RAB M&E Rusun Pekerja Keluarga Type 36 (4 LT) TINGGI
RAB M&E Rusun Pekerja Keluarga Type 36 (4 LT) TINGGI
JUMLAH HARGA
AIAN PEKERJAAN
(Rp.)
1,082,825,093.81
358,989,200.79
723,835,893.02
1,877,861,476.71
77,593,060.19
81,593,443.89
80,024,444.31
1,638,650,528.33
E KAP ITU LAS I
( RAB ) - P E K E R JAAN MEKANIKAL DAN ELEKTRIKAL
JUMLAH HARGA
AIAN PEKERJAAN
(Rp.)
Pekerjaan : Prototype Rumah susun Keluarga 4 lantai Type - 36, TNI/Polri, Pekerja, (Prototype 1
Lokasi : PROV. ACEH
Tahun Anggaran : 2015
INSTALASI PEMIPAAN
a LANTAI 1
- PPR PN10 dia. 15 m 73.20
- PPR PN10 dia. 20 m 34.50
- PPR PN10 dia. 20 m 4.50
- PPR PN10 dia. 32 m 49.00
- PPR PN10 dia. 40 m 2.00
- PPR PN10 dia. 50 (Riser dari Tangki Air Atas) m 25.00
- PPR PN10 dia. 65 (Riser ke tanki air atas) m 25.00
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 40 bh 1.00
- dia. 20 bh 3.00
- Meter Air c/w BV dia. 20 bh 2.00
b LANTAI 2
- PPR PN10 dia. 15 m 139.20
- PPR PN10 dia. 20 m 35.04
- PPR PN10 dia. 20 m 24.00
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART
c LANTAI 3
- PPR PN10 dia. 15 m 139.20
- PPR PN10 dia. 20 m 35.04
- PPR PN10 dia. 20 m 24.00
- PPR PN10 dia. 32 m 119.20
- PPR PN10 dia. 40 m 8.00
- PPR PN10 dia. 50 (Riser dari Tangki Air Atas) m 12.80
- PPR PN10 dia. 65 (Riser ke tanki air atas) m 12.80
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 40 bh 1.00
- dia. 20 bh 2.00
- Meter Air c/w BV dia. 20 bh 16.00
d LANTAI 4
- PPR PN10 dia. 15 m 139.20
- PPR PN10 dia. 20 m 35.04
- PPR PN10 dia. 20 m 24.00
- PPR PN10 dia. 32 m 119.20
- PPR PN10 dia. 40 m 8.00
- PPR PN10 dia. 50 (Riser dari Tangki Air Atas) m 12.80
- PPR PN10 dia. 65 (Riser ke tanki air atas) m 12.80
Peralatan Katup-katup
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 50 bh 11.00
- dia. 32 bh 2.00
INSTALASI PEMIPAAN
a LANTAI 1
- dia. 150 ( horisontal pipa air kotor) m 140.00
- dia. 150 ( horisontr pipa air Bekas) m 140.00
- dia. 100 ( riser pipa air kotor) m 80.00
- dia. 100 ( riser pipa air bekas ) m 80.00
- dia. 100 m 12.70
- dia. 80 m 6.00
- dia. 65 m 10.50
- dia. 50 m 2.50
Clean Out (CO)
- CO, dia. 150 bh 2.00
- CO, dia. 100 bh 8.00
- Portable Grease Trap bh 2.00
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART
b LANTAI 2
- dia. 100 ( riser pipa air kotor) m 51.20
- dia. 100 ( riser pipa air bekas ) m 51.20
- dia. 100 m 13.44
- dia. 65 m 24.00
- dia. 50 m 32.00
- Portable Grease Trap bh 16.00
c LANTAI 3
- dia. 100 ( riser pipa air kotor) m 51.20
- dia. 100 ( riser pipa air bekas ) m 51.20
- dia. 100 m 13.44
- dia. 65 m 24.00
- dia. 50 m 32.00
- Portable Grease Trap bh 16.00
d LANTAI 4
- dia. 100 ( riser pipa air kotor) m 51.20
- dia. 100 ( riser pipa air bekas ) m 51.20
- dia. 100 m 13.44
- dia. 65 m 24.00
- dia. 50 m 32.00
- Portable Grease Trap bh 16.00
INSTALASI PEMIPAAN
a LANTAI 1
- dia. 100 ( pipa tegak ) m 80.00
- dia. 80 ( pipa dapur/tempat jemur ) m 5.00
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART
b LANTAI 2
- dia. 100 ( pipa tegak ) m 51.20
- dia. 80 ( pipa dapur/tempat jemur ) m 50.00
- dia. 80 ( pipa selasar ) m 12.00
c LANTAI 3
- dia. 100 ( pipa tegak ) m 51.20
- dia. 80 ( pipa dapur/tempat jemur ) m 40.00
d LANTAI 4
- dia. 150 ( pipa tegak ) m 51.20
- dia. 80 ( pipa dapur/tempat jemur ) m 40.00
f LANTAI ATAP
- dia. 80 (roof tank ) m 20.00
IV INSTALASI VENT
Pipa PVC Kelas AW (Incl. Fitting & Accessories)
INSTALASI PEMIPAAN
a LANTAI 1
- Dia. 50 ( pipa riser ) m 51.20
- Dia. 32 m 13.76
b LANTAI 2
- Dia. 50 ( pipa riser ) m 51.20
- Dia. 32 m 13.76
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART
c LANTAI 3
- Dia. 50 ( pipa riser ) m 51.20
- Dia. 32 m 13.76
d LANTAI 4
- Dia. 50 ( pipa riser ) m 51.20
- Dia. 32 m 13.76
I PEKERJAAN PANEL
a. INSTALASI
1 P-PLN unit
- MCCB 3P, 320 A : 1 bh
- Accessories & Termination : 1 lot
- Box Panel : 1 unit
2 PEKERJAAN MDP
3 P-PENGELOLA
- Box Panel
- KW-meter/3ph/63A bh 1
4 P-KWH LT.1
- KW-meter/1ph/6A bh 2
5 P-KWH/LT.2 s/d lt 4
- Rel MCB 3P
- Cu Bar 5 x 63 A
- Accessories & Termination
- Box Panel
- KW-meter/1ph/6A bh 48
10 P-KEBAKARAN
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 25 A
- Accessories & Termination
- Box Panel
P-UNIT
Pengadaan dan pemasangan P-UNIT , dengan kompo-
nen panel, sbb :
11 LANTAI-1 unit 5
- MCB 1P, 6 A : 1 bh
- MCB 1P, 4 A : 4 bh
- Box Hanger : 1 bh
a. INSTALASI
- NYY 4 x 185 mm2 + E-NYA 95 mm2 Dari P-PLN ke MDP m' 30.00
a. INSTALASI
Pengadaan dan Pemasangan Kabel Ladder lengkap dengan se-
mua fitting, aksesoris, berikut material dan alat bantu pemasa-
ngan lainnya sesuai diuraikan dalam Gambar dan Spesifikasi
Teknis.
1 Lantai-1
- Kabel Tray W200 x H100 m' 70.00
Fitting-Fitting :
- Elbow W200 x H100 bh 1.00
Material bantu ( mur, baut, hanger rod, supporting, dll ) lot 1.00
2 Lantai-2 s/d 4
- Kabel Tray W200 x H100 m' 195.00
Fitting-Fitting :
- Elbow W200 x H100 bh 3.00
Material bantu ( mur, baut, hanger rod, supporting, dll ) lot 3.00
3 Shaft
- Kabel Tray W600 x H100 m' 11.00
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART
a. INSTALASI
1 Lantai-1
- TL 1 x 36 W, TL Balk Type bh 12.00
- TL 1 x 18 W, TL Balk Type bh 45.00
- TL 1 x 18 W, TL Balk Type c/w battery charger bh 2.00
- Lampu baret isi TL Bulat-32 watt c/w battery charger bh 3.00
- Lampu PL 13 Watt , Fitting E-27 bh 21.00
- Exit Lamp-18 watt c/w battery charger bh 3.00
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh 29.00
- Saklar 1 gang bh 7.00
- Saklar 2 gang bh 16.00
2 Lantai-2
- Lampu PL 13 Watt , Fitting E-27 bh 130.00
- Lampu TL 1 x 18 Watt , Balk Type (Selasar) bh 17.00
- TL 1 x 18 W, TL Balk Type c/w battery charger (Selasar) bh 2.00
- Lampu baret isi TL Bulat-32 watt c/w battery charger bh 3.00
- Exit Lamp-18 watt c/w battery charger bh 3.00
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh 64.00
- Saklar 1 gang bh 56.00
- Saklar 2 gang bh 38.00
3 Lantai-3
- Lampu PL 13 Watt , Fitting E-27 bh 130.00
- Lampu TL 1 x 18 Watt , Balk Type (Selasar) bh 17.00
- TL 1 x 18 W, TL Balk Type c/w battery charger (Selasar) bh 2.00
- Lampu baret isi TL Bulat-32 watt c/w battery charger bh 3.00
- Exit Lamp-18 watt c/w battery charger bh 3.00
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh 64.00
- Saklar 1 gang bh 56.00
- Saklar 2 gang bh 38.00
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART
4 Lantai-4
- Lampu PL 13 Watt , Fitting E-27 bh 130.00
- Lampu TL 1 x 18 Watt , Balk Type (Selasar) bh 17.00
- TL 1 x 18 W, TL Balk Type c/w battery charger (Selasar) bh 2.00
- Lampu baret isi TL Bulat-32 watt c/w battery charger bh 3.00
- Exit Lamp-18 watt c/w battery charger bh 3.00
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh 64.00
- Saklar 1 gang bh 56.00
- Saklar 2 gang bh 38.00
6 Lantai-Atap
- Lampu TL 1 x 18 Watt , Balk Type bh 2.00
- Saklar 1 gang bh 1.00
7 R.Pompa
- TL 1 x 36 W, TL Balk Type bh 2.00
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh 1.00
- Saklar 1 gang bh 1.00
a. INSTALASI
Lantai-1
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 86.00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 29.00
Lantai-2
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 155.00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 64.00
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART
Lantai-3
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 155.00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 64.00
Lantai-4
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 155.00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 64.00
Lantai-Atap
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 2.00
R.Pompa
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 2.00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 1.00
a. INSTALASI
Pentanahan (Grounding) Netral Sistem & Pentanahan Body
Item SBB:
- Grounding Rod GIP 1' ( untuk R lebih kecil dari 2 ohm ) bh 1.00
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Termination R.Supporting Material lot 1.00
- Kabel BC 50 mm2 m 60.00
a. INSTALASI
- Arester Lightning protection radius 50 meter unit 1.00
- Tiang pipa dia 65 = 5 meter + acessories unit 1.00
- Down Conduktor BC 50mm + accessories m' 70.00
- Grounding System max. 3 ohm lot 1.00
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Biaya Instalasi lot 1.00
- Material Bantu lot 1.00
- Testing & Comissioning included perijinan dari DEPNAKER lot 1.00
- Bracket, Seal , Test Box , dls
ANGGARAN BIAYA (RAB)
JAAN MEKANIKAL & ELEKTRIKAL
1,082,825,093.81
358,989,200.79
162,249,359.51
32,831.37 2,403,256.28
39,783.87 1,372,543.52
39,783.87 179,027.42
87,540.57 4,289,487.93
122,100.57 244,201.14
180,690.57 4,517,264.25
274,144.32 6,853,608.00
355,722.74 355,722.74
168,161.74 504,485.21
414,417.80 828,835.60
32,831.37 4,570,126.70
39,783.87 1,394,026.80
45,448.06 1,090,753.35
HARGA SATUAN TOTAL HARGA
(Rp) (Rp)
87,540.57 10,434,835.94
122,100.57 976,804.56
180,690.57 2,312,839.30
274,144.32 3,509,047.30
355,722.74 355,722.74
168,161.74 336,323.47
414,417.80 6,630,684.80
32,831.37 4,570,126.70
39,783.87 1,394,026.80
45,448.06 1,090,753.35
87,540.57 10,434,835.94
122,100.57 976,804.56
180,690.57 2,312,839.30
274,144.32 3,509,047.30
355,722.74 355,722.74
168,161.74 336,323.47
414,417.80 6,630,684.80
32,831.37 4,570,126.70
39,783.87 1,394,026.80
45,448.06 1,090,753.35
87,540.57 10,434,835.94
122,100.57 976,804.56
180,690.57 2,312,839.30
274,144.32 3,509,047.30
HARGA SATUAN TOTAL HARGA
(Rp) (Rp)
355,722.74 355,722.74
168,161.74 336,323.47
414,417.80 6,630,684.80
2,409,753.74 2,409,753.74
274,144.32 9,046,762.56
180,690.57 29,813,944.05
27,609.02 165,654.12
355,722.74 3,912,950.10
259,183.99 518,367.97
147,222,438.85
192,664.31 26,973,003.28
192,664.31 26,973,003.28
89,789.10 7,183,128.13
89,789.10 7,183,128.13
89,789.10 1,140,321.59
43,434.48 260,606.87
43,434.48 456,062.03
32,872.89 82,182.22
451,028.64 902,057.28
146,191.86 1,169,534.91
748,256.46 1,496,512.91
HARGA SATUAN TOTAL HARGA
(Rp) (Rp)
89,789.10 4,597,202.00
89,789.10 4,597,202.00
89,789.10 1,206,765.53
43,434.48 1,042,427.49
32,872.89 1,051,932.44
748,256.46 11,972,103.28
89,789.10 4,597,202.00
89,789.10 4,597,202.00
89,789.10 1,206,765.53
43,434.48 1,042,427.49
32,872.89 1,051,932.44
748,256.46 11,972,103.28
89,789.10 4,597,202.00
89,789.10 4,597,202.00
89,789.10 1,206,765.53
43,434.48 1,042,427.49
32,872.89 1,051,932.44
748,256.46 11,972,103.28
39,409,830.29
89,789.10 7,183,128.13
57,630.41 288,152.07
HARGA SATUAN TOTAL HARGA
(Rp) (Rp)
89,789.10 4,597,202.00
57,630.41 2,881,520.71
57,630.41 691,564.97
179,290.86 358,581.73
89,789.10 4,597,202.00
57,630.41 2,305,216.56
89,789.10 4,597,202.00
179,290.86 7,171,634.55
57,630.41 1,152,608.28
179,290.86 2,868,653.82
179,290.86 717,163.46
10,107,572.14
32,872.89 1,683,091.90
24,985.55 343,801.13
32,872.89 1,683,091.90
24,985.55 343,801.13
HARGA SATUAN TOTAL HARGA
(Rp) (Rp)
32,872.89 1,683,091.90
24,985.55 343,801.13
32,872.89 1,683,091.90
24,985.55 343,801.13
125,000.00 2,000,000.00
723,835,893.02
212,290,230.56
by pln by pln
62,403,201.66 62,403,201.66
HARGA SATUAN TOTAL HARGA
(Rp) (Rp)
10,603,387.02 10,603,387.02
HARGA SATUAN TOTAL HARGA
(Rp) (Rp)
1,500,000.00 1,500,000.00
14,619,679.86 14,619,679.86
775,000.00 1,550,000.00
13,127,155.68 39,381,467.03
HARGA SATUAN TOTAL HARGA
(Rp) (Rp)
775,000.00 37,200,000.00
10,935,761.16 10,935,761.16
6,084,109.74 6,084,109.74
HARGA SATUAN TOTAL HARGA
(Rp) (Rp)
528,540.08 2,642,700.39
528,540.08 25,369,923.72
112,173,963.87
905,365.87 27,160,976.21
249,805.19 1,249,025.97
69,913.56 699,135.63
126,196.01 3,785,880.17
HARGA SATUAN TOTAL HARGA
(Rp) (Rp)
126,196.01 5,047,840.23
126,196.01 6,309,800.28
69,913.56 2,097,406.90
249,805.19 7,494,155.82
26,987.02 1,411,421.09
26,987.02 844,693.69
26,987.02 404,805.28
26,987.02 1,411,421.09
26,987.02 912,161.24
26,987.02 412,901.39
26,987.02 1,775,745.84
26,987.02 1,505,875.65
26,987.02 1,424,914.60
26,987.02 1,155,044.41
26,987.02 1,020,109.31
26,987.02 750,239.13
26,987.02 628,797.54
26,987.02 358,927.35
26,987.02 358,927.35
26,987.02 628,797.54
26,987.02 750,239.13
26,987.02 1,020,109.31
26,987.02 1,155,044.41
26,987.02 1,424,914.60
26,987.02 1,505,875.65
26,987.02 1,775,745.84
26,987.02 404,805.28
HARGA SATUAN TOTAL HARGA
(Rp) (Rp)
26,987.02 1,775,745.84
26,987.02 1,505,875.65
26,987.02 1,424,914.60
26,987.02 1,155,044.41
26,987.02 1,020,109.31
26,987.02 750,239.13
26,987.02 628,797.54
26,987.02 358,927.35
26,987.02 358,927.35
26,987.02 628,797.54
26,987.02 750,239.13
26,987.02 1,020,109.31
26,987.02 1,155,044.41
26,987.02 1,424,914.60
26,987.02 1,505,875.65
26,987.02 1,775,745.84
26,987.02 404,805.28
26,987.02 1,775,745.84
26,987.02 1,505,875.65
26,987.02 1,424,914.60
26,987.02 1,155,044.41
26,987.02 1,020,109.31
26,987.02 750,239.13
26,987.02 628,797.54
26,987.02 358,927.35
26,987.02 358,927.35
26,987.02 628,797.54
26,987.02 750,239.13
26,987.02 1,020,109.31
HARGA SATUAN TOTAL HARGA
(Rp) (Rp)
26,987.02 1,155,044.41
26,987.02 1,424,914.60
26,987.02 1,505,875.65
26,987.02 1,775,745.84
26,987.02 404,805.28
45,894,539.00
146,322.60 10,242,582.34
197,800.00 197,800.00
750,000.00 750,000.00
146,322.60 28,532,907.95
250,350.00 751,050.00
750,000.00 2,250,000.00
288,199.88 3,170,198.72
HARGA SATUAN TOTAL HARGA
(Rp) (Rp)
88,302,316.82
108,965.12 1,307,581.41
76,106.84 3,424,807.69
820,200.00 1,640,400.00
768,342.33 2,305,027.00
47,920.20 1,006,324.20
1,006,700.00 3,020,100.00
36,333.73 1,053,678.03
33,042.63 231,298.42
59,485.12 951,761.95
47,920.20 6,229,626.00
76,106.84 1,293,816.24
820,200.00 1,640,400.00
768,342.33 2,305,027.00
1,006,700.00 3,020,100.00
36,333.73 2,325,358.41
33,042.63 1,850,387.36
59,485.12 2,260,434.62
47,920.20 6,229,626.00
76,106.84 1,293,816.24
820,200.00 1,640,400.00
768,342.33 2,305,027.00
1,006,700.00 3,020,100.00
36,333.73 2,325,358.41
33,042.63 1,850,387.36
59,485.12 2,260,434.62
HARGA SATUAN TOTAL HARGA
(Rp) (Rp)
47,920.20 6,229,626.00
76,106.84 1,293,816.24
820,200.00 1,640,400.00
768,342.33 2,305,027.00
1,006,700.00 3,020,100.00
36,333.73 2,325,358.41
33,042.63 1,850,387.36
59,485.12 2,260,434.62
76,106.84 152,213.68
33,042.63 33,042.63
108,965.12 217,930.24
36,333.73 36,333.73
33,042.63 33,042.63
632,082.90 10,113,326.35
225,125,260.91
259,388.74 22,307,431.53
308,899.43 8,958,083.37
259,388.74 40,205,254.50
308,899.43 19,769,563.30
HARGA SATUAN TOTAL HARGA
(Rp) (Rp)
259,388.74 40,205,254.50
308,899.43 19,769,563.30
259,388.74 40,205,254.50
308,899.43 19,769,563.30
259,388.74 518,777.48
259,388.74 518,777.48
308,899.43 308,899.43
536,802.39 8,588,838.25
2,500,000.00 2,500,000.00
1,500,000.00 1,500,000.00
11,515,191.63
3,500,000.00 3,500,000.00
HARGA SATUAN TOTAL HARGA
(Rp) (Rp)
250,000.00 250,000.00
116,919.86 7,015,191.63
500,000.00 500,000.00
250,000.00 250,000.00
28,534,390.23
7,500,000.00 7,500,000.00
1,500,000.00 1,500,000.00
116,919.86 8,184,390.23
3,500,000.00 3,500,000.00
5,000,000.00 5,000,000.00
350,000.00 350,000.00
2,500,000.00 2,500,000.00
RENCANA ANGGARAN BIAYA (RAB)
PE K E R JAAN MEKANIKAL & ELEKTRIKAL
Pekerjaan : Prototype Rumah susun Keluarga 4 lantai Type - 36, TNI/Polri, Pekerja, (Prototype 15-06)
Lokasi : PROV. ACEH
Tahun Anggaran : 2015
a LANTAI 1
Pemipaan BSP Sch. 40
(Incl.Fitting & All Accessories)
- dia. 100 mm (Pipa Riser ) m 30.00
- dia. 65 mm m 6.00
- dia. 40 mm m 0.60
- Indoor Hydrant Box (IHB) 750x1200x180 set 2.00
lengkap dengan : Landing Valve, Hose Valve, Hoze Nozzle
dan Accessories
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type CO2 Class B & C 3,5 kg Seamless, c/w support bh 1.00
- Type Class ABC 3,5 kg Seamless, c/w support bh 3.00
b LANTAI 2
Pemipaan BSP Sch. 40
(Incl.Fitting & All Accessories)
- dia. 100 mm (Pipa Riser ) m 6.40
- dia. 65 mm m 6.00
- dia. 40 mm m 0.60
HAL-39
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
c LANTAI 3
Pemipaan BSP Sch. 40
(Incl.Fitting & All Accessories)
- dia. 100 mm (Pipa Riser ) m 6.40
- dia. 65 mm m 6.00
- dia. 40 mm m 0.60
- Indoor Hydrant Box (IHB) 750x1200x180 set 2.00
lengkap dengan : Landing Valve, Hose Valve, Hoze Nozzle
dan Accessories
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 3,5 kg Seamless, c/w support bh 3.00
d LANTAI 4
Pemipaan BSP Sch. 40
(Incl.Fitting & All Accessories)
- dia. 100 mm (Pipa Riser ) m 6.40
- dia. 65 mm m 6.00
- dia. 40 mm m 0.60
- Indoor Hydrant Box (IHB) 750x1200x180 set 2.00
lengkap dengan : Landing Valve, Hose Valve, Hoze Nozzle
dan Accessories
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 3,5 kg Seamless, c/w support bh 3.00
- Automatic Air Vent dia 25, c/w Pressure gate, gate valve bh 2.00
HAL-40
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
1 LANTAI DASAR
- Exhaust kap 200 CMH ( ceiling Mounted ) unit 2
2 LANTAI 2 s/d 4
- Exhaust kap 200 CMH ( ceiling Mounted ) unit 48
I. PEKERJAAN SYSTEM TV
HAL-41
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
b SPLITTER TV
LANTAI-1
Splitter 7 ports bh 1.00
TB-Splitter-TV/lt.1 bh 1.00
Lantai-2
Splitter 7 ports bh 5.00
TB-Splitter-TV/lt.2 bh 1.00
Lantai-3
Splitter 7 ports bh 5.00
TB-Splitter-TV/lt.3 bh 1.00
Lantai-4
Splitter 7 ports bh 5.00
TB-Splitter-TV/lt.4 bh 1.00
Lantai-1
Coaxial 7C/2V dari TB-Splitter-TV/lt.2 ke TB-Splitter-lt.1 mtr 10.00
HAL-42
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
Lantai-2
Coaxial 7C/2V dari TB-Splitter-TV/lt.3 ke TB-Splitter-lt.2 mtr 15.00
Lantai-3
Coaxial 7C/2V dari TB-Splitter-TV/lt.4 ke TB-Splitter-lt.3 mtr 20.00
Lantai-4
Coaxial 7C/2V dari TB-Splitter-TV/lt.5 ke TB-Splitter-lt.4 mtr 25.00
d TV OUTLET
Lantai-1
TV Outlet bh 5.00
Lantai-2
TV Outlet bh 16.00
Lantai-3
TV Outlet bh 16.00
Lantai-4
TV Outlet bh 16.00
e INSTALASI OUTLET TV
HAL-43
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
Lantai-1
TV Outlet ttk 5.00
Lantai-2
TV Outlet ttk 16.00
Lantai-3
TV Outlet ttk 16.00
Lantai-4
TV Outlet ttk 16.00
HAL-44
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
Kabel NYA 5 x 2 x 2,5 mm2 in conduit Dia.32 dari MCFA ke MDF mtr 28.00
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.1 mtr 2.00
###
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.2 mtr 6.00
###
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.3 mtr 12.00
###
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.4 mtr 16.00
###
Lantai-1
- Rate Of Rise Temperature - Heat detector bh 27.00
- Manual push button bh 1.00
- Lampu Indikator bh 1.00
- Bell alarm bh 1.00
- End of Line Resistor bh 2.00
- TB-FA-Lt.Ground bh 1.00
Lantai-2
- Rate Of Rise Temperature - Heat detector bh 31.00
- Manual push button bh 1.00
- Lampu Indikator bh 1.00
- Bell alarm bh 1.00
- End of Line Resistor bh 2.00
- TB-FA-Lt2 bh 1.00
Lantai-3
- Rate Of Rise Temperature - Heat detector bh 31.00
- Manual push button bh 1.00
HAL-45
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
Lantai-4
- Rate Of Rise Temperature - Heat detector bh 31.00
- Manual push button bh 1.00
- Lampu Indikator bh 1.00
- Bell alarm bh 1.00
- End of Line Resistor bh 2.00
- TB-FA-Lt4 bh 1.00
Instalasi titik detector dari TB-FA dengan kabel NYA 2 x 1,5 mm2
didalam conduit dia. 20 mm2 lengkap dengan aksesoris dan
semua peralatan / material bantu pemasangan sesuai detail
Gambar dan Spesifikasi Teknis.
Lantai-1
- Rate Of Rise Temperature - Heat detector ttk 27.00
- Manual push button ttk 1.00
- Lampu Indikator ttk 1.00
- Bell alarm ttk 1.00
Lantai-2
- Rate Of Rise Temperature - Heat detector ttk 31.00
- Manual push button ttk 1.00
- Lampu Indikator ttk 1.00
- Bell alarm ttk 1.00
Lantai-3
HAL-46
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
Lantai-4
- Rate Of Rise Temperature - Heat detector ttk 31.00
- Manual push button ttk 1.00
- Lampu Indikator ttk 1.00
- Bell alarm ttk 1.00
HAL-47
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
HAL-48
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
a SITE PLAN
- dia. 150 (air kotor dan air bekas ) m 15.00
###
- dia. 150 (air kotor dan air bekas) m 15.00
###
HAL-49
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
5 Gate Valve
- dia. 150 mm bh 3.00
- dia. 50 mm bh 2.00
- dia. 25 mm bh 1.00
6 Strainer
- dia. 150 mm bh 1.00
- dia. 50 mm bh 1.00
7 Check Valve
HAL-50
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
HAL-51
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
Pit Valve
- ukuran 500 x 500 mm bh 3.00
- ukuran 1000 x 500 mm bh 1.00
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type CO2 Class 5 kg Seamless, c/w support bh 1.00
HAL-52
DAFTAR HARGA BAHAN BANGUNAN
PROV. ACEH
HARGA
Kelompok NO. NAMA / JENIS BAHAN SATUAN
SATUAN BAHAN
1 2 3 4 5
A BAHAN ELEKTRIKAL.
1 Pasang listrik /Wirring. Ttk Rp.
2 Lampu TL 1 x 10 w Bh Rp.
3 Lampu TL 1 x 20 w Bh Rp.
4 Lampu TL 1 x 40 w Bh Rp.
5 Lampu pijar 25 w Bh Rp.
6 Lampu pijar 40 - 100 w Bh Rp.
7 Lampu TL Balk 1x36 watt Bh Rp.
8 Lampu TL Balk 1x18 watt Bh Rp.
9 Lampu TL Balk 1x18 watt + batteray Bh Rp.
10 Lampu Baret 32 watt + Batteray Bh Rp.
11 Lampu Baret 32 watt Bh Rp.
12 Lampu Taman SL-26 watt Bh Rp.
13 Isolator Bh Rp.
14 Las Doof Bh Rp.
15 Fiting Plafoond Bh Rp.
16 T dos PVC Bh Rp.
17 Stop Kontak Bh Rp.
18 Stop Kontak-TV Bh Rp.
19 Stop Kontak-TELEPON Bh Rp.
20 Saklar tunggal Bh Rp.
21 Sakla ganda Bh Rp.
22 Kabel NYA 1000 Volt 1,5 mm M1 Rp.
23 Kabel NYA 1000 Volt 2x1,5 mm M1 Rp.
24 Kabel NYA 1000 Volt 3x1,5 mm M1 Rp.
25 Kabel NYA 1000 Volt 2,5 mm M1 Rp.
26 Kabel NYA 1000 Volt 4 mm M1 Rp.
27 Kabel NYA 1000 Volt 6 mm M1 Rp.
28 Kabel NYA 1000 Volt 10 mm M1 Rp.
29 Kabel NYA 1000 Volt 16 mm M1 Rp.
30 Kabel NYA 1000 Volt 95 mm M1 Rp.
31 Kabel NYM 300/750 Volt 3x2,5 mm2 M1 Rp.
32 Kabel NYM 300/750 Volt 3x4 mm2 M2 Rp.
33 Kabel NYY 0,6/1 Kv 4x2,5 mm2 M1 Rp.
34 Kabel NYY 0,6/1 Kv 4x4 mm2 M1 Rp.
35 Kabel NYY 0,6/1 Kv 4x6 mm2 M1 Rp.
36 Kabel NYY 0,6/1 Kv 4x185 mm2 M2 Rp.
37 Kabel NYFGBY 0,6/1 Kv 3x2,5 mm2 M1 Rp.
38 Kabel NYY 0,6/1 Kv 4x16 mm2 M1 Rp.
39 Kabel NYFGBY 0,6/1 Kv 4x240 mm2 M1 Rp.
40 Kabel NYY 0,6/1 Kv 70 mm2 M1 Rp.
41 Kabel FRC 0,6/1 Kv 3x2,5 mm2 M1 Rp.
42 Kabel FRC 0,6/1 Kv 4Cx4 mm2 M1 Rp.
43 Kabel FRC 0,6/1 Kv 4Cx6 mm2 M1 Rp.
44 Kabel Coaxial 7C-2V M1 Rp.
45 Kabel Coaxial 5C-2V M1 Rp.
46 Kabel ITC 4x0,6 mm2 M1 Rp.
47 Pipa Konduit HI dia.20 mm M1 Rp.
48 Tray W=200 mm M1 Rp.
49 TEE W=200 mm M1 Rp.
50 Elbow W=200 mm M1 Rp.
51 Heat detector BH Rp.
52 Smoke detector BH Rp.
53 Manual push button BH Rp.
54 Bell alarm BH Rp.
55 Lampu indikator BH Rp.
56 MCFA-10 Zone BH Rp.
57 terminal Fire alarm BH Rp.
58 Terminal -TV BH Rp.
59 Antena UHF,10 element BH Rp.
60 Antena VHF,10 element BH Rp.
61 Master Amplifier BH Rp.
62 Penangkal petir Spitzen BH Rp.
63 Sekrering Tunggal "LN" biasa Bh Rp.
64 Sekering ganda "LN" biasa Bh Rp.
65 Sekering 1 group + MCB Unit Rp.
66 Sekering 2 group + MCB Unit Rp.
67 Sekering 3 group + MCB Unit Rp.
68 Kwh/1phase Digital Unit Rp.
69 Kwh/3 phase/63 A Digital Unit Rp.
70 MCB,1ph/6/10/16/25 amper Unit Rp.
71 Box panel Hanger Unit Rp.
72 Grounding box 40x40x40cm Unit Rp.
73 Grounding Rod,1" Unit Rp.
74 BC 50 mm2 M1 Rp.
75 Genset 25 kva Silent type Unit Rp.
76 Box Telepon Unit Rp.
77 Jelly armoured 10x2x0,6 mm M1 Rp.
78 Splitter 6 port bh Rp.
79 MDF-FA ( 10 zone ) bh Rp.
80 Kabel NYA 1000 Volt 6x1,5 mm M1 Rp.
81 Kabel NYA 1000 Volt 20x1,5 mm M1 Rp.
82 Pipa Konduit HI dia.32 mm M1 Rp.
83 Pipa Konduit HI 2 x dia.32 mm M1 Rp.
HARGA
SATUAN BAHAN
5
Halaman : 115
Memasang Splitter TV
Bahan An. SNI ( Revisi ) 6.16.1
1.000 bh Splitter 6 port @ Rp. 124,836.00 = Rp 124,836.00
5.000 % Perlengkapan instalasi = Rp 6,241.80
Sub total : = Rp 131,077.80
Upah An. SNI ( Revisi ) 6.16.2
0.025 Oh Pembantuk tukang listrik @ Rp. 59,800.00 = Rp 1,495.00
0.025 Oh Tukang listrik @ Rp. 70,000.00 = Rp 1,750.00
0.017 Oh Kepala tukang istrik @ Rp. 130,000.00 = Rp 2,158.00
0.014 Oh Mandor @ Rp. 92,200.00 = Rp 1,290.80
Sub total : = Rp 6,693.80
Lain-lain K3 + CAR = Rp 413.31
Memasang MCFA
Bahan An. SNI ( Revisi ) 6.29.1
1.000 bh MCFA-5 Zone @ Rp. 5,670,000.00 = Rp 5,670,000.00
5.000 % Perlengkapan instalasi = Rp 283,500.00
Sub total : = Rp 5,953,500.00
Upah An. SNI ( Revisi ) 6.29.2
0.166 Oh Pembantuk tukang listrik @ Rp. 59,800.00 = Rp 9,926.80
0.166 Oh Tukang listrik @ Rp. 70,000.00 = Rp 11,620.00
0.033 Oh Kepala tukang istrik @ Rp. 130,000.00 = Rp 4,290.00
0.017 Oh Mandor @ Rp. 92,200.00 = Rp 1,530.52
Sub total : = Rp 27,367.32
Lain-lain K3 + CAR = Rp 17,942.60
Memasang P-PLN
Bahan An. SNI ( Revisi ) 6.55.1
1.000 bh Box Panel @ Rp. 1,018,224.00 = Rp 1,018,224.00
1.000 bh Cu Bar @ Rp. 520,150.00 = Rp 520,150.00
1.000 bh MCCB,3p 300 A @ Rp. 3,953,140.00 = Rp 3,953,140.00
5.000 % Perlengkapan instalasi = Rp 76,918.70
Sub total : = Rp 5,568,432.70
Upah An. SNI ( Revisi ) 6.55.2
0.166 Oh Pembantuk tukang listrik @ Rp. 59,800.00 = Rp 9,926.80
0.166 Oh Tukang listrik @ Rp. 70,000.00 = Rp 11,620.00
0.033 Oh Kepala tukang istrik @ Rp. 130,000.00 = Rp 4,290.00
0.017 Oh Mandor @ Rp. 92,200.00 = Rp 1,530.52
Sub total : = Rp 27,367.32
Lain-lain K3 + CAR = Rp 16,787.40
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang 1 M Kabel Power ( NYY 4x185 mm + NYA 95 mm )
Bahan An. SNI ( Revisi ) 6.12.1
1.000 m NYY 4x185 mm @ Rp. 697,522.00 = Rp
1.000 m NYA 95 mm @ Rp. 154,850.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.12.2
0.033 Oh Pembantuk tukang listrik @ Rp. 59,800.00 = Rp
0.033 Oh Tukang listrik @ Rp. 70,000.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 130,000.00 = Rp
0.014 Oh Mandor @ Rp. 92,200.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang Lampu sorot
Bahan An. SNI ( Revisi ) 6.30.1
1.000 bh Lampu armatur HPI-T 250 W @ Rp. 1,100,000.00 = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang Panel DB Unit Lt 2 s/d 5
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Panel DB Unit lt 2,3,4,5 @ Rp. 12,444,000.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.150 Oh Pembantuk tukang listrik @ Rp. 59,800.00 = Rp
0.150 Oh Tukang listrik @ Rp. 70,000.00 = Rp
0.010 Oh Kepala tukang istrik @ Rp. 130,000.00 = Rp
0.010 Oh Mandor @ Rp. 92,200.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
228,064.00
34,000.00
13,103.20
275,167.20
9,926.80
11,620.00
4,290.00
1,530.52
27,367.32
907.60
303,442.12
226,184.00
11,309.20
237,493.20
9,926.80
11,620.00
4,290.00
1,530.52
27,367.32
794.58
265,655.10
123,018.00
6,150.90
129,168.90
9,926.80
11,620.00
4,290.00
1,530.52
27,367.32
469.61
157,005.83
159,075.00
7,953.75
167,028.75
9,926.80
11,620.00
4,290.00
1,530.52
27,367.32
583.19
194,979.26
954,450.00
154,850.00
55,465.00
1,164,765.00
9,926.80
11,620.00
4,290.00
1,530.52
27,367.32
3,576.40
1,195,708.72
11,930.00
0.00
596.50
12,526.50
9,926.80
11,620.00
4,290.00
1,530.52
27,367.32
119.68
40,013.50
406,757.00
20,337.85
427,094.85
9,926.80
11,620.00
4,290.00
1,530.52
27,367.32
1,363.39
455,825.56
247,591.00
12,379.55
259,970.55
9,926.80
11,620.00
4,290.00
1,530.52
27,367.32
862.01
288,199.88
150,750.00
7,147.00
7,894.85
165,791.85
9,926.80
11,620.00
4,290.00
1,530.52
27,367.32
579.48
193,738.65
84,900.00
4,245.00
89,145.00
9,926.80
11,620.00
4,290.00
1,530.52
27,367.32
349.54
116,861.86
200,435.00
10,699.00
10,556.70
221,690.70
9,926.80
11,620.00
4,290.00
1,530.52
27,367.32
747.17
249,805.19
169,569.00
8,478.45
178,047.45
9,926.80
11,620.00
4,290.00
1,530.52
27,367.32
616.24
206,031.01
188,814.00
9,440.70
198,254.70
9,926.80
11,620.00
4,290.00
1,530.52
27,367.32
676.87
226,298.89
263,196.00
13,159.80
276,355.80
9,926.80
11,620.00
4,290.00
1,530.52
27,367.32
911.17
304,634.29
241,350.00
12,067.50
253,417.50
9,926.80
11,620.00
4,290.00
1,530.52
27,367.32
842.35
281,627.17
697,522.00
154,850.00
42,618.60
894,990.60
1,943.50
2,275.00
2,158.00
1,290.80
7,667.30
2,707.97
905,365.87
19,250.00
0.00
962.50
20,212.50
1,495.00
1,750.00
2,158.00
1,290.80
6,693.80
80.72
26,987.02
1,100,000.00
55,000.00
1,155,000.00
9,926.80
11,620.00
4,290.00
1,530.52
27,367.32
3,547.10
1,185,914.42
820,200.00
41,010.00
861,210.00
9,926.80
11,620.00
4,290.00
1,530.52
27,367.32
2,665.73
891,243.05
227,500.00
11,375.00
238,875.00
897.00
1,050.00
130.00
92.20
2,169.20
723.13
241,767.33
59,233,200.00
2,961,660.00
62,194,860.00
8,970.00
10,500.00
1,300.00
922.00
21,692.00
186,649.66
62,403,201.66
10,047,600.00
502,380.00
10,549,980.00
8,970.00
10,500.00
1,300.00
922.00
21,692.00
31,715.02
10,603,387.02
13,861,200.00
693,060.00
14,554,260.00
8,970.00
10,500.00
1,300.00
922.00
21,692.00
43,727.86
14,619,679.86
12,444,000.00
622,200.00
13,066,200.00
8,970.00
10,500.00
1,300.00
922.00
21,692.00
39,263.68
13,127,155.68
5,756,400.00
287,820.00
6,044,220.00
8,970.00
10,500.00
1,300.00
922.00
21,692.00
18,197.74
6,084,109.74
10,363,200.00
518,160.00
10,881,360.00
8,970.00
10,500.00
1,300.00
922.00
21,692.00
32,709.16
10,935,761.16
499,800.00
24,990.00
524,790.00
897.00
1,050.00
130.00
92.20
2,169.20
1,580.88
528,540.08
DAFTAR HARGA BAHAN BANGUNAN
PROV. ACEH
HARGA
Kelompok NO. NAMA / JENIS BAHAN SATUAN
SATUAN BAHAN
1 2 3 4 5
E BAHAN VALVE
1 Gate valve 10K 3/4" (20 mm) Bh Rp.
2 Gate valve 10K 1" (25 mm) Bh Rp.
3 Gate valve 10K 1,25" (32 mm) Bh Rp.
4 Gate valve 10K 1,5" (40 mm) Bh Rp.
5 Gate valve 10K 2" (50 mm) Bh Rp.
6 Gate valve 10K 2,5" (65 mm) Bh Rp.
7 Gate valve 10K 3" (80 mm) Bh Rp.
8 Gate valve 10K 4" (100 mm) Bh Rp.
9 Gate valve 10K 6" (150 mm) Bh Rp.
10 Gate valve 16K 2" (50 mm) Bh Rp.
11 Gate valve 16K 4" (100 mm) Bh Rp.
12 Gate valve 16K 6" (150 mm) Bh Rp.
13 Butterfly valve 10K 6" (150 mm) Bh Rp.
14 Check valve 10K 2" (50 mm) Bh Rp.
15 Check valve 16K 4" (100 mm) Bh Rp.
16 Check valve 16K 6" (150 mm) Bh Rp.
17 strainer 10K 2" (50 mm) Bh Rp.
18 strainer 16K 2" (50 mm) Bh Rp.
19 strainer 16K 6" (150 mm) Bh Rp.
20 flexible joint 10K 2" (50 mm) Bh Rp.
21 flexible joint 10K 6" (150 mm) Bh Rp.
22 foot valve 10K 2" (50 mm) Bh Rp.
23 foot valve 10K 6" (150 mm) Bh Rp.
24 Roof drain 4" (100 mm) Bh Rp.
25 Roof drain 5" (125 mm) Bh Rp.
25 Floor drain 2" (50 mm) Bh Rp.
26 Clean out (FCO) 3" (80 mm) Bh Rp.
27 Clean out (FCO) 6" (150 mm) Bh Rp.
28 Clean out (FCO) 2" (50 mm) Bh Rp.
29 Clean out (FCO) 4" (100 mm) Bh Rp.
30 Meter air Bh Rp.
F PERALATAN HYDRAN
1 Indoor Hydran Box (IHB) Type B Bh Rp.
2 Outdoor Hydran Box (OHB) Type C Bh Rp.
3 Hydran pillar 2 ways (Ex. lokal) Bh Rp.
4 Siamesse connection (ex. Local) Bh Rp.
5 Fire Extinguisher Type CO2 Class B & C Kap. 2,5 kg bh Rp.
6 Fire Extinguisher Type Class ABC Kap. 2,5 kg Bh Rp.
BANGUNAN
EH
HARGA
SATUAN BAHAN
5
0.00 1.000
259,582,200.00 1.000 259,582,200.00 259,582,200.00
48,902,700.00 1.000 48,902,700.00 48,902,700.00
42,900,000.00 1.000 42,900,000.00 42,900,000.00
85,000,000.00 1.000 85,000,000.00 85,000,000.00
11,500,000.00 1.000 11,500,000.00 11,500,000.00
3,500,000.00 1.000 3,500,000.00
9,000,000.00 1.000 9,000,000.00
Memasang 1 bh Indoor Hydran Box (IHB) Type A2, termasuk fire hose 1,5"x30 m c/w coupling machino
jet nozzel, hydran valve 1,5" dan 2,5", dan hose rack
Bahan An. SNI ( Revisi ) 6.33.1
1 bh IHB @ Rp. 4,401,300.00 = Rp 4,401,300.00
10 % Perlengkapan = Rp 440,130.00
Sub total : = Rp 4,841,430.00
Upah An. SNI ( Revisi ) 6.32.2
0.250 Oh Pekerja @ Rp. 59,800.00 = Rp 14,950.00
0.250 Oh Tukang @ Rp. 78,700.00 = Rp 19,675.00
0.040 Oh Kepala tukang @ Rp. 106,780.00 = Rp 4,271.20
0.040 Oh Mandor @ Rp. 92,200.00 = Rp 3,688.00
Sub total : = Rp 42,584.20
Lain-lain K3 + CAR = Rp 14,652.04
Memasang 1 bh Ooutdoor Hydran Box (OHB) Type C, termasuk fire hose 2,5"x30 m c/w coupling machino
jet nozzel 2,5"
Bahan An. SNI ( Revisi ) 6.33.1
1 bh OHB @ Rp. 4,032,000.00 = Rp 4,032,000.00
10 % Perlengkapan = Rp 403,200.00
Sub total : = Rp 4,435,200.00
Upah An. SNI ( Revisi ) 6.32.2
0.180 Oh Pekerja @ Rp. 59,800.00 = Rp 10,764.00
0.180 Oh Tukang @ Rp. 78,700.00 = Rp 14,166.00
0.040 Oh Kepala tukang @ Rp. 106,780.00 = Rp 4,271.20
0.040 Oh Mandor @ Rp. 92,200.00 = Rp 3,688.00
Sub total : = Rp 32,889.20
Lain-lain K3 + CAR = Rp 13,404.27