Anda di halaman 1dari 17

LAPORAN TUGAS BESAR

SI-3151 MANAJEMEN KONSTRUKSI

PROYEK POWER STATION CIBE


Diajukan untuk memenuhi syarat kelulusan mata kuliah SI-3151 Manajemen
Konstruksi

Dosen :
Prof. Krishna Suryanto

Asisten :
Amri
Ratika Nursyaharani Salim 15014xx

Disusun Oleh :
Enggar Riana 150151XX
Laureno Lesmana 15015144
Leonardo Kumala 150151xx
Thifa Auliadewinta 15015152
Muhammad Fadhiila 15015153

PROGRAM STUDI TEKNIK SIPIL


FAKULTAS TEKNIK SIPIL DAN LINGKUNGAN
INSTITUT TEKNOLOGI BANDUNG
2017
SI 3141 PERANCANGAN GEOMETRIK JALAN

LEMBAR PENGESAHAN

BAB 1 - PENDAHULUAN ii
SI 3141 PERANCANGAN GEOMETRIK JALAN

KATA PENGANTAR

BAB 1 - PENDAHULUAN iii


SI 3141 PERANCANGAN GEOMETRIK JALAN

DAFTAR ISI

LEMBAR PENGESAHAN ...................................................................................... II

KATA PENGANTAR ............................................................................................. III

DAFTAR ISI........................................................................................................... IV

DAFTAR TABEL ................................................................................................... VI

DAFTAR GAMBAR .............................................................................................. VII

DAFTAR LAMPIRAN ......................................................................................... VIII

BAB I ....................................................................................................................... 9

PENDAHULUAN .................................................................................................... 9
2.1 LATAR BELAKANG .............................................................................................. 9
2.2 RUMUSAN MASALAH .......................................................................................... 9
2.3 TUJUAN ............................................................................................................... 9
2.4 RUANG LINGKUP ................................................................................................. 9

BAB II ....................................................................................................................10

DASAR TEORI ......................................................................................................10

BAB III ...................................................................................................................11

MANAJEMEN PROYEK POWER HOUSE CIBE ................................................11


3.1 WORK BREAKDOWN STRUCTURE ..................................................................... 11
3.2 ALOKASI DAN KEBUTUHAN SUMBER DAYA ..................................................... 12
3.3 PDM DAN PENJADWALAN ................................................................................ 13

BAB IV ...................................................................................................................17

MANAJEMEN MATERIAL PROYEK POWER HOUSE CIBE ...........................17


4.1 KEBUTUHAN SUMBER DAYA MATERIAL .......................................................... 17
4.2 PEMILIHAN SUPPLIER ........................................................................................ 17
4.3 PROSES PEMESANAN, PERSETUJUAN, PENGIRIMAN DAN PRODUKTIVITAS ...... 17

BAB 1 - PENDAHULUAN iv
SI 3141 PERANCANGAN GEOMETRIK JALAN

BAB 1 - PENDAHULUAN v
SI 3141 PERANCANGAN GEOMETRIK JALAN

DAFTAR TABEL

BAB 1 - PENDAHULUAN vi
SI 3141 PERANCANGAN GEOMETRIK JALAN

DAFTAR GAMBAR

BAB 1 - PENDAHULUAN vii


SI 3141 PERANCANGAN GEOMETRIK JALAN

DAFTAR LAMPIRAN

BAB 1 - PENDAHULUAN viii


SI 3141 PERANCANGAN GEOMETRIK JALAN

BAB I
PENDAHULUAN

1.1 Latar Belakang


1.2 Rumusan Masalah
1.3 Tujuan
Berdasarkan rumusan masalah yang telah dijabarkan pada subbab
sebelumnya, tujuan dari penulisan laporan tugas besar ini adalah :
1. Mengetahui jenis-jenis pekerjaan yang perlu dilakuakn dalam
pembangunan power station CIBE.
2. Megidentifikasi jenis-jenis sumber daya yang diperlukan.
3. Membuat Precedence Diagram Method (PDM) proyek power station
CIBE.
4. Membuat penjadwalan sumber daya yang digunakan dalam pembangunan
power station CIBE.
5. Membuat perataan sumber daya yang digunakan dalam pembangunan
power station CIBE.

1.4 Ruang Lingkup


Ruang lingkup dalam manajemen proyek Power Station CIBE ini antara lain
adalah:
Pembuatan WBS proyek
Penentuan kebutuhan dan penggunaan sumber daya
Penentuan durasi pekerjaan
Pembuatan PDM
Penjadwalan proyek
Pemilihan Supllier
Proses persetujuan, durasi pemesanan, pengiriman, dan produktivitas

BAB 1 - PENDAHULUAN 9
SI 3141 PERANCANGAN GEOMETRIK JALAN

BAB II
DASAR TEORI

BAB 1 - PENDAHULUAN 10
SI 3141 PERANCANGAN GEOMETRIK JALAN

BAB III
MANAJEMEN PROYEK POWER STATION CIBE

3.1 Work Breakdown Structure

BAB 1 - PENDAHULUAN 11
SI 3141 PERANCANGAN GEOMETRIK JALAN

3.2 Alokasi dan Kebutuhan Sumber Daya


Dalam pembangunan power station CIBE, diperlukan beberapa sumber daya guna memenuhi kebutuhan pekerjaan pembangunan.
Sumber daya tersebut dapat berupa sumber daya manusia maupun material. Untuk power station CIBE, dibutuhkan alokasi sumber daya
manusia yang dibutuhkan untuk setiap sub pekerjaan. Sumber daya yang digunakan mengacu pada SNI. Alokasi yang digunakan
menggunakan bantuan indeks yang ada pada SNI. Berikut adalah alokasi sumber daya yang dibutuhkan untuk proyek pembangunan power
station CIBE.
Index
No. Work Description Volume Unit Durasi SNI
Pekerja Tukang Batu Kepala Tukang Mandor Tukang Kayu Tukang Besi
I PREPARATION
1 Site Cleaning 126.00 m2 1 RSNI-T-12-2002 : 6.8 0.1 0.005
2
2 Staking Out (Marking) 50.00 m 2 RSNI-T-12-2002 : 6.4 0.1 0.01 0.005 0.1
TOTAL (I). PREPARATION
II EARTHWORK AND FOUNDATION
1 Earthwork Excavation 47.25 m3 3 SNI 2835-2008 : 6.1 0.75 0.025
3
2 Soil Excavation (Foundation) 39.23 m 3 SNI 2835-2008 : 6.4 1 0.032
3
3 Earth Back Filling 9.81 m 3 SNI 2835-2008 : 6.9 1 0.008333333
4 Fine Sand 100 mm 5.26 m3 1 SNI 2835-2008 : 6.11 0.3 0.01
5 Crushed Stone With Sand 150 mm 9.40 m3 1 SNI 2835-2008 : 6.15 0.25 0.025
3
6 Masonry (Foundation) ad. 1:4 40.15 m 6 SNI 2836-2008 : 6.2 1.5 0.75 0.075 0.075
TOTAL (II). EARTHWORK AND FOUNDATION
III WALL AND FLOOR WORK
1 Concrete Tie Beam formwork Multiplex 12 mm 23.50 m2 4 SNI BETON : 6.23 0.52 0.33 0.033 0.033
2
2 Concrete Genset Foundation formwork Multiplex 12 mm 5.93 m 2 SNI BETON 6:20 0.52 0.026 0.026 0.26
3 Concrete Slab formwork Multiplex 12 mm 26.40 m2 3 SNI BETON 6.24 0.52 0.033 0.033 0.33
4 Concrete wall formwork Multiplex 12 mm 22.00 m2 4 SNI BETON 6.25 0.66 0.033 0.033 0.33
2
5 Concrete Columns formwork Multiplex 12 mm 36.00 m 2 SNI BETON 6.22 0.15 0.033 0.015 0.15
6 Concrete Tie Beam rebar 352.50 Kg 3 SNI BETON 6.17 0.007 0.0007 0.0004 0.007
7 Concrete Genset Foundation rebar 451.50 Kg 2 SNI BETON 6.17 0.007 0.0007 0.0004 0.007
8 Concrete Slab rebar 2,341.30 Kg 3 SNI BETON 6.17 0.007 0.0007 0.0004 0.007
9 Concrete Wall rebar 214.50 Kg 3 SNI BETON 6.17 0.007 0.0007 0.0004 0.007
10 Concrete Columns rebar 202.50 kg 1 SNI BETON 6.17 0.007 0.0007 0.0004 0.007

BAB 1 - PENDAHULUAN 12
SI 3141 PERANCANGAN GEOMETRIK JALAN

11 Concrete Tie Beam Readymix Fc=21,7 Mpa 2.35 m3 1 SNI BETON 6.8 0.66 0.275 0.028 0.05
3
12 Concrete Genset Foundation Readymix Fc=30 Mpa 2.58 m 1 SNI BETON 6.12 0.66 0.35 0.035 0.105
3
13 Concrete Slab Readymix Fc=21,7 Mpa 18.01 m 2 SNI BETON 6.8 0.33 0.275 0.028 0.05
3
14 Concrete Wall Readymix Fc=21,7 Mpa 1.65 m 1 SNI BETON 6.8 1 0.275 0.028 0.05
15 Concrete Columns Readymix Fc=21,7 Mpa 1.35 m3 1 SNI BETON 6.8 1 0.275 0.028 0.05
16 Non Structure Columns Site Mix 1:2:3 + Rebar + Formwork 0.31 m3 3 SNI BETON 6.35 0.18 0.02 0.02 0.02 0.006 0.009
17 Brick Wall 1:4 101.32 m2 6 SNI DINDING 6.9 0.5 0.2 0.02 0.03
18 Plastering the walls 1:4 202.64 m2 3 SNI PLESTERAN 6.3 0.15 0.15 0.015 0.001
19 Finishing Coat the Walls 332.64 m2 1 PT T-38-2000-C Pasal 2.2 0.03 0.003 0.001
20 Finishing Coat the Concrete 111.00 m2 1 PT T-38-2000-C Pasal 2.3 0.03 0.003 0.001
21 Fine Sand 100 mm 13.00 m3 1 SNI Pekerjaan Tanah 6.11 0.3 0.01
2
22 Lean Concrete 50 mm 130.00 m 1 SNI Beton 6.4 0.05 0.05 0.03 0.002
3
23 Work floor T. 50 mm 1.61 m 1 SNI Beton 6.4 1.2 0.2 0.02 0.06
24 Drainage ( Brick 30x40 cm) + Plaster + Finishing Coat 50.00 m 4 RSNI T-15-2002 pasal 6.16 0.55 0.25 0.025 0.026
TOTAL (III). WALL AND FLOOR WORK
V ROOF WORK
1 Concrete Beam formwork Multiplex 12 mm 48.80 m2 2 SNI-7394-2008 : 6.23 0.33 0.033 0.033 0.33
2
2 Concrete Slab formwork Multiplex 12 mm 126.00 m 2 SNI-7394-2008 : 6.24 0.033 0.033 0.015 0.033
2
3 Concrete Eaves formwork Multiplex 12 mm 50.00 m 4 0.33 0.2 0.02 0.033
4 Concrete Beam rebar 915.00 Kg 3 SNI-7394-2008 :6.17 0.007 0.0007 0.0004 0.007
5 Concrete Slab rebar 2,129.40 Kg 3 SNI-7394-2008 : 6.17 0.007 0.0007 0.0004 0.007
6 Concrete Eaves rebar 175.00 kg 3 0.007 0.0007 0.0004 0.007
7 Concrete Beam Readymix Fc=21,7 Mpa 6.10 m3 1 0.5 0.275 0.028 0.05
3
8 Concrete Slab Readymix Fc=21,7 Mpa 16.38 m 2 0.5 0.275 0.028 0.05
3
9 Concrete Eaves Readymix Fc=21,7 Mpa 1.75 m 1 0.5 0.275 0.028 0.05
3
10 Waterproof Membrane 126.00 m 3 0.25 0.25 0.05 0.0125
11 Lean Concrete 50 mm 126.00 m2 1 0.05 0.05 0.03 0.002
12 Finishing Coat the Concrete 176.00 m2 1 0.03 0.003 0.001
TOTAL (V). ROOF WORK
VI PAINTING
1 Interior Painting 101.32 m2 1 0.03 0.003 0.002
2 0.03 0.003 0.002
2 Exterior Painting 151.32 m 1
2 0.15 0.001 0.001
3 Painting steel frames and doors 19.50 m 1
TOTAL (V). ROOF WORK

BAB 1 - PENDAHULUAN 13
SI 3141 PERANCANGAN GEOMETRIK JALAN

Jumlah sumber daya manusia yang dibutuhkan untuk setiap pekerjaan


dihitung dari perkalian faktor pengali (indeks) dengan volume/jumlah pekerjaan
yang diperlukan. Faktor pengali yang dimaksud berupa indeks pekerja yang
diperoleh dari SNI. Untuk waktu kerja disama ratakan yaitu 8 jam per hari per
pekerjaan, sedangkan kebutuhan durasi untuk tiap pekerjaan dihitung berdasarkan
volume pekerjaan dan batasan jumlah pekerja/resource. Batasan jumlah pekerja
yang ada yaitu 15 pekerja per hari. Hasil perhitungan jumlah pekerja dapat dilihat
pada table berikut.

Contoh perhitungan untuk pekerjaan site clearing dengan volume


pekerjaan 126 m3:
Diketahui indeks pekerjaan untuk pekerjaan site clearing adalah 0.05
untuk mandor, dan 0.1 untuk pekerja.
=
= 0.05 126 = 0.63 1
= 0.1 126 = 12.6 13

=
15
13
= = 0.867 1
15

BAB 1 - PENDAHULUAN 14
SI 3141 PERANCANGAN GEOMETRIK JALAN

Index Jumlah Pekerja Jumlah Pekerja Per Hari (Roundup)


No. Work Description Volume Unit Durasi SNI Tukang Kepala Tukang Tukang Tukang Kepala Tukang Tukang Tukang Kepala Tukang Tukang
Pekerja Mandor Pekerja Mandor Pekerja Mandor
Batu Tukang Kayu Besi Batu Tukang Kayu Besi Batu Tukang Kayu Besi
I PREPARATION
1 Site Cleaning 126.00 m2 1 RSNI-T-12-2002 : 6.8 0.1 0.005 12.60 - - 0.63 - - 13 0 0 1 0 0
2 Staking Out (Marking) 50.00 m2 2 RSNI-T-12-2002 : 6.4 0.1 0.01 0.005 0.1 5.00 - 0.50 0.25 5.00 - 3 0 1 1 3 0
TOTAL (I). PREPARATION
II EARTHWORK AND FOUNDATION
1 Earthwork Excavation 47.25 m3 3 SNI 2835-2008 : 6.1 0.75 0.025 35.44 - - 1.18 - - 12 0 0 1 0 0
2 Soil Excavation (Foundation) 39.23 m3 3 SNI 2835-2008 : 6.4 1 0.032 39.23 - - 1.26 - - 14 0 0 1 0 0
3
3 Earth Back Filling 9.81 m 3 SNI 2835-2008 : 6.9 1 0.00833333 9.81 - - 0.08 - - 4 0 0 1 0 0
4 Fine Sand 100 mm 5.26 m3 1 SNI 2835-2008 : 6.11 0.3 0.01 1.58 - - 0.05 - - 2 0 0 1 0 0
3
5 Crushed Stone With Sand 150 mm 9.40 m 1 SNI 2835-2008 : 6.15 0.25 0.025 2.35 - - 0.24 - - 3 0 0 1 0 0
3
6 Masonry (Foundation) ad. 1:4 40.15 m 6 SNI 2836-2008 : 6.2 1.5 0.75 0.075 0.075 60.23 30.11 3.01 3.01 - - 11 6 1 1 0 0
TOTAL (II). EARTHWORK AND FOUNDATION
III WALL AND FLOOR WORK
2
1 Concrete Tie Beam formwork Multiplex 12 mm 23.50 m 4 SNI BETON : 6.23 0.52 0.33 0.033 0.033 12.22 - 7.76 0.78 0.78 - 4 0 2 1 1 0
2 Concrete Genset Foundation formwork Multiplex 12 mm 5.93 m2 2 SNI BETON 6:20 0.52 0.026 0.026 0.26 3.08 - 0.15 0.15 1.54 - 2 0 1 1 1 0
2
3 Concrete Slab formwork Multiplex 12 mm 26.40 m 3 SNI BETON 6.24 0.52 0.033 0.033 0.33 13.73 - 0.87 0.87 8.71 - 5 0 1 1 3 0
4 Concrete wall formwork Multiplex 12 mm 22.00 m2 4 SNI BETON 6.25 0.66 0.033 0.033 0.33 14.52 - 0.73 0.73 7.26 - 4 0 1 1 2 0
2
5 Concrete Columns formwork Multiplex 12 mm 36.00 m 2 SNI BETON 6.22 0.15 0.033 0.015 0.15 5.40 - 1.19 0.54 5.40 - 3 0 1 1 3 0
6 Concrete Tie Beam rebar 352.50 Kg 3 SNI BETON 6.17 0.007 0.0007 0.0004 0.007 2.47 - 0.25 0.14 - 2.47 1 0 1 1 0 1
7 Concrete Genset Foundation rebar 451.50 Kg 2 SNI BETON 6.17 0.007 0.0007 0.0004 0.007 3.16 - 0.32 0.18 - 3.16 2 0 1 1 0 2
8 Concrete Slab rebar 2,341.30 Kg 3 SNI BETON 6.17 0.007 0.0007 0.0004 0.007 16.39 - 1.64 0.94 - 16.39 6 0 1 1 0 6
9 Concrete Wall rebar 214.50 Kg 3 SNI BETON 6.17 0.007 0.0007 0.0004 0.007 1.50 - 0.15 0.09 - 1.50 1 0 1 1 0 1
10 Concrete Columns rebar 202.50 kg 1 SNI BETON 6.17 0.007 0.0007 0.0004 0.007 1.42 - 0.14 0.08 - 1.42 2 0 1 1 0 2
11 Concrete Tie Beam Readymix Fc=21,7 Mpa 2.35 m3 1 SNI BETON 6.8 0.66 0.275 0.028 0.05 1.55 0.65 0.07 0.12 - - 2 1 1 1 0 0
3
12 Concrete Genset Foundation Readymix Fc=30 Mpa 2.58 m 1 SNI BETON 6.12 0.66 0.35 0.035 0.105 1.70 0.90 0.09 0.27 - - 2 1 1 1 0 0
13 Concrete Slab Readymix Fc=21,7 Mpa 18.01 m3 2 SNI BETON 6.8 0.33 0.275 0.028 0.05 5.94 4.95 0.50 0.90 - - 3 3 1 1 0 0
3
14 Concrete Wall Readymix Fc=21,7 Mpa 1.65 m 1 SNI BETON 6.8 1 0.275 0.028 0.05 1.65 0.45 0.05 0.08 - - 2 1 1 1 0 0
15 Concrete Columns Readymix Fc=21,7 Mpa 1.35 m3 1 SNI BETON 6.8 1 0.275 0.028 0.05 1.35 0.37 0.04 0.07 - - 2 1 1 1 0 0
3
16 Non Structure Columns Site Mix 1:2:3 + Rebar + Formwork 0.31 m 3 SNI BETON 6.35 0.18 0.02 0.02 0.02 0.006 0.009 0.06 0.01 0.01 0.01 0.00 0.00 1 1 1 1 1 1
2
17 Brick Wall 1:4 101.32 m 6 SNI DINDING 6.9 0.5 0.2 0.02 0.03 50.66 20.26 2.03 3.04 - - 9 4 1 1 0 0
18 Plastering the walls 1:4 202.64 m2 3 SNI PLESTERAN 6.3 0.15 0.15 0.015 0.001 30.40 30.40 3.04 0.20 - - 11 11 2 1 0 0
19 Finishing Coat the Walls 332.64 m2 1 PT T-38-2000-C Pasal 2.2 0.03 0.003 0.001 9.98 - 1.00 0.33 - - 10 0 1 1 0 0
2
20 Finishing Coat the Concrete 111.00 m 1 PT T-38-2000-C Pasal 2.3 0.03 0.003 0.001 3.33 - 0.33 0.11 - - 4 0 1 1 0 0
21 Fine Sand 100 mm 13.00 m3 1 SNI Pekerjaan Tanah 6.11 0.3 0.01 3.90 - - 0.13 - - 4 0 0 1 0 0
22 Lean Concrete 50 mm 130.00 m2 1 SNI Beton 6.4 0.05 0.05 0.03 0.002 6.50 6.50 3.90 0.26 - - 7 7 4 1 0 0
3
23 Work floor T. 50 mm 1.61 m 1 SNI Beton 6.4 1.2 0.2 0.02 0.06 1.93 0.32 0.03 0.10 - - 2 1 1 1 0 0
24 Drainage ( Brick 30x40 cm) + Plaster + Finishing Coat 50.00 m 4 RSNI T-15-2002 pasal 6.16 0.55 0.25 0.025 0.026 27.50 12.50 1.25 1.30 - - 7 4 1 1 0 0
TOTAL (III). WALL AND FLOOR WORK
V ROOF WORK
1 Concrete Beam formwork Multiplex 12 mm 48.80 m2 2 SNI-7394-2008 : 6.23 0.33 0.033 0.033 0.33 16.10 1.61 - 1.61 16.10 - 9 1 0 1 9 0
2
2 Concrete Slab formwork Multiplex 12 mm 126.00 m 2 SNI-7394-2008 : 6.24 0.033 0.033 0.015 0.033 4.16 4.16 - 1.89 4.16 - 3 3 0 1 3 0
3 Concrete Eaves formwork Multiplex 12 mm 50.00 m2 4 0.33 0.2 0.02 0.033 16.50 10.00 1.00 1.65 - - 5 3 1 1 0 0
4 Concrete Beam rebar 915.00 Kg 3 SNI-7394-2008 :6.17 0.007 0.0007 0.0004 0.007 6.41 - 0.64 0.37 - 6.41 3 0 1 1 0 3
5 Concrete Slab rebar 2,129.40 Kg 3 SNI-7394-2008 : 6.17 0.007 0.0007 0.0004 0.007 14.91 - 1.49 0.85 - 14.91 5 0 1 1 0 5
6 Concrete Eaves rebar 175.00 kg 3 0.007 0.0007 0.0004 0.007 1.23 - 0.12 0.07 - 1.23 1 0 1 1 0 1
7 Concrete Beam Readymix Fc=21,7 Mpa 6.10 m3 1 0.5 0.275 0.028 0.05 3.05 1.68 0.17 0.31 - - 4 2 1 1 0 0
8 Concrete Slab Readymix Fc=21,7 Mpa 16.38 m3 2 0.5 0.275 0.028 0.05 8.19 4.50 0.46 0.82 - - 5 3 1 1 0 0
9 Concrete Eaves Readymix Fc=21,7 Mpa 1.75 m3 1 0.5 0.275 0.028 0.05 0.88 0.48 0.05 0.09 - - 1 1 1 1 0 0
3
10 Waterproof Membrane 126.00 m 3 0.25 0.25 0.05 0.0125 31.50 31.50 6.30 1.58 - - 11 11 3 1 0 0
2
11 Lean Concrete 50 mm 126.00 m 1 0.05 0.05 0.03 0.002 6.30 6.30 3.78 0.25 - - 7 7 4 1 0 0
12 Finishing Coat the Concrete 176.00 m2 1 0.03 0.003 0.001 5.28 - 0.53 0.18 - - 6 0 1 1 0 0
TOTAL (V). ROOF WORK
VI PAINTING
1 Interior Painting 101.32 m2 1 0.03 0.003 0.002 3.04 - 0.30 0.20 - - 4 0 1 1 0 0
2 Exterior Painting 151.32 m2 1 0.03 0.003 0.002 4.54 - 0.45 0.30 - - 5 0 1 1 0 0
3 Painting steel frames and doors 19.50 m2 1 0.15 0.001 0.001 2.93 - 0.02 0.02 - - 3 0 1 1 0 0
TOTAL (V). ROOF WORK

BAB 1 - PENDAHULUAN 15
SI 3141 PERANCANGAN GEOMETRIK JALAN

3.3 PDM dan Penjadwalan

BAB 1 - PENDAHULUAN 16
SI 3141 PERANCANGAN GEOMETRIK JALAN

BAB IV
MANAJEMEN MATERIAL PROYEK POWER STATION CIBE

3.4 Kebutuhan Sumber Daya Material


Sumber daya material bisa didapat dengan menghitung volume yang dibutuhkan
untuk setiap elemen struktur. Adapun dimensi penampang didapat dari data yang
sudah diberikan.

3.5 Pemilihan Supplier


3.6 Proses Pemesanan, Persetujuan, Pengiriman dan Produktivitas

BAB 1 - PENDAHULUAN 17