UNTUK PENGEBORAN
PADA SUMUR YDM-1
HAIQAL MUHAMMAD
071001400068
OBJEKTIF
SISTEM ANGKAT
SISTEM PUTAR
SISTEM SIRKULASI
SISTEM BOP
SISTEM POWER
SISTEM ANGKAT
Trayek Weight Lcasing W casing
type interval
Casing (lbs) (ft) (lbs/ft)
Block = 30.000lbs
n =8
EB = 0,98
Wtotal = Wdrillstring + Wblock + WOverpull + TF+ TD
= 98558,72 + 30.000 + 100.000 + 33581,43 + 28569,59
= 290709,99lbs
= 133 ton
WtotalxV h 1
HPdrawwork = x
33.000
(290709,99lbs)(60𝑓𝑡 /𝑚𝑖𝑛 ) 1
= 𝑥
33.000 0.80
= 422,85HP
SISTEM PUTAR
MAASP
0.1psi/ft x 3000ft = 300 psi
(1389 – 300) psi = 1089 psi
Sistem BOP 3000 psi 1089 psi BOP rating cukup untuk menjalankan 36.3 %
pemboran
Sistem Power - - - -
KESIMPULAN
KAPASITAS
RIG SUDAH SESEUAI
UNTUK MENJALANKAN PEMBORAN
SUMUR YDM-1
Rekomendasi