Basic PLTM
Basic PLTM
Hydropower Capacity
P = Q x H x g x Eff
Dimana:
P = Power (kW)
Q = Water flow rate (m3/s)
H = Net Head (m)
g = acceleration due to
gravity (9.81 m/s2)
Eff = Efficiency of Turbine &
Generator (± 85%)
1
Design Engineering
(Basic Design Sipil)
2
Design Engineering
(Basic Design Generating Equipment)
• Diameter Runner
• Diameter Spiral Case
• Dimensi Draft Tube
• Elevasi CL Turbin
• Kapasitas Turbin Generator
• Arrangement Layout PH
• Dimensi PH
• Switchyard
• Transformer
• 20 KV Lokal TL
• Grounding System
3
BoQ, EE, dan Kurva S
Tahap menghitung BoQ dan EE
1. Persiapan dan pengecekan
DED
2. Perhitungan volume
3. Membuat Harga Satuan
Pekerjaan untuk EE
4. Menghitung jumlah biaya
pekerjaan untuk EE
5. Rekapitulasi EE
4
Project Management
5
Construction
6
Operation & Maintenance