MAJLIS PERBANDARAN KAJANG

SEBUTHARGA S34/2009
CADANGAN KERJA-KERJA
PENYELENGGARAAN INFRASTRUKTUR
DI ZON 12, MUKIM CHERAS UNTUK
MAJLIS PERBANDARAN KAJANG
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
ISI KANDUNGAN
1. BORANG SEBUTHARGA
2. ARAHAN KEPADA PENYEBUTHARGA
3. SYARAT-SYARAT SEBUTHARGA
4. RINGKASAN SEBUTHARGA
5. SPESIFIKASI KERJA
. LAMPIRAN
!. BORANG REKOD PENGALAMAN KERJA
". SENARAI KERJA KONTRAK SEMASA
#. MAKLUMAT LATAR BELAKANG KE$ANGAN
%. &ROAD$ORK SPECIFICATION'
(. SENARAI LOKASI ZON 12
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
BORANG SEBUTHARGA
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
MAJLIS PERBANDARAN KAJANG
BORANG SEBUT HARGA
Yang DiPertua Bil :
Majlis Perbandaran Kajang No Fail :
Tarikh :
Tuan,
(Perkara/Tajuk Projek)

Di ba!ah dan tertakluk ke"ada #rahan Ke"ada Pen$ebut %arga &$arat's$arat #( &ebut %arga,
&"esi)ikasi Kerja dan "elan'"elan, sa$a $ang bertandatangan di ba!ah ini adalah dengan ini
(ena!arkan untuk (elaksanakan dan (en$ia"kan kerja'kerja tersebut bagi ju(lah harga "ukal
seban$ak *inggit Mala$sia:
(*M)
+ &a$a bersetuju (en$ia"kan kerja'kerja ini dala( (asa (inggu dari tarikh
akhir te("oh (ula kerja se"erti $ang diarahkan oleh Pega!ai ,nden
Bertarikh "adaharibulan+-

Tandatangan kontraktor Tandatangan &aksi
Na(a Penuh: Na(a Penuh
No K/P: No K/P:
#la(at: #la(at:


#tas si)at:

Meterai atau .a" Kontraktor


SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
MAJLIS PERBANDARAN KAJANG
CADANGAN KERJA-KERJA PENYELENGGARAAN
INFRASTRUKTUR DI ZON 12, MUKIM CHERAS UNTUK
MAJLIS PERBANDARAN KAJANG
( Salinan-salinan Dokumen Meja Sebutharga yang merangkumi Perjanjian Kontrak,
Pelan-pelan tersebut di atas, speksifikasi dan dokumen sebutharga yang lain boleh dilihat
di tempat yang dinyatakan dalam Notis sebutharga dalam masa waktu pejabat pada mana-
mana hari bekerja hingga tarikh akhir yang ditetapkan bagi penyerahan sebutharga
Kepada ! "ang Dipertua,
Majlis Perbandaran Kajang
#$%N,
Di bawah dan tertakluk kepada Syarat-syarat Membuat Sebutharga yang dilampirkan
bersama ini, yang bertandatangan di bawah ini adalah dengan ini membuat sebutharga
dan menawar untuk melaksanakan dan menjalankan kerja-kerja dan peruntukan-
peruntukan dan membekalkan semua buruh, bahan dan logi-logi, tanda-tanda amaran,
mesin-mesin, pen&ahayaan waktu malam dan pada keadaan-keadaan yang
memerlukan' Kubuan dan lain-lain yang diperlukan termasuk perlindungan insuran
kerja, pampas an pekerja, tanggungan awam dan lain-lain risiko am dan bayaran
&ukai dan le(i berkaitan kepada pihak berkuasa yang berkaitan dan segala benda dari
tiap-tiap jenis yang masing-masing disebut dan lain-lain benda yang diperlukan dalam
menjalankan kerja-kerja dengan &ara yang selamat dan betul, yang samada ditunjuk,
diperihal dan dimaksudkan dalam atau yang hendak ditakrifkan daripada Dokumen
sebutharga, yang hendaklah dilaksanakan dan dibekalkan oleh pihak kontraktor, bagi
kerja-kerja yang diperihalkan diatas, dengan menepati Dokumen Sebutharga tersebut
dengan kadar harga yang disebut di bawah ini'
)' "ang bertandatangan di bawah ini bersetuju menjadi terikat oleh dan tunduk kepada
syarat-syarat kontrak dan spesifikasi tersebut dan bersetuju bahawa jika sebutharga
ini disetujuterima, kadar harga dalam jadual Kadar *argayang telah diselaraskan
mengikut tawaran seperti para + ,orang #awaran ini hendaklah menjadi asas bagi
menilaikan apa-apa kerja seperti diarahkan oleh Pegawai Penguasa se&ara bertulis
dari semasa ke semasa' "ang bertandatangan di bawah ini selanjutnya bersetuju
bahawa ,orang Pesanan yang dikeluarkan oleh Pegawai Penguasa mengikut syarat-
syarat kontrak kini hendaklah menjadi asas bagi menilaikan Perakuan bayaran
sementara'
-' Dan selanjutnya bertandatangan di bawah ini bersetuju menyiapkan kerja-kerja itu
dalam masa yang akan ditentukan oleh Pegawai Penguasa atau dalam apa-apa tempoh
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
BORANG SEBUTHARGA
lanjutan yang diperuntukan dalam Syarat-syarat Kontrak' #empoh kontrak ini adalah
berkuatkuasa selama enam (. bulan daripada tarikh surat penerimaan tawaran (jika
ada atau surat arahan melainkan terdapat arahan memanjangkan / memendekkan
tempoh seperti yang diarahkan oleh "ang Dipertua' "ang Dipertua bagaimanapun
sentiasa berhak untuk mengubah *ad 0umlah harga Kumulaif dan / atau
melanjutkantempoh masa kontrak yang ia sifatkan sesuai'
+' "ang bertandatangan di bawah menggemukakan tawaran bagi melaksanakan kerja-
kerja ini dengan kadar seperti berikut !
i 122222222222'3 tambahan / kurangan 11
(2222222222222'222222' peratus tambahan / kurangan 11
nyatakan dalam perkataan daripada Senarai kadar harga Di ,ahagian % dan seperti
yang tersenarai dalam dokumen ini bagi tempoh setahun dari surat tawaran tahun
)445
Nota sila isikan peratus yang ditawarkan kepada dua titik
Perpuluhan ( e.g.20.20)
! sila potong yang tidak berkenaan
6' "ang bertandatangan di bawah ini mengesahkan bahawa kadar peratus yang ditawarkan
akan diselaraskan dengan Senarai *arga tersebut untuk menghasilkan 0umlah ,ayaran
yang akan dibuat terhadap sesuatu pesanan /
arahan yang dikeluarkan oleh Pegawai Penguasa' "ang bertadatangan di bawah ini
bersetuju bahawa "ang Dipertua adalah sentiasa berhak untuk memilih dan / atau
melantik Kontraktor lain sekiranya yang bertandatangan gagal menjalankan arahan
kerja yang diarahkan oleh Pihak ,erkuasa'
" S#$%&a'(a t#&)a*at $#&+a-$#&+a (a', )%+a-a'$a' t%a)a )%'(ata$a' )a-a. Ja)/a-
Ka)a& 0a&,a, Ma+-%1 a$a' .#.2/at *#.2a(a&a' 2#&)a1a&$a' $#*a)a Ka)a&
Ha&,a (a', )%,/'a*a$a% o-#0 Ja2ata' K#&+a Ra(a 3JKR4 5 $#-/a&a' t#&$%'%
ATAU '%-a% 0a&,a (a', )%$#./$a$a' o-#0 P#.2o&o', 0#')a$-a0 )%*#&1#t/+/%
o-#0 Ma+-%1
7' "ang bertandatangan di bawah ini juga bersetuju bahawa nilai anggaran keseluruhan
perolehan ini adalah di bawah -%',$/',a' RM 266,666!66 /'t/$ #'a. 3"4 2/-a'!
%rahan tersendiri dikeluarkan oleh Pegawai Penguasa di mana dan apabila kerja perlu
dijalankan'
8' "ang bertandatangan di bawah ini bersetuju bahawa tempoh kontrak ini akan
berkuatkuasa selama enam (. bulan seperti dinyatakan dalam para - di atas dan juga
tertakluk kepada *ad 0umlah *arga Kumulatif tidak melebihi 9M )44,444'44 bagi
keseluruhan perolehan ini atau apa-apa jumlah amaun yang dipersetujui oleh "ang
Dipertua' 0umlah *arga Kumulatif ini bermaksud jumlah ke semua pesanan yang
dikeluarkan oleh Pegawai Penguasa bagi kerja ini' Melainkan terdapat apa-apa arahan
bertulis daripada "ang Dipertua samada memanjangkan tempoh kontrak dan / atau
menambah *ad jumlah *arga Kumulatif, maka kontrak ini akan luput dengan
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
tersendirinya atau dengan notis daripada Pegawai Penguasa, apabila yang ditentukan
telah di&apai'
5' ,ahawasanya adalah diketahui bahawa "ang Dipertua sentiasa berhak menyetujuterima
atau menolak Sebutharga ini, samada ianya lebih rendah atau lebih tinggi daripada
sebutharga-sebutharga yang lain atau sama amaunnya' "ang bertandatangan di bawah
ini bersetuju yang sebutharga ini akan berterusan sah dan tarikh tidak akan ditarik balik
dalam tempoh sembilan puluh (54 hari dari tarikh akhir ditetapkan bagi penyerahan
sebutharga dan bersetuju bahawa tiada apa-apa had, syarat atau janjian lain akan
dikenakan oleh kami selepas tarikh tersebut'
:4' "ang bertandatangan di bawah ini bersetuju, jika sebutharga ini disetujuterima,
mendepositkan dalam tempoh 7 hari selepas penerimaan Surat #awaran Sebutharga
sebelum bermulanya kerja-kerja, perkara-perkara berikut !
a' Polisi ;nsuran Kerja dan #anggungan %wam (iaitu insuran
terhadap ben&ana kepada orang-orang dan kerosakan kepada
harta atau Nota <iputan beserta denga resit bagi premium yang
telah dibayar'
b' Nombor pendaftaran di bawah Skim Keselamatan Sosial Pekerja
(P=9K=S> ! dan / atau
&' Polisi ;nsuran Pampasan Pekerja atau Nota <iputan berserta
dengan resit bagi premium yang telah dibayar'
"ang bertandatangan di bawah ini selanjutnya bersetuju akan mendapatkan polisi
insuran tersebut daripada Panel-panel ,roker insuran yang boleh diterima pakai dan
akan mendeposit Polisi insuran bagi kerja-kerja tersebut kepada Pegawai Penguasa
sebelum melaksanakan kerja' "ang bertandatangan di bawah ini juga akan
melaksanakan perjanjian kontrak yang formal dalam masa yang munasabah'
::' "ang bertandatangan di bawah ini dengan ini juga bersetuju bahawa ,orang
sebutharga ini berserta surat setujuterima sebutharga ini ( jika ada hendaklah menjadi
kontrak yang mengikat antara kita walaupun perjanjian kontrak yang formal belum
dilaksanakan'
:)' "ang bertandatangan di bawah ini mengesahkan, selepas menyemak sendiri,
,ahawa dokumen-dokumen dan pelan-pelan yang digunakan oleh yang bertandatangan
di bawah ini menyusun sebutharga ini adalah salinan-salinan yang sebenarnya bagi
dokumen-dokumen dan pelan-pelan yang dimasukkan dalam dokumen meja
sebutharga'
:-' "ang bertandatangan di bawah ini bersetuju bahawa !
a' 0ika sebutharga ini ditarik balik sebelum tamatnya tempoh sah
sebut harga atau apa-apa tempoh lanjutan atau
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
b' jika yang bertandatangan di bawah ini mengenakan apa-apa had, syarat
atau janjian tambahan kepada sebutharga ini selepas tarikh akhir yang
ditetapkan bagi penyerahan sebutharga atau
&' jika sekiranya sebutharga telah disetujuterima yang
bertandatangan di bawah ini enggan dan tidak melaksanakan
perjanjian kontrak yang formal atau tidak mendeposit ,on
Pelaksanaan sebagaimana dikehendaki oleh syarat-syarat kontrak
atau tidak meneruskan kerja-kerja'
Maka, dalam masa hal itu, tanpa menyentuh apa-apa hak lain yang ada padanya' "ang
DiPertua sentiasa berhak mengambil tindakan tatatertib terhadap yang bertandatangan
di bawah ini atau membatalkan pendaftaran yang bertandatangan di bawah sebagai
Kontraktor "ang DiPertua sebagaimana difikirkan perlu oleh "ang DiPertua'
,ertarikh pada ! 22222222222haribulan22222222')422222
"ang diberikuasa dengan sempurnanya
untuk menandatangani sebutharga ini
$ntuk dan bagi pihak!
2222222222'
#andatangan Kontraktor
Nama Penuh ! '''''''''''''''''''''''''''''''''''''''''''''''''''''''
%tas Sifat ! ''''''''''''''''''''''''''''''''''''''''''''''''''''''''
Materi atau ?op Kontraktor

'''''''''''''''''''''''''''''''''''
#andatangan saksi
Nama Penuh ! ''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''
%tas Sifat ! ''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''
%lamat ! ''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''
''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''
''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
ARAHAN KEPADA
PENYEBUTHARGA
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
ARAHAN KEPADA PENYEBUT HARGA
1. HAK MAJLIS PERBANDARAN KAJANG (MPKj) UNTUK
MENERIMA/MENOLAK SEBUT HARGA
Majlis Perbandaran Kajang (MPKj) adalah tidak terikat untuk (eneri(a sebut
harga $ang terendah atau (ana'(ana sebut harga atau (e(beri a"a'a"a sebab
di atas "enolakan sesuatu sebut harga Ke"utusan /a!atankuasa &ebut %arga
MPKj adalah (ukta(ad
2. CARA-CARA MELENGKAPKAN DOKUMEN SEBUT HARGA
2.1 Pene!"##n Se$%& H#'(#
Kontraktor adalah dikehendaki (engisi dengan dak!at segala (aklu(at
berikut dengan se"enuhn$a:'
(a) %arga dan tandatangan Kontraktor di *ingkasan &ebut %arga,
(b) %arga, te("oh dan tandatangan dala( Borang &ebut %arga,
(0) &enarai Kerja Dala( Tangan (jika ada),
(d) /adual Kadar %arga (jika ada),
(e) Butir'butir &"esi)ikasi (jika ada)
2.2 Pene'#)#n D*+%,en Se$%& H#'(#
(a) Doku(en &ebut %arga $ang telah diisi dengan lengka"
hendaklah di(asukkan ke dala( sa("ul surat berlakri $ang
ber0atatkan dengan bilangan sebut hargaserta
tajuk sebut harga dan hendaklah di(asukkan ke dala( "eti sebut
harga "ada (asa dan te("at $ang diteta"kan dala( Notis &ebut
%arga
(b) /ika Doku(en &ebut %arga tidak diserahkan dengan tangan,
Pen$ebut %arga hendaklah (enghantar Doku(en tersebut
dengan "os su"a$a tiba "ada atau sebelu( (asa dan di te("at
$ang diteta"kan
(0) &ebut %arga $ang diserahkan sele"as (asa $ang diteta"kan,
berbangkit dari sebarang sebab, tidak akan di"erti(bangkan
2.- Pen".#"#n Se$%& H#'(#
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
1ntuk tujuan "enilaian sebut harga, kontraktor'kontraktor !"/#j"$+#n
(enge(ukakan doku(en'doku(en se"erti berikut:'
(a) &alinan 2esen PKK, Ke(enterian Ke!angan, .,DB atau lain'lain
lesen $ang berkaitan dengan "rojek dan "erlu disertakan
bersa(a'sa(a Doku(en &ebut %arga
(b) &alinan Pen$ata Bulanan #kaun Bank &$arikat bagi Tiga (3) Bulan
Terakhir sebelu( tarikh tutu" sebut harga
(0) &enarai kerja dala( tangan (sekiran$a ada)
(d) *ekod "engala(an kerja
&ekiran$a Kontraktor (#(#. (enge(ukakan doku(en'doku(en se"erti
$ang din$atakan diatas, sebut harga kontraktor akan !"&*.#+ dan tidak
akan di"erti(bangkan
2.0 Penje.#1#n L#nj%&
&ekiran$a terda"at (aklu(at dala( Doku(en &ebut %arga $ang tidak
jelas atau ber0anggah, Kontraktor boleh (enghubungi Pega!ai ,nden
untuk "enjelasan lanjut
-. TEMPOH SIAP KERJA
Kerja ini hendaklah disia"kan dala( te("oh tidak (elebihi 4 bulan
0. BAYARAN DOKUMEN SEBUT HARGA 5
Doku(en &ebut %arga ini dijual dengan harga RM23.33
(*inggit Mala$sia: 2i(a Puluh &ahaja)
2. PERBELANJAAN PENYEDIAAN SEBUT HARGA
&e(ua "erbelanjaan bagi "en$ediaan sebut harga ini hendaklah
ditanggung oleh "en$ebut harga sendiri
4. TEMPOH SAH SEBUT HARGA
&ebut harga ini sah sela(a se(bilan "uluh (6-) hari dari tarikh tutu"
sebut harga Pen$ebut harga tidak boleh (enarik balik sebut hargan$a
sebelu( ta(at te("oh sah sebut harga Tindakan tatatertib akan dia(bil
sekiran$a "en$ebut harga (enarik balik sebuthargan$asebelu( ta(at
te("oh sah sebut harga
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
5 %endaklah diisi oleh Pega!ai Mengurus sebut %arga
7 Pengiraan harga doku(en sebut harga hendaklah dibuat berdasarkan
kadar $ang diteta"kan bagi ba$aran doku(en tender (enerusi &PP $ang terkini
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
SYARAT-SYARAT SEBUTHARGA
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
SYARAT-SYARAT SEBUT HARGA
1. PEMERIKSAAN TAPAK BINA
Kontraktor disi)atkan telah (e(eriksa dan (eneliti ta"ak bina dan
sekitarn$a, bentuk dan jenis ta"ak bina, takat dan jenis kerja, bahan dan
barang $ang "erlu bagi (en$ia"kan Kerja, 0ara'0ara "erhubungan dan
laluan (asuk ke ta"ak bina dan hendaklah (enda"atkan sendiri segala
(aklu(at $ang "erlu tentang risiko, luar jangkaan dan segala hal'
keadaan $ang (e("engaruhi dan (enjejas sebut hargan$a &ebarang
tuntutan $ang ti(bul akibat dari"ada kegagalan kontraktor (e(atuhi
kehendak ini tidak akan di"erti(bangkan
2. INSURANS
+8 Kontraktor hendaklah atas na(a bersa(a MPKj dan Kontraktor
(enga(bil ,nsurans 2iabiliti #!a( dan ,nsuran Kerja5 (sekiran$a
din$atakan di dala( butir'butir *ingkasan &ebut %arga) bagi te("oh
"elaksanaan Kerja ini Kontraktor hendaklah juga (enge(ukakan
No(bor Kod Penda)taran dengan P9*K9&:
++ Kontraktor hendaklah (enge(ukakan ke"ada Pega!ai ,nden se(ua
"olisi insurans dan No(bor Kod Penda)taran dengan P9*K9&: $ang
tersebut di atas sebelu( (e(ulakan kerja Bagai(ana"un untuk tujuan
(e(ulakan Kerja sahaja Nota'nota Perlindungan dan resit'resit ba$aran
"re(iu( adalah (en0uku"i &ekiran$a Kontraktor gagal (enge(ukakan
se(ua "olisi insurans sele"as te("oh sah nota'nota "erlindungan, tan"a
sebarang $ang (unasabah, Pega!ai ,nden berhak (enga(bil tindakan
se"erti di ba!ah )asal 6(d)
-. PERATURAN PELAKSANAAN KERJA
38 Kerja'kerja $ang dilaksanakan hendaklah (e(atuhi &"esi)ikasi, "elan'
"elan, butir'butir kerja dala( *ingkasan &ebut %arga dan &$arat's$arat
$ang din$atakan dala( Doku(en &ebut %arga ini dan arahan Pega!ai
,nden atau ;akiln$a
53+ Kerja'kerja elektrik dilaksanakan disa("ing (e(atuhi kehendak di
"erenggan 38 di atas, hendaklah juga (e(atuhi se(ua "eraturan dan
"ekeliling, undang'undang dan undang'undang ke0il $ang diluluskan
oleh:
(i) &uruhanja$a Tenaga
(ii) /abatan Kesela(atan Pekerja dan Kesihatan
(iii) Pe(egang 2esen dan Pihak Berkuasa Bekalan 9lektrik
(i<) /abatan Bo(ba dan Pen$ela(at
(<) Pihak Berkuasa Te("atan
5 Potong jika tidak di"erlukan
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
0. KEGAGALAN KONTRAKTOR MEMULAKAN KERJA
&ekiran$a Kontraktor gagal (e(ulakan kerja sele"as tujuh (=) hari dari
tarikh akhir te("oh (ula kerja $ang din$atakan dala( inden, tan"a
sebab'sebab $ang (unasabah, inden akan dibatalkan oleh Pega!ai
,nden dan tindakan tatatertib akan dia(bil terhada" Kontraktor
2. SUB-SE5A DAN MENYERAHHAK KERJA
Kontraktor tidak dibenarkan (engsub'se!akan Kerja ke"ada Kontraktor'
kontraktor lain Kontraktor tidak boleh (en$erahhak a"a'a"a )aedah di
ba!ah ,nden ini tan"a terlebih dahulu (enda"atkan "ersetujuan bertulis
dari"ada Pega!ai ,nden
4. PENOLAKKAN BAHAN6 BARANG DAN MUTU HASIL KERJA OLEH
PEGA5AI INDEN
48 Pega!ai ,nden atau ;akiln$a berhak (enolak bahan, barang dan (utu
hasil kerja dari jenis "ia!aian $ang tidak (ene"ati se"erti di"erihalkan
dala( s"esi)ikasi Kontraktor hendaklah, a"abila di(inta oleh Pega!ai
,nden, (e(beri ke"adan$a bau0ar'bau0ar dan/atau "erakuan ujian
"engilang untuk (e(buktikan baha!a bahan'bahan dan barang'barang
itu (e(enuhi s"esi)ikasi Bahan, barang dan kerja'kerja $ang ditolak
hendaklah diganti dan sebarang kos ta(bahan $ang terlibat hendaklah
ditanggung oleh Kontraktor sendiri
4+ Kontraktor hendaklah dengan se"enuhn$a atas "erbelanjaan sendiri
(en$ediakan sa("el bahan dan barang'barang untuk ujian
43 Tiada "enggantian untuk "eralatan, bahan dan 0ara kerja $ang telah
ditentukan di dala( s"esi)ikasi atau dita!arkan dan telah diteri(a,
dibenarkan ke0uali (enda"at "ersetujuan dari"ada Pega!ai ,nden
se0ara bertulis
7. RINGKASAN SEBUT HARGA
=8 *ingkasan &ebut %arga hendaklah (enjadi sebahagian dari"ada Borang
&ebut %arga ini dan hendaklah (enjadi asas /u(lah %arga &ebut
%arga
=+ %arga'harga dala( *ingkasan &ebut %arga hendaklah (enga(bil kira
se(ua kos ter(asuk kos "engangkutan, 0ukai, 0uti, ba$aran dan 0aj'0aj
lain "erlu dan berkaitan bagi "en$ia"an Kerja dengan se("urnan$a
=3 Tiada sebarang tuntutan akan dila$an bagi "elarasan harga akibat
dari"ada "erubahan kos buruh, bahan'bahan dan se(ua duti dan 0ukai
Kerajaan, sa(a ada dala( te("oh sah sebut harga atau dala( te("oh
Kerja
=> %arga'harga dala( *ingkasan &ebut %arga $ang dike(ukakan oleh
Kontraktor hendaklah tertakluk ke"ada "ersetujuaan sebelu(n$a
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
dari"ada Pega!ai ,nden tentang ke(unasabahann$a Persetujuan
sebelu(n$a itu dan a"a'a"a "elarasan ke(udiann$a ke"ada harga'
harga dala( *ingkasan &ebut %arga hendaklah dibuat sebelu( ,nden
Kerja dikeluarkan
=? #"a'a"a "elarasan harga dala( *ingkasan &ebut %arga (enurut
"erenggan => tersebut diatas a"a'a"a kesila"an hisab dala( *ingkasan
&ebut %arga hendaklah dilaras dan di"erbetulkan sebelu( ,nden Kerja
dikeluarkan /u(lah a(aun $ang dilaraskan hendaklah sa(a dengan
a(aun ju(lah harga "ukal dala( borang &ebut %arga #(aun ju(lah
harga "ukal dala( Borang &ebut %arga hendaklah teta" tidak berubah
=4 &ekiran$a sebut harga berasaskan senarai kuantiti se(entara,
"engukuran se(ula hendaklah dibuat dan harga sebut harga
diselaraskan
8. PERCANGGAHAN DAN KECUKUPAN DOKUMEN SEBUT HARGA
@8 Doku(en sebut harga adalah dikira sebagai saling jelas'(enjelas antara
satu sa(a lain Kontraktor hendaklah (engadakan segala $ang "erlu
untuk (elaksanakan kerja dengan se!ajarn$a sehinggalah sia"
(engikut tujuan dan (aksud sebenar Doku(en &ebut %arga "ada
keseluruhann$a sa(a ada atau tidak tujuan dan (aksud itu ada ditunjuk
atau di"erihal se0ara khusus, dengan s$arat baha!a tujuan, (aksud itu
hendaklah di)aha(kan dengan (unasabahn$a dari Doku(en &ebut
%arga itu
@+ /ika Kontraktor (enda"ati a"a'a"a "er0anggahan dala( Doku(en &ebut
%arga dia hendaklah (erujuk ke"ada Pega!ai ,nden untuk
(enda"atkan ke"utusan
9. KEGAGALAN KONTRAKTOR MENYIAPKAN KERJA DAN
PENAMATAN PERLANTIKAN KONTRAKTOR
Pega!ai ,nden berhak (e(batalkan ,nden sekiran$a Kontraktor berada
dala( keadaan berikut dan setelah (eneri(a surat a(aran dari"ada
Pega!ai ,nden:
(a) &ekiran$a Kontraktor (asih gagal (en$ia"kan Kerja dala(
te("oh (asa $ang telah diteta"kanA
(b) Ke(ajuan Kerja terlalu le(bab tan"a a"a'a"a sebab $ang
(unasabahA
(0) Penggantungan "erlaksanaan seluruh atau sebahagian Kerja,
tan"a a"a'a"a sebab $ang (unasabahA
(d) Tidak (e(atuhi arahan Pega!ai ,nden tan"a a"a'a"a alasan
$ang (unasabahA
(e) #"abila Kontraktor diis$tiharkan bankra" oleh "ihak $ang sah
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
13. BAYARAN KEMAJUAN
Pega!ai ,nden dibenarkan (e(buat "e(ba$aran interi( sehingga kerja'
kerja sia" dilaksanakan
11. KERJA PERUBAHAN
888 Pega!ai ,nden boleh (enurut budi bi0aran$a (engeluarkan arahan'
arahan $ang berkehendakkan sesuatu "erubahan kerja dengan se0ara
bertulis Tiada a"a'a"a "erubahan $ang dikeluarkan oleh Pega!ai ,nden
atau $ang disahkan ke(udian oleh Pega!ai ,nden boleh (e(batalkan
sebut harga ini
88+ &e(ua kerja "erubahan dan/atau ta(bahan $ang diluluskan oleh
Pega!ai ,nden akan diukur atau dinilai dengan (enggunakan kadar
harga $ang ada dala( &enarai Kuantiti/*ingkasan &ebut %arga /ika
terda"at sebarang kadar harga $ang bersesuaian, kadar harga $ang
di"ersetujui oleh Pega!ai ,nden dan Kontraktor hendaklah digunakan
12. TEMPOH TANGGUNGAN KECACATAN (DLP)
8+8 Te("oh Tanggungan Ke0a0atan bagi sebut harga hendaklah
sekurangn$a' kurangn$a ena( (4) bulan dari tarikh kerja di"erakukan
sia" Bagi kerja'kerja (ekanikal dan elektrikal di(ana te("oh !aranti ke
atas alat'alat dan loji'loji adalah dua belas (8+) bulan dan dala( kes'kes
tertentu oleh kerana jenis dan keru(itan kerja, te("oh tanggungan
ke0a0atan $ang lebih la(a dari"ada ena( (4) bulan boleh dikenakan
8++ Kontraktor di"ertanggungja!abkan untuk (e(baiki ke0a0atan,
ketidakse("urnaan, keke0utan atau a"a'a"a jua kerosakan lain $ang
(ungkin kelihatan dan $ang disebabkan oleh bahan atau barang atau
(utu hasil kerja $ang tidak (ene"ati sebut harga ini a"abila diarahkan
oleh Pega!ai ,nden dan dala( (asa $ang ber"atutan Kontraktor
hendaklah (e(baiki ke0a0atan, ketidakse("urnaan, keke0utan atau
a"a'a"a jua kerosakan lain atas Kontraktor sendiri
8+3 &ekiran$a Kontraktor gagal (e(baiki ke0a0atan, ketidakse("urnaan,
keke0utan atau a"a'a"a jua kerosakan lain se"erti diarahkan, Pega!ai
,nden berhak (e(otong kos (e(baiki dari baki !ang $ang akan diba$ar
ke"ada Kontraktor atau, jika baki itu tidak (en0uku"i, (engeluarkan
surat "enges$oran ke"ada Pusat Khid(at Kontraktor untuk
(enggantungkan "enda)taran Kontraktor, dan (enghantar salinan'
salinan surat tersebut ke"ada Pengarah /abatan Kerja *a$a Negeri/
Ketua /abatan, bahagian Pe(bangunan Bu(i"utera, Ke(enterian Kerja
*a$a dan 2e(baga Pe(bangunan ,ndustri Pe(binaan Bagi kerja'kerja
elektrik/(ekanikal, salinan surat hendaklah dihantar ke"ada Pengarah
.a!angan Kerja 9letrikal/ Pengarah .a!angan Kerja Mekanikal
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
1-. PERATURAN MEMBAYAR SELEPAS SIAP
Ba$aran se"enuhn$a han$a akan diba$ar setelah Kontraktor (en$ia"kan
kerja dengan se("urnan$a dan Perakuan &ia" Kerja dikeluarkan
Kontraktor hendaklah (enge(balikan Borang'borang ,nden Kerja #sal
iaitu Borang Perjanjian ,nden Kerja /K* ?@ dan Borang Pengesahan
Pen$ia"an ,nden Kerja /K* ?@# ke"ada Pega!ai ,nden
10. PERAKUAN SIAP KERJA
Pega!ai ,nden hendaklah (engeluarkan Perakuan &ia" Kerja sebaik
sahaja kerja disia"kan dengan se("urna dan (e(uaskan Tarikh sia"
kerja ini ber(ulan$a Te("oh Tanggungan Ke0a0atan
12. PERAKUAN SIAP MEMPERBAIKI KECACATAN
Pega!ai ,nden hendaklah (engeluarkan Perakuan &ia" Me(baiki
Ke0a0atan sebaik sahaja kontraktor telah (e(baiki ke0a0atan,
ketidakse("urnaan, keke0utan atau a"a'a"a jua kerosakan lain
14. PEMATUHAN KEPADA UNDANG-UNDANG OLEH KONTRAKTOR.
Kontraktor hendaklah (e(atuhi segala kehendak 1ndang'undang Ke0il
dan 1ndang'undang Berkanun dala( Mala$sia se(asa "elaksanaan
Kerja Kontraktor tidak berhak (enuntut sebarang kos dan ba$aran
ta(bahan kerana "e(atuhann$a dengan s$arat's$arat ini
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
RINGKASAN SEBUTHARGA
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
RINGKASAN SEBUTHARGA
Borang ini adalah mer!a"an #e$ahagian dari!ada do"men #e$%harga&
Pem$orong henda"lah mema%hi #'ara% !engi#ian $orang ini& Piha" (P)*
$oleh menola" #e$%harga %an!a #e$arang ala#an #e"iran'a %ida" mengi"%
#'ara%+#'ara% #e!er%i $eri"%,
BIL SEBUTHARGA , S -./2009
NO /AIL , (P)* / -. / )E0 / 1 / 2009
TARI)H , 222222222222222222222&&
RINGKASAN KADAR HARGA
BIL ITEM ) PERKARA PERATUS *+, KURANGAN )
TAMBAHAN
3& 1A4ANGAN )ER0A+)ER0A PEN5ELENGGARAAN
IN/RASTRU)TUR 4I ZON 326 (U)I( 1HERAS UNTU)
(A0LIS PERBAN4ARAN )A0ANG


JUMLAH KESELURUHAN
Ringgi% (ala'#ia ,777777777777777777777777777777777777777777777
7777777777777777777777777777777777777777777777777777777777777
7777777777777777777777777777777777777777777777777777777777777
8Tem!oh Perla"#anaan )er*a BULAN
-Nilai Anggaran "o# !er$ahan di$a9ah ling"ngan RM 2..,......
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
SPESIFIKASI KERJA
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
B,2 P9*K#*# 1N,T %#*B#
MPKj
(*M)
5P9*#T1&
K1*#NB#N
/ T#MB#%#N
%#*B#
P9MB:*:NB
(*M)
# KERJA-KERJA A5ALAN
#8 Kerja'Kerja Pen$ediaan / Penghabisan
Ta"ak (CMobilisation D De(obilisionE)
'Kerja'kerja "enghantaran (asuk ke ta"ak
ter(asuk "ekerja'"ekerja, bahan binaan,
jentera dan lain'lain ke"erluan asas bagi
tujuan "erlaksanaan kerja Kadar ter(asuk
(e(ba!a keluar sele"as kerja'kerja sia"
dijalankan
#+ ,nsuran
'Pihak kontraktor bertanggungja!ab untuk
(en$ediakan insuran tanggungan a!a(,
insuran "a("asan kerja, ski( akta
kesela(atan sosial "ekerja se"erti $ang
terkandung dala( "asal 33,3>,3?,dan 34
dala( s$arat's$arat kontrak sebelu(
(e(ulakan kerja
#3 2a"oran Ke(ajuan Berga(bar
'Kontraktor "erlu (en$ediakan la"oran
berga(bar (ingguan sebelu(, se(asa,
dan sele"as "rojek berjalan
' 2a"oran berga(bar "erlu disediakan
dala( bentuk digital seban$ak + set setia"
la"oran
#> Pen$ediaan Peralatan Kerja
'Kontraktor "erlu (en$ediakan "eralatan
kesela(atan di ta"ak untuk kegunaan
Pega!ai Penguasa atau !akil Pega!ai
Penguasa se"erti to"i kesela(atan, jaket
dan kasut kesela(atan
#? Pen$elenggaraan /alan &edia ada dan
Ka!alan 2alulintas
'Men$ediakan, (en$elenggara dan
(enanggal se(ula sesudah "rojek sia"
segala "a"antanda se(entara $ang
digunakan untuk tujuan ka!alan lalulintas
'Men$elengara jalan F jalan se(entara
(len0ongan) $ang digunakan se"anjang
te("oh "erlaksanaan kerja tersebut
%B
%B
%B
%B
%B
+,-----
3,-----
?----
?----
8,?----
5 &,2# P:T:NB B#%#B,#N Y#NB T,D#K B9*K9N##N
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
B,2 P9*K#*# 1N,T %#*B#
MPKj
(*M)
5P9*#T1&
K1*#NB#N
/ T#MB#%#N
%#*B#
P9MB:*:NB
(*M)
# KERJA-KERJA A5ALAN
#4 Mes$uarat Ta"ak
'Kontraktor "erlu (enghadiri (es$uarat
ta"ak $ang telah diteta"kan (engikut
ke"erluan Pega!ai Penguasa Kakitangan
kontraktor $ang bertanggungja!ab dala(
(en$elia "rojek ini "erlu hadir sa(a bagi
(e(bentangkan segala (asalah atau
"erkara berbangkit berkaitan "engurusan
"rojek ini serta (e(bentangkan la"oran
ke(ajuan "rojek
'Kakitangan $ang dilantik oleh "ihak
kontraktor untuk (enghadiri (es$uarat
ta"ak "erlulah seorang $ang (e("un$ai
kuasa atau boleh (e(buat ke"utusan bagi
"ihak kontraktor se(asa (es$uarat ta"ak
diadakan
#= Kerja'kerja Pe(bersihan Ta"ak &ele"as
&ia" Kerja
'Kerja'kerja "enghabisan dengan
(e(bersihkan se(ua sa("ah sara" dan
bahan'bahan $ang tidak "erlu di ta"ak $ang
terlibat ke "elu"usan sa("ah MPKj
%B
%B
@----
8,-----
5 &,2# P:T:NB B#%#B,#N Y#NB T,D#K B9*K9N##N
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
B,2 P9*K#*# 1N,T %#*B#
MPKj
(*M)
5P9*#T1&
K1*#NB#N
/ T#MB#%#N
%#*B#
P9MB:*:NB
(*M)
B KERJA-KERJA MEMBINA JALAN
B8 Kerja'kerja "e(bersihan ta"ak $ang
terdiri dari"ada (e(bersihkan jalan sediada
dengna (enggorek dan (e(otong jalan
$ang rosak sehingga "aras 0rusher run
sediada Kadar ter(asuk 0akar dan ena"
"ada "er(ukaan jalan dan (eratakan
(ana'(ana gigi jalan $ang rosak
B+ Kerja'kerja "en$ediaan tenaga buruh,
se!aan jentera se"erti roller @ tan, (esin
"engorek dan "e(otong jalan untuk te("oh
+ hari Kadar juga ter(asuk (en$ediakan
"erkara'"erkara bersangkutan $ang
di)ikirkan "erlu
B3 Kerja'kerja (e(bekal dan (enabur
batu'batu 0rusher run ke atas "er(ukaan
jalan $ang dikorek "ada ketebalan lebih
kurang 8?-(( dan "asir 8--(( tebal
Kadar ter(asuk kerja (e(adat dan (erata
dengan jentera "enggelek seberat @ tan
B> Kerja'kerja (enura" "er(ukaan jalan
dengan ?-(( tebal la"isan "engikat
(!earing 0oarse) #.;. 8> sele"as
di(a("at ter(asuk la"isan asas berbitu(in
bergred "ene(busan @-/8-- ("ri(e 0oat)
dise(bur "ada kadar > liter/(eter "ersegi
dan di(a("atkan dengan (esin "enggelek
@ tan
B? Kerja'kerja (elukis garisan tengah
jalan, te"i jalan, garisan berhenti dan
sebagain$a dengan 0at ther(o"lastik
ber!arna "utih dan (elukis (engikut
arahan "ega!ai "enguasa ter(asuk
(enge0at se(ula bonggol sediada
sekiran$a "erlu
B4 Kerja'kerja (e(bina bonggol (s"eed
hu(") dari"ada "re(iG (engikut saiH dan
bentuk se"erti $ang ditunjukkan dala(
"elan dan hendaklah (erujuk ke"ada
"ega!ai bertugas
:(termasu!a" er#a$er#a mem%ua&'
%(&''(! "aram )a&' t*+a me&'*ut
s,es*-*as*)
.Item B/4 "e&+a!a" +*#a!a&a& +e&'a&
me&''u&aa& mes*& ,e&)e!era .0,a1er23
%a'* er#a$er#a )a&' me!*%ata& ,e&ura,a&
se4ara ,a&#a&'3
%B
%B
M+
M+
M
B,2
8,@----
3,-----
8>--
+4--
?--
@?---
5 &,2# P:T:NB B#%#B,#N Y#NB T,D#K B9*K9N##N
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
B,2 P9*K#*# 1N,T %#*B#
MPKj
(*M)
5P9*#T1&
K1*#NB#N
/ T#MB#%#N
%#*B#
P9MB:*:NB
(*M)
B
C
KERJA-KERJA MEMBINA JALAN
B= Kerja'kerja (elukis Iebra .rossing ke
atas bonggol dengan 0at Ther(o"lastik
be!arna kuning/"utih (engikut arahan
"ega!ai "enguasa bertugas Kadar
ter(asuk (enge0at bonggol sediada
B@ Kerja'kerja (e(bekal dan (e(asang
konkrit susur jalan tuang dulu berukuran
lebih kurang 8--(( G 3--(( (tinggi)
dengan satu "er(ukaan 0ondong (engikut
"anjang $ang bersesuaian ter(asuk
(e(bina ta"ak konkrit (8:3:4'3@(()
3=?(( lebar G ?-(( tebal dan disa(bung
antara satu sa(a lain dengan si(en (ortar
B6 Kerja'kerja (e(bina o"en s0u""er
drain dari"ada konkrit tuang dulu berukuran
lebih kurang 3--(( lebar dan 8?-((
tinggi Kadar ter(asuk (e(bina ta"ak
dari"ada konkrit tuang di situ (8:3:4'3=(()
dan lebar ++?(( G ?-(( tebal
KERJA-KERJA MEMBINA LONGKANG
.8 Kerja'kerja "e(bersihan ta"ak $ang
terdiri dari"ada (e(bersihkan jalan sediada
dengan (engorek longkang $ang rosak dan
tanah sehingga "aras $ang di"erlukan
.+ Kerja'kerja "en$ediaan tenaga buruh,
se!aan jentera se"erti ba0khoe untuk
te("oh + hari Kadar ter(asuk
(en$ediakan "eralatan'"eralatan $ang
berkaitan dengann$a
(Konkrit untuk longkang'longkang
hendaklah dari jenis Bred +-
%arga longkang dan (e(asang ter(asuk
harga (enggali dan (eni(bus balik tanah
%arga (e(buka dan (e(buang ter(asuk
harga (e("erbaiki kerosakan'kerosakan
disekelilingn$a dan (engisi "arit dengan
tanah$ atau (eratakan tanah ke aras (le<el)
$ang baru
%arga (e(buang dan (e(asang se(ula
ter(asuk harga (e("erbaiki kerosakan'
kerosakan disekelilingn$a, (eratakan tanah
ke aras $ang baru (eni(bus tanah jika
"erlu dan (e(betulkan tau"an longkang
dengan longkang $ang la(a dihujungn$a)
B,2
M
M
%B
%B
>@---
>+--
4---
8,-----
8,-----
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
5 &,2# P:T:NB B#%#B,#N Y#NB T,D#K B9*K9N##N
B,2 P9*K#*# 1N,T %#*B#
MPKj
(*M)
5P9*#T1&
K1*#NB#N
/ T#MB#%#N
%#*B#
P9MB:*:NB
(*M)
C KERJA-KERJA MEMBINA LONGKANG
K:NK*,T P*#T1#NB (B*9D +-)
T9*M#&1K T9T12#NB /,K#
D,K9%9ND#K, #.1#N M9NB9M#&
&9/#T, P#D# P9*M1K##N T9*D9D#%
D#N M9NB#NBK#T D#N M9NB,K#T
D9NB#N M:*T#* &,M9N(8:3)
.3 8?-(( Dia(eter longkang se"aruh
bulatan dan =?(( tebal ter(asuk kerja'
kerja "enggalian
.> ++?(( Dia(eter longkang se"aruh
bulatan dan =?(( tebal ter(asuk kerja'
kerja "enggalian
.? 3--(( Dia(eter longkang se"aruh
bulatan dan =?(( tebal ter(asuk kerja'
kerja "enggalian
.4 3=?(( Dia(eter longkang se"aruh
bulatan dan =?(( tebal ter(asuk kerja'
kerja "enggalian
.= ++?(( Dia(eter longkang se"aruh
bulatan =?(( tebal ter(asuk se(ua kerja
"enggalian, (e(bentuk bebendul =?((
tebal dikedua'dua belah, "urata =?((
tinggi dan "er(ukaan terdedah dibahagian
dala( "etak dengan 8+(( tebal 0a("uran
si(en dan "asir (8:3)
K:NK*,T P*#T1#NB (B*9D +-)
T9*M#&1K T9T12#NB /,K#
D,K9%9ND#K, #.1#N M9NB9M#&
&9/#T, P#D# P9*M1K##N T9*D9D#%
D#N M9NB#NBK#T D#N M9NB,K#T
D9NB#N M:*T#* &,M9N(8:3)
.@ Ta(abahan untuk ite( B? di atas bagi
setia" +?(( ta(bahan tinggi bebendul
.6 3--(( Dia(eter longkang se"aruh
bulatan =?(( tebal ter(asuk se(ua kerja
"enggalian, (e(bentuk bebendul =?((
tebal dikedua'dua belah, "urata =?((
tinggi dan "er(ukaan terdedah dibahagian
dala( "etak dengan 8+(( tebal 0a("uran
si(en dan "asir (8:3)
M
M
M
M
M
M
M
+8--
+@--
3?--
>+--
3@--
?--
>4--
5 &,2# P:T:NB B#%#B,#N Y#NB T,D#K B9*K9N##N
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
B,2 P9*K#*# 1N,T %#*B#
MPKj
(*M)
5P9*#T1&
K1*#NB#N
/ T#MB#%#N
%#*B#
P9MB:*:NB
(*M)
C KERJA-KERJA MEMBINA LONGKANG
.8- 3=?(( Dia(eter longkang se"aruh
bulatan =?(( tebal ter(asuk se(ua kerja
"enggalian, (e(bentuk bebendul =?((
tebal dikedua'dua belah, "urata =?((
tinggi dan "er(ukaan terdedah dibahagian
dala( "etak dengan 8+(( tebal 0a("uran
si(en dan "asir (8:3)
.88 Ta(bahan harga bagi ite( .= dan
.@ di atas bagi setia" bebendul
.8+ ++?(( G ++?(( longkang "en0egah
(alaria =?(( tebal serta (e(buat "arit
.83 3--(( G 3--(( longkang "en0egah
(alaria =?(( tebal serta (e(buat "arit
.8> 3=?(( G 3=?(( longkang "en0egah
(alaria =?(( tebal serta (e(buat "arit
.8? >?-(( G >?-(( longkang "en0egah
(alaria =?(( tebal serta (e(buat "arit
.84 3--(( lebar G 4--(( "anjang kekisi
keluli sederhana keras "enutu" longkang
terdiri dari 84(( dia(eter rod "engalas
"ada setia" jarak 3-(( diki("al ka(bi
"ada ?-(( G ?-(( G @(( tebal rangka
sesiku ter(asuk satu la"is 0at asas loga(
.8= ++?(( lebar G 4--(( "anjang kekisi
keluli sederhana keras "enutu" longkang
terdiri dari 84(( dia(eter rod "engalas
"ada setia" jarak 3-(( diki("al ka(bi
"ada ?-(( G ?-(( G @(( tebal rangka
sesiku ter(asuk satu la"is 0at asas loga(
.8@ Kerja'kerja (e(bekal dan (e(bina
dinding batu bata berukuran ++?(( tebal
Kadar ter(asuk kerja'kerja konkrit asas dan
(e(asang saluran air 1PJ. 8--((
dia(eter "ada jarak 8---(( setia" satu
serta (ele"a "er(ukaan terdedah
.86 Kerja'kerja (e(bekal dan (e(bina
dinding batu tuna( berukuran ++?(( tebal
Kadar ter(asuk kerja'kerja konkrit asas dan
(e(asang saluran air 1PJ. 8--((
dia(eter "ada jarak 8---(( setia" satu
M
M
M
M
M
M
N:
N:
M+
M+
?3--
?--
36--
4---
4@--
@---
?@--
>8--
@?--
@?--
5 &,2# P:T:NB B#%#B,#N Y#NB T,D#K B9*K9N##N
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
B,2 P9*K#*# 1N,T %#*B#
MPKj
(*M)
5P9*#T1&
K1*#NB#N
/ T#MB#%#N
%#*B#
P9MB:*:NB
(*M)
D1
D2
MEMOTONG POKOK
KETERANGAN
D88 Kadar'kadar harga di dala( jadual
adalah bagi $ang dijalankan (enggunakan loji
berjentera ,a (eli"uti kerja'kerja (e(otong
"okok serta (engorek tunggul hingga ke
"aras akar
D8+ /ika batang, akar, u(bi dan sebagain$a,
"erlu dikeluarkan dari ta"ak bina atas arahan
Pega!ai Pen$elia Kerja, kos
"engangkutann$a hendaklah di"ersetujui
D83 Kadar di dala( jadual ini han$alah
untuk kerja $ang dijalankan dika!asan,
te("at la"ang dan ka!san'ka!asan $ang
sa(a dengann$a di (ana tidak terda"at
gangguan lelu'lintas atau baha$a ke"ada
kabel, !a$ar elektrik dan bangunan Bagi
ka!asan lain di(ana kesukaran atau
gangguan se"erti di atas diala(i harga
"ersetujuan hendakalh di"erolehi
UKUR LILIT
(Diukur 6--(( dari "aras tanah)
D+8 Tidak lebih 4--((
D++ 2ebih 4--(( dan tidak lebih 8+--((
D+3 2ebih 8+--(( dan tidak lebih 8@--((
D+> 2ebih 8@--(( dan tidak lebih +>--((
D+? 2ebih +>--(( dan tidak lebih 3---((
D+4 2ebih 3---(( dan tidak lebih 34--((
D+= 2ebih 34--(( dan tidak lebih >+--((
D+@ 2ebih >+--(( dan tidak lebih >@--((
D+6 2ebih >@--(( dan tidak lebih ?>--((
D+8- 2ebih ?>--(( dan tidak lebih
4---((
%B
%B
%B
N:
N:
N:
N:
N:
N:
N:
N:
N:
N:
+,-----
8,?----
+,-----
8>@?-
863?-
+@3?-
>@+@-
?-43-
4@+--
==+--
@@?6-
8,-->--
8,8++--
P1*#T# P9*T1& K9&921*1%#N
5 &,2# P:T:NB B#%#B,#N Y#NB T,D#K B9*K9N##N
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
SEBUTHARGA 2009 / HASNI / ZON PANEL 2009
LAMPIRAN
REKOD PENGALAMAN KERJA
3S#'a&a% S#./a K#&+a Ya', D%1%a*$a' Da-a. 7 Ta0/' L#*a14
,;< N%M% K>N#9%K/P9>0=K D%N
SK>P K=90%
@
N;<%;
K>N#9%K
(9M
N;<%;
P=N"=,$#*%9A%1
,=9#%NAA$NA0%B%,
#=MP>*
K>N#9%K
11
#%9;K*
M;<;K
#%P%K
#%9;K* S;%P N%M% D%N %<%M%#
P=A%B%; P=NA$%S%/
0$9$#=9% P=9$ND;NA
N%M% D%N %<%M%#
M%0;K%N
K>N#9%K S=,=N%9
@
Salinan Perakuan/Pengesahan Siap Kerja bagi setiap kerja yang disenaraikan hendaklah disertakan
( sebutharga yang tidak disertakan dengan salinan perakuan siap kerja akan DITOLAK
1
*anya perlu diisi sekiranya penyebutharga melaksanakan kerja sebagai ahli Syarikat gabungan
11
#empoh kontrak hendaklah termasuk <anjutan Masa yang diluluskan
SENARAI KERJA KONTRAK SEMASA
3S#'a&a% S#./a K#&+a D% )a-a. Ta',a'8S#)a', B#&+a-a' Da' B#-/. S%a* T#&.a1/$ Ko't&a$ Ya', Ba&/ D%a9a&)4
,;< N%M%
K>N#9%K/P9>0=K
@
N;<%;
K>N#9%K
(9M
N;<%;
P=N"=,$#*%9A% 1
,=9#%NAA$NA0%B%,
#=MP>*
K>N#9%K
11
#%9;K*
M;<;K
#%9;K*
S;%P
K>N#9%K
K=M%0$%N K=90% N%M% D%N %<%M%#
0$9$#=9% P9>0=K
N%M% D%N %<%M%#
M%0;K%N
;K$#
0%D$%<
(9M
S=,=N%9
D;?%P%;
(9M
1
*anya perlu diisi sekiranya penyebutharga melaksanakan kerja sebagai ahli syarikat gabungan
1 1
#empoh kontrak hendaklah termasuk lanjutan masa yang diluluskan
@
Peringatan Penting
,agi setiap kerja semasa yang bukan projek MPKj sertakan (wajib <aporan Penyelia Projek atas format seperti ,orang A%, dalam satu sampul berlakri'
Sebutharga yang tidak disertakan dengan <aporan ini bagi setiap kerja semasa yang disenaraikan akan DITOLAK!
DATA-DATA KE5ANGAN
# *ingkasan harta dan liabiliti se"erti $ang ditunjukkan dala( 2e(baran ,(bangan
(Balan0e &heet)5 $ang diaudit bagi tahun ke!angan terakhir
#sset 5
(#)
2iabiliti 5
(B)
Nilai Ke!angan
(;orth) (# F B)
&e(asa : *M
Teta" : *M
''''''''''''''''''
/u(lah : *M

KKKKKKKKKKKKKK
&e(asa : *M
Teta" : *M
''''''''''''''''''
/u(lah : *M

KKKKKKKKKKKKKK
Modal Pusingan : *M
Modal Teta" : *M
CNett ;orthE : *M

B #kaun ;ang Di tangan (.ash in %and)55
8 Na(a dan #la(at Bank di (ana akaun di buka :
LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL

LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL
+ No(bor #kaun : LLLLLLLLLLLLLLLLLLLL
. Ke(udahan kredit (jika ada)5
8 Na(a dan #la(at Bank/,nstitusi Ke!angan $ang (e(beri Ke(udahan Kredit :
LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL
LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL
+ Bentuk dan baki a(aun $ang boleh digunakan untuk "rojek "e(binaan
i) :<erdra) atau Talian Kredit : *M
ii) :<erdra) ber0agar : *M
iii) Pinja(an Teta" $ang akan/la$ak di"erolehi untuk "rojek : *M
i<) LLLLLLLLLLLLLLLLLLLLLLLLLL : *M
/u(lah : *M
'''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''
Pe'"n(#&#n Pen&"n(
&ila sertakan salinan #kaun &$arikat bagi dua (+) tahun ke!angan terakhir, $ang
disahkan dan diaudit oleh /uru #udit bertauliah (0erti)ied #00ountant) atau sekiran$a
tiada, bagi tahun ke!angan setahun sebelu(n$a bagi (en$okong data'data $ang diberi
&ebutharga $ang tidak disertakan dengan #kaun ini akan ditolak
&ila sertakan salinan Pen$ata Bulanan Bank bagi tiga (3) bulan terakhir sebelu( tarikh
tutu" &ebutharga &ebutharga $ang tidak disertakan dengan "en$ata ini, akan ditolak
&ila da"at dan sertakan 2a"oran sulit daria"da "ihak Bank/,nstitusi Ke!angan atas
)or(at se"erti Borang .#, dala( satu sa("ul berlakri
SULIT
LAPORAN BANK / INSTITUSI KE5ANGAN
MENGENAI KEDUDUKAN KE5ANGAN PENYEBUTHARGA
(Borang ini hendaklah dilengka"kan oleh "ihak bank atau institusi ke!angan lain dan diserahkan
ke"ada "entender dala( satu sa("ul berlakri untuk disertakan bersa(a'sa(a tendern$a
sekiran$a "entender (e("un$ai ke(udahan kredit dengan Bank/,nstitusi Ke!angan $ang
berkenaan)
Ke"ada : YANG DIPERTUA
M#/2,& P9*B#ND#*#N K#/#NB (MPK/),
Menara MPK/,
/alan .e("aka Putih :)) /alan &e(en$ih,
>3--- Kajang,
&elangor Darul 9hsan
Na(a Pen$ebutharga : LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL
Projek: LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL
LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL
(#) Ke(udahan Kredit $ang boleh digunakan untuk "elaksanaan Projek :
Ke(udahan Kredit $ang telah lulus dan ke(udahan kredit ta(bahan (ini(u( $ang
la$ak di"erolehi oleh "en$ebutharga adalah se"erti berikut :
Bentuk Ke(udahan Baki dari"ada $ang Ta(bahan Mini(a
Kredit telah diluluskan $ang akan diluluskan
MMMMMMMMMMMMMM MMMMMMMMMMMMMM MMMMMMMMMMMMMMM MMMMMMMMMMMM
(i) :<erdra) *M *M *M
(ii) :<erdra) ber0agar *M *M *M
(iii) Talian Kredit *M *M *M
(i<) Pinja(an Teta"
$ang akan/la$ak
di"erolehi untuk
"rojek
(<) LLLLLLLLL *M *M *M
MMMMMMMMMMMMMMM MMMMMMMMMMMMMMM MMMMMMMMMMMM
/u(lah *M *M *M
MMMMMMMMMMMMMMM MMMMMMMMMMMMMMM MMMMMMMMMMMM
(5 /ika Projek dia!ardkan ke"ada Pen$ebutharga)
1lasan'ulasan (engenai kedudukan ke!angan dan akaun "en$ebutharga :
Tandatangan untuk dan bagi "ihak bank : LLLLLLLLLLLLLLLLLLLL
Bank : LLLLLLLLLLLLLLL Na(a Pega!ai : LLLLLLLLLL
/a!atan : LLLLLLLLLLLLL
Tarikh : LLLLLLLLLLLLLL
SECTION E
(SPECI;ICATION 5ORK)
PA<EMENT
1. PREPARATION O; ;ORMATION TO RECEI<E ROAD PA<EMENT
88Drainage ;orks To Be .o("leted
8 The "re"aration o) )or(ation shall be 0arried out onl$ a)ter 0o("letion o)
all subgrade drainage, "i"ed drains, ser<i0es and du0ts or an$ other drainage
!ork that (ight a))e0t the !ork unless other!ise agreed b$ the 9ngineer
Pre"aration o) )or(ation shall be 0arried out i((ediatel$ "rior to the la$ing o) the
sub'base or the roadbase !here no sub'base is reNuired
+ The sur)a0e o) the )or(ation shall be substantiall$ uni)or( in densit$
throughout its entire !idth and shall 0on)or( to the densit$ reNuire(ents )or
0o("a0tion ,t shall be tri((ed to 0on)or( to the lines, 0a(bers, grades and
t$"i0al 0ross se0tions sho!n on the Dra!ings or as dire0ted b$ the 9ngineer
;here ruts or other obje0tionable irregularities o00ur as a result o) 0onstru0tion
tra))i0 or other 0auses the .ontra0tor shall resha"e and re'0o("a0t the )or(ation
to the reNuired densit$ be)ore the sub'base or roadbase is "la0ed
3 ;here so)t s"ots and unsuitable (aterials o00ur the$ shall be re(o<ed
and ba0k)illed !ith a""ro<ed (aterial and 0o("a0ted b$ not less than >, "asses
o) a s(ooth'!heeled rolled !eighing not less than 8- tonne or an eNui<alent
<ibrator$ roller The )or(ation shall then be 0he0ked and the )inal tri((ed
sur)a0e shall be rolled b$ one "ass o) a s(ooth !heeled roller o) not less than ?
tonne or an eNui<alent <iorator$ roller "rior to the la$ing o) the subbase or
roadbase The )or(ation shall be so 0onstru0ted to drain sur)a0e !ater to the
side dit0hes or other drainage s$ste( ,) the 0ontra0tor allo!s the (oisture
0ontent o) the 0o("leted )or(ation to rea0h a <alue abo<e the "er(itted
(aGi(u( )or the 0o("a0ted (aterial the .ontra0tor shall allo! the (aterial to
re<ert to an a00e"table (oisture 0ontent and i) dire0ted b$ the 9ngineer (ake
good at his o!n eG"ense the sur)a0e b$ re'0o("a0tion be)ore la$ing the sub'
base or roadbase
> The )or(ation o) *o0k Fill shall be tri((ed to 0on)or( to the lines, grades
and t$"i0al 0ross'se0tions sho!n on the Dra!ing or as dire0ted b$ the 9ngineer
and shall lie !ithin an$ s"e0i)ied toleren0es The sur)a0e shall be blinded !ith
a""ri<ed )ine grade (aterial to s0al the sur)a0e The 0ri((ed )or(ation shall be
rolled b$ one "ass or a s(ooth'!heelad roller o) not less than ? tonne !eight or
an eNui<alent <ibrator$ roller
8+ Toleran0es in &ur)a0e 2e<el
? # 0ough 0o("ensated (aGi(u( de<iation o) +?((, "lus or (inus !ill be
"er(is0ed on the sur)a0e o) the )inal 0o("letion )or(ation
+ P#J9M9NT T%,.KN9&&
8 The thi0kness o) the <arious la$ers o) the "a<e(ent shall be as sho!n in
the Dra!ings
+ The 9ngineer (a$ order <ariation in the thi0kness o) the <arious la$ers o)
the "a<e(ent as sho!n in the t$"i0al 0ross'se0tion dra!ings as a result o) the
.ali)ornia Bearing *atio (.B*) soaked tests #n$ su0h 0hanges shall be
treated as a <ariation to the .ontra0t
3 &1B'B#&9
38 Materials
8 The sub'base (aterial shall be hard, durable and 0lean ,t shall be
granular (aterial su0h as gra<el or 0rushed ro0k or sand and shall be )ree )ro(
organi0 (aterial, 0la$ balls and an$ other deleterious substan0es
+ The 0rushed ro0k or gra<el shall 0on)or( to one o) the grading sho!n in
Table ?8
T#B29 ?8
Brading li(its )or 0rushed ro0k or gra<el as sub'base (aterial
B& &ie<e &iHe
Per0entege b$ !eight "assing
(#) (B)
8
8O
3/>O
3/@O
3/84O
No =
No 34
No +--
8--
=?'8--
4-'6-
>?'=?
3-'4-
+-'?-
8-'3-
-'+
'
8--
=-'8--
?@'=?
3?'4?
+?'?-
8?'3-
-'+
The sand shall 0on)or( to the grading sho!n in Table ?+
T#B29 ?+
Brading li(its )or sand as sub'base (aterial
B& &ie<e &iHe Per0entage b$ !eight "assing
3/@O
3/84O
8>
?+
No 8--
8--
6-'8--
>?'@-
8-'3-
+'8-
> #lternati<e suitable (aterial (a$ be a00e"ted subje0t to the "rior a""ro<al
o) the 9ngineer The "ro"osed sub'base (aterial shall ha<e a .B* <alue o) not
less than 8? !hen 0o("a0ted to 6?P o) (aGi(u( dr$ densit$ as deter(ined b$
the B& %ea<$ .o("a0tion Test The (aterial shall be )ree )ro( <egetable
(atter, so)t "arti0le or 0la$ lu("s
? The sub'base shall be laid in one la$er to the 0o("a0ted thi0kness as
sho!n on the Dra!ings on the "re"ared )or(ation ,t shall be thoroughl$
0o("a0ted, at the o"ti(u( (oisture 0ontent, a00ording to Table ?>
4 *olling o"eration shall begin )ro( the outer edge to!ards the 0entre
graduall$ in a longitudinal dire0tion eG0e"t on su"er ele<ated 0ur<es !here rolling
shall 0o((en0e at the lo! side and "rogress to!ards the high side
= The )inished sub'base le<el shall not (ore than +-((, "lus or (inus )ro(
the grade or le<el sho!n on the Dra!ings
> *:#DB#&9
>8 M#T9*,#2&
8 The roadbase to be "la0e on to" o) the sub'base shall be 0rusher run laid
in t!o la$ers ea0h o) 8--(( to 8?-(( thi0kness a)ter 0o("a0tion so as to
gi<en the s"e0i)ied total 0o("a0ted thi0kness to the !idth, 0orre0t )ine had
le<els sho!n on the dra!ing or as dire0ted b$ the 9ngineer The (aterial shall be
0rushed ro0k o) hard durable "arti0ules o) )rag(ents o) ro0k 0rushed to the
0orre0t siHe and !ell graded and lie !ithin the grading li(its gi<en in Table ?3
+ The "arti0le siHes shall be deter(ined in a00ordan0e !ith the reNuire(ent
o) B& 83== The (aterial "assing the No 34 B & &ie<e !hen tested in
a00ordan0e !ith B&83== shall be non'"lasti0
T#B29 ?3
Brading li(its )or 0rusher run roadbase (aterial
B& &ie<e &iHe Per0entage b$ !eight "assing
(#) (B)
3O
8 8/+O
3/@O
3/84O
No+?
No+--
8--
@?'8--
>-'=-
+?'>?
@'++
-'8-
'
?-'@?
+-'>-
8-'+?
+'@
-'?
>+ 2a$ing #nd .o("a0tion
3 #ll !ork on the "ortion o) the sub'grade or sub'base on !hi0h the
roadbase is to be laid shall be "ro"erl$ sha"ed and 0o("a0t be)ore the "la0ing
o) the road'base (aterial The "re"aration o) the sub'grade or sub'base shall be
0o("leted at least 8@- (etre ahead o) the "la0ing o) the roadbase (aterial The
roadbase shall be 0onstru0ted to the )ull 0o("a0ted thi0kness as sho!n on the
Dra!ing or as dire0ted b$ the 9ngineer
> Material o) Brading # Table ?3, shall be "la0ed and s"read e<enl$ to the
!idth o) the roadbase The (aGi(u( 0o("a0ted thi0kness o) an$ one la$er shall
not eG0eed 8?-(( !hen the s"e0i)ied 0o("a0ted thi0kness o) road'base
eG0eeds 8?-((, it shall be 0onstru0ted in t!o o) (ore la$ers o) a""roGi(atel$
eNual thi0kness 9a0h la$er shall be 0o("a0ted to Table > be)ore the neGt la$er
is "la0ed .are shall be taken to "re<ent segregation o) the (aterial into the
0oarse and )ine )ra0tions &egregated sur)a0es areas o) a roadbase (aterial
0onta(inated to su0h an eGtent that it no longer 0o("lies !ith the reNuired
s"e0i)i0ation shall be re(o<ed and re"la0ed !ith !ell graded and satis)a0tor$
(aterial at the eG"ense o) the .ontra0tor
? Brading B (aterial shall be (iGed !ith su))i0ient non'"lasti0 )ines to attain
Brading # it shall be laid in la$ers and su))i0ient non'"lasti0 )ine s"read o<er and
the 0o(bination shall be 0o("a0ted using <ibrating "late 0o("a0tor or <ibrator$
roller The :"eration o) s"reading and <ibrating in the )ines shall be re"eated as
ne0essar$ until no (ore !ill "enetrate into the Brading B (aterial !hen it shall
be broo(ed to re(o<e eG0ess )ines The la$er shall then be 0o("a0ted to Table
> and the !hole o"eration re"eated as ne0essar$ to "ro<ide the )ull s"e0i)ied
thi0kness o) roadbase
4 The a(ount o) )ines to be added to (aterial Brading B, the thi0kness o) la$ers
and the nu(ber o) "resses to <ibrate the )ines to o"tain a (iGture o) Brading #
shall be deter(ined b$ trial se0tion The trial shall be 0arried out at the
.ontra0torEs o!n 0ost
= The (aterial shall be s"read b$ a (otor grader or other a""ro<ed (e0hani0al
"lant ;hen roadbase (aterial is s"read adja0ent to 0on0rete kerbs or gutter
se0tion, eGtre(e 0are shall be eGer0ised so as not to da(age the kerbs or
gutters #n$ da(ages kerbs or gutters shall be re(o<ed and re"la0ed at the
.ontra0torEs o!n eG"ense
@ .o("a0tion shall be 0o("leted as soon as "ossible a)ter ea0h la$ers has
been s"read and sha"ed satis)a0toril$ 9a0h la$er shall be throuhl$ 0o("a0ted
!ith suitable 0o("a0tion eNui"(ent to the reNuire(ent s"e0i)ied in Table >
.o("a0tion *eNuire(ent )or Branular Materials *olling o"erations shall begin
along the edges and "rogress to!ards the 0entre graduall$ in a longitudinal
dire0tion :n su"er'ele<ated 0ur<es the rolling shall begin at the lo! side and
"rogress to!ards the high side The rolling o"eration )or ea0h la$er shall
0ontinue until all rolling (arks, ridges or 0ra0kers are eli(inated #n$
irregularities, segregation or loose (aterial !hi0h (a$ de<elo" in the sur)a0es
during or a)ter 0onstru0tion shall be 0orre0ted or re(o<ed and the de)e0ti<e
areas (ade good to the )ull thi0kness o) la$er and re'0o("a0ted
6 Be)ore the la$ing o) ea0h la$er o) 0rusher run a "arrial !idth o) the shoulder
not less than 3--((, !ide shall be 0onstru0ted to the to" o) ea0h un0o("a0ted
la$er o) the roadbase to a0t as a haun0h to su""ort the edges
8- *oadbase (aterial shall be (aintained at the 0orre0t (oisture 0ontent
ne0essar$ )or "ro"er 0o("a0tion b$ s"rinkling !ith !ater or dr$ing as reguired
#ll these shall be 0arried out at the .ontra0torEs o!n eG"ense
88 The sur)a0e o) the roadbase shall be !ell drained at all ti(es
>3 Finished &ur)a0e
8+ The )inished roadbase sur)a0e shall be e<en, )ree )ro( loose (aterial o) )ines
and true to 0ross'se0tions, lines and le<el Prior to the la$ing o) the Ta0k .oat or
the Penetration Ma0ada(, the roadbase shall be rolled !ith at least > "assess o)
a 8- tonne s(ooth'!heeled roller #n$ irregularities at the )inished roadbase
sur)a0es o) (ore than 8+((, !hen (easured !ith a straight edge 3 (etre long
laid either "arallel to the 0entre line o) the road or laid trans<ersel$ shall be
0orre0ted b$ loosening, adding or re(o<ing (aterial or re0o("a0ting
? B,T1M,N:1& T#.K .:#T
?8 Beneral
8 # bitu(inous ta0k 0oat shall be a""lied to the to" o) the 0o("leted 0rusher
run roadbase be)ore the la$ing o) the bitu(inous (a0ada(e sur)a0e
?+ Materials
+ The bitu(inous (aterial )or the ta0k 0oat shall be either a ra"id 0uring
0utba0k gi<en in B& 346- : 86=- o) a ra"id breaking shall 0on)or( to the
reNuire(ent )or the a""ro"riate grade in use o) e(ulsion shall be in a00ordan0e
!ith B& +?>+ : 864-
3 The 0ontra0tor shall a""l$ the ta0k 0oat on the 0o("leted "ortion o) the
roadbase as soon as "ra0ti0able %o!e<er, he shall not a""l$ the ta0k 0oat i) the
(oisture 0ontent in the to" ?-(( o) the 0rusher run roadbase eG0eeds the
higher o) either :'
(a) the a<erage o) the o"ti(u( (oisture 0ontent as deter(ined b$ the
&tandard .o("a0tion Test and the #bsor"tion o) the "lus 3/84O
sle<e )ra0tion
or (b) t!o'thirds o) the o"ti(u( (oisture 0ontent as deter(ined b$ the
&tandard .o("a0tion Test
> The sur)a0e o) the roadbase shall be 0leaned i((ediatel$ "rior to the
a""li0ation o) the ta0k 0oat The bitu(inous (aterial shall be a""lied b$ (eans
o) a distributor at the rates dire0ted b$ the 9ngineer, but not to be less than 8?
litre "er sNuare (etre and the te("erature !ithin the range sho!n in the Table
?? )or the "arti0ular (aterial being used
T#B29 9?
#""li0ation Te("erature For Binders
4 D9N&9 B,T1M9N M#.#D#M B#&9.:1*&9
48 Beneral
8 The sur)a0ing shall be single 0ourse and shall 0o("rise a bitu(inous
(a0ada( binder 0ourse o) 0o("a0ted thi0kness as sho!n on the Dra!ing and
laid in a00ordan0e !ith B&84+8
4+ .oarse #ggregate
+ The 0oarse aggregate shall be natural aggregate substantiall$ )ree )ro(
(aterial "assing and 8/@O B& &ie<e ,t shall be hard, 0lean, durable 0rushed
granite or si(ilar ro0k grou" as (a$ be a""ro<ed b$ the 9ngineer
43 Fine #ggregate
3 The )ine aggregate shall 0onsist o) 0rushed ro0k or 0lean sand
substantiall$ all o) !hi0h shall "ass an 8/@O in B& &ie<e ,) sand is used the
0ontent o) silt, loa( and 0la$ shall not eG0eed 3P b$ !eight o) the )ine aggregate
deter(ined in a00ordan0e !ith B& @8+, Method # or B
4> Binder
> The binder shall be straight run bitu(en !hi0h shall ha<e a "enetration o)
+?Q. bet!een @-'8--
4? .o("osition
? The 0o("osition o) )reshl$ (iGed (aterial )or the bitu(en (a0ada( shall
0o("l$ on anal$sis !hi0h the reNuire(ents gi<en in BB 84+8 Table 3 RO
no(inal siHe )or the base0ourse and SO no(inal siHe )or the !earing 0ourse
44 MiGing
4 The aggregate shall be sur)a0e dr$ and the aggregate and binder
se"aratel$ heated to be )ollo!ing te("eratures be)ore entering the (iGer:
(a) #ggregate 8?-QF ' 3--QF
(b) Binder +--QF ' 3+?QF
,t is "arti0ularl$ i("ortant to a<oid eG0essi<e heating o) the binder and
eG0essi<el$ high te("erature o) the aggregate at the ti(e o) (iGing, as these !ill
ad<ersel$ e))e0t the Nualit$ o) the resultant (a0ada( Material in0luding (iGer
and thoroughl$ in su0h a (anner that all "arti0les o) the aggregate are
0o("letel$ and uni)or(l$ 0oated
4= Trans"ort
= The bitu(en (a0ada( shall be trans"orted )ro( the (anu)a0turing "lant
to the site o) the !ork in 0lean <ehi0les and shall be "rote0ted against ad<erse
!eather 0onditions b$ (eans o) tar"aulin The use o) 0oated dust oil !ater on the
interior o) <ehi0les to )a0ilitate dis0harge o) bitu(en (a0ada( is "er(issible but
the a(ount shall be ke"t to a (ini(u( and an$ eG0ess shall be re(o<ed b$
ti""ing or brushing ,t is "arti0ularl$ i("ortant that bitu(en (a0ada( !hi0h is to
be laid !ar( shall be "rote0ted to (ini(iHe lose o) heat during transit so that all
(aterial is deli<ered in a 0ondition suitable )or s"reading and 0o("a0ting
4@ 2a$ing and .o("a0ting
@ The Bitu(en Ma0ada( shall as soon as "ossible a)ter arri<al at the site,
be su""lied 0ontinuousl$ to the "a<er and laid !ithout dela$ The rate o) deli<er$
o) (aterial to the "a<er shall be so regulated as to enable the "a<er to be
o"erated 0ontinuousl$ and it shall be so o"erated !hene<er "ra0ti0able
6 ;hene<er "ra0ti0able road "a<e(ent (aterials ha<ing bitu(en as the
binder shall be s"read le<eled and ta("ed b$ a""ro<ed sel)'"ro"elled "a<ers,
0a"able o) la$ing to the reNuired !idths "ro)ile, 0a(ber or 0ross)all The rate o)
the tra<el o) the "a<er and its (ethod o) o"eration shall be adjusted to ensure an
e<en and uni)or( )lo! o) (aterial a0ross the )ull la$ing !idth, )reedo( )ro(
dragging or tearing o) the (aterial and (ini(u( segregation
8- The sur)a0e on !hi0h the (aterial is to be laid shall 0leaned to the
satis)a0tion o) the 9ngineer
88 %and la$ing o) an$ bitu(inous (aterial !ill be "er(itted onl$ in the
)ollo!ing 0ir0u(stan0es:
i) For la$ing regulating 0ourses o) irregular sha"e and <ar$ing thi0kness in
s(all areas
ii) ,n 0on)ined s"a0es !here it is i("ra0ti0able )or "a<er to o"erate
iii) For )oot"aths
i<) #t the a""roa0hes to eG"ansion joints at bridges
8+ ,((ediatel$ a)ter an$ 0ourse is "la0ed and be)ore rolling is started the
sur)a0e shall be 0he0ked and all de)e0ts and irregularities in align(ent, grade or
teGture 0orre0ted b$ the addition or re(o<el ao) (iGture %o!e<er, hand raking o)
!earing 0ourse (aterial hi0h has been laid b$ a "o<er and the addition o) su0h
(aterial b$ hand Cs"readingE to the "a<ed area )or adjust(ent o) le<el shall be
"er(itted onl$ in the )ollo!ing 0ir0u(stan0es
i) #t the edge o) the la$ers o) (aterial and at gulle$s and (anholes
ii) #t the a""roa0hes to the eG"ansion joints at bridge
iii) ;here other!ise dire0ted b$ the 9ngineer
83 Material shall be 0o("a0ted as soon as rolling 0an be a))e0ted !ithout
0ausing undue dis"la0e(ent o) the (iGed (aterial and !hile this has at least the
(ini(u( rolling te("erature s"e0i)ied The (aterial shall be uni)or(l$
0o("a0ted b$ an @/8+ ton s(ooth steel !heeled roller ha<ing a !idth o) roll not
less than >?-((, or b$ a (ulti'!heeled "neu(ati0 t$red roller o) eNui<alent
!eight eG0e"t that !earing 0ourse and base 0ourse (aterial shall be sur)a0es
)inished !ith a s(ooth !hell roller The roller shall be )itted !ith a Nui0k and
s(ooth'a0ting re<erse and the nu(ber o) roller reNuired !ill de"end on the rate
o) la$ing and the thi0kness o) the as"halt
8> The (aterial shall be rolled in longitudinal dire0tion, )ro( the side to the
0entre o) the 0arriage!a$, o<erla""ing on su00essi<e "asses b$ at least hal) the
!idth o) the near roll or in the 0ase o) a "neu(ati0 t$red rolled, at the no(inal
!idth o) one t$re The "oints at !idth the roller is re<ersed shall be staggered ,n
the e<en o) a te("orar$ dela$ in la$ing o"erations the rolling shall be 0o("leted
and !here a three !heel roller is e("lo$ed it shall !here ne0essar$ be turend
round to ensure that all the !ork is 0o("a0ted !ith the rear rollers
8? *oller shall not stand on ne!l$ laid (aterial !hile there is a risk that it !ill
be de)or(ed thereb$
84 ;hen a "a<er la$ing base0ourse or !earing 0ourse (aterial a""roa0hes
an eG"ansion joint at a bridge , it shall be taken out o) use as soon as there is a
danger o) the (aterial being laid )oulding the joint ,n la$ing the re(ainder o) the
"a<e(ent u" to the joint and the 0orres"onding area be$ond it b$ hand, the joint
or joint 0a<it$ shall not be )oulded !ith sur)a0e (aterial
8= ;here joints bet!een la$ing !idths or trans<erse joints ha<e been to be
(ade in !earing 0ourses, the (aterial shall be )ull$ 0o("a0ted and the joint
(ade )lush in one or tran<erse joints ha<e been to be (ade in !earing 0ourses,
the (aterial shall be )ull$ 0o("a0ted and the joint (ade )lush in one or other o)
the )ollo!ing !a$s, (ethod (iii) #l!a$s being used )or tran<erse joints
i) B$ heating the joints !ith an a""ro<ed joint heater at the ti(e !hen
the additional !idth is being laid but !ithout 0utting ba0k or 0oating
!ith binger The heater shall raise the te("erature o)) the )ull de"th
o) !earing 0ourse to a )igure !ithin the rolling te("erature range
s"e0i)ied )or the (aterial and )or a !idth nor less =?(( on ea0h
side o) the joint ,n this 0ase, ho!e<er, the 0ontra0tor shall ha<e
a<ailable )or use in the e<ent o) breakdo!n, eNui"(ent ne0essar$
)or o"erating (ethod (iii)
ii) B$ using t!o or (ore "a<ers o"erating in e0helon !here this is
"ra0ti0able and insu))i0ient "roGi(it$ )or adja0ent !idths to be )ull$
0o("a0ted b$ 0ontinuous rolling A or b$ using a (ulti"le'lane'!idth
"a<er
iii) B$ 0utting ba0k the eG"osed joints to a <erti0al )a0e o) not less than
the s"e0i)ied thi0kness dis0arding all loosened (aterial and 0oating
the <erti0al )a0e 0o("letel$ !ith a grade o) not bitu(en suitable )or
the "ur"ose the neGt !idth is laid
8@ #ll the joints shall be o))set at least 3--(( )ro( "arallel joints in the la$er
beneath
86 The engineer (a$ dire0t the a""li0ation o) the ta0k 0oat, to the
reNuire(ents o) .lause ? ("ara >) in this se0tion to the sur)a0e on !hi0h la$ing is
to take "la0e
+- Base 0ourse (aterial shall not re(ain un0o<ered b$ the !earing 0ourse
)or (ore than three (3) 0onse0uti<e da$s a)ter being laid The 9ngineer (a$
eGtend this "eriod b$ the (ini(u( a(ount o) ti(e ne0essar$ i) 0o("lian0e
there!idth is i("ra0ti0able be0ause o) !eather 0onditions or )or an$ other
reasons su0h as a!aiting the results o) the tests (aid
+8 #t the onset o) rain instru0tions shall be gi<en b$ the .ontra0tor to
sus"end (iGing )urther su""lies Material alread$ (iGed (a$ be laid onl$ !ith the
a""ro<al o) the 9ngineer
= 2a$ing :) #s"halti0 .on0rete
=8 ,ntrodu0tion
#s"halti0 .on0rete shall be designed to Marshall Method as detailed in
a00ordan0e !ith )ollo!ing &0hedule :'
&0hedule , : #s"halti0 .on0rete )or !earing .ourse (#.;. 8>)
&0hedule ,, : #s"halti0 .on0rete )or Binder .ourse (#.B. +@)
=+ Material
(a) .oarse #ggregate
.oarse #ggregate shall be hard, un!eathered, durable, 0lean 0rushed
ro0k angular in sha"e and )ree dust ;hen tested in a00ordan0e !ith the
(ethods des0ribed in B& @8+, its shall ha<e the )ollo!ing "ro"erties:'
#ggregate .rushing <alue ' not (ore than 3-P
Flakiness ,ndeG ' not (ore than 3-P
;ater #bsor"tion ' not than +P
The .ontra0tor shall in)or( the 9ngineer (&:) o) the grou" to !hi0h the
ri0k belongs as 0lassi)ied in #""endiG B to B& @-+
(b) Fine #ggregate
Fine aggregate shall be a""ro<ed 0lean natural bank, ri<er, dune or "it
sand or Nuarr$ sand "rodu0ed in a se0ondar$ "lant The$ shall be )ree
)ro( 0la$, loa(, loosel$ bonded aggregations and other )oreign (atters
:ther sour0es o) )ine aggregate shall be subje0t to the a""ro<al o) the
9ngineer
(0) Filler
Filler shall be Portland 0e(ent 0o("l$ing !ith B& 8+
(d) Binder
The binder shall be @-/8-- "en &traight run bitu(en !ith the )ollo!ing
"ro"erties to B& 346-:'
Min MaG
i) Penetration at +?Q @- 8--
ii) 2oss on heating )or ? hrs at 843Q.:
2oss b$ !eigth ' -?P
Dro" in "enetration ' +-P
iii) &olubilit$ in 0arbon disul"hide 66P '
i<) Flash "oint (.le<eland o"en 0u") ++?P '
<) Du0tilit$ at +?PQ. 8-- .M
<i) &o)tening "oint >?Q. ?+Q.
=3 2aborator$ Design o) MiGture
The .ontra0tor shall )irst design the (iG in a00ordan0e !ith the Marshall
Method gi<en in the #""endiG to this &"e0i)i0ation The )igures gi<en in the
&0hedule shall be used as a guide MiGes shall be (ade not onl$ at but also
abo<e and belo! the binder 0ontents sho!n The (iGes shall be (ade and
0o("a0ted at the te("eratures indi0ated in the a""ro"riate &0hedule
The 0o("a0ted sa("les shall then be !eighed in air and !ater so that the
densit$ and <oids (a$ be 0al0ulated #)ter i((ersion in a !ater bath,
ther(ostati0all$ 0ontrolled at 4-Q. )or >?'4- (inutes, the sa("les shall be
"la0ed in the (ashing )or (easure(ent o) the Marshall stabilit$ and )lo! <alue
.ur<es shall be "lotted o) Marshall &tabilit$, .o("a0ted Densit$, Joids in (ineral
#ggregate, and )lo! <alue all against binder 0ontent
These 0ur<es shall be sub(itted to the 9ngineer !ith the .ontra0torEs
re0o((endation )or the binder 0ontent o) the "ro"osed (iGture, !hi0h (ust
(eet the reNuire(ents o) the Marshall sti))ness (&tabilit$/Flo!) ,t (a$ be
ne0essar$ to adjust the grading until the reNuire(ents are (et
The )ollo!ing "rin0i"les (a$ be a""lied )or adjusting (iGes:
i) Joids in (iG lo! and, &tabilit$ satis)a0tor$
' redu0e bitu(en 0ontent or )iller 0ontentA Modi)$ aggregate grading
to gi<e (ore <oids
ii) <oids in (iG lo! and &tabilit$ lo! F in0rease )iller 0ontentA redu0e
bitu(en 0ontentA in0rease stone 0ontent and angularit$ o) stone
iii) Joids in (iG satis)a0tor$ and &tabilit$ lo!
' ,n0rease )iller 0ontentA redu0e bitu(enA 0ontentA in0rease stone
0ontent or angularit$ o) stone
i<) Joids in (iG high and &tabilit$ satis)a0tor$
' in0rease bitu(en 0ontent or )iller 0ontentA (odi)$ grading to gi<e
less <oids
<) Joids in (iG high and &tabilit$ lo!
' in0rease )iller 0ontentA in0rease bitu(en 0ontentA (odi)$ grading
to gi<e less <oids
;hen all the <alue )all !ithin the li(its stated in the a""ro"riate &0hedule
and the results are a""ro<ed b$ the 9ngineer, the (iGture at (ean o"ti(u(
bitu(en 0ontent and a""ro<ed "ara(eters shall be designated the T2aborator$
Design MiGtureO and shall be used )or agreeing the a""ro<ed T/ob &tandard
MiGtureO
=> Trial #reas
# trial area ha<ing a length o) at least 8-- )eets shall be laid b$ the
.ontra0tor, )or the 9ngineerEs a""ro<al, at the beginning o) the !ork
The out)a0e o) the trial shall be as belo! :'
(i) ;earing .ourse:
The sur)a0e )inish shall be as rough as "ossible, !ithin the reNuire(ents
o) the Design o) MiGtures b$ Marshall Method, )ree )ro( dragging 0ra0ks or other
sur)a0e ble(ished Ba0k 0asting !ill not be "er(itted but !here dragging o00urs
under the s0reed o) the "a<ers, )ine bitu(inous (aterial (a$ be 0ast o<er the
sur)a0e to )ill the dragging 0ra0ks, "ro<iding that this is done be)ore the initial
rolling and "ro<iding that rolling is 0arried out at the s"e0i)ied te("eratures
&hould dragging o00ur )reNuentl$ the 0ause shall be in<estigated !ithout dela$
and re0ti)ied
(ii) Binder .ourse:
The sur)a0e )inish o) binder 0ourses shall be as des0ribed in .lause >(8)
)or !earing 0ourse eG0e"t that roughness shall be a<oided and the sur)a0e shall
be as C0loseE as "ossible
#t least t!o sa("les o) 0o("a0ted (aterials )ro( the trial area shall be
taken in a00ordan0e !ith B& ?6@ and shall be anal$Hed and the aggregate
grading and binder 0ontent deter(ined The )indings shall be sub(itted to the
9ngineer and shall ha<e been a""ro<ed b$ hi( be)ore )urther (iGing or la$ing is
0arried out
=? /ob &tandard MiGture
,) the C2aborator$ Design MiGtureE a)ter "assing through the (iGing "lant
and being laid b$ and 0o("a0ted !ith a""ro<ed "lant )ails to "rodu0e a
satis)a0tor$ trail area, the grading and (iGture "ro"ortions (a$ be (odi)ied b$
agree(ent !ith the 9ngineer, as ne0essar$ and !ithin the reNuire(ents o) the
&0hedules, to "rodu0e a (iGture o) satis)a0tor$ !orkabilit$ and a00e"table
sur)a0e )inish #)ter a""ro<al o) the trial area b$ the 9ngineer this (iGture shall be
designated the C/ob &tandard MiGtureE and shall therea)ter be the a""ro<ed
(iGture
Be)ore general (iGing or la$ing "ro0eeds, the .ontra0tor shall re"ort in
!riting to the 9ngineer, the 0o(bined aggregate grading, the (iGture "ro"ortions
and the <alue )or stabilit$, )lo!, unit !eight and <oids ((ean <alues )ro( )our
s"e0i(ens) o) the C /ob &tandard MiGture C, !hi0h shall not be 0hanged theres)ter
!ithout the 9ngineerEs a""ro<al The C/ob &tandard MiGtureE shall be used )or the
densit$ 0ontrol s"e0i(ens re)erred to herea)ter
=4 Plant MiGture
The series o) (iGtures )ro( the (iGing "lant during nor(al "rodu0tion
shall be designated the CPlant MiGturesE and the li(its go<erning "er(issible
<ariations bet!een the CPlant MiGtureE and the C/ob &tandard MiGtureE are gi<en in
the a""ro"riate &0hedules Through the 0ontra0t, an$ <ariations outside these
li(its shall be in<estigated and 0orre0ted, ,) )or an$ reasons the Nualit$, grading
or su""l$ o) aggregates is 0hanged or i) at an$ ti(e the 0ause o) <ariations
"ortside the "er(issible li(its 0annot be 0orre0ted )or reasons be$ond the
0ontrol o) the .ontra0tor, the 9ngineer (a$ reNuest a ne! C2aborator$ Design
MiGtureE or C/ob &tandard MiGtureE, de"ending on the eGtent o) 0hange or
<ariations
== &a("ling and Testing
&a("les o) the (iGed (aterial shall be taken in the )irst t!o hours and
e<er$ t!o hours therea)ter to deter(ine grading and binder 0ontent ,) these tests
sho! results !hi0h are not in a00ordan0e !ith the a""ro<ed C/ob &tandard
MiGtureE !ithin the "er(issible <ariations suitable adjust(ents shall i((ediatel$
be (ade to ensure 0o("lian0e there!ith &a("les o) the (iGed (aterial shall be
taken t!i0e a da$ )or (aking Marshall s"e0i(ens to deter(ine stabilit$, )lo! and
unit !eight #ll sa("ling and testing reNuired shall be under taken b$ the
.ontra0tor The 9ngineer !ill also 0arr$ out, su0h testing as be ne0essar$ to
ensure 0o("lian0e !ith the &"e0i)i0ation
=@ /ob &tandard MiGture Densit$
The densit$ o) the 0o("a0ted (iGed (aterial shall be related to the C/ob
&tandard MiGture Densit$E, The C/ob &tandard MiGture Densit$E shall be
deter(ined b$ (aking, sa("les o) the a""ro<ed C/ob &tandard MiGtureE &iG (4)
&tandard Marshall s"e0i(ens and b$ deter(ining the a""arent s"e0i)i0 gra<it$ o)
ea0h and 0o("aring the( !ith the (ean <alue o) the siG #n$ indi<idual result
!hi0h di))ers )ro( the (ean b$ (ore than --8? shall be reje0ted and, "ro<ided
that not (ore than t!o results are so reje0ted, the (ean o) the re(aining results
(ulti"lied b$ 4+> shall be designated the C/ob &tandard MiGture Densit$E
=6 Trial #reas to 9stablish *olling Method
#)ter the a""ro<al o) the C/ob &tandard MiGtureE a )urther trial area shall be
laid using this (iGture to establish the rolling (ethod reNuired to "rodu0e the
s"e0i)ied )ield densit$ Three (3) "airs o) sa("les shall be taken )ro( the
0o("a0ted area and the (ean densit$ o) ea0h "air shall be :'
(a) not less than 66 "er 0ent o) the C/ob &tandard MiGture Densit$E )or
the ;earing .ourseA
(b) not less than 6= "er 0ent o) the C/ob &tandard MiGture Densit$E )or
the binder 0ourse
,) the reNuired )ield densit$ is not obtained the rolling "ro0edure shall be
adjusted and )urther trial areas shall be laid and tested until satis)a0tor$ results
are obtained These shall be sub(itted to the 9ngineer and the rolling (ethod
agreed be)ore (iGing or la$ing is 0ontinued
=8- Field Densit$ .ontrol
T!in sa("les shall be taken )ro( e<er$ 8,--- sNuare $ards o) the
0o("a0ted 0ourse o) e<er$ t!o hours !hi0he<er is (ore )reNuent, and their
densities deter(ined b$ the 9ngineer The sa("les shall be 4 in0h dia(eter 0ore
0ut b$ the .ontra0tor using and a""ro<ed (a0hine under the dire0tion o) the
9ngineer The (ean <alue obtained )ro( the t!in sa("les )ro( the sa(e area
shall be taken as the )ield densit$ o) the 0o("a0ted 0ourse The )ield densit$ is to
be su0h that out o) t!ent$ 0onse0uti<e (ean <alues not (ore that three <alues
shall be :'
(a) belo! 6@ "er 0ent o) the C/ob &tandard MiGture Densit$E )or the
!earing .ourseA
(b) belo! 64 "er 0ent o) the C/ob &tandard MiGture Densit$E )or the binder
.ourse
Material !hi0h does not (eet this reNuire(ent shall be 0ut and re"la0ed
The sa("les (a$ also be used to deter(ine the .ourse thi0kness
=88 %eating and MiGing
#ggregate in0luding )illers, shall be thoroughl$ dr$ i((ediatel$ be)ore
(iGing The aggregate and binder shall be heated se"aratel$ to the s"e0i)ied
te("eratures a)ter !hi0h the$ shall be thoroughl$ and inti(atel$ (iGed together
in the 0orre0ted "ro"ortions )or at least 88/+ (inutes and until e<er$ "arti0le o)
aggregate is 0o("letel$ 0oated Filler (a$ be added be)ore or a)ter the binder
but (iGing shall 0ontinue )or at least one (inute a)ter the addition o) the )iller The
total (iGing ti(e (a$ be redu0ed "ro<iding the 9ngineer is satis)ied that
throughout (iGing is being obtained
;here the eGtra0ted du0t is )ed ba0k, the )eeding shall be 0ontrolled to
ensure a uni)or( "er0entage o) )ine (aterials !ithin the li(it gi<en b$ the
&"e0i)i0ation and at least 4-P o) the (aterial "assing the No +-- B& &te<e
shall be )iller :<erheating o) aggregates and binder shall be a<oided
=8+ Ta0k .oak
# ta0k 0oat o) 0ationi0 bitu(inous e(ulation (>-P bitu(en 0ontent) shall be
a""lied at the rate o) -?? liter "er sNuare (eter to the eGisting bitu(inous
sur)a0e be)ore la$ing the binder 0ourse and to the sur)a0e o) the binder 0ourse
be)ore la$ing the !earing 0ourse
;here it is ne0essar$ to "re"are a sur)a0e )or the a""li0ation o) ta0k 0oat
and to undertake the s"ra$ing, this shall be done in a00ordan0e !ith the
re0o((endations o) the 1nited Kingdo( Ministr$ o) Trans"ort *oad Notes
relating to sur)a0e dressing in so )ar as the$ a""l$ to the !ork to be undertaken
The !ork shall also be undertaken in a00ordan0e !ith the under (entioned
general reNuire(ents and an$ s"e0i)i0 reNuire(ents o) the 9ngineer
.ationi0 e(ulsion shall 0o("l$ !ith B& >3> in res"e0t o) general
"ro"erties The grade and use o) the e(ulsion shall be in a00ordan0e !hi0h B&
+?>+
The 9ngineer (a$ reNuire the .ontra0tor to "ro<ide a 0erti)i0ate stating
that a "arti0ular e(ulsion distributor has been tested !ithin the "re<ious siG
(onths and that the test indi0ates 0on)or(it$ o) the distributor !ith the
reNuire(ents o) B& 3834 )or e(ulsion distributors
Be)ore s"ra$ing is 0o((ented, the shall be )ree o) all loose (aterials The
sur)a0e as a !hole shall be dr$ and an$ da(" areas shall be 0o("letel$ )ree o)
standing !ater
=83 Trans"orting, 2a$ing and .o("a0tion
(a) Trans"ortation :
Bitu(inous (aterials shall be trans"orted in 0lean <ehi0les and
shall be 0o<ered o<er !hen in transit or a!aiting ti""ing The use o) dust, 0oated
dust, oil or !ater on the interior o) the <ehi0les to )a0ilitate dis0harge o) the (iGed
(aterials is "er(issible b$ the a(ount shall be ke"t to a (ini(u( and an$
eG0ess shall be re(o<ed b$ ti""ing or brushing
9<er$ "re0aution is to be taken to a<oid segregation o) (iGed (aterials
and to ensure that the$ do not be0o(e 0onta(inated !ith )oreign (atter ,n order
to (aintain satis)a0tor$ te("eratures o) (aterials in transit "arti0ularl$ in 0ool
!eather and to "re<ent undue loss o) heart adeNuate "re0autions are to be taken
to ensure that the (aterials are "ro"erl$ "rote0ted ,) eG0essi<e 0orner 0ooling is
likel$ to o00ur the 0orners o) all <ehi0les 0on<e$ing (iGed (aterials are to be
blanked o)) b$ (eans o) a board at least + in0h thi0k and 8? in0h !ide eGtending
the )ull de"th o) the 0ontainer and "la0ed a0ross the 0orner at >?Q
&hould an$ loads arri<e at the la$ing site belo! the te("erature s"e0i)ied
in the a""ro"riate s0hedule or !etted b$ rain, the$ !ill be reje0ted b$ the
9ngineer
(b) 2a$ing :
The (iGed (aterials shall, as soon as "ossible a)ter arri<al at the
la$ing site , be su""lied 0ontinuousl$ to the "a<ers and laid !ithout dela$ The
rate o) deli<er$ o) (aterial to the "a<ers shall be so regulated as to enable the
"a<ers to be o"erated !hen "ra0ti0able
;here<er "ra0ti0able, road "a<e(ent (aterials ha<ing bitu(en as
the binder shall be s"read, le<eled and te("ed b$ a""ro<ed sel)'"ro"elled
"a<ers 0a"able o) la$ing to the reNuired !idth, "ro)ile, 0a(ber or 0ross)all The
rate o) tra<el o) the "a<ers and its (ethods o) o"eration shall be adjusted to
ensure on e<en and uni)or( )lo! o) (aterial a0ross the )ull la$ing !idth, )reedo(
dragging or tearing to the (aterial and (ini(u( segregation
The sur)a0e on !hi0h the (aterial is to be laid shall be 0leaned to
the satis)a0tion o) the 9ngineer
%and 2a$ing o) an$ bitu(inous (aterial !ill be "er(itted onl$ in the
)ollo!ing 0ir0u(stan0es :'
i) )or la$ing regulating 0ourse o) irregular, sha"e and <ar$ing thi0kness in
s(all areasA
ii) in 0on)ined s"a0es !here it is i("ra0ti0able )or a "a<er to o"erateA
iii) at the a""roa0hes to eG"ansion joints at bridges
,((ediatel$ a)ter an$ 0ourse is "la0ed and be)ore rolling is starred, the
sur)a0e shall be 0he0ked and all de)e0ts and irregularities in align(ent, grade or
teGture 0orre0ted b$ the addition or re(o<al o) (iGture %o!e<er, hand raking o)
bitu(inous (aterial !hi0h has been laid b$ a "a<er and the addition o) su0h
(aterial b$ hand's"reading to the "a<ed area )or adjust(ent o) le<el !ill be
"er(itted onl$ in the )ollo!ing 0ir0u(stan0es:'
i) at the edges o) the la$ers o) (aterial and at gullies and (anholes,
ii) at the a""roa0hes to eG"ansion joints at bridgesA
iii) !here other!ise dire0ted b$ the 9ngineer
;hen a "a<er la$ing (aterial a""roa0hes and eG"ansion joint at a bridge,
it shall be taken out o) use as soon as there is danger o) the (aterial being laid
)ouling the joints ,n la$ing the re(ainder o) the "a<e(ent u" to the joint and the
0orres"onding area be$ond it b$ hand, the joint or joint 0a<it$ shall not be )oulded
!ith sur)a0e (aterial
;here joints bet!een la$ing !idths or trans<erse joints ha<e been (ade
in !earing 0ourse, the (aterial shall be )ull$ 0o("a0ted and the joint (ade )lush
in one or other o) the )ollo!ing !a$s, (ethod (888) al!a$s being used )or
trans<erse joints:'
i) b$ heating the joint !ith an a""ro<ed joint heater at the ti(e
;hen the additional !idth is being 8 aid but !ithout 0utting ba0k or 0oating !ith
binder The heater shall raise the te("erature o) the )ull de"th o) the !earing
0ourse to a )igure !ithin the rolling te("erature range s"e0i)ied )or the (aterial
and )or a !idth not less than 3 in0hes on ea0h side o) the joint ,n this 0ase,
ho!e<er, the 0ontra0tor shall ha<e a<ailable eNui"(ent ne0essar$ )or o"eration
(ethod (iii) in the e<en o) breakdo!nA
ii) b$ using t!o or (ore "a<ers o"erating in e0helon !here this is "ra0ti0able
and in su))i0ient "ra0ti0able and in su))i0ient "roGi(it$ )or adja0ent !idths
to be )ull$ 0o("a0ted b$ 0ontinuous rolling, or b$ using a (ulti"l$'lane'
!idth "a<erA
iii) b$ 0utting ba0k the eG"osed joints to a <erti0al )a0e o) not less than the
s"e0i)ied thi0kness dis0arding all loosened (aterial and 0oating the
<erti0al )a0e 0o("letel$ !ith a grade o) not bitu(en suitable )or the
"ur"ose be)ore the neGt !idth is laid
#ll joints shall be o))set at least 8+ in0hes )ro( "arallel joints in the la$er
beneath
The 9ngineer (a$ dire0t the a""li0ation o) a ta0k 0oat to the sur)a0e on
!hi0h la$ing is to take "la0e The rate shall be 8-'8? sNuare $ards "er gallon
The binder 0ourse (aterial shall not re(ained un0o<ered b$ the !earing
0ourse (i) reNuired) )or (ore than 3 0onse0uti<e da$s a)ter being laid The
9ngineer (a$ eGtend this "eriod b$ the (ini(u( a(ount o) t(e ne0essar$ i)
0o("lian0e here!ith is i("ra0ti0able be0ause o) !eather 0onditions or )or an$
other reasons su0h as a!aiting the results o) tests (ade
#t the onset o) rain, instru0tion shall be gi<en b$ the 0ontra0tor to sus"end
(iGing )urther su""lies Material alread$ (iGed (a$ be laid onl$ !ith the a""ro<al
o) the 9ngineer
(0) .o("a0tion :
The (aterial shall be 0o("a0ted as soon as rolling 0an be e))e0ted
!ithout 0ausing undue dis"la0e(ent o) the (iGed (aterial and !hile, this has at
least the (ini(u( rolling te("erature s"e0i)ied in the a""ro"riate s0hedules
The )ollers shall be )itted !ith a Nui0k and s(ooth'a0ting re<erse and the
nu(ber o) rollers reNuired !ill de"end on the rate o) la$ing and the thi0kness o)
the sur)a0ing (aterial
The (aterial shall be rolled in a longitudinal dire0tion )ro( the sides to the
0enter o) the 0arriage!a$, o<erla""ing on su00essi<e "asses b$ at least hal) the
!idth o) the tear roil or in the 0ase o) a "neu(ati0 t$"ed roller, at least the
re<ersed shall be staggered ,n the e<ent o) a te("orar$ dela$ in la$ing o"eration
The rolling shall be 0o("leted and !here a three !heel roller is e("lo$ed it
shall, !here ne0essar$, be turned around to ensure that all the !ork is
0o("a0ted !ith the tear !heel o) the roller
*ollers shall not stand on ne!l$ laid (aterial !hile there is a risk that it !ill
be de)or(ed thereb$
.o("a0tion shall be 0arried out in a00ordan0e !ith this .lause !ith the
)ollo!ing reNuire(ents :'
i) 1nless other!ise dire0ted b$ the 9ngineer at least t!o sel)'"ro"elled
s(ooth'!heeled rollers )ollo!ing 0losel$ one behind the other shall be
used in 0onjun0tion !ith ea0h "a<er and ea0h roller shall !eight not less
than @ tons (ore than 8+ tons
ii) #t least'one o) these rollers shall be three !heeled !ith a !eight "er in0h
!idth o) rear !heel bet!een 3-- lb and >-- lb This roller shall be used
i((ediatel$ behind the "a<er !ith its dri<ing !heels adja0ent to the "a<er,
unless other!ise dire0ted
iii) The se0ond roller na$ be either tande( or three !heeled !ith a !eight "er
in0h !idth o) roll bet!een +- lb, and >-- lb
i<) # sel) "ro"elled "neu(ati0 t$"ed s(ooth trend roller !ith t$re "ressure o)
@?'6- lb "er sN in shall be used bet!een the t!o s(ooth' !heeled rollers
=8> #s"arti0 .on0rete MiG Design *eNuire(ents
(a) Beneral
%ot (iGed bitu(inous (iGtures shall be used )or binder 0ourse and
!earing 0ourse The 0o("ositions o) these (iGture shall be
designed based on the standard Marshall Test Pro0edure .are
(ust be taken in the sele0tion o) (aterial, gration and bitu(en
0ontent so as to obtain a (iG !ith the desirable stabilit$, durabilit$
and su))i0ient skid resistan0e (in 0ase o) !earing 0ourse) as !ell as
good !orkabilit$
Bitu(inous (iGture 0onsist o) a !ell graded (iGture o) 0ourse
aggregates, )ine aggregates and )iller, bound together !ith bitu(en
Their stabilit$ dri<es both )ro( the interlo0king o) the !ell'graded
aggregate and )ro( the 0ohesion "ro<ided b$ the bitu(en binder
The$ are suitable )or sur)a0ing hea<il$ tra))i0ked roads in hot
0li(ate and )or use !here an i("er(eable sur)a0ing us reNuired
83+ &tone Foundations
.rusher'run stone as s"e0i)ied in the s"e0i)i0ation shall be "ro<ided to a
de"th o) 3--(( and in an$ 0ase to !ithin ?-(( o) the 0arriage!a$ single and to
!ithin +?(( o) the )oot"ath sur)a0e ;here "ossible, 0onsolidation b$ rolling
shall be 0arried out !ith a diesel @ ton roller utiliHing a s"e0ial h$drauli0 rolling
!heel atta0h(eril 9lse!here 0onsolidation shall be e))e0ted b$ (eans o) a
"o!er dri<en ra((er
The 3--(( 0rusher run stone base )an tren0hes !ithin 0arriage!a$ shall
be 0onsolidated in 3 la$ers o) la$ers o) 8--(( ea0h
833 Ta0k .oat
# ta0k 0oat o) 0ationi0 bitu(inous e(ulsion (>-P) (ust be a""lied to the
rolled 0rusher run stone base at the rate o) @ sN $ards "er gallon be)ore the
"re(iGed as"halt (a0ada( is <alid
83> &ur)a0ing
;hen 0onsideration o) the stone )oundation is 0o("leted "re(iGed
as"halt obtained )ro( a""ro<ed (anu)a0turer shall be a""lied e<enl$ o<er the
treated stone sur)a0e and rolled until 0o("lete 0onsolidation has been obtained
and the resultant sur)a0e le)t slightl$ "roud o) the eGisting adja0ent sur)a0e )or
0arriage!a$ 0onsolidation, a 4'@ ton roller shall be used and )or )oot"ath
0onsolidation, a roller not eG0eeding + tons on su0h other !eight as the 9ngineer,
(a$ 0onsider ad<isable shall be used
Note : Pre(iG as"halt !hi0h has be0o(e sti)) and un!orkable through
standing shall not be used )or (aking u" the )inal sur)a0e and it is
the .ontra0torEs res"onsibilit$ to ensure that onl$ su))i0ient "re(iG
in deli<ered as reNuired )or one da$Es !ork at a ti(e
83? .o("letion o) ;ork
:n .o("letion o) tren0h reinstate(ent !ork at an$ site The .ontra0tor
shall 0lear a!a$ all debris, sur"lus (aterials and "lant and lea<e the site in a
0lean and tid$ 0ondition to the a""ro<al o) the Pengarah
'''''''''oo--oo'''''''''
SENARAI ZON 12
KA$ASAN ZON 12
3: TA(AN 1HERAS A;ANA
3: T(N )OOP 1UEPA1S BT& <3/2
-: TA(AN 1HERAS PER(ATA
.: TA(AN /ERNGRO=E
>: TA(AN ALA( 0A5A
?: TA(AN E(AS
<: TA(AN (U4UN
@: TA(AN SUNTEA
9: TA(AN SRI (U0UR
30: TA(AN (ASRIA
33: TA(AN SEGAR PER4ANA
32: TA(AN 1HERAS PER(AI
3-: )A(PUNG SUNGAI RA5A
3.: )A(PUNG BARU BATU 9