µ
Mining boundary
2°7'30"S
2°7'30"S
N=9764767.987 N=9764767.987
E=272173.522 E=272509.830
SKALA 1:10,000
0 8,500 17,000 34,000 51,000 68,000
Centimeters
ASH DISPOSAL
PROYEKSI PETA
N=9764493.272 Proyeksi.........................Transverse Mecator
Existing Road E=272734.225 Sistem Grid...................Grid Geografis (Lat-Long)
Datum Horizontal.........UTM Zona 48S
N=9764654.095
E=272173.522
N=9764279.600 Ash
E=272452.450 Gambar 2.2
transportation road
N=9764224.487
PETA LAYOUT
N=9764068.914 E=272864.732
E=272339.977 ANALISIS DAMPAK LINGKUNGAN
PLTU MULUT TAMBANG JAMBI-1 (2X300 MW)
N=9763996.715
E=272358.489 BESERTA SARANA PENUNJANGNYA
Using Land's boundary
N=9764069.696
E=272258.946
LEGENDA
2°8'0"S
2°8'0"S
ASH DISPOSAL Lokasi PLTU Jambi-1 Jalan Utama
300m
Batas Kecamatan Danau
N=9763952.705 Access road
E=272009.936
Pemukiman Sungai
for fuel
Mesjid Kota
ö
Jalan
Belt conveyer
C BO
A A CBO from coal mining area
B A A
N=9763587.537 B \U+4EBA\U+5B54
E=271810.692
POWER PLANT
300m
N=9763273.963
E=272361.079
2°8'30"S
Access road
Sumber :
1. Peta Rupa Bumi Indonesia, Skala 1:50.000, 2013
2. Peta Administrasi Provinsi Jambi
3. Peta Administrasi Kabupaten Sarolangun