Anda di halaman 1dari 107

PELAPORAN JENIS PEKERJAAN PENUNJANG DALAM PEMBORONGAN PEKERJAAN

SAMPAI DENGAN 3 MEI 2017

PEKERJA/BURUH NOMOR BUKTI BUKTI PELAPORAN


LAPORAN JUMLAH PERUBAHAN JENIS PEKERJAAN
NO NAMA PERUSAHAAN SEKTOR KET
YANG KE- PEKERJA/BURUH PENUNJANG
L P

1 PT. KALTIM PRIMA COAL PERTAMBANGAN BATU BARA 1 4,389 335 4,724 Nomor :560/JPP-01/248/HIJ/2017 √
M1 Swarga Bara Kec. Sangatta Utara
Kab. Kutai Timur
Nomor Surat Permohonan :
L.41-HR.IR/I/2017,
Tanggal 24 Januari
2017

2 4,335 332 4,667 Nomor :560/JPP-05/920/HIJ/2017 √

Nomor Surat Permohonan : 3 4,308 328 4,636 Nomor :560/JPP-06/ /HIJ/2017 √


L-363/HR.IR/VIII/2017,
Tanggal 04 Agustus
2017
Nomor Surat Permohonan : 4 4,266 324 4,590 Nomor :560/JPP-09/ /HIJ/2017 √
L-461/HR.IR/X/2017,
tanggal 06 Oktober
2017

2 PT. TAMBANG RAYA USAHA TAMA PERTAMBANGAN BATU BARA 1 737 26 763 Nomor :560/JPP-02/438/HIJ/2017 √
Kec. Teluk Pandan Kab. Kutai
Timur Nomor
Surat Permohonan :
124/TRUST/HR/EXT/II/2017,
Tanggal 17
Februari 2017

2 733 26 759 Nomor :560/JPP-04/768/HIJ/2017 √

Nomor Surat Permohonan : 3 745 26 771 Nomor :560/JPP-07/ /HIJ/2017 √


510/TRUST/HR/EXT/8/2017,
tanggal 07
Agustus 2017
3 PT. INDOMINCO MANDIRI PERTAMBANGAN BATU BARA 1 605 46 651 Nomor :560/JPP-03/510/HIJ/2017 √
Kec. Teluk Pandan Kab. Kutai Timur
Nomor Surat
Permohonan : 079/L-IMB-GOV/II/17 ,
28 Februari 2017
4 PT. PAMAPERSADA NUSANTARA District PERTAMBANGAN BATU BARA 1 3,015 9 3,024 Nomor :560/JPP-08/ /HIJ/2017 √
KPC Sangatta Bintang
Area, KPC Mine Project Swarga Bara
Kec. Sangatta Utara
Nomor Surat Permohonan :
KPCS/OPR/17/16/PN, 04 September
2017
PENDAFTARAN PERJANJIAN PEMBORONGAN PEKERJAAN
SAMPAI DENGAN 2017

NO NAMA PERUSAHAAN SEKTOR PEMBERI PEKERJAAN NOMOR KONTRAK


KOPERASI KARYAWAN KPC BARANG DAN JASA PT. KALTIM PRIMA COAL 1 NO. KPC-55-0057,
Jl. Dr. Soetomo No.1 No.Variasi : 002
Swarga Bara Sangatta Utara 30 September 2016
Nomor Surat Permohonan : "PROVISION OF
675/K3PC-HRD&GA /Ext/ HYDROCARBON AND MEDICAL
XII/2016 WASTE DESTRUCTION SERVICES"

No. Surat : 480/K3PC- BARANG DAN JASA PT. KALTIM PRIMA COAL 2 NO. KPC-77-0050 Tgl 24 Februari 2017
HRD7GA/Ext/VIII/2017 "PENYEDIAAN MAKANAN KOTAKAN
UNTUK KARYAWAN KERJA BERGILIR
12 JAM"
1

No. Surat : 453/K3PC- BARANG DAN JASA PT. KALTIM PRIMA COAL 3 No. KPC-44-0169 No. VARIASI : 001 Tgl
HRD&GA/Ext/VIII/2017 Tanggal 31 Juli 04 Juli 2017 "PROVISION OF
2017 CLEANING SERVICE AND PLANT
SUPPORT TO CPHD AREA"
No. Surat : 455/K3PC- BARANG DAN JASA PT. KALTIM PRIMA COAL 4 No.005/P/VII-10/2017 Tgl 10 Juli 2017
HRD&GA/Ext/VIII/2017 TGL 01 Agustus "MAINTENANCE HELPER SERVICE
2017 AGREEMENT"

PT. WIRA KELUARGA MANDIRI General Contractors PT. KALTIM PRIMA COAL 1 No. KPC-22-0167
Jl. Yos Sudarso III RT.19 No.23 No. Perubahan : 01
Sangatta 08 September 2016
Nomor "
Surat Permohonan : 001/WKM- PROVISION OF CLEANING
Pro/I/2017 Tanggal 05 April 2017 WORKSHOP, FUEL STATION AREA,
OPERATING WASH PAD, AND OIL
TRAP SERVICES"
2
PT. WIRA KELUARGA MANDIRI 2 No.KPC-45-0125
Jl. Yos Sudarso III RT.19 No.23 14 Juni 2016
Sangatta "PENGADAAN
Nomor LAYANAN PENGASPALAN JALAN"
Surat Permohonan : 001/WKM-
Pro/I/2017 Tanggal 05 April 2017

PT. ODG INDONESIA Jasa Pelaksanaan PT. KALTIM PRIMA COAL 1 No. KPC-22-0136
Jl. Road 9 KPC Area Kec. Kontruksi Mekanikal,
Sangatta Utara Elektrik, Fire & Security No. Variasi : 01
3 Nomor Surat System 14 November 2016
Permohonan : Sgt- " PENYEDIAAN
17097, Tanggal 12 Januari 2017 JASA PEMELIHARAAN LIGHTING
PLANT, LIGHTING TOWER DAN
2 No. KPC-22-0154

No. Variasi : 02
14 November 2016
" PENYEDIAAN
JASA PEMELIHARAAN LISTRIK DI
BENGKEL DAN DI AREA PIT"
PT. ANJEV MITRA KARYA General Contractors PT. KALTIM PRIMA COAL 1 No.A0262/016
Jl. Cendana No.01 RT.05 01 Oktober 2016
Kabo Jaya Kec. Sangatta Utara " KONTRAK
PENGADAAN SUKU CADANG
Nomor Surat Permohonan : RADIATOR"
008/SK-AMK/I/2017,
Tanggal 23 Januari 2017
Nomor Surat Permohonan : General Contractors PT. KALTIM PRIMA COAL 2 No. KPC-22-0198
011/SK-AMK/I/2017, 20 JULI 2015
Tanggal 23 Januari 2017 "
PENYEDIAAN JASA PERBAIKAN
RADIATOR DAN PENDINGIN ALAT
BERAT"
Nomor Surat Permohonan : General Contractors PT. KALTIM PRIMA COAL 3 No. KPC-22-0200
010/SK-AMK/I/2017, 11 JULI 2016
Tanggal 23 Januari 2017 "
PENYEDIAAN JASA PENGECATAN
4 UMUM UNTUK ALAT BERAT DAN
KOMPONEN, ABRASIVE BLASTING
AIR INDUCTION TUBING, PERBAIKAN
FIBERGLASS TUBING, DAN PRA-
PEMERIKSAAN RIM RODA"
Nomor Surat Permohonan : General Contractors PT. KALTIM PRIMA COAL 4 No. KPC-22-0166
009/SK-AMK/I/2017, 15 AGUSTUS 2014
Tanggal 23 Januari 2017 "
PENYEDIAAN LAYANAN
PEMBERSIHAN SARINGAN UDARA
ALAT PERTAMBANGAN"
Nomor Surat Permohonan : General Contractors PT. KALTIM PRIMA COAL 5 PURCHASE ORDER NO : F73760
012/SK-AMK/II/2017, 22
Tanggal 06 Februari 2017 NOVEMBER 2016
"SERVICE OF REPAIR
RADIATOR OF WARTSILA DIESEL
GENERATOR & SUPPLY MATERIAL"
PT. AMBAR BORNEO General Contractors PT. KALTIM PRIMA COAL 1 No.KPC-11-0194
Jl. Poros Kabo Dusun III 01 September 2015
No.22 RT.09 Swarga Bara Kec. Sangatta "LAYANAN UMUM
5 Utara UNTUK WILAYAH HATARI DAN
Nomor Surat Permohonan : BINTANG SERTA LAYANAN TRUK
002/AB-SGT/I/2017, TINJA UNTUK WILAYAH MOD"
Tanggal 27 Januari 2017
PT. AGUS SUTA LINE General Contractors PT. KALTIM PRIMA COAL 1 No.KPC-44-0206
Jl. P. Suriansyah No.32 09 September 2016
Samarinda "PENYEDIAAN
6 Nomor Surat LAYANAN PENGERUKAN DAN
Permohonan : 006/ASL- PEMELIHARAAN TERMINAL"
ACC/II/Rr-17, Tanggal
03 Februari 2017
PT. PELITA BUMI WANGI Jasa Kontraktor Listrik PT. KALTIM PRIMA COAL 1 No.KPC-44-0165
Jl. Margo Santoso II 30 November 2016
No.145 Sangatta "PROVISION OF
Nomor Surat ELECTRICAL APPLIANCES
Permohonan : 002/PBW- MAINTENANCE SERVICES AT CPHD
Disnaker/II-17, Tanggal FIXED PLANT AREAS"
14 Februari 2017
7
PT. PELITA BUMI WANGI PT. KALTIM PRIMA COAL 2 No.KPC-44-0165 No.Variasi : 002
Jl. Margo Santoso II 30
No.145 Sangatta November 2016
Nomor Surat "PROVISION OF ELECTRICAL
Permohonan : 003/PBW- APPLIANCES MAINTENANCE
Disnaker/II-17, Tanggal SERVICES AT CPHD FIXED PLANT
14 Februari 2017 AREAS"
PT. MULTI KONTROL NUSANTARA Kontraktor Telekomunikasi PT. KALTIM PRIMA COAL 1 No.KPC-33-0030
KPC No.Variasi : 011
Communication Bulding Tango Delta D8 21 Oktober 2016
8 Kec. Sangatta Utara "PROVISION OF
Nomor Surat COMMUNICATION REPAIR AND
Permohonan : 028/MKN- MAINTENANCE SERVICE"
Disnakertrans/X/2017,
tanggal
PT. H & 10 OktoberINTERNATIONAL
H UTAMA 2017 Industri Stell Fabrication PT. KALTIM PRIMA COAL 1 No.KPC-44-0168
Jl. Swarga Bara dan Dock Yard No.Variasi : 003
Road 09 Kec. 07 Desember 2016
Sangatta Utara "PROVISION OF
Nomor Surat SUPPORTING COAL PROCESSING
Permohonan : PLANT MAINTENANCE (CPPM) IN
05/HH/SGT/II/2017, REPLACEMENT, REFURBISH &
Tanggal 16 Februari 2017 RECTIFICATION WORN OUT
COMPONENT"

N0.Surat Permohonan : Industri Stell Fabrication PT. KALTIM PRIMA COAL 2 PO No. 93934 Tanggal 23 Oktober 2017
006/HH/SGT/X/2017 Tanggal 26 Oktober dan Dock Yard
2017

3 PO No. F68655 Tanggal 05 September


9 2017
4 PO No. F76670 Tanggal 10 Januari 2017

PT. WARINGIN ARUM 1 No.KPC-45-0127


Jl. Road 9 RT.17 RW.G4 18 Mei 2016
Kec. Sangatta Utara "LAYANAN
PENGADAAN PEMELIHARAAN
Nomor Surat Permohonan : BANGUNAN"
001/WA/DISNAKER/II/2017
Tanggal 17 Februari 2017
10 Jasa Konstruksi PT. KALTIM PRIMA COAL
Nomor Surat Permohonan : 2 No.KPC-44-0214
002/WA/DISNAKER/VI/2017 24 Januari 2017
Tanggal 08 Juni 2017 "PEMBANGUNAN
FASILITAS BENGKEL LAYANAN DI
INUL"

PT. KARSA UTAMA BENGALON Jasa Boga PT. MADHANI TALATAH NUSANTARA 1 Surat Perjanjian No.
Jl. Lembak Dalam 0179/045C/IX/2016/MTN-KUB
RT.06 Dese Sepaso Timur Kec. "PERJANJIAN
Bengalon Kab. Kutai Timur KERJASAMA AKOMODASI, TATA
11 Nomor GRAHA, BINATU DAN JASA CATERING
Surat Permohonan : BENGALON PROJECT"
0123/SK/KUB/II/2017
Tanggal 23 Februari 2017
PT. TRIWISNNA Jasa Transport, PT. KALTIM PRIMA COAL 1 No. KPC-55-0021 No Variasi : 008
Jl. Yos Sudarso II / 17 Kec. Sangatta Maintenance, Supplier dan Tanggal 19 Agustus 2016
Utara Kab. Kutai Timur Contractor "TRANSFER AND
Nomor DELIVER HYDROCARBON WASTE"
Surat Permohonan :
02/EXT-TW/II/2017
Tanggal 08 Februari 2017
PT. KALTIM PRIMA COAL 2 No. KPC-22-0103 No Variasi : 03
Tanggal 01 Desember 2016
"PENYEDIAAN JASA
PEMELIHARAAN KENDARAAN
RINGAN KPC"

PT. TRIWISNNA PT.PAMAPERSADA NUSANTARA KPCS 3 No. KPCS/11/XII/059/SPM ADDENDUM


Jl. Yos Sudarso II / 17 Kec. Sangatta NO. KPCS/16/III/ADD-04 Tanggal 20
Utara Kab. Kutai Timur MARET 2016
Nomor "PERJANJIAN SEWA MENYEWA"
Surat Permohonan :
06/EXT-TW/V/2017
Tanggal 16 Mei 2017
PT.PAMAPERSADA NUSANTARA KPCS 4 No. KPCS/13/XI/020/SPM ADDENDUM
NO. KPCS/16/XI/ADD-01 Tanggal 01
NOVEMBER 2016
"PERJANJIAN SEWA
MENYEWA"
PT.PAMAPERSADA NUSANTARA KPCS 5 No. KPCS/13/XI/021/SPM ADDENDUM
NO. KPCS/16/XI/ADD-01 Tanggal 01
NOVEMBER 2016
"PERJANJIAN SEWA
MENYEWA"
PT.PAMAPERSADA NUSANTARA KPCS 6 No. KPCS/13/XII/019/SPM ADDENDUM
NO. KPCS/16/X/ADD-01 Tanggal 29
OKTOBER 2016
"PERJANJIAN SEWA
MENYEWA"
PT.PAMAPERSADA NUSANTARA KPCS 7 No. KPCS/12/V/009/SPM ADDEMDUM
NO. KPCS/16/XI/ADD-04 Tanggal 08
November 2016 ''PERJANJIAN SEWA
MENYEWA''
12
PT.PAMAPERSADA NUSANTARA KPCS 8 NO. KPCS/13/VIII/009/SPM
ADDEMDUM NO. KPCS/7/II/ADD-02
Tanggal 17 februari 2017 "PERJANJIAN
SEWA MENYEWA

PT.PAMAPERSADA NUSANTARA KPCS 9 NO. KPCS/13/VIII/009/SPM


ADDEMDUM NO. KPCS/17/II/ADD-02
Tanggal 17 februari 2017 "PERJANJIAN
SEWA MENYEWA

PT.PAMAPERSADA NUSANTARA KPCS 10 NO. KPCS/11/XII/056/SPM ADDEMDUM


NO. KPCS/16/XII/ADD-05 Tanggal 06
Desember 2017 "PERJANJIAN SEWA
MENYEWA

PT.PAMAPERSADA NUSANTARA KPCS 11 NO. KPCS/12/V/010/SPM ADDEMDUM


NO. KPCS/17/II/ADD-05 Tanggal 08
Februari 2017 "PERJANJIAN SEWA
MENYEWA

PT.PAMAPERSADA NUSANTARA KPCS 12 NO. KPCS/13/VIII/007/SPM


ADDEMDUM NO. KPCS/17/II/ADD-02
Tanggal 17 Februari 2017 "PERJANJIAN
SEWA MENYEWA
PT.PAMAPERSADA NUSANTARA KPCS 13 NO. KPCS/13/VIII/006/SPM
ADDEMDUM NO. KPCS/17/II/ADD-02
Tanggal 03 Februari 2017 "PERJANJIAN
SEWA MENYEWA

Nomor Surat Permohonan : PT. KALTIM PRIMA COAL 14 No. KPC-11-0210 No Variasi : 001
08/EXT-TW/VII/2017 Tanggal 23 Desember 2016
Tanggal 05 Juli 2017 "CONSTRUCTION OF
BENGKUANG POND"

Nomor Surat Permohonan : PT. KALTIM PRIMA COAL 15 PURCHASE ORDER NO : F69044
08/EXT-TW/VII/2017 Tanggal
Tanggal 05 Juli 2017 14 September 2016
"CONSTRUCT
MENTARI ROAD & DAM STRUCTURE"
PT. FRASTA SURVEY INDONESIA Jasa Konsultasi Bidang PT. KALTIM PRIMA COAL 1 No. KPC-89-0038 No Variasi : 003
Jl. Tongkonan Survey dan Pemetaan Tanggal 02 Januari 2017
Ranu No.73 RT.11 Desa Singa Gembara "PENYEDIAAN JASA
13 Kec. Sangatta Utara JOINT SURVEY UNTUK AREA
Nomor Surat SANGATTA UTARA"
Permohonan : 009/FSI-
Disnaker/SPPP/III/2017
Tanggal 09 Maret 2017
PT. AIR BORN INDONESIA Jasa Angkutan Pesawat PT. KALTIM PRIMA COAL 1 No. KPC-33-0070 No Variasi : 01
Tanjung Bara Kec. Udara Niaga tidak Tanggal 08 Agustus 2012
Sangatta Utara Berjadwal "PROVISION OF AIR
14 Nomor Surat TRANPORTATION"
Permohonan : ABI/BPN-
031/EXT/III/2017
Tanggal 07 Maret 2017
PT. NARIKI MINEX SEJATI Pengeboran Bidang PT. DARMA HENWA, Tbk 1 No. DH/BCP/05/2014 , ADDENDUM I
Jl. M. Yusuf RT.03 Pertambangan dan Tanggal 27 Januari 2017
Kel.Sepaso Induk Kec. Bengalon Explorasi "PEKERJAAN
15 PENGEBORAN UNTUK KEGIATAN
Nomor Surat Permohonan : PERTAMBANGAN DI SITE BENGALON
001/NMS-BCP/ADM/III/2017 COAL PROJECT"
Tanggal 05 April 2017
PT. AEL INDONESIA Jasa konsultan dan PT. KALTIM PRIMA COAL 1 No. KPC-11-0074 No Variasi : 23
Drill & Blast Section D1 Surya Eksplorasi Tanggal 27 September 2016
Building KPC Project Kec. Sangatta "EXPLOSIVE
Utara Kab.Kutai Timur SUPPLY AND BLASTING SERVICE"
16 Nomor
Surat Permohonan : L-
029/SGT/III/2017
Tanggal 07 Maret 2017

PT. KARYANTI INDAH JAYA PERDAGANGAN UMUM PT. KALTIM PRIMA COAL 1 PURCHASE ORDER NO : F80829
Jl Yos Sudarso II No.118 Tanggal
Kec. Sangatta Utara 16 Maret 2017
Nomor Surat "WOOD MEASUREMENT
Permohonan : SERVICES AT KPC CLEARING AREA"
023/III/SPM/2017 Tanggal
20 Maret 2017

Nomor Surat Permohonan : PERDAGANGAN UMUM PT. KALTIM PRIMA COAL 2 NO. KPC-55-0069
065/V/SPM/2017 Tanggal 10 April 2017
Tanggal 15 Juni 2017 "PENYEDIAAN JASA PEMANTAUAN
TANAMAN DI AREA REHABILITASI
KPC"

17
17
Nomor Surat Permohonan : PERDAGANGAN UMUM PT. KALTIM PRIMA COAL 3 NO. KPC-55-0043
101/VIII/SPM/2017 tanggal 26 Juli 2017
Tanggal 24 Agustus 2017 "PROVISION OF BLANKET AND COCO
MESH INSTALLATION SERVICES"

Nomor Surat Permohonan : PERDAGANGAN UMUM PT. KALTIM PRIMA COAL 4 No. F90217 tanggal 30 Agustus 2017 "
133/XI/SPM/2017 tanggal 13 November SERVICE ORDER REFER TO BODY
2017 OF ORDER"

PT. PATRIA BIMA FIXED PLANT PT. CIPTA KUSUMA PERDANA 1 REF No : 2227/CKP/L/VI/2016 Tanggal
Jl. Poros Munthe No.1 MAINTENANCE, OIL SPILL 23 juni 2016
Kec. Sangatta Utara CONTROL, CORROSION "3X18 MW KPC SANGATTA POWER
Nomor DAN ABRASION PLANT PROJECT"
Surat Permohonan : PROTECTION
006/PB-HRGA/III/2016
Tanggal 20 Maret 2017

18
Nomor Surat Permohonan : FIXED PLANT PT. DIRE PRATAMA 2 NO. 026/DP-PB/PK/I/2017
007/PB-HRGA/VI/2017 MAINTENANCE, OIL SPILL Tanggal 03 Januari 2017
Tanggal 20 Juni 2017 CONTROL, CORROSION "JASA PENYEDIAAN
DAN ABRASION PEMELIHARAAN SISTEM CONVEYOR
PROTECTION BATUBARA BENGALON
CV. JULAK MAHAKAM JASA TRANSPORTASI PT. TAMBANG RAYA USAHA TAMA 1 TRUST :000018/E-CTR/TRUT/2016
Jl. D.I. PANJAITAN Gg. PIANO Tanggal 19 DESEMBER 2016
6 RT.03 NO.79 KEC. BONTANG UTARA "AMANDEMEN
KEEMPAT TERHADAP PERJANJIAN
19 Nomor Surat Permohonan : JASA SEWA KENDARAAN"
03/JMM-TRUST/BTG/III/2017
Tanggal 23 Maret 2017

PT. INTI TEKNIK PERDANA KONSTRUKSI ELEKTRIK PT. KALTIM PRIMA COAL 1 PURCHASE ORDER NO : F79294
Jl. Poros Kabo Gg. Tanggal
Fadillah RT.10 No.21 Desa Swarga Bara 21 FEBRUARI 2017
Kec.Sangatta Utara "REPAIR 6 EA CABIN
20 Nomor Surat CAT TRUCK T505 T528 T541 T746 T742
Permohonan : 013/ITP- T716"
SGT/IV/2017 Tanggal 07
April 2017
PT. ANDALAN MINING KONSTRUKSI PT. KALTIM PRIMA COAL 1 No.KPC-11-0214
Jl. Yos Sudarso IV No.88 Tanggal 30 Januari 2017
Kec. Sangatta Utara "KONSTRUKSI JALAN
PENGANGKUTAN BATUBARA
21 Nomor Surat Permohonan : PEDAYAK"
013/SK-P4/Adm.AM/IV/2017,
Tanggal 03 April 2017

PT. INTRACO PENTA PRIMA SERVIS PERDAGANGAN BESAR PT. KALTIM PRIMA COAL 1 No.KPC-22-0177
Volvo Shop ALAT BERAT DAN SUKU Variasi : 003
Tanggo Delta - KPC Project Kec. CADANGNYA Tanggal 06 Januari 2017
Sangatta Utara "KONTRAK
Nomor Surat PERAWATAN PENUH ATAS
Permohonan : ARTICULATED DUMP TRUCK VOLVO
03/IPPS/IV/2017, A35E (Diatas 24,000 Jam SMU)
Tanggal 25 April 2017

22
Nomor Surat Permohonan : PERDAGANGAN BESAR PT. KALTIM PRIMA COAL 2 No.KPC-22-0065
01/IPPS/IV/2017, ALAT BERAT DAN SUKU Variasi : 007
Tanggal 25 April 2017 CADANGNYA Tanggal 25 November 2016
"PERAWATAN
22 PENUH ATAS ARTICULATED DUMP
TRUCK VOLVO A35E, A35F, DAN
EXCAVATOR)

Nomor Surat Permohonan : PERDAGANGAN BESAR PT. KALTIM PRIMA COAL 3 No.KPC-22-0177
02/IPPS/IV/2017, ALAT BERAT DAN SUKU Variasi : 004
Tanggal 25 April 2017 CADANGNYA Tanggal 6 Januari 2017
"KONTRAK PERAWATAN
PENUH ATAS ARTICULATED DUMP
TRUCK VOLVO A35E, A35F (Diatas
24,000 Jam SMU)

PT. PRAKARSA ARYA PERDANA KONTRAKTOR PT. KALTIM PRIMA COAL 1 No.KPC-11-0139
Jl. Soekarno Hatta PERTAMBANGAN BATU Variasi No : 004
RT.026, Singa Gembara Sangatta Utara BARA Tanggal 14 Desember 2016
"PENEDIAAN
Nomor Surat Permohonan : JASA PENGELASAN DI DALAM
060/TR/PAP-SGT/IV/2017, WILAYAH MOD"
Tanggal 27 April 2017

PT. KALTIM PRIMA COAL 2 No.KPC-11-0167


Variasi No : 004
Tanggal 21 September 2016
"PEENYEDIAAN
JASA PENGELOLAAN AIR KOLAM DI
KEPODANG, KEDASIH, ANGSOKA,
ANGSANA, ASPARAGA DAN
KAKAKTUA"
23
23
Nomor Surat Permohonan : PT. KALTIM PRIMA COAL 3 No. KPC-11-0167 tanggal 04 Maret 2015
152/TR/PAP-SGT/XI/2017, "Penyediaan jasa pengelolaan air kolam
Tanggal 09 Novemer 2017 di kepodang, kedasih, angsoka,
angsana, asparaga, kakaktua

PT. KALTIM PRIMA COAL 4 No.KPC-11-0154


Variasi No : 003
Tanggal 31 Juli 2015
"LAYANAN
INFRASTRUKTUR MINOR DALAM
DEPARTEMEN BINTANG, HATARI DAN
PROYEK DALAM PIT"

PT. FAJAR MAS MURNI PERDAGANGAN UMUM/ PT. KALTIM PRIMA COAL 1 No.KPC-22-0135
Jl. H. Masdar Gg. Harapan I KEAGENAN BARANG Tanggal 01 September 2014
RT.17 No.37 Kec. Sangatta Utara INTERNASIONAL/ "PENYEDIAAN
PERDAGANGAN BESAR JASA PEMELIHARAAN KOMPRESOR"
24 Nomor Surat Permohonan : ALAT BERAT
016/HRD/FMM-BPP/IV/2017,
Tanggal 06 April 2017

PT. SANTOMIC MITRA BERSAMA JASA PT. KALTIM PRIMA COAL 1 PURCHASE ORDER NO : R80196
Jl. Apt. Pranoto Tanggal
No.262 RT.10 Kec. Sangatta Utara 21 Maret 2017
25 Nomor Surat Permohonan :
002/SMBSGT/PK/2017,
Tanggal 12 April 2017
PT. MI SANGATTA General Contractors PT. KALTIM PRIMA COAL 1 PURCHASE ORDER NO : F78685
Jl. Road 9 Kec. Sangatta Utara tanggal 09 Februari 2017

Nomor Surat Permohonan :


010/MI/V/2017, Tanggal 29 Mei 2017

PT. KALTIM PRIMA COAL 2 PURCHASE ORDER NO : F73391


tanggal 19 November 2016

PT. KALTIM PRIMA COAL 3 PURCHASE ORDER NO : F80678


tanggal 14 Maret 2017;

PT. KALTIM PRIMA COAL 4 PURCHASE ORDER NO : F74812


tanggal 08 Desember 2016

Nomor Surat Permohonan : PT. KALTIM PRIMA COAL 5 Nomor KPC-44-0219


011/MI/V/2017, Tanggal 29 Mei 2017

Nomor Surat Permohonan : PT. TRAKINDO UTAMA 6 Purchase Order Lokal


012/MI/V/2017, Tanggal 29 Mei 2017 Nomor : 4500065410

Nomor Surat Permohonan : PT. PELABUHAN INDONESIA IV 7 Nomor : 09/HK.301/III/SGT-2017 ,


013/MI/V/2017, Tanggal 29 Mei 2017 (Persero) Pekerjaan Pembangunan Gedung
Kantor PT. Pelabuhan Indonesia IV
(Persero) UPK Sangatta di Wilayah
Terbatas PT. Kaltim Prima Coal

26
26
Nomor Surat Permohonan : PT. TRAKINDO UTAMA 8 PURCHASE ORDER LOKAL NOMOR :
MI/05/VIII/2017, tanggal 18 Agustus 4500071985 tanggal 10 Juni 2017,
2017 "Repair Blower 13 Unit & Repair Gutter"

Nomor Surat Permohonan : PT. PAMAPERSADA NUSANTARA 9 Surat Perjanjian Pemborongan (SPP) No
MI/06/VIII/2017, tanggal 18 Agustus DISTRICK KPC SANGATTA : KPCS/17/VII/044/CT "Rumah Pompa
2017 Kolam 3"

Nomor Surat Permohonan : General Contractors PT. KALTIM PRIMA COAL 10 PURCHASE ORDER NO : F91314
MI/20/IX/2017, tanggal 25 September tanggal 12 September 2017
2017

Nomor Surat Permohonan : General Contractors PT. KALTIM PRIMA COAL 11 PURCHASE ORDER NO : F91312
MI/21/IX/2017, tanggal 25 September tanggal 12 September 2017
2017
PT. SUMBER KARYA UTAMA JASA KONSTRUKSI PT. KALTIM PRIMA COAL 1 PURCHASE ORDER NO : F82397
Jl. Yos Sudarso III Teluk tanggal 10 April 2017
Lingga Kec. Sangatta Utara
Nomor
Surat Permohonan :
018/SKU-S/SP/V/2017
Tanggal 08 Mei 2017

2 PURCHASE ORDER NO : F83790


tanggal 02 Mei 2017

27

3 PURCHASE ORDER NO : F83556


tanggal 27 April 2017

4 PURCHASE ORDER NO : F82165


tanggal 04 April 2017

PT.INFOTECH KOMUNIKATAMA PERDAGANGAN BESAR PT. KALTIM PRIMA COAL 1 No.KPC-34-032


KPC M3 Building, Kec. MESIN, PERALATAN DAN Tanggal 15 Juni 2015
Sangatta Utara PERLENGKAPAN "PEMELIHARAAN
Nomor Surat LAINNYA ABSENSI SIDIK JARI DAN PERALATAN
28 Permohonan : PENUNJNG LAINNYA"
036/EXT/IKT/V/2017,
Tanggal 22 Mei 2017
PT.BUDHI WIGUNA PRIMA JASA/KONTRAKTOR PT. KALTIM PRIMA COAL 1 No.KPC-11-0215
Road 9, Swarga Bara Kec. PERTAMBANGAN BATU Tanggal 20 Maret 2017
Sangatta Utara BARA "KONTRUKSI KOLAM
Nomor Surat MELAYANG"
Permohonan :
No.L.01/PPPP/BWP/SGT/VI/2017,
Tanggal 14 Juni 2017

Nomor Surat Permohonan : PT. KALTIM PRIMA COAL 2 No.KPC-11-0212


No.L.02/PPPP/BWP/SGT/VI/2017, Tanggal 20 Maret 2017
Tanggal 14 Juni 2017 "KONTRUKSI
STRUKTUR TIMBUNAN BAN"

Nomor Surat Permohonan : PT. KALTIM PRIMA COAL 3 PURCHASE ORDER NO : F85140
No.L.03/PPPP/BWP/SGT/VI/2017, tanggal 29 Mei 2017 "PROVISION
Tanggal 14 Juni 2017 MATERIAL HANDLING EQUIPMENT
FOR OPERATIONAL KPC POWER
29 PLANT"

PT. KALTIM PRIMA COAL 4 PURCHASE ORDER NO : F69265


tanggal 15 September 2016
"DAMBODY OPEN CHANNEL J VOID"
PT. KALTIM PRIMA COAL 5 No.KPC-11-0068A
Variasi No : 010
Tanggal 06 Deseber 2016
"LIMESTONE
CRUSHER"

PT. ATLAS COPCO NUSANTARA PERDAGANGAN DAN PT. KALTIM PRIMA COAL 1 No.KPC-33-0061, No Variasi : 5
Road 9, Swarga Bara JASA Tanggal 13 April 2017
Kec. Sangatta Utara
Nomor Surat "PROVISION OF MAINTENANCE AND
30 Permohonan : 078/ACN- SERVICE OF BANLAW FMS"
SGT/VII/2017, Tanggal 4
Juli 2017

PT. GADING JAYA PERKASA KONTRAKTOR PT.PAMAPERSADA NUSANTARA SITE 1 NOMOR : JIEP/SEM/13/1057/SP
Desa Suka Rahmat, PERTAMBANGAN DAN INDOMINCO COAL MINING PROJECT Tanggal 30 Oktober 2013
Tandung Mayang Kec. Teluk Pandan JASA
"PERJANJIAN TENTANG
31 Nomor Surat Permohonan : PEMBORONGAN PEKERJAAN
024/GJP-BTG/SKRK/VII/2017, ANTARA PT.PAMAPERSADA
Tanggal 31 Juli 2017 NUSANTARA DENGAN PT.GADING
JAYA PERKASA INDO- BONTANG"
PT. ALPHA BETHA SUKSES PRIMA KONTRAKTOR PT. KALTIM PRIMA COAL 1 PURCHASE ORDER NO : F80912
Road 9 Kec. PERTAMBANGAN DAN tanggal 17 Maret 2017
Sangatta Utara JASA
Nomor Surat
Permohonan :
024/VII/PP/BPN/17,
Tanggal 24 Juli 2017
PT. ALPHA BETHA SUKSES PRIMA KONTRAKTOR PT. TRAKINDO UTAMA 2 PURCHASE ORDER LOKAL NOMOR :
Road 9 Kec. PERTAMBANGAN DAN 4500071987 tanggal 10 Juni 2017,
Sangatta Utara JASA
Nomor Surat
Permohonan :
173/ABSP-SGT/SK/IX/2017,
tanggal 24 Juli 2017

3 PURCHASE ORDER LOKAL NOMOR :


4500073033 tanggal 10 Juli 2017,

4 PURCHASE ORDER LOKAL NOMOR :


4500074187 tanggal 01 Agustus 2017,

5 PURCHASE ORDER LOKAL NOMOR :


4500074188 tanggal 01 Agustus 2017,
32

PT. ALPHA BETHA SUKSES PRIMA KONTRAKTOR PT. SUCOFINDO (PERSERO) 6 NOMOR : 0079/SGT-V/KONTRAK/2017,
Road 9 Kec. PERTAMBANGAN DAN SANGATTA tanggal 5 Mei 2017 PERBAIKAN ATAP
Sangatta Utara JASA LABORATOTIUM DI GEDUNG PT.
Nomor Surat SUCOFINDO LUBUK TUTUNG,
Permohonan :
174/ABSP-SGT/SK/IX/2017,
tanggal 18 September 2017
7 NOMOR : 0078/SGT-V/KONTRAK/2017,
tanggal 5 Mei 2017 PERBAIKAN ATAP
GUDANG KONTAINER DI GEDUNG PT.
SUCOFINDO LUBUK TUTUNG,

PT. ALPHA BETHA SUKSES PRIMA KONTRAKTOR PT. PETRO STORINDO ENERGI 8 PURCHASE ORDER NO : 217/L/VII-
Road 9 Kec. PERTAMBANGAN DAN 18/2017/PSE-ABSP/DIR/DJrn tanggal 18
Sangatta Utara JASA Juli 2017
Nomor Surat
Permohonan :
175/ABSP-SGT/SK/IX/2017,
tanggal 18 September 2017
PT. ALPHA BETHA SUKSES PRIMA KONTRAKTOR PT. KALTIM PRIMA COAL 9 PURCHASE ORDER NO : 792759
Road 9 Kec. PERTAMBANGAN DAN tanggal 03 Oktober 2017
Sangatta Utara JASA
Nomor Surat
Permohonan :
186/ABSP-SGT/SK/X/2017,
PT. tanggal
KALTIM05 Oktober
GRAHA 2017
SENTOSA KONTRAKTOR PT. KALTIM PRIMA COAL 1 PURCHASE ORDER NO : F79727
Jl. Munthe Kec. PERTAMBANGAN DAN tanggal 27 Februari 2017
Sangatta Utara JASA
Nomor Surat
33 Permohonan :
P.010/ENG-Disnakertrans/VII/2017
Tanggal 10 Juli 2017
Nomor Surat Permohonan : KONTRAKTOR PT. KALTIM PRIMA COAL 1 PURCHASE ORDER NO : F85757
P.011/ENG-Disnakertrans/VII/2017 PERTAMBANGAN DAN tanggal 07 Juni 2017
Tanggal 10 Juli 2017 JASA

KOPERASI KARYAWAN KALTIM PRIMA KONTRAKTOR PT. KALTIM PRIMA COAL 1 No.KPC-44-0169, No.Variasi : 001
COAL (K3PC) PERTAMBANGAN DAN Tanggal 04 Juli 2017
Jl. Dr. Soetomo No.1 Swarga LABOUR SUPPLY
Bara Kec. Sangatta Utara "PROVISION OF CLEANING SERVICE
Nomor Surat AND PLANT SUPPORT TO CPHD
Permohonan : AREA"
453/K3PC-HRD & GA/Ext/VII/2017
Tanggal 31 Juli 2017
Nomor Surat Permohonan : KONTRAKTOR PT. PETRO STORINDO ENERGI 2 NO.005/P/VII-10/2017/PSE-
455/K3PC-HRD & GA/Ext/VIII/2017 PERTAMBANGAN DAN K3PC/DIR/HGrn
34 Tanggal 01 Agustus 2017 LABOUR SUPPLY Tanggal 10 Juli 2017
"MAINTENANCE HELPER
SERVICE AGREEMENT"

Nomor Surat Permohonan : KONTRAKTOR PT. KALTIM PRIMA COAL 3 NO. KPC-77-0050
480/K3PC-HRD7GA/Ext/VIII/2017 PERTAMBANGAN DAN tanggal 24 Februari 2017
Tanggal 15 Agustus 2017 LABOUR SUPPLY "PENYEDIAAN
MAKAN KOTAKAN UNTUK KARYAWAN
KERJA BERGILIR 12 JAM"
PT. TJOKRO BERSAUDARA KONTRAKTOR PT. KALTIM PRIMA COAL 1 No.KPC-44-0212
Jl. Soekarno PERTAMBANGAN Tanggal 27 April 2017
Hatta RT.20 Kec. Sangatta Utara "PENYEDIAAN LAYANAN
Nomor PEMBARUAN ROLL CRUSHERS,
35 Surat Permohonan : SIZERS & BREAKERS DI COAL
003/HRD-TB.Sgt/VII/2017 PROCESSING PLANT MAINTENANCE"
Tanggal 27 Juli 2017

PT. DIKALVIN NURANI KONTRAKTOR PT. KALTIM PRIMA COAL 1 No.KPC-45-0113, No Variasi : 001
Jl. Sepakat No.05 PERTAMBANGAN Tanggal 30 November 2016
Kec. Sangatta Utara
Nomor Surat "LANDSCAPING MAINTENANCE AND
36 Permohonan : 005/DIKA- WASTE MANAGEMENT (SWARGA
VIII/2017 Tanggal 07 BARA AREA)"
Agustus 2017

PT. SUMBERDAYA SEWATAMA KONTRAKTOR PT. KALTIM PRIMA COAL 1 No.KPC-45-0114, No Variasi : 006
Area KPC PERTAMBANGAN tanggal 06 Juli 2017
AB Phase Dua Hatari Kec. Sangatta "Provision of
Utara Temporary Diesel Power Generation
Nomor Surat Permohonan : Services (ROM Areas)
SS-003/SGT.16/VIII/2017
tanggal 16 Agustus 2017

37
2 No.KPC-45-0045, No Variasi : 011
tanggal 06 Juli 2017
"Provision of
Temporary Diesel Power Generation
Services (CPP and Tanjung Bara Areas)
PT. KALIMANTAN MAKKERSARA KONTRAKTOR PT. KALTIM PRIMA COAL 1 No.KPC-22-0195
MANDIRI PERTAMBANGAN tanggal 06 Juli 2017
Jl. Soekarno Hatta RT.025 Kec. "PENYEDIAAN JASA
Sangatta Utara PEMELIHARAAN MISCELLANEOUS
38 Nomor Surat UNIT"
Permohonan : KMM-
008/HR/EXT-SGT/VIII/17
tanggal 25 Agustus 2017

PT. KARYA MANDIRI VERANA KONTRAKTOR PT. KALTIM PRIMA COAL 1 No.KPC-44-0216
Gg. Prima PERTAMBANGAN tanggal 17 Januari 2017
RT.19 Desa Teluk Lingga, Kecamatan "PENYEDIAAN
Sangatta Utara LAYANAN PEMELIHARAAN LANSEKAP
Nomor Surat DAN PENGATURAN LIMBAH DI
Permohonan : 457/KMV- WILAYAH TANJUNG BARA"
SGT/VIII/2017 tanggal 31
Agustus 2017
Nomor Surat Permohonan : KONTRAKTOR PT. KALTIM PRIMA COAL 2 PURCHASE ORDER NO : F88655
460/KMV-SGT/VIII/2017 PERTAMBANGAN tanggal 31 Juli 2017
tanggal 31 Agustus 2017
39

Nomor Surat Permohonan : KONTRAKTOR PT. KALTIM PRIMA COAL 3 No.KPC-55-0046, No.Variasi : 003
478/KMV-SGT/IX/2017 PERTAMBANGAN tanggal 31 Mei 2017
tanggal 13 September 2017 "PROVISION OF
MAINTENANCE OF PLANTS
ACTIVITIES AT KPC REHABILITATIONS
AREA - REHABILITATION PROGRAM
PT. KALTIM PRIMA COAL
PT. UNITED TRACTORS PERDAGANGAN JASA PT. KALTIM PRIMA COAL 1 No.KPC-22-0086, No.Variasi : 003
Jl. Tango Delta, DAN SUKU CADANG tanggal 08 Februari 2017
Swarga Bara, Kecamatan Sangatta "SITE SUPPORT
Utara SERVICE AGREEMENT OF KOMATSU
Nomor Surat Permohonan : MOBILE EQUIPMENT"
LUT/172/3303-F/2017
tanggal 04 Juli 2017

Nomor Surat Permohonan : PERDAGANGAN JASA PT. KALTIM PRIMA COAL 2 No.KPC-22-0199B, No. Variasi : 01
LUT/225/3303-F/2017 DAN SUKU CADANG tanggal 03 Agustus 2017
tanggal 04 September 2017 "PROVISION
OF OVERHAUL WET END
40 DEWATERING PUMP AND DREDGING"

Nomor Surat Permohonan : PERDAGANGAN JASA PT. KALTIM PRIMA COAL 3 No.KPC-22-0180, No. Variasi : 01
LUT/224/3303-F/2017 DAN SUKU CADANG tanggal 20 April 2017
tanggal 04 September 2017 "PROVISION OF
ANALYSIS SERVICES"

PT. GLOMINPRO INDONESIA KONTRAKTOR PT. KALTIM PRIMA COAL 1 No.KPC-22-0114, No.Variasi : 01
Site PT.KPC PERTAMBANGAN tanggal 01 September 2015
Kec. Sangatta Utara "PROVISION
Nomor Surat OF MAINTENANCE, REPAIR, AND
41 Permohonan : GI- CALIBRATION OF POWER TOOLS"
ADM018-2017 tanggal
29 Agustus 2017
PT. KALTIM NUSA ETIKA PENYEDIA JASA TENAGA PT.PAMAPERSADA NUSANTARA 1 Nomor : INDO/SPMG/17/1070PN
Jln. Pupuk Raya No.55 KERJA INDOMINCO COAL MINING PROJECT tanggal 31 Januari 2017
Kelurahan : Belimbing, Kec. Bontang "PERJANJIAN
Barat PENYEDIAAN TENAGA KERJA
Nomor Surat Permohonan : ANTARA PT. PAMAPERSADA
KNE-544/DIR-EXT/BTG/VIII/17 NUSANTARA DISTRIK INDO DENGAN
tanggal 22 Agustus 2017 PT. KALTIM NUSA ETIKA"

42
PT.PAMAPERSADA NUSANTARA 2 Nomor : INDO/SPMG/17/3201/PN
INDOMINCO COAL MINING PROJECT tanggal 09 Februari 2017
"PERJANJIAN
PEMBORONGAN JASA PENGAMANAN
ANTARA PT.
PAMAPERSADA NUSANTARA DISTRIK
INDO DENGAN PT. KALTIM NUSA
ETIKA"
PT. ASIH EKA ABADI JASA KESEHATAN (BALAI PT. KALTIM PRIMA COAL 1 NO.KPC-77-007A
Jln. Dr. Soetomo S-01, PENGOBATAN) tanggal 31 Januari 2017
Swarga Bara Kec. Sangatta Utara "PENYEDIAAN SUPPLY
Nomor MEDIS DAN PROGRAM KUNJUNGAN
43 Surat Permohonan : SPESIALIS" - Terkait dengan Perjanjian
031/SK-HR/NJUM/IX/2017 Penyediaan Jasa Medis"
tanggal 01. Februari 2017, surat
kelengkapan berkas kami terima tanggal
11 September 2017
PT. NAGAMAS JAYA MULIA PENYEDIA JASA TENAGA PT. PAMAPERSADA NUSANTARA 1 NOMOR : JIEP/PLA/17/0255/PN/MIKAD-
Jl. Poros Kabo KERJA DISTRICK KPC SANGATTA NJU tanggal 08
RT.06 No.84 Kabo Jaya Swarga Bara Mei 2017
Kec. Sangatta Utara "PERJANJIAN TENTANG
44 Nomor Surat PENGADAAN PENYEDIA TENAGA
Permohonan : 031/SK- KERJA ANTARA PT. PAMAPERSADA
HR/NJUM/IX/2017 NUSANTARA DENGAN PT. NAGAMAS
tanggal 06 September 2017 JAYA UTAMA"
PT. MITRA KARYA BERSAMA KONSTRUKSI PT. KALTIM PRIMA COAL 1 PURCHASE ORDER NO : F79842
Jl. Yos Sudarso III tanggal 01 Maret 2017
Gg. Damai No.02 RT.07 Teluk Lingga
Kec. Sangatta Utara
Nomor Surat
Permohonan :
001/MKB/IX/2017
tanggal 12 September 2017
45
KONSTRUKSI PT. KALTIM PRIMA COAL 2 PURCHASE ORDER NO : F80346
tanggal 09 Maret 2017

PT. PRIMA JAYA PERSADA JASA PERSEWAAN ALAT PT. PAMAPERSADA NUSANTARA 1 No. : JIEP/SEM/17/374/SP
NUSANTARA BERAT DISTRICK KPC SANGATTA tanggal 23 Maret 2017
Perumahan Panorama No.139 "PERJANJIAN PENYEWAAN ALAT
Swarga Bara Kec. Sangatta Utara BERAT"
46 Nomor
Surat Permohonan :
026/IX/PJPN/2017
tanggal 06 September 2017
PT. LINDA JAYA MANDIRI MAINTENANCE PT. INDOMINCO MANDIRI 1 No. : 2015/90/IMM tanggal
Site PT. Indominco CONVEYOR SYSTEM 14 Juli 2015 "COAL
Mandiri Kec. Teluk Pandan LOADING & CBU SYSTEM ROUTINE
Nomor Surat MAINTENANCE SERVICES
47 Permohonan : 096/HRD- AGREEMENT"
LIM/BPP/IX/2017 tanggal
29 September 2017
PT. ROLIZ JAYA UTAMA JASA SANITASI PT.KALTIM PRIMA COAL 1 NO. KPC-44-0215
Jl. Cendrawasih LINGKUNGAN DAN PEST tanggal 30 Januari 2017
Gg.Kakatua RT.04 Teluk Lingga COTROL SERVICE "PENGADAAN LAYANAN
Kec.Sangatta Utara PENGENDALIAN BINATANG DAN
48 Nomor Surat HAMA"
Permohonan : 357/RJU-
SGT/VIII/2017 tanggal 16
Agustus 2017
PT. THIESS CONTRACTORS JASA KONSTRUKSI DAN PT. KALTIM PRIMA COAL 1 "OPERATING AGREEMENT MINING
INDONESIA PERTAMBANGAN SERVICES" tanggal 10 Oktober 2003,
Jl. Porodisa Raya, Kec.Sangatta Variasi Kontrak : No.89 tanggal 06
Utara September 2016
49 Nomor Surat Permohonan :
L092/TCI-COM/Sp/IX/2017
tanggal 25 September 2017

PT. CAKRA PERKASA ENGINEERING MEKANIKAL & PT. KALTIM PRIMA COAL 1 NO. KPC-22-0234
Jl. Kabo ELECTRIKAL tanggal 23 Januari 2017 "LAYANAN
Jaya No.7 Kec.Sangatta Utara PEMELIHARAAN BUCKET AND FRAME
Nomor EX2500 AND EX3500"
50 Surat Permohonan :
030/CPE/SGT/X/2017
tanggal 31 Oktober 2017

PT KARUNIA WAHANANUSA Jl. Lok PERJANJIAN SEWA PT PERKASA INAKAKERTA 1 115/PIK-KWN/IV/16


Beruang Rt. 004 Rw. 001 Dusun Sekurau PERALATAN
awah Desa Sekarat Kec. Bengalon-
51 Kutim Nomor Surat Permohonan :
KWN/PIK/2017/IX/II/17
PT DAYA MITRA MULTI PRATAMA Jl PERDAGANGAN PT. KALTIM PRIMA COAL 1 No. KPC-22-0245 tanggal 01 Juni 2017 "
poros kabo Rt.12 No. 36 Swwarga Bara PENGADAAN SEWA KENDARAAN
Kec. Sangatta Utara 038/DMM- RINGAN 4 WD UNTUK OPERASIONAL
SGT/XI/17

PERDAGANGAN PT. KALTIM PRIMA COAL 2 NO. KPC-22-0243 TGL 15 MEI 2017 "
PENADAAN SEWA KENDARAAN
RINGAN 4WD UNTUK OPERASIONAL
52
Nomor Surat Permohonan : PERDAGANGAN PT KALTIM PRIMA COAL 3 NO KPC-89-005 Variasi ke 3 Tanggal 31
035/DMM-SGT/XI2017 Juli 2017 " PENYEPEAAN JASA
tanggal 09 November 2017 PEMADAM KEBAKARAN SPONTAN DI
LOKASI PENUPUKAN BATU BARA PIT
KONTRAK PENEBANGAN"

PT KANITRA MITRA JAYAUTAMA Jl. PT . UNITED TRACTOR 1 NO. 005/SM-HC/I/2017 Tanggal 04


Raya bontang-samarinda KM.10 Distric Januari 2017 " PENGELOLAAN
Indominco Mandiri Desa Suka Rahmat KEGIATAN ADMINISTRASI"
Kec. Teluk Pandan Kutim
KMJ/001/XI/2017

PT . UNITED TRACTOR 2 NO. 006/SM-HC/I/2017 Tanggal 04


Januari 2017 " PENGUKURAN
KOMPONEN UNDERCARRIAGE"

53
53 PT . UNITED TRACTOR 3 NO. 010/SM-HC/I/2017 Tanggal 04
Januari 2017 " PENDUKUNG
PERAWATAN ALAT BERAT"

PT . UNITED TRACTOR 4 NO. 011/SM-HC/I/2017 Tanggal 04


Januari 2017 "PENGELOLAAN
PENDUKUNG WORKSHOP SERVICE"

PT. KALTIM PRIMA COAL 1 No. KPC-11-0151 Tanggal 31 Agustus


2017 " WATER TREATMENT SERVICE
AT KENNY J, MELAWAI, VOICO,
KALTIM BANUA ETAM Jl. Kabo Jaya No AZALEA, TIUNG, AND PSS POND
05 Swarga Bara Komp. Perumahan PT.
KPC Sangatta Kutim 050/KBE-
SSO/X/2017 26 Oktober 2017
PT. KALTIM PRIMA COAL 2 No. KPC-89-0054 Tanggal 17 Agustus
2017 " WATER TREATMENT SERVICE
KALTIM BANUA ETAM Jl. Kabo Jaya No AT PELANGI PIT"
05 Swarga Bara Komp. Perumahan PT.
KPC Sangatta Kutim 051/KBE-
54 SSO/X/2017 26 Oktober 2017
PT. KALTIM PRIMA COAL 3 No. KPC-11-0211 Tanggal 01 Agustus
2017 " PROVISION OF WATER
KALTIM BANUA ETAM Jl. Kabo Jaya No TREATMENT SERVICE AT NORTH
05 Swarga Bara Komp. Perumahan PT. PONDS"
KPC Sangatta Kutim 052/KBE-
SSO/X/2017 26 Oktober 2017
PT. KALTIM PRIMA COAL 4 No. KPC-20-0070C Tanggal 01 Agustus
2017 " LABOUR SUPPLY FOR PT KPC
KALTIM BANUA ETAM Jl. Kabo Jaya No BY KBE "
05 Swarga Bara Komp. Perumahan PT.
KPC Sangatta Kutim 052/KBE-
SSO/X/2017 26 Oktober 2017
PT. KALTIM PRIMA COAL 1 No. KPC-55-0066 Tanggal 08 Januari
2017 "PROGRAM PENGONTROLAN
PT RENTOKIL Jl. Bungur No L173 NYAMUK"
55 Perum Lembah Hijau, Swarga bara
Sangatta 010/RI-BPP/VIII/2017 21
Agustus 2017
PT. KALTIM PRIMA COAL 1 No. KPC-11-0216 Tgl 18 Juni 2017 "
PENYEDIAAN JASA INSTALASI AIR
PT EMPAT ENAM JAYA ABADI Jl. Poros
DECK"
56 Kabo, Perum. Swarga Bara Extention
Blok H No. 07 Rt. 52 Sangatta Utara
MBORONGAN PEKERJAAN
AN 2017

MASA BERLAKU KONTRAK NOMOR BUKTI PENDAFTARAN PPP


KET
14 OKTOBER 2016 S/D 14 OKTOBER 2019 560/PPP-01/173/HIJ √
11 Januari 2017

01 MARET 2017 S/D 03 NOVEMBER 2017 560/PPP-61/1311-HIJ √

03 JUNI 2017 S/D 03 OKTOBER 2017 560/PPP-55/1203/HIJ √


06 JULI 2017 S/D 06 JULI 2017 560/PPP-56/1201/HIJ √

30 NOVEMBER 2016 S/D 30 NOVEMBER 2019 560/PPP-02/233/HIJ √


23 Januari 2017

1 AGUSTUS 2016 S/D 31 JULI 2019 560/PPP-27/762/HIJ √


25 April 2017

30 NOVEMBER 2016 S/D 30 NOVEMBER 2019 560/PPP-03/249/HIJ √


25 Januari 2017
30 NOVEMBER 2016 S/D 30 NOVEMBER 2019 560/PPP-03/249/HIJ √
25 Januari 2017

01 OKTOBER 2016 S/D 30 SEPTEMBER 2018 560/PPP-04/261/HIJ √


26 Januari 2017

20 JULI 2015 S/D 19 JULI 2018 560/PPP-05/263/HIJ √


26 Januari 2017

11 JULI 2016 S/D 10 JULI 2019 560/PPP-06/262/HIJ √


26 Januari 2017

15 AGUSTUS 2014 S/D 14 AGUSTUS 2017 560/PPP-07/264/HIJ √


26 Januari 2017
560/PPP-10/318/HIJ √
06 Februari 2017

01 NOVEMBER 2015 S/D 31 OKTOBER 2017 560/PPP-08/314/HIJ √


03 Januari 2017

10 OKTOBER 2016 S/D 09 AGUSTUS 2017 560/PPP-09/316/HIJ √


06 Februari 2017

31 MARET 2017 S/D 31 MARET 2020 560/PPP-11/390/HIJ √


14 Februari 2017

31 MARET 2017 S/D 31 MARET 2020 560/PPP-86/ /HIJ


17 Oktober 2017
31 OKTOBER 2016 S/D 30 APRIL 2017 560/PPP-12/401/HIJ √
16 Februari 2017

07 FEBRUARI 2017 S/D 06 FEBRUARI 2020 560/PPP-13/429/HIJ √


22 Februari 2017

560/PPP-87/1588/HIJ
22 Februari 2017

560/PPP-87/1588/HIJ
22 Februari 2017
560/PPP-87/1588/HIJ
22 Februari 2017

19 MEI 2016 S/D 18 MEI 2019 560/PPP-14/437/HIJ √


23 Februari 2017

08 MEI 2017 S/D 07 JANUARI 2018 560/PPP-43/940/HIJ √


13 JUNI 2017

01 SEPTEMBER 2016 S/D 31 JANUARI 2018 560/PPP-15/446/HIJ √


24 Februari 2017
05 OKTOBER 2016 S/D 05 OKTOBER 2019 560/PPP-16/532/HIJ √
14 Maret 2017

31 DESEMBER 2016 S/D 31 DESEMBER 2019 560/PPP-16/532/HIJ √


14 Maret 2017

20 MARET 2016 S/D 19 MARET 2017 560/PPP-17/531/HIJ √


14 Maret 2017

01 NOVEMBER 2016 S/D 30 APRIL 2017 560/PPP-17/531/HIJ √


14 Maret 2017

01 NOVEMBER 2016 S/D 30 APRIL 2017 560/PPP-17/531/HIJ √


14 Maret 2017
29 OKTOBER 2016 S/D 28 APRIL 2017 560/PPP-17/531/HIJ √
14 Maret 2017

08 NOVEMBER 2016 S/D 07 MEI 2017 560/PPP-42/927/HIJ √


14 Maret 2017

17 FEBRUARI 2017 S/D 16 AGUSTUS 2017 560/PPP-42/927/HIJ √


14 Maret 2017

17 FEBRUARI 2017 S/D 16 AGUSTUS 2017 560/PPP-42/927/HIJ √


14 Maret 2017

06 DESEMBER 2017 S/D 05 JUNI 2017 560/PPP-42/927/HIJ √


14 Maret 2017

08 FEBRUARI 2017 S/D 07 AGUSTUS 2017 560/PPP-42/927/HIJ √


14 Maret 2017

17 FEBRUARI 2017 S/D 16 AGUSTUS 2017 560/PPP-42/927/HIJ √


14 Maret 2017
03 FEBRUARI 2017 S/D 02 AGUSTUS 2017 560/PPP-42/927/HIJ √
14 Maret 2017

09 JANUARI 2017 S/D 08 MARET 2017 560/PPP-50/1030/HIJ √


11 JULI 2017

20 DESEMBER 2016 560/PPP-50/1030/HIJ √


11 JULI 2017

03 JANUARI 2017 S/D 03 JANUARI 2022 560/PPP-18/530/HIJ √


14 Maret 2017

07 MEI 2012 S/D 06 MEI 2017 560/PPP-19/533/HIJ √


14 Maret 2017
01 APRIL 2017 S/D 31 MARET 2018 560/PPP-20/534/HIJ √
14 Maret 2017

30 SEPTEMBER 2017 S/D 31 DESEMBER 2021 560/PPP-21/557/HIJ √


20 Maret 2017

PERIODE 3 TAHUN 560/PPP-22/571/HIJ √


22 Maret 2017

01 MEI 2017 S/D 30 APRIL 2020 560/PPP-47/997/HIJ √


03 JULI 2017
30 APRIL 2017 S/D 30 APRIL 2019 560/PPP-63/1313/HIJ √
29 Agustus 2017

30 Agustus 2107 s/d 28 September 2017 560/PPP-79/1718/HIJ √

- 560/PPP-23/570/HIJ √
22 Maret 2017

03 JANUARI 2017 S/D 31 DESEMBER 2017 560/PPP-48/996/HIJ √


03 JULI 2017
01 JANUARI 2017 S/D 31 DESEMBER 2017 560/PPP-24/596/HIJ √
29 Maret 2017

2 BULAN 560/PPP-25/642/HIJ √
10 April 2017

DIMULAI 01 MARET 2017, 560/PPP-26/740/HIJ √


PERKIRAAN PENYELESAIAN PEKERJAAN 18 APRIL 2017
8 BULAN

46 BULAN 560/PPP-28/771/HIJ √
27 APRIL 2017
46 BULAN 560/PPP-29/772/HIJ √
27 APRIL 2017

46 BULAN 560/PPP-30/774/HIJ √
27 APRIL 2017

14 JANUARI 2017 S/D 14 JANUARI 2018 560/PPP-31/787/HIJ √


02 MEI 2017

13 OKTOBER 2016 S/D 13 OKTOBER 2017 560/PPP-32/788/HIJ √


02 MEI 2017
13 OKTOBER 2017 S/D 13 JANUARI 2018 560/PPP-93/1717/HIJ √

01 JANUARI 2016 S/D 31 DESEMBER 2017 560/PPP-33/789/HIJ √


02 MEI 2017

01 SEPTEMBER 2014 S/D 31 AGUSTUS 2017 560/PPP-34/790/HIJ √


02 MEI 2017

- 560/PPP-35/801/HIJ √
04 MEI 2017
- 560/PPP-36/880/HIJ √
29 MEI 2017

560/PPP-36/880/HIJ √
29 MEI 2017

560/PPP-36/880/HIJ √
29 MEI 2017

560/PPP-36/880/HIJ √
29 MEI 2017

560/PPP-37/881/HIJ √
29 MEI 2017

560/PPP-38/882/HIJ √
29 MEI 2017

560/PPP-39/888/HIJ √
29 MEI 2017
560/PPP-59/ /HIJ √
21 Agustus 2017

560/PPP-60/ /HIJ √
21 Agustus 2017

19-Sep-17 560/PPP-80/1441/HIJ √
28 September 2017

19-Sep-17 560/PPP-81/1442/HIJ √
28 September 2017
560/PPP-40/891/HIJ √
30 Mei 2017

560/PPP-40/891/HIJ √
30 Mei 2017

560/PPP-40/891/HIJ √
30 Mei 2017

560/PPP-40/891/HIJ √
30 Mei 2017

01 JULI 2015 S/D 30 JUNI 2018 560/PPP-41/900/HIJ √


31 MEI 2017
10 APRIL 2017 S/D 17 SEPTEMBER 2017 560/PPP-44/995/HIJ √
03 Juli 2017

01 JULI 2017 S/D 30 JUNI 2019 560/PPP-45/994/HIJ √


03 JULI 2017

05 JUNI 2017 560/PPP-46/993/HIJ √


03 JULI 2017

27 JANUARI 2017 560/PPP-46/993/HIJ √


03 JULI 2017
31 MARET 2017 S/D 31 DESEMBER 2018 560/PPP-46/993/HIJ √
03 JULI 2017

19 NOVEMBER 2016 S/D 19 NOVEMBER 2018 560/PPP-49/1025/HIJ √


10 Juli 2017

1-Nov-13 560/PPP-51/1520/HIJ √
31 Juli 2017

24 Maret 2017 560/PPP-52/1200/HIJ √


01 Agustus 2017
560/PPP-76/1443/HIJ √
22 September 2017

560/PPP-76/1443/HIJ √
22 September 2017

560/PPP-76/1443/HIJ √
22 September 2017

560/PPP-76/1443/HIJ √
22 September 2017

560/PPP-77/1442 /HIJ √
22 September 2017
560/PPP-77/1442/HIJ √
22 September 2017

560/PPP-78/1441/HIJ √
22 September 2017

560/PPP-86/ /HIJ √
13 Oktober 2017

06 Maret 2017 560/PPP-53/1199/HIJ √


01 Agustus 2017
14 Juni 2017 560/PPP-54/1204/HIJ √
01 Agustus 2017

30-Sep-17 560/PPP-55/1203/HIJ √
08 Agustus 2017

06 JULI 2017 S/D 06 JULI 2019 560/PPP-56/1201/HIJ √


08 Agustus 2017

01 MARET 2017 S/D 03 NOVEMBER 2017 560/PPP-61/1311/HIJ √


28 Agustus 2017
27 APRIL 2017 S/D 26 APRIL 2020 560/PPP-57/1202/HIJ √
08 Agustus 2017

tanggal Penyelesaian Kontrak 30 April 2018 560/PPP-58/ /HIJ √


14 Agustus 2017

27 Juli 2017 s/d 27 Oktober 2017 560/PPP-62/1310/HIJ √


28 Agustus 2017

27 Juli 2017 s/d 27 Oktober 2017 560/PPP-62/1310/HIJ √


28 Agustus 2017
09 NOVEMBER 2015 s/d 08 NOVEMBER 2018 560/PPP-64/1314/HIJ √
29 Agustus 2017

01 FEBRUARI 2017 s/d 31 JANUARI 2020 560/PPP-65/1386/HIJ √


04 September 2017

07 AGUSTUS 2017 560/PPP-66/1387/HIJ √


04 September 2017

31 MARET 2017 S/D 31 OKTOBER 2017 560/PPP-74/ /HIJ √


22 September 2017
31 DESEMBER 2016 s/d 31 DESEMBER 2017 560/PPP-67/1382/HIJ √
06 September 2017

12 JULI 2017 S/D 12 JANUARI 2018 560/PPP-68/1384/HIJ √


06 September 2017

31 MEI 2017 S/D 30 NOVEMBER 2017 560/PPP-69/1383/HIJ √


06 September 2017

30 SEPTEMBER 2015 s/d 30 SEPTEMBER 2018 560/PPP-70/1385/HIJ √


11 September 2017
01 FEBRUARI 2017 s/d 31 JANUARI 2019 560/PPP-71/1389/HIJ √
11 September 2017

10 FEBRUARI 2017 s/d 09 FEBRUARI 2018 560/PPP-71/1389/HIJ √


11 September 2017

01 JANUARI 2016 s/d 31 DESEMBER 2018 560/PPP-72/ /HIJ √


11 September 2017

01 FEBRUARI 2017 s/d 28 FEBRUARI 2018 560/PPP-73/1388/HIJ √


11 September 2017
560/PPP-75/1445/HIJ √
11 September 2017

560/PPP-75/1445/HIJ √
11 September 2017

01 FEBRUARI 2017 S/D 31 JANUARI 2018 560/PPP-82/1444/HIJ √


25 September 2017

20 AGUSTUS 2015 S/D 19 AGUSTUS 2017 560/PPP-83/ /HIJ √


04 Oktober 2017
01 APRIL 2017 S/D 31 MARET 2020 560/PPP-84/ /HIJ √
05 Oktober 2017

JANUARI 2017 S/D JUNI 2019 560/PPP-85/ /HIJ √


06 Oktober 2017

23 JANUARI 2017 S/D 22 JANUARI 2020 560/PPP-88/ /HIJ √


06 Oktober 2017

1 APRIL 2016 S/D 18 OKTOBER 2021 560/PPP-89/ 1750 /HIJ √


01 JUNI 2017 S/D 31 MEI 2017 560/PPP-90/1719/HIJ PT. DMM NO 90, 91, 92.pdf

15 MEI 2017 S/D 14 MEI 2020 560/PPP-91/1719/HIJ √

31 JULI 2017 S/D 31 JULI 2018 560/PPP-92/1719/HIJ √

01 JANUARI 2017 S/D 31 DESEMBER 2018 560/PPP-92/1716/HIJ √

2 JANUARI 2017 S/D 31 DESEMBER 2018 560/PPP-92/1716/HIJ √


3 JANUARI 2017 S/D 31 DESEMBER 2018 560/PPP-92/1716/HIJ √

4 JANUARI 2017 S/D 31 DESEMBER 2018 560/PPP-92/1716/HIJ √

31 Agustus 2017 s/d 31 Desember 2017 560/PPP-93/1715/HIJ √

17 Agustus 2017 s/d 12 Februari 2018 560/PPP-93/1715/HIJ √

01 Agustus 2017 s/d 31 Juli 2019 560/PPP-93/1715/HIJ √


15 Juni 2017 s/d 15 Juni 2018 560/PPP-93/1715/HIJ √

08 Januari 2017 s/d 07 Januari 2020 pengembalian berkas

01 Juli 2017 S/D 30 JUNI 2018 560/PPP-SGT/1714/HIJ √


PENDAFTARAN PERJANJIAN PENYEDIA JASA PEKERJA/BURUH

NO NAMA PERUSAHAAN SEKTOR PEMBERI PEKERJAAN NOMOR KONTRAK

1 PT. MAJU BERSAMA ALAM PERSADA Penyedia Jasa KOPERASI PAMANDIRI 1 NO.KP/2016/000264/EXT
Jl. Pupuk Raya Km.2 No.55 Pekerja/Buruh 03 November 2016
RT.40 Kecamatan Bontang Barat, "PENGADAAN PENYEDIA JASA
Kalimantan Timur Nomor TENAGA KERJA"
Surat Permohonan : MBAP-007/Dir-
Ext/II/2017, Tanggal 02
Februari 2017

2 PT. CIPTA KARYA BARU Penyedia Jasa PT. PERTAMINA EP ASSET 5 SANGATTA 1 NO.3900410290
RT.004 Dusun Lestari Jaya Desa Pekerja/Buruh FIELD 27 Mei 2016
Sangkima Kec.Sangatta Selatan, "PERJANJIAN PENYEDIAAN PEKERJA
Kabupaten Kutai Timur JASA PENUNJANG TENAGA
Prov. Kalimantan Timur ADMINISTRASI, LABORATORIUM,
Nomor Surat Permohonan : CKB/112/- MEDICAL DAN ICT di PT. PERTAMINA EP
PBM/II/2017, Tanggal 25 ASSET 5 SANGATTA FIELD TAHUN 2016-
Januari 2017 2018"

Penyedia Jasa PT. PERTAMINA EP ASSET 5 SANGATTA 2 NO.3900411682


Pekerja/Buruh FIELD "PERJANJIAN
PENYEDIAAN PEKERJA JASA
PENUNJANG FUNGSI SCM DAN
GENERAL SERVICE PT. PERTAMINA EP
ASSET 5 SANGATTA FIELD TAHUN 2016-
2018"
Penyedia Jasa PT. PERTAMINA EP ASSET 5 SANGATTA 3 NO.3900407396
Pekerja/Buruh FIELD 26 April 2016
"PERJANJIAN PENYEDIAAN PEKERJA
JASA PENUNJANG FUNGSI RAM
PT. PERTAMINA EP ASSET 5
SANGATTA FIELD"

Penyedia Jasa PT. PERTAMINA EP ASSET 5 SANGATTA 4 NO.3900410286


Pekerja/Buruh FIELD 01 April 2016
"PERJANJIAN PENYEDIAAN PEKERJA
JASA PENUNJANG FUNGSI WOWS
PT. PERTAMINA EP ASSET 5
SANGATTA FIELD, TAHUN 2015-2017"
3 PT. RAMAI JAYA ABADI Penyedia Jasa PT. PERTAMINA EP ASSET 5 SANGATTA 1 NO.3900410648
RT.004 Dusun Lestari Jaya Desa Pekerja/Buruh FIELD Tanggal 10 Juni 2016
Sangkima Kec.Sangatta Selatan, "PERJANJIAN PENGADAAN JASA
Kabupaten Kutai Timur TENAGA PENGAMANAN OPERASIONAL
Prov. Kalimantan Timur SANGATTA FIELD ASSET 5 PT.
Nomor Surat Permohonan : 530/RJA- PERTAMINA EP"
SK/II/2017, Tanggal 05
Februari 2017

Penyedia Jasa PT. PERTAMINA EP ASSET 5 SANGATTA 2 NO.3900408883


Pekerja/Buruh FIELD Tanggal 25 April 2016
"PERJANJIAN
PENGADAAN JASA PENUNJANG FUNGSI
HSSE PT PERTAMINA EP ASSET 5
SANGATTA FIELD"

4 PT.YEPEKA USAHA MANDIRI Penyedia Jasa PT. TAMBANG RAYA USAHA TAMA 1 No Legal : 2014/0002/TRUST
JL. Enggang Blok Z No.1 BTN PKT. Pekerja/Buruh Tanggal 02 Januari 2017,
Bontang Nomor Surat Permohonan : Amandemen Kedua TRUST No:
583/YUM-HRD /III/2017, 000001/E-CTR/TRUST/2017 Tanggal 11
Tanggal 02 Maret 2017 Januari 2017
"PERJANJIAN JASA PENYEDIAAN
TENAGA KERJA"

5 PT.AVIAKO SEPINGGAN Penyedia Jasa PT. TRAKINDO UTAMA 1 Ref. No. HR-GA/N-KAL/022/XII/13
JL. Trakindo Utama Sangatta Tanggo Pekerja/Buruh
Delta Komplek KPC Nomor Surat Tanggal 01 Desember 2014,
Permohonan : AVS.01/UM- ("Addendum II")
OUTS/IV/2017, "PERJANJIAN PENYEDIA JASA
Tanggal 04 April 2017 PEKERJA/BURUH"
6 PT.ALLO JAYA Penyedia Jasa PT.PAMAPERSADA NUSANTARA DISTRICK 1 NO : INDO/SPMG/17/0428/PN tanggal
Site PT.Pamapersada Nusantara Pekerja/Buruh INDO 28 Februari 2017 " "PEKERJAAN
Districk Indo Kec.Teluk Pandan PENCUCIAN UNIT A2B DAN DT"
Nomor Surat Permohonan :
044/AJ/IX/2017,
tanggal 29 September 2017

NO : INDO/SPMG/17/0703/PN tanggal
31 Maret 2017 " "PEKERJAAN
PENEBANGAN DAN PEMOTONGAN
POHON

NO : INDO/SPMG/17/0426/PN tanggal
28 Februari 2017 " "PERJANJIAN KERJA
SAMA PEMOTONGAN RUMPUT DI
LINGKUNGAN KERJA PT.PAMAPERSADA
NUSANTARA DISTRICT INDO"

NO. INDO/SPMG/17/1425/PN,
ADDENDUM II tanggal 31 Mei 2017
"PERJANJIAN KERJASAMA
PEMBORONGAN PEKERJAAN
PENGAWASAN AKTIVITAS DUMPING
MATERIAL OB KE ARAH AIR

NO. INDO/SPMG/17/1426/PN,
ADDENDUM II tanggal 09 Mei 2017
"PERJANJIAN KERJASAMA
PEMBORONGAN PEKERJAAN
PENGAWASAN AKTIVITAS CROSS JALUR
HAULING
7 PT. KALTIM NUSA ETIKA Penyedia Jasa PT. KALTIM PRIMA COAL 1 NO.KPC-20-0070A, No Variasi : 012
Road 9 Kec. Sangatta Pekerja/Buruh tanggal 25 April 2016 "Labour Supply
Utara Nomor Surat Permohonan : For PT. KPC by KNE
No. KNE-566/Perso/Ext/X/2017,
tanggal 12 Oktober 2017

PT. SANGGAR SARANA BAJA 2 NO.046/SSB-BS/KTR/IV/2017 tanggal 07


April 2017 " PERJANJIAN PENYEDIA JASA
TENAGA KERJA"

8 PT. BORNEO PRIMA JASA Penyedia Jasa PT. BOART LONGYEAR 1 NO : 002/PKPTK/BPJ-BLY/VIII/2017
Komplek Yayasan Pekerja/Buruh "PERJANJIAN PENYEDIA JASA TENAGA
Sangatta Baru Swarga Bara Sangatta KERJA"
Nomor Surat Permohonan :
Nomor : 0576/BPJ-HR/Ext/X/17 tanggal
05 Oktober 2017

9 PT. IMARI NOURRITURE INDONESIA Penyedia Jasa PT. KALTIM PRIMA COAL 1 NO.KPC-77-0052 "PENYEDIAAN JASA
Jobsite PT. KPC Pekerja/Buruh KAMP DAN KATERING" tanggal 01
Kec. Sangatta Utara Oktober 2017
Nomor Surat Permohonan : Nomor :
009/SPU-MGMNT/X/TK-2017 tanggal 31
Oktober 2017

PT. IMARI NOURRITURE INDONESIA Penyedia Jasa P. TAMBANG RAYA USAHA TAMA 2 NO. 000021/E-CTR/COI/2017 "
Jobsite PT. KPC Kec. Sangatta Utara Pekerja/Buruh PENYEDIA LAYANAN CATERING, OFFICE
Nomor Surat Permohonan : Nomor : BOY, GARDENER"
010/SPU-MGMNT/XI/TK-2017 tanggal
10 November 2017
10 PT PHILINDO JAYA Jl. Hidaya tullah Rt. 03 Penyedia Jasa PT PAMAPERSADA NUSANTARA 1 NO : KPC/17/I/054/CT
teluk Lingga- sangatta utara No. Pekerja/Buruh
UM/PLJ-SGT/104/XI/2017 Tanggal 16
November 2017

11 NO :KPC/17/I/002/CT " HELPER


PRODUKSI PIT GEOLOGIS"
/BURUH

MASA BERLAKU KONTRAK NOMOR BUKTI PENDAFTARAN PPP


KET
03 NOPEMBER 2016 S/D 02 NOPEMBER 2018 560/PPJP-01/313/HIJ √
03 Februari 2017

01 MEI 2016 S/D 19 JUNI 2018 560/PPJP-02/376/HIJ √


13 Februari 2017

01 JUNI 2016 S/D 20 JULI 2018 560/PPJP-03/377/HIJ √


13 Februari 2017
01 APRIL 2016 S/D 20 MEI 2018 560/PPJP-04/378/HIJ √
13 Februari 2017

01 MARET 2016 S/D 19 APRIL 2018 560/PPJP-05/379/HIJ √


13 Februari 2017
01 JUNI 2016 S/D 20 JULI 2018 560/PPJP-06/380/HIJ √
13 Februari 2017

01 JUNI 2016 S/D 20 JULI 2018 560/PPJP-07/381/HIJ √


13 Februari 2017

01 JANUARI 2017 S/D 31 DESEMBER 2017 560/PPJP-08/492/HIJ √


06 Maret 2017

560/PPJP-09/761/HIJ √
25 April 2017
01 MARET 2017 S/D 28 FEBRUARI 2018 560/PPJP-10/ /HIJ √
12 Oktober 2017

01 APRIL 2017 S/D 31 MARET 2018 560/PPJP-10/ /HIJ


12 Oktober 2017

01 MARET 2017 S/D 28 FEBRUARI 2018 560/PPJP-10/ /HIJ


12 Oktober 2017

560/PPJP-10/ /HIJ
12 Oktober 2017

560/PPJP-10/ /HIJ
12 Oktober 2017
15 JUNI 2017 S/D 15 JUNI 2018 560/PPJP-11/ /HIJ √
17 Oktober 2017

01 APRIL 2017 S/D 31 MARET 2018 560/PPJP-12/ /HIJ √


17 Oktober 2017

14 AGUSTUS 2017 S/D 13 AGUSTUS 2018 560/PPJP-13/ /HIJ √


02 November 2017

04 NOVEMBER 2017 S/ 03 NOVEMBER 2020 560/PPJP-14/ /HIJ √


02 November 2017

01 Oktober 2017 s/d 30 September 2019 560/PPJP-09/1710/IV/HIJ/2017 √


04 SEPTEMBER 2017 S/D 03 SEPTEMBER 2018 560/PPJP-16/ /HIJ 21 √
NOVEMBER 2017

30 JANUARI 2017 S/D 29 JUNI 2017 560/PPJP-15/ /HIJ 21 √


NOVEMBER 2017

MENGETAHUI :
KABID. HI DAN JAMSOSTEK
DISNAKERTRANS KAB.KUTAI TIMUR,

RAMLI, SH
NIP.19710309 200502 1 004
REKAP PENDAFTARAN PERJANJIAN PEMBORONGAN PEKERJAAN
TAHUN 2016

NO NAMA PERUSAHAAN SEKTOR PEMBERI PEKERJAAN NOMOR KONTRAK

1 PT. AMBAR BORNEO Jl. KONSTRUKSI PT. KALTIM PRIMA COAL 1 NO. KPC-11-0194,
Poros Kabo Dusun III Kabo Jaya No.22 1 September 2015
RT.009 Swarga Bara Sangatta Utara "GENERAL SERVICE FOR HATARI AND
BINTANG AREA AND SLUDGE TRUCK
SERVICES FOR MOD AREA"

PT. LIEBHEER INDONESIA PERKASA 2 NO. 276/LIP/VII/SGT/2016


1 JULI 2016
"SEWA MENYEWA
KENDARAAN"

2 PT. MERCI PERDANA KARYA JASA KONSTRUKSI PT. KALTIM PRIMA COAL 1 NO. KPC-47-0098, Var. No : 002
Perum SBE Blok G/18 Swarga Bara Tgl 27-1-2014, Tgl Var.
18-02-2015
"PROVISION OF PROJECT SURVEY
SERVICES AT OLC, TBCT & SHIP LOADER
AREA"
3 PT. SKEFINDO PRIMATAMA PERDAGANGAN BESAR PT. KALTIM PRIMA COAL 1 NO. KPC-44-0153
Kop GPL Jl. Tiung IX No.H361 Sangatta Tgl 2 SEPTEEMBER 2013
"FIXED PLANT CONDITION
MONITORING SERVICES"

4 KOPERASI KARYAWAN KPC PERDAGANGAN BARANG PT. KALTIM PRIMA COAL 1 NO. KPC-55-0057 Var. No : 001
Swarga Bara Sangatta Utara DAN JASA Tgl 15-10-2014, Tgl Var.
14-10-2015
"PROVISION OF HDROCARBON AND
MEDICAL WASTE DESTRUCTION
SERVICES"
2 NO. KPC-55-0040 Var. No : 002
Tgl 20-04-2016
3 NO. KPC-55-0061
Tgl 25-07-2016
"PENYEDIAAN JASA PEMBIBITAN
KELAPA SAWIT PROGRAM CSR PT.KPC"

4 NO. KPC-11-0208
Tgl 8 AGUSTUS 2016
"PENYEDIAAN JASA PEMBERSIH DAN
PEMBANTU UMUM UNTUK MOD"

5 PT. PELAYARAN LOGISTIK KONVERSI PELAYARAN PT. KALTIM PRIMA COAL 1 NO. KPC-99-0013
INDONESIA Tgl 5 APRIL 2010
Gedung PG Kantor Coal Terminal,
Sangatta Kutai Timur Kaltim

6 PT. CAKRA PERKASA ENGINEERING PERDAGANGAN BARANG PT. KALTIM PRIMA COAL 1 NO. KPC-22-0164, Var. No :03
Jl. Poros DAN JASA Tgl 1-01-2014, Tgl Var. 29-
Kabo No.07 RT.II Kel Swarga Bara, 09-2015 "PROVISION OF
Sangatta Kaltim GENERAL REPAIR, FABRICATION, AND
LINE BORING AT THE FIELD"

7 PT. KARYANTI INDAH JAYA PERDAGANGAN UMUM PT. KALTIM PRIMA COAL 1 NO. KPC-55-0045, Var. No : 003
Jl. Yos sudarso II Tgl 15-07-2013, Tgl Var.
No.118 Sangatta Kutai Timur 01-10-2015 "PROVISION OF
PLANTING AND MAINTENANCE
SERVICES AT CMD AREA-
REHABILITATIONS PROGRAM PT.KPC"

2 NO. KPC-55-0065, Var. No : 001


TANGGAL 3 OKTOBER
2016 "PENYEDIAAN JASA
PENANAMAN DAN PERAWATAN DIAREA
CMD-PAMA"
8 PT. MULTI KONTROL NUSANTARA KONTRAKTOR PT. KALTIM PRIMA COAL 1 NO. KPC-34-0030B,
KPC TELEKOMUNIKASI Tgl 1 APRIL 2015
Communication Building Tanggo Delta "PROVISION OF RADIO TRANSMISSION
D8 Sangatta DEVICES AND MAINTENANCE SUPPORT"

2 NO. KPC-34-0009, VARIASI :002


Tgl 25 JANUARI 2016
"PROVISION OF
TRANSPORTABLE TOWER RENTAL FOR
MOBILE REPEATER"

9 PT. NAWAKARA PERSADA NUSANTARA SECURITY PT. PAMAPERSADA NUSANTARA 1 KPCS/14/II/019/CT, TGL. 19-02-2015
Jl. Jend. ADENDUM KPCS/15/II/ADD-02,
Sudirman M16 Swarga Bara Sangatta Tgl 1 JANUARI 2014

10 PT. TRANSAVIA OTOMASI PRATAMA PERDAGANGAN PT. PUNJ LLOYD INDONESIA 1 NO.PLI/DFID03/D17/WO/E7/2015/001
Jl. Murai H- TGL. 06 JANUARI 2014
199, Perum GPL Munthe Kec. Sangatta
Utara
11 PT. INDOKOMAS BUANA PERKASA KONTRAKTOR PT. KALTIM PRIMA COAL 1 NTP-47-0087,
Plaza Oleos, Jl.TB Simatupang 12 FEBRUARI 2014
No.53A "ELECTRICAL AND CONTROL SYSTEM
WORK COMPLETION OF MELAWAN
PROJECT"

12 PT. HANEAGLE HEAVYPART INDONESIA DISTRIBUTOR ALAT BERAT PT. KALTIM PRIMA COAL 1 NO. A0074114 1
Area Workshop Surya KPC MARET 2015
"CONTRACT SUPPLY OF ARMSTRONG
PRODUCT HANDTOOLS"

2 NO. A0246014 1
JANUARI 2015
"SUPPLY OF CARLISLE BRAKE CALLIPER"
13 PT. FRASTA SURVEY INDONESIA KONTRAKTOR PT. KALTIM PRIMA COAL 1 NO.KPC-89-0038 , VARIASI : 002
04 JANUARI 2016

14 PT. TRAKINDO UTAMA RENTAL/JUAL BELI PT. KALTIM PRIMA COAL 1 NO.KPC-22-0084 07
ALAT BERAT JANUARI 2016

15 PT. DHARMA RAYA ANUGERAH CANDRA KONTRAKTOR PT. KALTIM PRIMA COAL 1 NO.KPC-44-0156A, Var : 003
29 JANUARI 2016

16 PT. PRAKARSA ARYA PERDANA KONTRAKTOR PT. KALTIM PRIMA COAL 1 NO.KPC-11-0139
18 FEBRUARI 2015

2 NO.KPC-11-0167
4 MARET 2015

3 NO.KPC-11-0154
31 JULI 2015

17 PT. ENERGI BUMI SAKTI KONTRAKTOR PT. PAMAPERSADA NUSANTARA 1 NO. JIEP/SEM/16/0113/SP
SANGATTA 22 JANUARI 2016

18 PT. ATLAS COPCO NUSANTARA KONTRAKTOR PT. DARMA HENWA, Tbk 1 NO.P-017/PA/DH.SCM-CAN/BCP/R2/15

TANGGAL 1 NOVEMBER 2015

19 PT. ANDALAN MINING KONTRAKTOR PT. KALTIM PRIMA COAL 1 NO. KPC-11-0205 TANGGAL
1 JANUARI 2016

2 NO. KPC-11-0206 TANGGAL


25 APRIL 2016

20 PT. TRIWISNNA KONTRAKTOR PT. KALTIM PRIMA COAL 1 NO. KPC-11-0201 TANGGAL
Jl. Yos Sudarso II/17, Sangatta 10 JUNI 2015
Kaltim
2 NO. KPC-22-0103 VAR.002
TANGGAL 27 MEI 2015

3 NO. KPCS-10/VI/044/SPM
TANGGAL 08 SEPTEMBER 2015

4 NO. KPCS/11/XII/059/SPM
TANGGAL 20 MARET 2015

5 NO. KPCS/12/V/009/SPM
TANGGAL 08 MEI 2015

6 NO. KPCS/I2/V/010/SPM
TANGGAL 8 MEI 2015
7 NO. KPC-33-0073 VARIASI : 1
TANGGAL 11 APRIL 2016
8 NO. KPC-33-0038 VARIASI : 009
TANGGAL 04 APRIL 2016
9 NO. KPC-11-0210
TANGGAL 10 AGUSTUS 2016
"KONSTRUKSI KOLAM BENGKUANG"

21 PT. KALIMANTAN MAKKERSARA KONTRAKTOR PT. KALTIM PRIMA COAL 1 NO. KPC-22-0195
MANDIRI TANGGAL 9 NOVEMBER 2015
Jl. Soekarno Hatta RT.025, Desa
Singa Gembara , Sangatta Utara Kutai
Timur Kaltim

22 PT. ORICA MINING SERVICES BLASTING PT. KALTIM PRIMA COAL 1 NO. KPC-11-0166
TANGGAL 01 OKTOBER 2014

23 PT. OELANGAN KARYA ETAM KONTRAKTOR BATU BARA PT. DARMA HENWA, Tbk 1 DH/BCP/22/2014
Jl. Lembak Dalam RT.05 Desa TANGGAL 30 OKTOBER 2014
Sepaso Timur Kec. Bengalon Kutim P-006/PA/DH.SCM-OKE/BCP15/14
TANGGAL 26 MEI 2015
24 PT. MHE DEMAG INDONESIA KONTRAKTOR BATU BARA PT. KALTIM PRIMA COAL 1 NO. KPC-22-0184
Komplek Pertokoan STC Jl.Yos TANGGAL 5 JANUARI 2015
Sudarso Sangatta Kutim

25 KOPERASI KARYAWAN KALTIM PRIMA PERDAGANGAN BARANG PT. KALTIM PRIMA COAL 1 NO. KPC-11-0150, VAR.004
COAL DAN JASA TANGGAL 15 FEBRUARI 2016
Jl. Dr. Soetomo No.1 Swarga Bara
Sangatta Kutim

2 NO. KPC-22-0227
TANGGAL 19 OKTOBER 2016
"PENYEDIAAN JASA UMUM UNTUK
WILAYAH MSD"

26 PT. DIKALVIN NURANI PERDAGANGAN BARANG PT. KALTIM PRIMA COAL 1 NO. KPC-45-0113
Jl. Sepakat No.05 DAN JASA TANGGAL 1MEI 2015
Sangatta Utara
27 PT. SANTOMIC MITRA BERSAMA PERTAMBANGAN PT. KALTIM PRIMA COAL 1 NO. KPC-45-0129
Jl. Apt. TANGGAL 14 MARET 2016
Pranoto No.262 RT.10 Sangatta Utara

2 NO. KPC-45-0128
TANGGAL 1 MARET 2016
3 NO. KPC-47-0051
TANGGAL 23 DESEMBER 2015
27 PT. INDO TRACTOR UTAMA PERTAMBANGAN PT. KALTIM PRIMA COAL 1 NO.4012
Jl. Apt. Pranoto TANGGAL 05 JANUARI 2016
No.138 RT.38 Sangatta

28 PT. GLOBAL ARROW SECURITY PT. KALTIM PRIMA COAL 1 NO.KPC-55-0051 VAR.003
Jl. Poros Bengalon TANGGAL 07 APRIL 2017
-Sangkulirang Km.2 RT.10 Sepaso Timur

29 PT. SERASI AUTORAYA RENTAL MOBIL PT. KALTIM PRIMA COAL 1 NO.KPC-22-0049 VAR :011
Jl. Kabo Jaya No.9 Sangatta TANGGAL 28 JANUARI 2015
2 NO.KPC-22-0115 VAR :016
TANGGAL 07 JULI 2015
3 NO.KPC-22-0113 VAR :005
TANGGAL 06 OKTOBER 2015
4 NO.KPC-22-0194
TANGGAL 01 SEPTEMBER 2015
5 NO.KPC-22-0193
TANGGAL 01 JULI 2015
6 NO.KPC-22-0192
TANGGAL 01 SEPTEMBER 2015
30 PT. CALMIC INDONESIA KONTRAKTOR PT. KALTIM PRIMA COAL 1 NO.KPC-45-0121
Site KPC Kec. Sangatta Utara PERTAMBANGAN BATU TANGGAL 01 MARET 2016
BARA

31 PT. TUNAS MITRA SEJATI KONTRAKTOR PT. KALTIM PRIMA COAL 1 NO.KPC-89-0037 Variasi No :1
Perum GPL Munthe Cluster PERTAMBANGAN BATU TANGGAL 23 Oktober 2014
Hatari No.A4-05 Kec. Sangatta Utara BARA

2 NO.KPC-89-0050
TANGGAL 01 JULI 2015
3 NO.KPC-89-0024 Variasi No :1
TANGGAL 10 JULI 2014
32 PT. PATRIA BIMA KONTRAKTOR PT. KALTIM PRIMA COAL 1 NO.KPC-44-0161
Kec. Sangatta Utara PERTAMBANGAN BATU TANGGAL 16 JULI 2013
BARA

2 NO.KPC-44-0162
TANGGAL 16 JULI 2013
3 NO.KPC-45-0082 VAR : 003
TANGGAL 18 FEBRUARI 2016
33 PT. BUDHI WIGUNA PRIMA KONTRAKTOR PT. KALTIM PRIMA COAL 1 NO.KPC-45-0074
Jl.Road 9 Kec. Sangatta PERTAMBANGAN BATU TANGGAL 1 MEI 2015
Utara BARA

2 NO.KPC-11-0196
TANGGAL 1 JUNI 2016
34 PT. JUHDI SAKTI ENGINEERING KONTRAKTOR PT. CITRA KUSUMA PERDANA 1 No.015/CONTR-CKP/2014
Kec. Sangatta Utara PERTAMBANGAN BATU TANGGAL 23 OKTOBER 2014
BARA

2 No.1179/CKP/L/I/2015
TANGGAL 08 JUNI 2015
3 No.1181/CKP/L/I/2015
TANGGAL 13 APRIL 2015
4 No.1182/CKP/L/I/2015
TANGGAL 13 APRIL 2015
35 PT. ANIFA SURYA MANDIRI KONTRAKTOR PT. KALTIM PRIMA COAL 1 NO.KPC-77-0045
Jl. Poros Kabo Kec. PERTAMBANGAN BATU TANGGAL 1 NOVEMBER 2014
Sangatta Utara BARA

36 PT. PHILINDO JAYA PENYEDIA JASA TENAGA PT. UNITED TRACTORS, Tbk 1 NO.LUT/532/3303-F/2014
Jl. Hidayatullah Kec. Sangatta KERJA TANGGAL 15 OKTOBER 2014
Utara
2 NO.LUT/533/3303-F/2014
TANGGAL 15 OKTOBER 2014
3 NO.LUT/528/3303-F/2014
TANGGAL 15 OKTOBER 2014
4 NO.LUT/529/3303-F/2014
TANGGAL 15 OKTOBER 2014
5 NO.LUT/531/3303-F/2014
TANGGAL 15 OKTOBER 2014
6 NO.LUT/530/3303-F/2014
TANGGAL 15 OKTOBER 2014
7 KPCS/16/VI/81/CT
TANGGAL 10 JUNI 2016
8 KPCS/16/VI/20/CT
TANGGAL 09 JUNI 2016
9 KPCS/16/I/002/CT
TANGGAL 30 JANUARI 2016
37 PT. OMIKA BHAKTI KONTRAKTOR PT. KALTIM PRIMA COAL 1 No.F53875
Jl. Cendana Kec. Sangatta Utara PERTAMBANGAN BATU TANGGAL 11 NOVEMBER 2015
BARA

38 PT. TUNGGAL IKA SAKTI KONTRAKTOR PT. KALTIM PRIMA COAL 1 No. KPC-55-0044
Jl. Cendana Kec. Sangatta PERTAMBANGAN BATU TANGGAL 1 OKTOBER 2015
Utara BARA
2 No. KPC-55-0062
TANGGAL 15 AGUSTUS 2018
"PENYEDIAAN JASA PENANAMAN DAN
PERAWATAN DI AREA BINTANG DAN
JUPITER"

3 No. KPC-55-0063
TANGGAL 15 AGUSTUS 2018
"PENYEDIAAN JASA PENANAMAN DAN
PERAWATAN DI AREA HATARI DAN
BINTANG"

39 PT. DELTA GARDA PERSADA SECURITY PT. DARMA HENWA, Tbk 1 SURAT PENUNJUKAN PENYEDIA JASA
Site PT. Darma Henwa KEAMANAN DI BENGALON COAL
Bengalon PROJECT TANGGAL 4 AGUSTUS 2015

40 PT. DELTA MAS MANDIRI JASA KONSTRUKSI PT. KALTIM PRIMA COAL 1 NO.KPC-45-1117
Jl. Yos Sudarso I No.79 RT.VI TANGGAL 1 SEPTEMBER 2015
Sangatta Utara

41 PT. SANGGAR SARANA BAJA INDUSTRI KOMPONEN PT. KALTIM PRIMA COAL 1 NO.KPC-22-0223
Kompleks Tanggo Delta ALAT BERAT, FABRIKASI TANGGAL 26 APRIL 2016
Kec. Sangatta Utara BAJA DAN PERBAIKAN ALAT "PENYEDIAAN LAYANAN PERBAIKAN
ALAT BERAT SASIS DAN BADAN BAK TRUK
CATERPILAR KOMATSU, HITACHI DAN
LIEBHEER"

2 NO.KPC-22-0221
TANGGAL 26 APRIL 2016
"LAYANAN PENGADAAN PERBAIKAN
UMUM DAN FABRIKASI DI BENGKEL
PERUSAHAAN"

3 NO.KPC-22-0222
TANGGAL 26 MEI 2016 "LAYANAN
PENGADAAN PERBAIKAN UMUM DAN
FABRIKASI DILAPANGAN"
4 NO.KPC-22-0224
TANGGAL 26 APRIL 2016
"LAYANAN PENGADAAN PERBAIKAN
UMUM DAN FABRIKASI DILAPANGAN"

42 PT. BAGUS RIZKY ABADI PEMASOK PERALATAN PT. KALTIM PRIMA COAL 1 NO.KPC-22-0158
Jl. Margo Santoso RT.19 No.61 PENUNJANG TANGGAL 5 AGUSTUS 2016
Kec. Sangatta Utara PERTAMBANGAN, "PROVISION OF AIR CONDITIONING
PEMELIHARAAN MAINTENANCE FOR HEAVY
PERALATAN, PEMASOK EQUIPMENT"
BAHAN BAKAR DAN OLI

43 PT. WEIRS MINERALS INDONESIA JASA PENGADAAN PT. KALTIM PRIMA COAL 1 NO.KPC-22-0199A
Jl. Yos Sudarso IV PERALATAN TANGGAL 13 JULI 2015
No.25 RT.23 Kec. Sangatta Utara PERTAMBANGAN DAN "PENYEDIAAN JASA PERBAIKAN DAN
PERDAGANGAN BESAR PEMERIKSAAN WET END UNTUK
POMPA DE WATERING"

44 PT. ISS JASA FASILITAS JASA CATERING PT. KALTIM PRIMA COAL 1 NO.KPC-77-0044
Jl. Shinzi Tanjung Bara Kec. TANGGAL 04 NOVEMBER 2014
Sangatta Utara "PENYEDIAAN JASA CAMP DAN
CATERING"

45 PT. KALTIM BAJA TEKNIK LABOUR SUPPLY PT.PAMAPERSADA NUSANTARA SITE 1 NO.INDO/SPMG/16/1264/PN
Jl. S. Parman RT.48 Kel INDO TANGGAL 08 APRIL 2016
Belimbing Kota Bontang "MAINTENANCE SERVICE ALAT BERAT"

46 PT. KALTIM GRAHA SENTOSA SIPIL KONTRUKSI, ARCHI PT. KALTIM PRIMA COAL 1 NO.KPC-44-0201
Jl. Munthe NO.43 RT.20 Sangatta TECTURE, MECHANICAL, TANGGAL 14 JUNI 2016
ELECTRICAL "PEMBANGUNAN LANDASAN
PENCUCIAN DIBENGKEL INUL"
47 PT. DAYINDO ADI PRATAMA KONTRAKTOR PT. KALTIM PRIMA COAL 1 NO.KPC-45-0126
Jl. Road 9, KPC Blok IV Kav. NO.18 MAINTENANCE TANGGAL 12 APRIL 2016
"PENYEDIAAN LAYANAN
PEMELIHARAAN ALAT LISTRIK
DIWILAYAH OPERASI SANGATTA DAN
BENGALON"

48 PT. KALTIM NUSA ETIKA LABOUR SUPPLY PT. UNITED TRACTORS, Tbk 1 NO.LUT/370/3308/XI/2015
Jl. Poros Bontang-Samarinda KM. 10 TANGGAL 10 NOVEMBER 2015
Kec.Teluk Pandan "PENGOPERASIAN PERALATAN
PENDUKUNG"

49 PT. DAYA MITRA MULTIPRAMA PERDAGANGAN PT. KALTIM PRIMA COAL 1 NO.KPC-89-0051
Jl. Poros Kabo RT.12 NO. 36 Swarga TANGGAL 24 MEI 2016
Bara kecamatan Sangatta Utara "PENYEPEAAN JASA PEMADAMAN
KEBAKARAN SPONTAN DILOKASI
PENUMPUKAN BATU BARA PIT
KONTRAK PENEBANGAN "

2 NO.KPC-33-0071
TANGGAL 29 JUNI 2016
"PENYEDIAAN JASA ANGKUTAN
RINGAN "

50 PT. MANNA JAYA Jl. KONTRAKTOR DAN COAL PT. TRUST 1 NO.2015/0034/TRUST
BELIBIS RT.008 KEL.KANAAN KEC. MINING TANGGAL 24 AGUSTUS 2015
BONTANG BARAT

51 PT. LIEBHERR INDONESIA PERKASA INDUSTRI KOMPENEN ALAT PT.KALTIM PRIMA COAL 1 NO.KPC/22/0217 TANGGAL
Kpc Project Area Sus BERAT, PERDAGANGAN 01 JANUARI 2015
Surya PIT OLP, Sangatta BESAR

52 PT. WARINGIN ARUM GENERAL KONTRAKTOR PT.KALTIM PRIMA COAL 1 NO.KPC-44-0205 TANGGAL
Jl. Road 9 RT.17 gg.IV Kec. Sangatta DAN SUPPLIER 18 JULI 2016 "PENYEDIAAN
Utara PEKERJA SIPIL MINOR DAN LAYANAN
INSFRASTRUKTUR"
2 NO.KPC-45-0124 TANGGAL
1 JUNI 2016
"PEMBANGUNAN PUSAT DATA TAHAP
KEDUA"

3 NO.KPC-45-0120 TANGGAL
1 JUNI 2016
"PENGGANTIAN ATAP GUDANG
PELABUHAN P#02 DAN PEMBANGUNAN
TAMBAHAN UNTUK PELINDUNG
TRAFO"

53 PT. TAMBANG RAYA USAHA TAMA JASA PERTAMBANGAN PT. INDOMINCO MANDIRI 1 LEGAL NO :2013/0152/IMM
Jl. Bontang - Samarinda BATU BARA TANGGAL 12 DESEMBER 2013
Km.10 Kec. Teluk Pandan

54 PT. PERMATA DWI TUNGGAL ABADI PERDAGANGAN DAN JASA PT. CIPTA KUSUMA PERDANA 1 NO.1606405-WO-CKP
Tanjung Bara Kec. KONSTRUKSI TANGGAL 20 JUNI 2016
Sangatta utara
55 PT. MARGA SUKSES SEJAHTERA JASA KEAMANAN PT. KALTIM PRIMA COAL 1 NO.KPC-55-0050, NO.VARIASI :003
Komplek PT.KPC Jl.Road IC TANGGAL 7 APRIL 2016
Tanjung Bara "PROVISION OF TANJUNG BARA
SECURITY SERVICE"

56 PT. OSSIANA SAKTI EKA MAJU INDUSTRI VUKANISIR DAN PT. KALTIM PRIMA COAL 1 NO.KPC-22-0142, NO.VARIASI :02
SANGATTA TYRE REPAIR TANGGAL 8 MARET 2016
"PROVISION OF TYRE REPAIR SERVICE
R25-R29)"

2 NO.KPC-22-0201
TANGGAL 7 SEPTEMBER 2015
"PROVISION OF OUT SITE TYRE REPAIR
(R49) SERVICE)"

57 PT. GREEN BORNEO MANDIRI JASA PERTAMBANGAN, PT. KALTIM PRIMA COAL 1 NO.KPC-55-0064,
Jl. Sepakat No.83 RT.17 Desa Singa REKLAMASI, PENANAMAN TANGGAL 15 AGUSTUS 2016
Geweh, Kec. Sangatta Utara DAN PERAWATAN "PENYEDIAAN JASA PENANAMAN DAN
TANAMAN PERAWATAN DI AREA CMD-THIESS"
58 PT. INTERMATRA JASA KONSTRUKSI PT. CIPTA KUSUMA PERDANA 1 NO.1602573-WO-CKP,
Tanjung Bara Area PLTU 3x18 MW KPC TANGGAL 15 FEBRUARI 2016
Kec. Sangatta Utara "UNIT 5 BOILER INSULTAN AND
CLADDING WORK I UNIT"

59 PT. KALTIM BANUA ETAM PERDAGANGAN BARANG PT. KALTIM PRIMA COAL 1 NO.KPC-55-0041 NO.VARIASI : 003
Jl. Kabo Jaya No.05 Swarga Bara DAN JASA PENYEDIA TANGGAL 15 MEI 2016
Kec. Sangatta Utara TENAGAKERJA "PROVISION OF KPC
ENVIRONMENTAL MONITORING
SERVICES"

2 NO.KPC-44-0176 NO.VARIASI : 001


TANGGAL 20 JULI 2016
"PROVISION OF CLEANING SERVICE
AND GENERAL HAND FOR
CPHD,MKT&EPD"
3 NO.KPC-89-0054
TANGGAL 17 JUNI 2016
"PENYEDIAAN JASA PENGELOLAAN AIR
DI KOLAM SRIGUNTING DAN KUTILANG"

4 NO.KPC-11-0151 NO.VARIASI : 004


"PENYEDIAAN JASA PENGELOLAAN
AIR KOLAM DI KENNY J, MELAWAI,
RANGKOK, JUPITER, SERIWANG,
BURAKSA DAN PSS"

5 NO.KPC-11-0199 "LAYANAN
UMUM UNTUK WILAYAH JUPITER, COAL
MINING, MINING SERVICES DAN MSD"

6 NO.KPC-11-0155 NO.VARIASI : 003


TANGGAL 12 JANUARI 2016
"LAYANAN INFRASTRUKTUR
MINOR DALAM WILAYAH
DEPARTEMENT PIT J, MINING SERVICE
DAN COAL MINING"

60 PT. SUMBERDAYA SEWATAMA PENYEDIA PT. KALTIM PRIMA COAL 1 NO.KPC-22-0178


Area KPC AB PHASE Dua KETENAGALISTRIKAN TANGGAL 8 SEPTEMBER 2016
Hatari Kec. Sangatta Utara "PENYEDIAAN JASA PERAWATAN
POMPA DEWATERING DAN BOOSTER"

2 NO.KPC-11-0175, VARIASI : 001


TANGGAL 20 MEI 2016
"PENGOPERASIAN POMPA
DEWATERING DAN BOOSTER DI MOD
WILAYAH BINTANG, MINING SERVICES
DAN JUPITER A (WILAYAH SELATAN)
61 PT. ALKAUSAR PUTRA INDONESIA PENYEWAAN KENDARAAN PT.TRUST 1 LEGAL NO :2016/0023/TRUST
Tandung Mayang TANGGAL 13 APRIL 2016
"PERJANJIAN SEWA MENYEWA
KENDARAAN"

62 PT. ODG INDONESIA JASA PELAKSANAAN PT. KALTIM PRIMA COAL 1 PURCHASE ORDER NO: F73836
Jl. Road 9 KPC Area Kec. Sangatta KONSTRUKSI MEKANIKAL, TANGGAL 23 NOVEMBER 2016
Utara ELEKTRIK, FIRE DAN
SECURITY SYSTEM

MENGETAHUI :
KABID. HI DAN JAMSOSTEK
DISNAKERTRANS KAB.KUTAI TIMUR,

RAMLI, SH
NIP.19710309 200502 1 004
GAN PEKERJAAN

MASA BERLAKU KONTRAK NOMOR BUKTI PENDAFTARAN PPP

1 NOVEMBER 2015 S/D 31 OKTOBER 2017 560/PPP-01/1/07/HIJ/2016


4 JANUARI 2016

11 JULI 2016 S/D 10 JULI 2017 560/PPP-82/2035/HIJ


06 OKTOBER 2016

26 JANUARI 2015 S/D 26 JANUARI 2016 560/PPP-02/1/204/HIJ/2016


21 JANUARI 2016

02 OKTOBER 2013 S/D 1 OKTOBER 2016 560/PPP-03/II/262/HIJ/2016


2 FEBRUARI 2016

14 OKTOBER 2015 S/D 14 OKTOBER 2016 560/PPP-04/II/263/HIJ/2016


2 FEBRUARI 2016

560/PPP-47/1173/HIJ
13 JUNI 2016
1 AGUSTUS 2016 S/D 31 OKTOBER 2017 560/PPP-66/1541/HIJ
13 JUNI 2016

16 AGUSTUS 2016 S/D 15 AGUSTUS 2018 560/PPP-86/ /HIJ


11 OKTOBER 2018

05 APRIL 2010 S/D SEPTEMBER 2017 560/PPP-05/II/304/HIJ/2016


9 FEBRUARI 2016

31 DESEMBER 2015 S/D 31 MARET 2016 560/PPP-06/II/305/HIJ/2016


9 FEBRUARI 2016

14 OKTOBER 2016 S/D 14 MARET 2017 560/PPP-07/II/330/HIJ/2016


10 FEBRUARI 2016

1 NOVEMBER 2015 S/D 30 JUNI 2018 560/PPP-105/II/2320/HIJ/2016


5 DESEMBER 2016
DELIVERY, INSTALATION AND COMISSIONING 1 560/PPP-08/II/329/HIJ/2016
APRIL 2015 S/D 30 JUNI 2015 10 FEBRUARI 2016
SERVICES
1 JULI 2015 S/D 30 JUNI
2020

07 FEBRUARI 2016 S/D 07 FEBRUARI 2018 560/PPP-72/1540/HIJ


16 AGUSTUS 2016

01 JANUARI 2015 S/D 31 DESEMBER 2016 560/PPP-09/II/369/HIJ/2016


17 FEBRUARI 2016

1 MARET 2015 S.D 29 FEBRUARI 2016 560/PPP-10/II/370/HIJ/2016


19 FEBRUARI 2016

7 FEBRUARI 2014 S/D 13 OKTOBER 2015 560/PPP-11/II/405/HIJ/2016


24 FEBRUARI 2016

1 MARET 2015 S/D 28 FEBRUARI 2017 560/PPP-12/II/ /HIJ/2016


FEBRUARI 2016

1 JANUARI 2015 S/D 31 DESEMBER 2017 560/PPP-13/II/ /HIJ/2016


FEBRUARI 2016
560/PPP-14/III/ /HIJ/2016
22 MARET 2016

560/PPP-15/III/ /HIJ/2016
22 MARET 2016

560/PPP-16/III/ /HIJ/2016
22 MARET 2016

560/PPP-17/III/ /HIJ/2016
22 MARET 2016

560/PPP-18/III/ /HIJ/2016
22 MARET 2016

560/PPP-19/III/ /HIJ/2016
22 MARET 2016

560/PPP-20/III/ /HIJ/2016
22 MARET 2016

560/PPP-21/III/ /HIJ/2016
22 MARET 2016

560/PPP-22/III/ /HIJ/2016
22 MARET 2016

560/PPP-32/III/997/HIJ/2016
25 MEI 2016

560/PPP-23/III/ /HIJ/2016
24 MARET 2016
560/PPP-24/III/ /HIJ/2016
24 MARET 2016

560/PPP-25/III/ /HIJ/2016
24 MARET 2016

560/PPP-25/III/ /HIJ/2016
24 MARET 2016

560/PPP-25/III/ /HIJ/2016
24 MARET 2016

560/PPP-25/III/ /HIJ/2016
24 MARET 2016
560/PPP-48/1163/HIJ
13 JUNI 2016
560/PPP-49/1162/HIJ
13 JUNI 2016
22 AGUSTUS 2016 S/D 31 JANUARI 2017 560/PPP-93/2094/HIJ
27 OKTOBER 2016

560/PPP-26/III/ /HIJ/2016

560/PPP-27/III/ /HIJ/2016
30 MARET 2016

560/PPP-28/III/ /HIJ/2016
01 APRIL 2016
560/PPP-29/III/ /HIJ/2016
01 APRIL 2016

560/PPP-30/III/ /HIJ/2016
14 APRIL 2016

5 NOVEMBER 2016 S/D 14 NOVEMBER 2019 560/PPP-106/2321/HIJ/2016 5


DESEMBER 2016

560/PPP-31/III/846/HIJ/2016
14 APRIL 2016
560/PPP-34/III/998/HIJ/2016
25 MEI 2016

560/PPP-33/III/999/HIJ/2016
25 MEI 2016
560/PPP-35/III/1000/HIJ/2016
25 MEI 2016
560/PPP-36/843/HIJ
22 APRIL 2016

560/PPP-37/1028/HIJ
30 MEI 2016

560/PPP-38/1028/HIJ
07 JUNI 2016
560/PPP-39/1088/HIJ
07 JUNI 2016

560/PPP-40/ /HIJ
13 JUNI 2016

560/PPP-41/ /HIJ
13 JUNI 2016
560/PPP-42/ /HIJ
13 JUNI 2016
560/PPP-43/1171/HIJ
13 JUNI 2016

560/PPP-44/1169/HIJ
13 JUNI 2016
560/PPP-45/1170/HIJ
13 JUNI 2016
560/PPP-46/1172/HIJ
13 JUNI 2016

560/PPP-51/1203/HIJ
1 JULI 2016
560/PPP-50/1204/HIJ
1 JULI 2016
560/PPP-52/ /HIJ
1 JULI 2016

560/PPP-53/1401/HIJ
25 JULI 2016
560/PPP-54/1400/HIJ
25 JULI 2016
560/PPP-55/1399/HIJ
25 JULI 2016
560/PPP-56/1398/HIJ
25 JULI 2016
560/PPP-57/1397/HIJ
25 JULI 2016
560/PPP-58/1395/HIJ
25 JULI 2016
560/PPP-59/1394/HIJ
25 JULI 2016
560/PPP-60/1393/HIJ
25 JULI 2016
560/PPP-61/1392/HIJ
25 JULI 2016
560/PPP-62/1440/HIJ
01 AGUSTUS 2016

560/PPP-63/1441/HIJ
01 AGUSTUS 2016
1 SEPTEMBER 2016 S/D 30 JUNI 2018 560/PPP-101/ /HIJ
01 AGUSTUS 2016

1 SEPTEMBER 2016 S/D 30 JUNI 2018 560/PPP-102/ /HIJ


01 AGUSTUS 2016

560/PPP-64/1462/HIJ
03 AGUSTUS 2016

01 FEBRUARI 2016 S/D 31 AGUSTUS 2017 560/PPP-65/1494/HIJ


08 AGUSTUS 2016

17 JUNI 2016 S/D 16 JUNI 2019 560/PPP-67/1547/HIJ


16 AGUSTUS 2016

17 JUNI 2016 S/D 16 JUNI 2019 560/PPP-68/1546/HIJ


16 AGUSTUS 2016

17 JUNI 2016 S/D 16 JUNI 2019 560/PPP-69/1545/HIJ


16 AGUSTUS 2016
17 JUNI 2016 S/D 16 JUNI 2019 560/PPP-69/1544/HIJ
16 AGUSTUS 2016

31 MARET 2016 S/D 31 MARET 2019 560/PPP-70/1543/HIJ


16 AGUSTUS 2016

13 JULI 2015 S/D 12 JULI 2017 560/PPP-71/1542/HIJ


16 AGUSTUS 2016

04 NOVEMBER 2014 S/D 03 NOVEMBER 2017 560/PPP-73/1553/HIJ


18 AGUSTUS 2016

08 APRIL 2016 S/D 07 APRIL 2017 560/PPP-74/1614/HIJ


29 AGUSTUS 2016

01 AGUSTUS 2016 S/D 31 JANUARI 2017 560/PPP-75/1664/HIJ


06 SEPTEMBER 2016
19 MEI 2016 S/D 18 MEI 2019 560/PPP-76/1665/HIJ
06 SEPTEMBER 2016

01 JANUARI 2016 S/D 31 JANUARI 2016 560/PPP-76/1673/HIJ

31 JULI 2016 S/D 31 JULI 2017 560/PPP-78/1635/HIJ

30 JUNI 2016 S/D 30 JUNI 2018 560/PPP-79/1733/HIJ

01 SEPTEMBER 2015 S/D 31 AGUSTUS 2017 560/PPP-80/1734/HIJ

01 JANUARI 2015 S/D 08 APRIL 2021 560/PPP-81/1732/HIJ

23 SEPTEMBER 2016 S/D 22 SEPTEMBER 2019 560/PPP-83/2036/HIJ


TANGGAL 6 OKTOBER 2016
1 JUNI 2016 S/D 30 NOVEMBER 2016 560/PPP-87/ /HIJ
TANGGAL 11 OKTOBER 2016

19 APRIL 2016 S/D 18 JULI 2016 560/PPP-88/ /HIJ


TANGGAL 11 OKTOBER 2016

560/PPP-84/2031/HIJ
TANGGAL 6 OKTOBER 2016

560/PPP-85/2037/HIJ
TANGGAL 6 OKTOBER 2016
31 MARET 2016 S/D 31 MARET 2019 560/PPP-89/ /HIJ
TANGGAL 11 OKTOBER 2016

13 MARET 2015 S/D 13 MARET 2016 560/PPP-90/2067/HIJ


TANGGAL 11 OKTOBER 2016

07 SEPTEMBER 2015 S/D 06 SEPTEMBER 2018 560/PPP-91/2068/HIJ


TANGGAL 11 OKTOBER 2016

1 SEPTEMBER 2016 S/D 30 JUNI 2018 560/PPP-92/2095/HIJ


TANGGAL 27 OKTOBER 2016
12 BULAN 560/PPP-94/2096/HIJ
TANGGAL 27 OKTOBER 2016

31 MEI 2016 S/D 31 MEI 2017 560/PPP-95/2184/HIJ


TANGGAL 11 NOVEMBER 2016

15 NOVEMBER 2016 S/D 15 NOVEMBER 2017 560/PPP-96/2185/HIJ


TANGGAL 11 NOVEMBER 2016
18 AGUSTUS 2016 S/D 17 AGUSTUS 2017 560/PPP-97/2186/HIJ
TANGGAL 11 NOVEMBER 2016

28 FEBRUARI 2015 S/D 28 FEBRUARI 2017 560/PPP-98/2198/HIJ


TANGGAL 11 NOVEMBER 2016

1 JANUARI 2016 S/D 31 FEBRUARI 2018 560/PPP-99/2199/HIJ


TANGGAL 11 NOVEMBER 2016

31 DESEMBER 2015 S/D 31 FEBRUARI 2016 560/PPP-100/2200/HIJ


TANGGAL 11 NOVEMBER 2016

1 JULI 2016 S/D 30 JUNI 2019 560/PPP-103/2319/HIJ


TANGGAL 5 DESEMBER 2016

1 JULI 2016 S/D 30 JUNI 2018 560/PPP-104/2324/HIJ


TANGGAL 5 DESEMBER 2016
560/PPP-107/2388/HIJ
TANGGAL 31 DESEMBER 2016

560/PPP-108/2389/HIJ
TANGGAL 31 DESEMBER 2016

MENGETAHUI :
KABID. HI DAN JAMSOSTEK
DISNAKERTRANS KAB.KUTAI TIMUR,

RAMLI, SH
NIP.19710309 200502 1 004

Anda mungkin juga menyukai