98 unit toliet
12 m2 / toilet / 45 org Pr = 70, lk = 28
Toilet 0,56m2/uniroil/jml toilet lk 70 unit urinoil 100,8
0,72 m2/wastafel/40org 70 unit wastafel
Service
Pr = 42, lk = 28
Cleaning Service 10,25 m2 / unit 1 unit 10,25
R. Chiller 8 m2 / unit 1 unit = 4 chiller 50
R. Genset 53,6 m2/unit/ruang 1 unit 53,6
Fire Pump 50 m2 / ruang 1 unit 50
R. AHU A 17 m2 / ruang 13 unit 221
R. AHU B 14,5 m2 / ruang 13 unit 188,5
Gudang 55,2 m2 1 unit 55,2
R. Sampah Basah 6 m2 / unit 1 unit 6
R. Sampah Kering 6 m2 / unit 1 unit 6
Sub Total 19.680,25
Sirkulasi 30% 5.904
Sub Total + Sirkulasi 25.584,25
Lobby/hall 1,6 m2/org 125 org 200
Penerima
R. Informasi 1,5 m2/org 1 unit = 2 org 3
Total 203
Sirkulasi 40% 81,2
Sub Total + Sirkulasi 284,5
Total Keseluruhan 27,410