SISTEM INFORMASI
Tako IT
Works in Partnership with Client and IT Solution
PENDAHULUAN
1
DESKRIPSI PERANGKAT LUNAK
2
2.4 Susunan Jabatan Tako IT
Developer Team :
1. Chairul Arfan
2. Gilang Ramadhan
3. Yesi Widiawanti
Quality Assuranse :
Bayu Aldo Prasetyo
2.5 Rincian Biaya
Rincian Harga
Perangkat Lunak Rp. 4.000.000
Biaya Tenaga Kerja (Developer dan Rp. 12.000.000
Quality Assurance)
Hosting Rp. 500.000
Transportasi Rp. 500.000
Biaya Pelatihan Rp. 1.000.000
Total Rp. 18.000.000
3
PENUTUP
Hormat Kami,
cap
Tako IT