2
50
3
6 0.8
2700
2600
2500
2,9
2400
2,8
2,7
2300
2,6
2,5
2200 2195.23
2,42
2,4
2100
100 120 140 160 180 200 220 240 260
100 2315
2.4 260 2160
100 2397
2.5 260 2218
100 2479
2.6 260 2276
100 2561
2,9
2.7 260 2334
100 2643
2,8
2.8 260 2392
100 2725
2,7
2.9 260 2450
2,6
2,42
2,4
233.333333 100 2195.23
233.333333 2195.23
240 260 233.333333 2100
=IF( AND( A=1 ; B=1 ) ; 11 ; IF( AND( A=2 ;