1.

0 TUJUAN SISTEM
Pembangkit listrik memiliki 150kV Swichgear untuk memasok daya untuk memulai dari
generator.
Tenaga start up ini berasal dari gardu induk PLN yang ada.
melalui kabel daya XLPE 150kV.
Daya start up turun ke level 13.8 kY dengan start up transformator dan
Dipasok ke gardu induk stasiun tenaga listrik.

2.O SYSTEM DESCRIPTION AND FUNCTIONS


2.1 Scope
The 150kV system consists of the 150kV SF6 Gas Insulated Switchgear,
150kV XLPE Power Cable. 150kV Disconnecting Switch. 150kV Lightning Arrester and
150kV Line Protection Panels as the followings;
(1) 150kV SF6 Gas Insulated Switchgear ( 7/8EY-SWGR )
(2) 150kV XLPE Power Cable ( 7/8EY-UGPC )
(3) 150kV Disconnection Switch ( CEY-LS )
(4) 150kV Lightning Arrester ( CEY-ZLA )
(5) 150kV Line Protection Panels ( CEY-CAB-RPl/2 )
2. Pengaturan Systea 2
2.2. 1 l50kV System Arrangeaent
Sistem 150kV terdiri dari dua nos. Pengisi kabel 150kV ditarik antara PLN 150kV
Gardu luar dan pembangkit listrik.
Pada ujung pembangkit listrik, masing-masing pengumpan kabel 150kV terhubung ke unit
7 dan unit 8 112MVA memulai transformator melalui 150kV Gas insulated
Swi tchgear, Di gardu PLN akhir, keduanya pengumpan, terhubung ke switchgear 150kV yang ada.
(Diamater ~ 5)
Selain itu di gardu PLN satu saklar pemutus tipe outdoor adalah
disediakan di masing-masing pengumpan kabel 150kV untuk memudahkan isolasi 150kV
Pengumpan secara terpisah untuk keperluan pemeliharaan atau sebaliknya.
Ada juga satu set penangkap petir yang terletak di pintu masuk ke 150kV
Teluk di gardu PLN.
Panel perlindungan 150kV disediakan pada akhir gardu PLN yang keluar dan
Pada akhir stasiun listrik dan relay proteksi untuk pengumpan kabel 'dilacasi
Di panel relay pelindung tanaman.
Bila terjadi kesalahan pada pengumpan kabel 150kV. Relay pelindung
akan merasakan kesalahan dan mengirimkan sinyal perjalanan ke sirkuit gas SF6 150kV akhir
pemecah.
Saat menerima sinyal perjalanan dari relay pelindung, gas SF6 150kV
Pemutus arus tersandung untuk membersihkan kesalahan ini. Pelepas gas circul tuas 150kV SF6 juga
dapat dioperasikan dengan perintah ON atau OFF 2 sinyal dari panel kontrol Listrik yang terletak di
ruang kontrol kekuatan baterai

2. 3 SISTEM EQUIPUNT DETAIL


2. 3. 1 150kV SF6 Gas Insulated Switchgear
Switchgear 150kV terisolasi oleh SF6 Gas dengan tekanan kerja 0,5
MPa dan tipe single phase yang tertutup.
Semua bagian hidup dilapisi di kandang logam dengan SF6 Gas.
Di sisi transformator start up. koneksi antara 150kV SF6 Gas
Switchgear terisolasi dan transformator start up dilakukan oleh SF6 Gas
Duct Bus Darah. langsung.
Untuk koneksi pengumpan kabel 150kV. Enam (6) kotak penyekat kabel adalah
Disediakan pada Switcher Gas Disalurkan 150kV SF6.
Peringkat dari 150kV SF6 Gas Insulated Switchgear adalah sebagai berikut;
(1) Tegangan terukur 170 kV rms
(2) Tegangan Maksimum Maksimum 185 kV rms
(3) Frekuensi 50 Hz
(4) Rangkaian Arus Hitung Lancar 50 kA
(5) Nilai BIL 750 kV
(6) Low Frequency Withstand 365 kV
(7) Rated Continuous Current 2.000 A
(8) Tegangan Maksimum yang Diizinkan 185 kV
(Terus menerus tidak lebih dari 30 menit)
The 150kY SF6 Gas Insulated Switchgear terdiri dari 150kV SF6 Gas Circuit
Pemecah. Melepaskan Switch. Grounding Switches. Transformers saat ini
Voltage Transformers. Penahan pencahayaan Compressed Air 'Supply System untuk
pengoperasian 150kY SF6 Gas Circuit Breaker dan Local Control Cubicle.

2. 3.2 Kabel Daya XLPE 150kV


Kabel power XLPE 150kY digunakan untuk koneksi antara yang ada
Gardu induk 150kV milik PLN dan tajuk 150GHz SF6 Gas Insulated Swi
Yang dipasang di Power Station.
Kabel Daya 150 kY adalah tipe terisolasi polietilena bertaut silang dan
Konduktor kompak bulat terdampar tembaga.
Kabel Daya XLPE 150kV mengirimkan kekuatan berikut ke transformator start-up.

(1) Jumlah Beban


(2) Tegangan Nominal
C150kV adalah fase ke fase tegangan.
(3) Continuous Full Load Current
168MVA
150kV 3 fase, 50 Hz
Sistemnya adalah wye grounded grounded)
650 A (pada tegangan minimum)
Di ujung kabel. Satu sisi memiliki kabel pengait kabel 150 kV Ai r untuk terhubung ke
Substation ISOkV milik PLN dan satu sisi lainnya memiliki Kabel Gas ISOkV SF6
Sealing End untuk terhubung ke Switcher Gas Insulated 150kV SF6.

2.3.3 Panel Pelindung Jalur 150kV


Pengumpan kabel 150kV dilindungi oleh pelindung diferensial 2nos saat ini
Relay di kedua ujungnya
GE membuat tipe DLS-3 bertindak sebagai proteksi utama dan Mi tshbishi membuat tipe MCD
CUFrent differential relay bertindak sebagai proteksi back up.
Relay pelindung keduanya adalah perjalanan transfer yang baik. (DTT) an.d menggunakan OSGI
Untuk komunikasi antara kedua ujungnya.
sebagai tambahan. Ada juga delay waktu instantone over relay saat ini
Bertindak sebagai perlindungan cadangan untuk kesalahan eksternal.
selain proteksi garis ini yang menempuh jalur pemutus arus
Di kedua ujungnya. Perlindungan transformator start up pada pembangkit listrik berakhir
Rencanakan pemutus arus gas SF6 masing-masing di GIS.
Rel No-vol t terhubung ke VT di GIS juga bertindak untuk membuka pengumpan sirkuit
Di GIS masing-masing.

2. 3.4 Switch Outdoor Disconnecting 150kV


The 150kV Outdoor Disconnecting Swi tch dipasang di PLN 150kV yang ada
Cabang.
Karena dua sirkuit 150kV untuk Unit No.7 dan Unit No.8 terhubung dengan
pengumpan 150kV PLN yang sama. Switch Pelepas 150kV ini digunakan untuk
memisahkan Unit No.7 dan / atau Unit No.8.
Switch Beralih 150kV adalah tipe operasi manual.
Peringkat Switch Beralih 150kV adalah sebagai berikut:
-Horizontal double break type
-Group dioperasikan
-Continuos current rating: 2000A

2. 3.5 Penahan Petir Outdoor 150kV


Penahan Petir Outdoor 150kV adalah Zinc Oxide Type dan dipasang di
Gardu induk 150kV yang ada di PLN.
150kV Outdoor Lightning Arrester digunakan untuk proteksi petir
Dari 150kV circui t termasuk 150kV XLPE Power Cable, 150kV SF6 Gas Insulated
Swi tchgear dan Start -up Transformer.
Peringkat Penangkal Petir 150kV adalah sebagai berikut:
-Rated Voltage: 144kV
-Zinc oxide type 5

3.0 SYSTEM OPERASI


3,1 150kV Syste. (EY)
Sistem 150kV dalam proyek ini memberikan kekuatan pada bahan pembantu pabrik melalui
150/13. 8kV 112MVA Start up Transformer saat unit start up / shut down dan juga standby
power selama padam Unit Auxiliary Transformer. Daya 150kV untuk unit 7 dan 8 berasal dari
gardu luar PLN 150kV yang memanfaatkan teluk yang ada di Indonesia
Diameter-5. Ada surge arrestor dan dua puting swi yang terlepas juga
dipasang di switchyard PLN untuk tujuan itu.
Start up Transformers untuk U # 7 dan U # 8 terhubung ke sistem PLN 150kV melalui GIS
individu 150kV pada ujung pembangkit listrik, kabel 150kV perorangan, individu
mencabut switch di switchyard PLN tapi teluk yang ada di switch switch PLN 150kV.
Perlindungan transformator 150kV start up terletak di Plant Protective Relay
Panel unit individu dan isolat aparatus dalam kasus faul t, dengan tersandung
Masing pemutus sirkuit 150kV dan 13.8kV.
Kesalahan pada kabel 150kV dirasakan oleh satu set primer dan back up
relay pelindung di kedua ujungnya. Termasuk dalam Plant Relay Relay Panel U # 7
Pada ujung pembangkit listrik dan pada panel terpisah di gardu induk PLN akhir.
CB transformator start up 150kV CB dapat ditutup dari ruang kontrol (ECR) dan
Transformator diberi energi setelah eusning bahwa voltase tersedia pada 150kV GIS
Terminal dan pemutus masuk 13.8kV masing-masing terbuka.
Relay pelindung transformer start up individu, saat merasakan kesalahan, bertindak
Untuk membuka 150kV masing-masing dan 13.8kV pemutus dan mengisolasi equIpment
tersebut.
Dimana as. garis relay pelindung, saat merasakan kesalahan pada kabel 150kV (s), bertindak
Buka pemutus arus di ujung pembangkit listrik serta di ujung kabel PLN
sehingga mengisolasi zona kesalahan sistem 150kV. Garis pelindung pada
Kedua ujungnya saling terhubung melalui saluran serat optik dan memiliki transfer langsung
perjalanan (DTT) facili ty. Terlepas dari pengoperasian relay Line Protective, operasi
Breaker gagal melindungi relay juga memastikan tersandungnya pemutus arus jarak jauh
Melalui saluran OTT
Untuk memastikan bahwa transformator startup tidak diberi energi langsung dari jarak jauh
akhir. Skema GIS termasuk tersandungnya start up Transformer 150kV CB di
GIS masing-masing tidak merasakan tegangan pada terminal GIS.

4.0 INSTRANENTASI DAN PENGENDALIAN


4. 1 GIS 150kV
The 150kV Gas Insulated Switchgear diisi dengan gas SF6 di pressreset 20O O. 5MPa).
GIS consi dari no. Zona dengan ruang gas terpisah dan masing-masing zona terpisah
Dipantau untuk sesak gas dengan menggunakan detektor kerapatan gas dengan alat pengukur tekanan.
Penurunan
Pada tekanan gas SF6 oleh O. 05MPa diucapkan dan setetes o. Tekanan IMPa di zona pemutus arus
ditransfer ke trip / tutup kunci pemutus arus. (Lihat Dwg No.
NIOI-24-1826.15-050IC311-3BW02631) halaman 7 untuk informasi lebih lanjut.)
G [S dilengkapi dengan Local Control Cubicle (LCC) yang mencakup peralatan untuk
kontrol. Saling terkait dengan peralatan G [S yang berbeda seperti CB. OS. Tekanan gas dan ESL
Skema pemalsuan moni. LCC dilengkapi dengan Mimic dan panel alarm. Semua
Melepaskan saklar. Saklar pembumian dikontrol dari LCe dimana sebagai penutup
pemutus arus untuk keperluan perawatan (dengan tombol Lepas. terbuka
Dan Earthing swi tches tertutup) sendiri disediakan di LCC. LCC juga bertindak
Seperti kotak Marshall ing untuk kabel antara berbagai panel remote seperti ECP, panel Proteksi dan
peralatan GIS.

4.2 Relay dan Pengukuran Pelindung


Relai pelindung untuk Sistem 150 kY terbagi menjadi dua kelompok (masing-masing
Komponen Sistem) - Primer dan Cadangan. Relay ini dipasang pada panel relay proteksi primer dan
cadangan (Transformers) yang sesuai terletak pada panel Generator Protective Relays di Ruang
Elektronik Pabrik.
Meter yang diberikan pada transformer individu memberikan informasi tentang "masing-masing
Transformator seperti oi l / winding temperature. Oi 1 level, oi 1 flow. Parameter seperti
vol tage, current, power flow dll dalam sistem 150kV ditampilkan pada Electrical Control
Panel terletak di Control Room. Informasi juga tersedia melalui DCS.

4.2.2 150kY power cables to PLN Substation


The I50kV Cable feeders to Start up Transformers of Unit#7 &Unit#8 are drawn
from one and the same bay in the 150kV Outdoor switchyard of PLN. Hence. the
two individual Cable feeders are provided with Common protective relays as
detailed below:
Device No.
(a) Primary
85-lST78
86-lST78
Function
l50kV Cable feeders Unit#7 &Unit#8"current
differential protection -Primary.
150kV cable feeders Uni t#7 &Uni t#8 tri pi lockout
re la y- Pri rna ry.

5. 0 SYSTEM COMPONENT DESIGN PARAMETERS


5. I 150kV SF6 Gas Insulated Switchgear
Manufacturer: Hitachi, Ltd.
Equipment Number 7/8 EY-SWGR
Specification: NIOI-15-1826. 15-0001
The 150kV SF6 Gas Insulated Switchgear consists of SF6 Gas Circuit Breaker,
Disconnecting Switch, Grounding Switch, Voltage Transformer, Current
Transformer and Lightning Arrester.
The ratings of 150kV SF6 Gas Insulated Switchgear are as follows.
1- 150kV SF6 Gas Insulated Switchgear
(I) Nominal Voltage 170 kV rms
(2) Rated Max. Voltage 185 kV rms
(3) Rated BIL 750 kV crest
(4) Low Frequency Withstand 365 kV rms
(5) Maximum Allowable Voltage 185 kV
(Continuous, not exceeding 30 minutes)
(6) Rated Continuous Current 2,000 A
(7) Rated Short Circuit Current 50 kA
2. 150kV Circuit Breaker
(1) Nominal Voltage 200 kV nms
(2) Rated Maximum Voltage 245 kV nms
(3) Rated Continuous Current 2,500 A
(4) Rated Short Circuit Current 50 kA
(5) Rated Interrupting Time 2.5 cycles
(6) Full Wave Impulse Withstand 1,050 kV
(7) One minute Withstand 460 kV
(8) Maximum Allowable Voltage 245 kV
(Continuously, not exceeding 30 minutes)
(9) Applicable Standard IEC-56
3. 150kV Disconnecting Switch
(1) Nominal Voltage 170 kV rms
10
(b) Backup
85-2ST78
86-2ST78
150kV cable feeders Unit#7 &Unit;8 Current
differential protection-Backup.
150kV ~ble feeder Unit#7 &Unit#8 trip/lockout
relay-Backup.
The trip/lockout relays 86-1ST78/86-2ST78 trip the I50kV CBs in GIS of Unit#7
and Unit#8 and the 13.8kV backup source incomers in Uint#7 and Unit#8.
The relays 85-1ST78/85-2ST78 also send trip signal to 150kV Unit#7 &Unit#8
CBs independently of the respective trip/lockout relays and also to PLN end
CBs through fibre optic channels.
4. 2. 3.2 Start up Transforwer C8 fai 1 protection
Device No.
50BFST7/8
86BFST7/8
Function
SUT CB fail protection
SUT CB fail-trip/lockout relay.
86BFST7/8 trips the Unit#8/Unit#7 SUT CB, PLN end 150kY CBs, I3.8kY backup
source incomers in Uint#7 and Uni t#8 in order to isolate the zone of faul t/faul ty
CB. The other aspects are similar to those explained above for generator CB
fail protection.
9
(2) Rated Max. Voltage
(3) Full Wave Impulse Withstand
(4) One-minute Withstand
(5) Maximum Allowable Voltage
(Continuously, not exceeding 30 minutes)
(6) Rated Continuous Current
(7) Rated Short Circuit Current
4. 150kV Fast Acting Grounding Switch
(1) Nominal Voltage
(2) Rated Max. Voltage
(3) Full Wave Impulse Withstand
(4) One-minute Withstand
(5) Maximum Allowable Voltage
(Continuously, not exceeding 30 minutes)
(6) Rated Close and Latch Current
185 kV rms
750 kV crest
365 kV rms
185 kV
2,000 A
50 kA
170 kV rms
185 kV rms
750 kV crest
365 kV rms
185 kV
80 kV
5. 150kV Maintenance Grounding Switch
(1) Nominal Voltage
(2) Rated Maximum Voltage
(3) Full Wave Impulse Withstand
(4) Maximum Allowable Voltage
(Continuously, not exceeding 30 minutes)
170 kV rms
185 kV rms
750 kV crest
185 kV
6. Current Transformer
(1) Continuos thermal current rating factor 2.0
(2) Max. winding temperature rise 30~
(3) Three second short time mechanical 50 kA
Current rating
(4) Rated Monetary current, kA(rms) 80 kA
(5) (urrent Ratios and Accuracy
(A) (-800 accuracy for 1200/5A Re lay CT. (ON 1200/5A TAP)
(8) X/5P20 accuracy for 2000-1000/1A 90/45VA Relay CT.
(C) 0.38-1.8 accuracy for 300/5A METERING CT
7. Voltage Transformer
(1) ~ominal Voltage 150 kV rms
11
(2) ~ated Maximum Voltage
(3) Voltage Transformer High Voltage rating
(4) Low voltage secondary and tertiary Ratio
(5) Thermal rating
(S)Basic Insulation Level
(7) One minute Low Frequency Withstand.
(8) Maximum allowable voltage
(Continuously, not do exceed 30 minutes)
165 kV ruts
86.6 kV for 150 kV Gnd. Y
66.4, 66.4 Volts
1 kVA
750 kV peak
365 kV rms
185 kV rms
8. SF6 Gas Lightning Arrestors
(1) Rating Duty cycle
(2) Max. Continuous Operating Voltage (MCOV)
(3) Max. Switching Surge Protective Level
(4) Voltage Withstand (BIL)
144 kV ruts
115 kVrms
289 kV crest
750 kV crest
5.2 150kV XLPE Power Cable
Manufacture: Hitachi Cable, Ltd.
Equipment Number 7/8 EY-UGPC
Specification: NI01-15-1826 04-0001
630 SQ mm
nom. 29.8 mm
(5) Diameter of Completed Cable Approx. 113 mm
The 150kV XLPE Power Cable will be used for the connection between PLN
existing 150kV conventional substation and 150kV SF6 Gas Insulated
Switchgear for Power Station.
The ratings of the 150kV SF6 Gas Insulated Switchgear is as the following.
(1) Rated Voltage (Phase to Phase) 161 kV
(2) Highest Voltage (Phase to Phase) 170 kV
(3) Basic Impulse Insulation Level 750 kV
(4) Conductor
Nominal Cross Sectional Area Diameter
Diameter
12
5.3 lSOkV Outdoor Disconnecting Switch
Manufacturer: TAKAOKA ELECTRIC ~FG.COLTD
Equipment Number: CEY-LS
Specification: NIOl-24-1826.03-0001
The 150kV Outdoor Disconnecting S~itch is installed in the existing
PLN's Subs ta t ion.
Since two 150kV circuits for Unit No. 7 and Unit No.8 are connected
to the same existing PLN's 150kV feeder, this 150kV disconnecting switch
is used to separate the Unit No. 7 and/or Unit No.8.
The ratings of the 150kV Disconnecting Switch is as follows.
(1) Rated Votage 170 kV
(2) Rated Current 2000 A
(3) Basic Impulse Insulation level 750 kV
5.4 150kV Outdoor Lightning Arrester
Manufacturer : HITACHI Ltd
Equipment Number : CEY-ZLA
Specification: NIOl-24-1826.03-0001
The 150kV Lightning Arrester is installed in the existing PLN's 150kV
Substation.
The 150kV Outdoor Lightning Arrester is used for a lightning protecton
of the 150kV cable circuit.
The ratings of the 150kV lightning Arrester is as the following.
(1) RATED VOLTAGE 144 kV
(2) RATED NOMINAL DISCHARGE CURRENT 10 kA
(3) FREQUENCY 50 Hz
(4) IMPULSE WITHSTAND VOLTAGE 750 kV
(5) MAXIMUM SYSTEM VOLTAGE 170 kV
(6) CLASS STATION CLASS
13
5. 5 150kV Line Protection Panel
Manufacturer : PT. INDOKOMAS
Equipment ~umber : CEY-CAB-RPI/2
Specification: NIOI-15-1826.12-0001
The 150kV line protection panels are installed in the existing relay room of PLN
500/150kV substation and in the plant electronics room to the power system.
The primary and back u.p protection relay reside on the threet S) protection relay
panel. (CEY-CAB-RPII. RPI2&RP2) at 500/150kV substation end and the two(2)
Protection
panelsC7EX-CAB-PR-I/RP-2CSECTION5 &6))at plant side. The main relays are some
as 500kY Line Protection.
14

6.0 BATASAN SISTEM DAN PENCEGAHAN


Isolasi dan de-energi peralatan untuk semua operasi pemeliharaan.
Namun. Perhatikan pentingnya sistem EY untuk menanam keamanan dan keandalan sebelum
mengeluarkan komponen sistem EY dari operasi.
Pastikan peralatan terpasang dengan benar dan bebas dari debu yang longgar,
Kotoran dan kotoran
Jangan bekerja pada interrupters pemutus sirkuit atau mekanisme penutupan kecuali
Pengisian pegas dilepaskan atau disumbat, pemutus terbuka atau gerendel pengunci kait pengunci
dipasang dan semua daya kontrol dilepaskan.
Personil menghapus pemutus dari switchgear 150kV seharusnya
Membiasakan diri dengan proses pemindahan di manual 0 & M vendor
Untuk mencegah cedera personil atau peralatan.
Bahan berbahaya tidak boleh disimpan atau digunakan di atau sekitar listrik
Formasi peralatan
Asalkan semua personil yang bekerja pada peralatan listrik sudah terbiasa dengan dan gunakan
prosedur penutupan dan penandaan pabrik.

7.0 SYSTEM/COIPONENT IAINTENANCE


Maintenance of electrical equipment is normally perfqrmed on a yearly basic
during plant shutdown.
ALL equipment should be wiped down. cleaned inspected as called for by plant
operating procedures and manufacturers instruction manuals listed in
Section 8.
16
8.0 REFERENCES
8. 1 DRAtlNG LIST
(I) UNIT 7/8 500/150/23kV MAIN GIOl-24-1800.00-000IC06S-00516)
ONE LINE DIAGRAM
(2) TRANSFORMER YARD LAYOUT GIOl-24-1800.00-
0101C06S-13008)
(3) TRANSFORMER YARD LAYOUT(SECTION) GIOI-24-1800.00-
0102C06S-21875)
(4) LAYOUT OF 150kV SF6 GAS I~SULATED NIOI-24-:1826.15-0101C311-
1BA41586)
SWITCHGEAR
(5) 16lkV POWER CABLE ROUTINGCI/2) NIOI-24-1826.04-0001CI-
0002)
(6) 16lkV POWER CABLE ROUTING(2/2) NIOI-24-1826.04-0002CI-
0003)
(7) SPECIFICATION FOR 161kV POWER CABLE NIOl-24-1826.04-
0101C4-0006)
&ACCESSORIES
(8) ARRANGEMENT OF EQUIPMENT IN 150kV NIOl-24-1826.03-
0001CI-0005)
SWITCHYARD CPLN)
(9) ISOLATOR NIOl-24-1826.08-0011C311-
2BA68388)
CIO) LIGHTNING ARRESTER TYPE ZLA-X15C NIOl-24-1826.03-
0041C311-2BA66467)
RATED VOLTAGE 144kV
CIl) 150kV PLN SWYD LI~E PROTECTION PANEL NIOl-24-1826.13-0001
FRONT VIEW CPAIT-76-SUBSTA-0060-1/2--2/2)
(12) POWER STATION UNIT7 TRANSFORMER PIOl-24-1831.00-0064
PRIMARY PROTECTION BOARDS-FRONT VIEW CPAIT-76-POWSTA-0070-
1/2)
PIOl-24-1831.00-0065
CPAIT-76-PorSTA-0070-2/2)
(13) POWER STATION UNIT7 TRANSFORMER PIOl-24-1831.00-0066
BACK UP RELAY PANEL-FRONT VIEW CPAIT-76-POWSTA-0075-1/2)
PIOl-24-1831.00-0067
(PAIT-76-POWSTA-0075-2/2)
(14) POWER STATION UNIT8 TRANSFORMER PIOl-24-1831.00-0068
PRI~ARY PROTECTION PANEL-FRONT VIEW CPAIT-76-POISTA-0080-1/2)
PIOl-24-1831.00-0069
CPAIT-76-POISTA-0080-2/2)
CIS) POWER STATION UNIT8 TRANSFORMER PIOl-24-1831.00-0070
BACK UP RELAY PANEL-FRONT VlEW (PAIT-76-POWSTA-0085-1/2)
PIOI-24-1831.00-0071
CPAIT-76-POWSTA-0085-2/2)
17
8. 2 INSTROCTION MANUAL
(1) 150kV GIS ~101-25-1826. 15-0001
(2) Line Protection Panel NI01-25-1826. 12-0001
(3) 150kV XLPE POWER CABLE
(4) 150kV OUTDOOR DS
(5) 150kV OUTDOOR LA