( ITP WELDING )
No : ITP-AM-002
PIHAK INSPEKSI
B). MATERIAL
PIHAK INSPEKSI
PIHAK INSPEKSI
untuk pengelasan pipa jalur baru harus selalu dilakukan : International standard & Code
- NDT Report, PER - KAK No.
as API 1104, KAK No.
E.6 NDT DPT 10% dari total joint di Pipa Jalur Baru dengan Random Joint 0082/ABO/CONTRACT Review & Inspection - H M/A H/A M/A
0082/ABO/CONTRACT OFFICE
OFFICE /III/2020,
/III/2020
RT 5% dari total joint di Pipa Jalur Baru dengan Random Joint
STATUS : I = Inspection, H = Hold Point, W = Witness, SW = Spot Witness, V = Verification, C = Construction,R = Review Document, T = Test Point, QC = Quality Control, E = Engineering, A = Approved, P = Provide, M = Monitor.