TINGKATAN KETERSEDIAAN ALAT MEKANIS

A. Tingkatan Ketersediaan Alat Muat

- waktu kerja (W) = 419,5 Menithari

- waktu repair (R) = 140 Menit/hari

- waktu standby (S) = 40,52 Menit/Hari

- total waktu (T) = 600 Menit/Hari

𝑊
E= x 100%
𝑊𝑡

419,5
E= x 100%
600

= 69,9% = 67%

1. Mechanical Availability (MA)

𝑊
MA = x 100%
𝑊+𝑅

419,5
MA = x 100%
419,5 +140

419,5
= x100%
559,5

= 75 %

2. Physical Availibility (PA)


148

𝑊+𝑆
PA = X 100%
𝑊+𝑅+𝑆
419,5+40,52
PA = X 100%
419,5+140+40,52
460
= X 100%
600
= 77 %

3. Use Of Availibility (UA)

𝑊
UA = X 100%
𝑊+𝑆

419,5
UA = X 100%
419,5+40,52

419,5
= X 100%
460

= 91 %

4. Efective Utilization (EU)

𝑊
EU = X 100%
𝑇

419,5
EU = X 100%
600

=70 %

B. Tingkat Ketersediaan Alat Angkut


Berdasarkan data di lapangan :
- waktu kerja (W) = 423,77 Menit/Hari

- waktu repair (R) = 130 Menit/Hari

- waktu standby (S) = 46,23 Menit/ Hari

- total waktu (T) = 600 Menit/Hari


149

𝑊
E= x 100%
𝑊𝑡

936,14
E= x 100%
1200

E = 78 %

1. Mechanical Availability (MA)


𝑊
MA = x 100%
𝑊+𝑅

423,77
MA = x 100%
423,77 +130

423,77
= x100%
553,77

= 77 %

2. Physical Availibility (PA)

𝑊+𝑆
PA = X 100%
𝑊+𝑅+𝑆

423,77+46,23
PA = X 100%
423,77 +130+46,23

470
= X 100%
600

= 78 %

3. Use Of Availibility (UA)

𝑊
UA = X 100%
𝑊+𝑆

423,77
UA = X 100%
423,77+46,23

423,77
= X 100%
470
150

= 90 %

4. Efective Utilization (EU)

𝑊
EU = X 100%
𝑇

423,77
EU = X 100%
600

= 71 %