K0DE
K - 210
(MENGGUNAKAN BURUH)
PROPINSI
KODE
KABUPATEN
KODE
DISIAPKAN OLEH
Tanggal :
SUMATERA UTARA
12
Serdang Bedagai
10
Januari 2010
PROSES :
1
ANGGAPAN - ASUMSI :
DAMIJA 12 M
PEKERJA
VOLUME
HARI
KODE
TOTAL VOL
UPAH(Rp./
BIAYA
SUB JUMLAH
(ORG.HARI)
ORG/HARI
( Rp )
( Rp )
K
E
R
Mandor
1,00
1,00
L.061
1,00
60.500,00
60.500,00
48,00
1,00
L.101
48,00
41.300,00
1.982.400,00
PEKERJA
MATERIAL
SATUAN
KODE
2.042.900,00
TOTAL
HARGA
BIAYA
SUB JUMLAH
VOL
SATUAN (Rp)
(Rp.)
(Rp )
T
E
R
Alat bantu
SET
M.170
1,92
100.000,00
192.000,00
I
A
L
MATERIAL
PERALATAN
JUMLAH
HARI
KERJA
K0DE
192.000,00
JAM
BIAYA
BIAYA
SUB JUMLAH
KERJA
(Rp./JAM)
(Rp.)
(Rp.)
R
A
L
A
T
A
N
PERALATAN
TOTAL (Rp.) :
VOLUME
1200,00
SATUAN M2
0,00
2.234.900,00
HARGA SATUAN
: Rp.
1.862,42
Per M2
DIBULATKAN
: Rp.
1.862,00
Per M2