Anda di halaman 1dari 26

PERHITUNGAN PERENCANAAN

 Kriteria Debit Banjir Rancangan untuk Perencanaan


 Perhitungan Hujan Jam-Jaman dengan Mononobe
Langkah-langkah perhitungan :
Sebaran hujan jam-jaman dipakai model Mononobe, dengan rumus :
R24
t 2/3
Rt = ×
t T ()
dengan :
Rt = Intensitas hujan rata-rata dalam T jam
R24 = Curah hujan efektif dalam satu hari (mm/hari)
t = Waktu mulai hujan
T = Waktu konsentrasi hujan (jam)
Untuk daerah di indonesia rata-rata t = 6 jam, maka :
T = 1 jam R1 = R24/6.(6/1)2/3 = 0,5503.R24
T = 2 jam R2 = R24/6.(6/2)2/3 = 0,3467.R24
T = 3 jam R3 = R24/6.(6/3)2/3 = 0,2646.R24
T = 4 jam R4 = R24/6.(6/4)2/3 = 0,2184.R24
T = 5 jam R5 = R24/6.(6/5)2/3 = 0,1882.R24
T = 6 jam R6 = R24/6.(6/6)2/3 = 0,1667.R24
Rumus Rasio Curah Hujan jam-jaman :

Rumus Rt = (t x Rt) - ((t-1)(Rt-1))

dengan Rt = prosentase intensitas


1 jam R1 = (1 x 0.5503R24) - ((1-1) x R0)
= 0.5503R24 – 0
= 0.5503 x 100% = 55,0321 %
2 jam R2 = (2 x 0.3467R24) - ((2-1) x 0.5503R24)
= 0.6934R24 - 0.5503R24
= 0.1430 x 100% = 14,304 %
3 jam R3 = (3 x 0.2646R24) - ((3-1) x 0.3467R24)
77
78

= 0,7937R24 - 0.6934R24
= 0.1003x 100% = 10,0339 %
4 jam R4 = (4 x 0.2184R24) - ((4-1) x 0.2646R24)
= 0.8736R24 - 0.7937R24
= 0.0799 x 100% = 7,988 %
5 jam R5 = (5 x 0.1882R24) - ((5-1) x 0.2184R24)
= 0.941R24 - 0.8736R24
= 0.0675 x 100% = 6,7456 %
6 jam R6 = (6 x 0.1667R24) - ((6-1) x 0.1882R24)
= R24 - 0.941R24
= 0.059 x 100% = 5,8964 %
Curah Hujan Efektif
 Untuk Tr 25 tahun
Dengan : C.H rancangan 25 tahun ( R25 ) = 117,05 mm/hari
Koefisien Pengaliran (c) = 0,80
Maka : - C.H efektif = c . R25
= 0,80 x 117,05
= 93,64 mm/hari
 Untuk Tr 50 tahun
Dengan : C.H rancangan 50 tahun ( R50 ) = 132,48 mm/hari
Koefisien Pengaliran (c) = 0,80
Maka : C.H efektif = c . R50
= 0,80 . 132,48
= 105,984 mm/hari
 Untuk Tr 200 tahun
Dengan : C.H rancangan 200 tahun ( R200 ) = 143,85 mm/hari
Koefisien Pengaliran (c) = 0,80
Maka : C.H efektif = c . R200
= 0,80 . 143,85
= 115,080 mm/hari
 Untuk Tr 1000 tahun
Dengan : C.H rancangan 1000 tahun ( R1000 ) = 235,97 mm/hari
79

Koefisien Pengaliran (k) = 0,80


Maka : C.H efektif = c . R1000
= 0,80 . 235,97
= 188,76 mm/hari
 Untuk Tr PMF tahun
Dengan : C.H rancangan PMF tahun ( RPMF ) = 406,15 mm/hari
Koefisien Pengaliran (c) = 0,80
Maka : C.H efektif = c . RPMF
= 0,80 . 406,15
= 324,920 mm/hari

Rumus Curah Hujan Jam-Jaman Mononobe :

Rumus = Rasio*c*(R24)

Contoh perhitungan dengan rasio curah hujan jam - jaman 55,032 %


 Untuk Tr 25 tahun
Rasio*c*(R25) = 55,032% x 0,80 x 117,05
= 51,532 mm/hari
 Untuk Tr 50 tahun
Rasio*c*(R50) = 55,032% x 0,80 x 132,48
= 58,325 mm/hari
 Untuk Tr 200 tahun
Rasio*c*(R200) = 55,032% x 0,80 x 143,85
= 63,331 mm/hari
 Untuk Tr 1000 tahun
Rasio*c*(R1000) = 55,032% x 0,80 x 235,97
= 103,887 mm/hari

 Untuk PMF Tahun


Rasio*c*(RPMF) = 55,032% x 0,80 x 406,15
80

= 178, mm/hari
Untuk perhitungan selanjutnya dapat dilihat pada tabel berikut.
Tabel 3.6 Curah Hujan Netto Jam-Jaman Tr 25 Tahun
C.H.netto jam-jaman
Jam Rasio %
(mm/hari)
1 55.03 51,532
2 14.30 13,394
3 10.03 9,396
4 7.99 7,480
5 6.75 6,317
6 5.90 5,521
Sumber : Hasil perhitungan
Tabel 3.7 Curah Hujan Netto Jam-Jaman Tr 50 Tahun
C.H.netto jam-jaman
Jam Rasio %
(mm/hari)
1 55.0321 58,325
2 14.3040 15,160
3 10.0339 10,634
4 7.9880 8,466
5 6.7456 7,149
6 5.8964 6,249
Sumber : Hasil perhitungan

Tabel 3.8 Curah Hujan Netto Jam-Jaman Tr 200 Tahun


C.H.netto jam-jaman
Jam Rasio %
(mm/hari)
81

1 55.0321 63,331
2 14.3040 16,461
3 10.0339 11,547
4 7.9880 9,193
5 6.7456 7,763
6 5.8964 6,786
Sumber : Hasil perhitungan
Tabel 3.9 Curah Hujan Netto Jam-Jaman Tr 1000 Tahun
C.H.efektif jam-jaman
Jam Rasio %
(mm/hari)
1 55.0321 103,887
2 14.3040 27,003
3 10.0339 18,942
4 7.9880 15,079
5 6.7456 12,734
6 5.8964 11,131
Sumber : Hasil perhitungan
Tabel 3.10 Curah Hujan Netto Jam-Jaman Tr PMF Tahun
C.H.efektif jam-jaman
Jam Rasio %
(mm/hari)
1 55.0321 178,810
2 14.3040 46,477
3 10.0339 32,602
4 7.9880 25,955
5 6.7456 21,918
6 5.8964 19,159
Sumber : Hasil perhitungan

 Perhitungan Hidrograf Banjir Rancangan dengan HSS Nakayasu


Data :
Luas DAS (A) = 100 km2
Panjang Sungai Utama (L) = 15,63 km
82

Parameter Alfa (α) = 2,00


Koefisien Pengaliran (C) = 0,80
Hujan Satuan (Ro) =1
Q baseflow = diasumsi sebesar 2 m3/dt
Persamaan untuk Menentukan HSS Nakayasu
Tg = 0,4 + 0,058.L
= 0,4 + (0,058 . 15,63)
= 1,307
T0,3 = α .tg
= 2,00 . 1,307
= 2,613
tr = 0,75 . tg
= 0,75 . 1,307
= 0,98
Tp = tg + (0,8 . tr)
= 1,307 + (0,8 . 0,98)
= 2,090
Qp = (A . Ro)/[3,6(0,3.Tp + T0,3)]
= (100 . 1)/[3,6(0,3 . 2,090 + 2,613)]
= 8,573 m3/dt

Tabel 3.11 Waktu Lengkung Hidrograf Nakayasu


Awal (jam) Akhir (jam)
No Karakteristik Notasi
Notasi Nilai Notasi Nilai
1 Lengkung Naik Qd0 0 0,000 Tp 2,766
83

2 Lengkung Turun Tahap 1 Qd1 Tp 2,766 Tp + T0,3 6,224


3 Lengkung Turun Tahap 2 Qd2 Tp + T0,3 6,224 Tp + 2,5 T0,3 11,410
4 Lengkung Turun Tahap 3 Qd3 Tp + 2,5 T0,3 11,410 ~ ~
Sumber : Hasil perhitungan
Keterangan :
Tg = 1,307
tr = 0,98 tahun
Tp = 2,090 = 2 jam
T0,3 = 2,613 = 3 jam
Qp = 8,573 m3/dt
Tabel 3.12 Tabel Persamaan Lengkung Hidrograf Nakayasu

No Karakteristik Notasi Persamaan


1 Lengkung Naik Qd0 Qp. (t/Tp)^2,4
2 Lengkung Turun Tahap 1 Qd1 Qp. 0,3^[(t-Tp)/T0,3]
3 Lengkung Turun Tahap 2 Qd2 Qp. 0,3^(t-Tp+0,5.T0,3)/(1,5.T0,3)
4 Lengkung Turun Tahap 3 Qd3 Qp. 0,3^(t-Tp+1.5T0.3)/(2.T0.3)
Sumber : Hasil perhitungan

Tabel 3.13 Ordinat Hidrograf Satuan Sintetik dengan Metode Nakayasu

Q
t (jam) ket
(m3/dt)
0 0,0000 Qa
84

Q
t (jam) ket
(m3/dt)
1 1,4606
2 7,7093
3 5,6380
Qd1
4 3,5565
5 2,2435
6 1,4152 Qd2
7 1,2703
8 0,9343
9 0,6872
10 0,5055
11 0,3718
12 0,3544
13 0,2815
14 0,2236
15 0,1776
16 0,1410
17 0,1120
18 0,0890
19 0,0707
20 0,0561
21 0,0446
22 0,0354 Qd3
23 0,0281
24 0,0223
25 0,0177
26 0,0141
27 0,0112
28 0,0089
29 0,0071
30 0,0056
31 0,0045
32 0,0035
33 0,0028
34 0,0022
35 0,0018
36 0,0014
37 0,0011 Qd3
38 0,0009
85

Q
t (jam) ket
(m3/dt)
39 0,0007
40 0,0006
41 0,0004
42 0,0004
43 0,0003
44 0,0002
45 0,0002
46 0,0001
47 0,0001
48 0,0001
49 0,0001
50 0,0001
51 0,0000
Sumber : Hasil perhitungan
86

Gambar 3.31 Grafik Hidrograf Hujan Rancangan Nakayasu


87

Tabel 3.14 Perhitungan HSS Nakayasu untuk Q25 Tahun


Jam Qt Akibat Hujan jam-jaman Qbaseflow Qbanjir
ke (m3/dt) 51,532 13,394 9,396 7,480 6,317 5,521 (m3/dt) (m3/dt)
0 0,000 0,000 0,000 0,000 0,000 0,000 0,000 2,000 2,000
1 1,461 75,269 0,000 0,000 0,000 0,000 0,000 2,000 77,269
2 7,709 397,274 19,564 0,000 0,000 0,000 0,000 2,000 418,838
3 5,638 290,537 103,260 13,724 0,000 0,000 0,000 2,000 409,521
4 3,557 183,274 75,517 72,434 10,925 0,000 0,000 2,000 344,151
5 2,243 115,611 47,637 52,973 57,665 9,226 8,065 2,000 293,177
6 1,415 72,929 30,050 33,416 42,172 48,696 42,566 2,000 271,829
7 1,270 65,460 18,956 21,079 26,603 35,613 31,130 2,000 200,839
8 0,934 48,147 17,014 13,297 16,781 22,465 19,637 2,000 139,342
9 0,687 35,414 12,515 11,935 10,586 14,171 12,387 2,000 99,008
10 0,505 26,048 9,205 8,779 9,502 8,939 7,814 2,000 72,286
11 0,372 19,159 6,770 6,457 6,989 8,024 7,014 2,000 56,412
12 0,354 18,264 4,980 4,749 5,140 5,902 5,159 2,000 46,194
13 0,281 14,506 4,747 3,493 3,781 4,341 3,794 2,000 36,662
14 0,224 11,521 3,770 3,330 2,781 3,193 2,791 2,000 29,386
15 0,178 9,150 2,995 2,645 2,651 2,348 2,053 2,000 23,842
16 0,141 7,268 2,378 2,101 2,106 2,239 1,957 2,000 20,048
17 0,112 5,772 1,889 1,668 1,672 1,778 1,554 2,000 16,334
18 0,089 4,584 1,500 1,325 1,328 1,412 1,234 2,000 13,385
19 0,071 3,641 1,192 1,052 1,055 1,122 0,980 2,000 11,042
20 0,056 2,892 0,946 0,836 0,838 0,891 0,779 2,000 9,182
21 0,045 2,297 0,752 0,664 0,665 0,708 0,618 2,000 7,704
22 0,035 1,824 0,597 0,527 0,529 0,562 0,491 2,000 6,530
23 0,028 1,449 0,474 0,419 0,420 0,446 0,390 2,000 5,598
24 0,022 1,151 0,377 0,333 0,333 0,354 0,310 2,000 4,858
25 0,018 0,914 0,299 0,264 0,265 0,282 0,246 2,000 4,270
26 0,014 0,726 0,238 0,210 0,210 0,224 0,195 2,000 3,803
27 0,011 0,577 0,189 0,167 0,167 0,178 0,155 2,000 3,432
28 0,009 0,458 0,150 0,132 0,133 0,141 0,123 2,000 3,137
29 0,007 0,364 0,119 0,105 0,105 0,112 0,098 2,000 2,903
30 0,006 0,289 0,095 0,083 0,084 0,089 0,078 2,000 2,717
31 0,004 0,229 0,075 0,066 0,066 0,071 0,062 2,000 2,570
32 0,004 0,182 0,060 0,053 0,053 0,056 0,049 2,000 2,452
33 0,003 0,145 0,047 0,042 0,042 0,045 0,039 2,000 2,359
34 0,002 0,115 0,038 0,033 0,033 0,035 0,031 2,000 2,285
35 0,002 0,091 0,030 0,026 0,026 0,028 0,025 2,000 2,227
36 0,001 0,073 0,024 0,021 0,021 0,022 0,020 2,000 2,180
37 0,001 0,058 0,019 0,017 0,017 0,018 0,016 2,000 2,143
38 0,001 0,046 0,015 0,013 0,013 0,014 0,012 2,000 2,114
39 0,001 0,036 0,012 0,010 0,011 0,011 0,010 2,000 2,090
88

Jam Qt Akibat Hujan jam-jaman Qbaseflow Qbanjir


ke (m3/dt) 51,532 13,394 9,396 7,480 6,317 5,521 (m3/dt) (m3/dt)
40 0,001 0,029 0,009 0,008 0,008 0,009 0,008 2,000 2,072
41 0,000 0,023 0,007 0,007 0,007 0,007 0,006 2,000 2,057
42 0,000 0,018 0,006 0,005 0,005 0,006 0,005 2,000 2,045
43 0,000 0,014 0,005 0,004 0,004 0,004 0,004 2,000 2,036
44 0,000 0,011 0,004 0,003 0,003 0,004 0,003 2,000 2,029
45 0,000 0,009 0,003 0,003 0,003 0,003 0,002 2,000 2,023
46 0,000 0,007 0,002 0,002 0,002 0,002 0,002 2,000 2,018
47 0,000 0,006 0,002 0,002 0,002 0,002 0,002 2,000 2,014
48 0,000 0,005 0,001 0,001 0,001 0,001 0,001 2,000 2,011
49 0,000 0,004 0,001 0,001 0,001 0,001 0,001 2,000 2,009
50 0,000 0,003 0,001 0,001 0,001 0,001 0,001 2,000 2,007
51 0,000 0,002 0,001 0,001 0,001 0,001 0,001 2,000 2,006
Sumber : Hasil perhitungan

Tabel 3.15 Perhitungan HSS Nakayasu untuk Q50 Tahun


89

Qbaseflo
Jam Qt Akibat Hujan jam-jaman Qbanjir
w
ke (m3/dt) 58,325 15,160 10,634 8,466 7,149 5,521 (m3/dt) (m3/dt)
0 0,000 0,000 0,000 0,000 0,000 0,000 0,000 2,000 2,000
1 1,461 85,192 0,000 0,000 0,000 0,000 0,000 2,000 87,192
2 7,709 449,644 22,143 0,000 0,000 0,000 0,000 2,000 473,788
3 5,638 328,837 116,872 15,533 0,000 0,000 0,000 2,000 463,242
4 3,557 207,434 85,472 81,983 12,366 0,000 0,000 2,000 389,255
5 2,243 130,852 53,917 59,956 65,267 10,442 0,000 2,000 322,434
6 1,415 82,543 34,011 37,821 47,731 55,115 8,065 2,000 267,286
7 1,270 74,089 21,455 23,858 30,109 40,307 42,566 2,000 234,384
8 0,934 54,494 19,257 15,050 18,993 25,426 31,130 2,000 166,351
9 0,687 40,082 14,164 13,509 11,981 16,039 19,637 2,000 117,412
10 0,505 29,482 10,418 9,936 10,754 10,118 12,387 2,000 85,095
11 0,372 21,685 7,663 7,308 7,910 9,081 7,814 2,000 63,461
12 0,354 20,671 5,636 5,375 5,818 6,680 7,014 2,000 53,194
13 0,281 16,418 5,373 3,954 4,279 4,913 5,159 2,000 42,096
14 0,224 13,040 4,267 3,769 3,148 3,614 3,794 2,000 33,632
15 0,178 10,357 3,389 2,993 3,000 2,658 2,791 2,000 27,189
16 0,141 8,226 2,692 2,378 2,383 2,534 2,053 2,000 22,265
17 0,112 6,533 2,138 1,888 1,893 2,012 1,957 2,000 18,421
18 0,089 5,189 1,698 1,500 1,503 1,598 1,554 2,000 15,042
19 0,071 4,121 1,349 1,191 1,194 1,269 1,234 2,000 12,359
20 0,056 3,273 1,071 0,946 0,948 1,008 0,980 2,000 10,227
21 0,045 2,600 0,851 0,751 0,753 0,801 0,779 2,000 8,534
22 0,035 2,065 0,676 0,597 0,598 0,636 0,618 2,000 7,190
23 0,028 1,640 0,537 0,474 0,475 0,505 0,491 2,000 6,122
24 0,022 1,302 0,426 0,376 0,377 0,401 0,390 2,000 5,274
25 0,018 1,034 0,339 0,299 0,300 0,319 0,310 2,000 4,600
26 0,014 0,822 0,269 0,237 0,238 0,253 0,246 2,000 4,065
27 0,011 0,653 0,214 0,189 0,189 0,201 0,195 2,000 3,640
28 0,009 0,518 0,170 0,150 0,150 0,160 0,155 2,000 3,303
29 0,007 0,412 0,135 0,119 0,119 0,127 0,123 2,000 3,035
30 0,006 0,327 0,107 0,094 0,095 0,101 0,098 2,000 2,822
31 0,004 0,260 0,085 0,075 0,075 0,080 0,078 2,000 2,653
32 0,004 0,206 0,067 0,060 0,060 0,064 0,062 2,000 2,518
33 0,003 0,164 0,054 0,047 0,047 0,050 0,049 2,000 2,412
34 0,002 0,130 0,043 0,038 0,038 0,040 0,039 2,000 2,327
35 0,002 0,103 0,034 0,030 0,030 0,032 0,031 2,000 2,260
36 0,001 0,082 0,027 0,024 0,024 0,025 0,025 2,000 2,206
37 0,001 0,065 0,021 0,019 0,019 0,020 0,020 2,000 2,164
38 0,001 0,052 0,017 0,015 0,015 0,016 0,016 2,000 2,130
39 0,001 0,041 0,013 0,012 0,012 0,013 0,012 2,000 2,103
40 0,001 0,033 0,011 0,009 0,009 0,010 0,010 2,000 2,082
90

Qbaseflo
Jam Qt Akibat Hujan jam-jaman Qbanjir
w
ke (m3/dt) 58,325 15,160 10,634 8,466 7,149 5,521 (m3/dt) (m3/dt)
41 0,000 0,026 0,008 0,007 0,008 0,008 0,008 2,000 2,065
42 0,000 0,021 0,007 0,006 0,006 0,006 0,006 2,000 2,052
43 0,000 0,016 0,005 0,005 0,005 0,005 0,005 2,000 2,041
44 0,000 0,013 0,004 0,004 0,004 0,004 0,004 2,000 2,033
45 0,000 0,010 0,003 0,003 0,003 0,003 0,003 2,000 2,026
46 0,000 0,008 0,003 0,002 0,002 0,003 0,002 2,000 2,021
47 0,000 0,007 0,002 0,002 0,002 0,002 0,002 2,000 2,016
48 0,000 0,005 0,002 0,001 0,001 0,002 0,002 2,000 2,013
49 0,000 0,004 0,001 0,001 0,001 0,001 0,001 2,000 2,010
50 0,000 0,003 0,001 0,001 0,001 0,001 0,001 2,000 2,008
51 0,000 0,003 0,001 0,001 0,001 0,001 0,001 2,000 2,007
Sumber : Hasil perhitungan

Tabel 3.16 Perhitungan HSS Nakayasu untuk Q200 Tahun


91

Qbaseflo
Jam Qt Akibat Hujan jam-jaman Qbanjir
w
ke (m3/dt) 63,331 16,461 11,547 9,193 7,763 6,786 (m3/dt) (m3/dt)
0 0,000 0,000 0,000 0,000 0,000 0,000 0,000 2,000 2,000
1 1,461 92,503 0,000 0,000 0,000 0,000 0,000 2,000 94,503
2 7,709 488,235 24,044 0,000 0,000 0,000 0,000 2,000 514,278
3 5,638 357,059 126,903 16,866 0,000 0,000 0,000 2,000 502,828
4 3,557 225,237 92,807 89,019 13,427 0,000 0,000 2,000 422,491
5 2,243 142,082 58,544 65,102 70,868 11,339 0,000 2,000 349,935
6 1,415 89,627 36,930 41,067 51,828 59,845 9,911 2,000 291,209
7 1,270 80,447 23,296 25,906 32,694 43,767 52,312 2,000 260,421
8 0,934 59,171 20,910 16,342 20,623 27,608 38,257 2,000 184,912
9 0,687 43,522 15,380 14,668 13,009 17,416 24,133 2,000 130,128
10 0,505 32,012 11,312 10,789 11,677 10,986 15,223 2,000 93,999
11 0,372 23,546 8,321 7,935 8,589 9,861 9,603 2,000 69,854
12 0,354 22,445 6,120 5,837 6,317 7,253 8,620 2,000 58,592
13 0,281 17,827 5,834 4,293 4,647 5,335 6,340 2,000 46,275
14 0,224 14,159 4,634 4,092 3,418 3,924 4,663 2,000 36,890
15 0,178 11,245 3,680 3,250 3,258 2,886 3,430 2,000 29,750
16 0,141 8,932 2,923 2,582 2,588 2,751 2,523 2,000 24,298
17 0,112 7,094 2,322 2,050 2,055 2,185 2,405 2,000 20,111
18 0,089 5,634 1,844 1,628 1,632 1,736 1,910 2,000 16,384
19 0,071 4,475 1,464 1,293 1,296 1,378 1,517 2,000 13,425
20 0,056 3,554 1,163 1,027 1,030 1,095 1,205 2,000 11,074
21 0,045 2,823 0,924 0,816 0,818 0,870 0,957 2,000 9,207
22 0,035 2,242 0,734 0,648 0,650 0,691 0,760 2,000 7,724
23 0,028 1,781 0,583 0,515 0,516 0,549 0,604 2,000 6,546
24 0,022 1,414 0,463 0,409 0,410 0,436 0,479 2,000 5,611
25 0,018 1,123 0,368 0,325 0,325 0,346 0,381 2,000 4,868
26 0,014 0,892 0,292 0,258 0,258 0,275 0,302 2,000 4,278
27 0,011 0,709 0,232 0,205 0,205 0,218 0,240 2,000 3,809
28 0,009 0,563 0,184 0,163 0,163 0,173 0,191 2,000 3,437
29 0,007 0,447 0,146 0,129 0,129 0,138 0,152 2,000 3,141
30 0,006 0,355 0,116 0,103 0,103 0,109 0,120 2,000 2,906
31 0,004 0,282 0,092 0,081 0,082 0,087 0,096 2,000 2,720
32 0,004 0,224 0,073 0,065 0,065 0,069 0,076 2,000 2,572
33 0,003 0,178 0,058 0,051 0,052 0,055 0,060 2,000 2,454
34 0,002 0,141 0,046 0,041 0,041 0,044 0,048 2,000 2,361
35 0,002 0,112 0,037 0,032 0,033 0,035 0,038 2,000 2,286
36 0,001 0,089 0,029 0,026 0,026 0,027 0,030 2,000 2,228
37 0,001 0,071 0,023 0,020 0,021 0,022 0,024 2,000 2,181
38 0,001 0,056 0,018 0,016 0,016 0,017 0,019 2,000 2,144
39 0,001 0,045 0,015 0,013 0,013 0,014 0,015 2,000 2,114
40 0,001 0,035 0,012 0,010 0,010 0,011 0,012 2,000 2,091
92

Qbaseflo
Jam Qt Akibat Hujan jam-jaman Qbanjir
w
ke (m3/dt) 63,331 16,461 11,547 9,193 7,763 6,786 (m3/dt) (m3/dt)
41 0,000 0,028 0,009 0,008 0,008 0,009 0,010 2,000 2,072
42 0,000 0,022 0,007 0,006 0,006 0,007 0,008 2,000 2,057
43 0,000 0,018 0,006 0,005 0,005 0,005 0,006 2,000 2,045
44 0,000 0,014 0,005 0,004 0,004 0,004 0,005 2,000 2,036
45 0,000 0,011 0,004 0,003 0,003 0,003 0,004 2,000 2,029
46 0,000 0,009 0,003 0,003 0,003 0,003 0,003 2,000 2,023
47 0,000 0,007 0,002 0,002 0,002 0,002 0,002 2,000 2,018
48 0,000 0,006 0,002 0,002 0,002 0,002 0,002 2,000 2,014
49 0,000 0,004 0,001 0,001 0,001 0,001 0,002 2,000 2,011
50 0,000 0,004 0,001 0,001 0,001 0,001 0,001 2,000 2,009
51 0,000 0,003 0,001 0,001 0,001 0,001 0,001 2,000 2,007
Sumber : Hasil perhitungan

Tabel 3.17 Perhitungan HSS Nakayasu untuk Q1000 Tahun


93

Jam Qt Akibat Hujan jam-jaman Qbaseflow Qbanjir


ke (m3/dt) 103,887 27,003 18,942 15,079 12,734 11,131 (m3/dt) (m3/dt)
0 0,000 0,000 0,000 0,000 0,000 0,000 0,000 2,000 2,000
1 1,461 151,741 0,000 0,000 0,000 0,000 0,000 2,000 153,741
2 7,709 800,895 39,441 0,000 0,000 0,000 0,000 2,000 842,336
3 5,638 585,717 208,170 27,667 0,000 0,000 0,000 2,000 823,553
4 3,557 369,477 152,240 146,026 22,025 0,000 0,000 2,000 691,768
5 2,243 233,070 96,035 106,793 116,251 18,600 0,000 2,000 572,748
6 1,415 147,023 60,580 67,366 85,018 98,170 16,258 2,000 476,415
7 1,270 131,965 38,214 42,495 53,630 71,794 85,812 2,000 425,911
8 0,934 97,064 34,301 26,807 33,830 45,289 62,756 2,000 302,047
9 0,687 71,393 25,229 24,061 21,341 28,569 39,587 2,000 212,180
10 0,505 52,512 18,557 17,698 19,155 18,021 24,972 2,000 152,915
11 0,372 38,624 13,649 13,017 14,089 16,176 15,753 2,000 113,307
12 0,354 36,819 10,039 9,574 10,363 11,898 14,139 2,000 94,833
13 0,281 29,243 9,570 7,042 7,622 8,751 10,400 2,000 74,629
14 0,224 23,226 7,601 6,713 5,606 6,437 7,649 2,000 59,233
15 0,178 18,447 6,037 5,332 5,344 4,734 5,626 2,000 47,521
16 0,141 14,651 4,795 4,235 4,245 4,513 4,138 2,000 38,577
17 0,112 11,637 3,808 3,363 3,371 3,584 3,945 2,000 31,709
18 0,089 9,242 3,025 2,671 2,678 2,847 3,133 2,000 25,596
19 0,071 7,340 2,402 2,122 2,127 2,261 2,489 2,000 20,741
20 0,056 5,830 1,908 1,685 1,689 1,796 1,976 2,000 16,885
21 0,045 4,630 1,515 1,338 1,342 1,426 1,570 2,000 13,822
22 0,035 3,678 1,204 1,063 1,065 1,133 1,247 2,000 11,389
23 0,028 2,921 0,956 0,844 0,846 0,900 0,990 2,000 9,457
24 0,022 2,320 0,759 0,671 0,672 0,715 0,786 2,000 7,923
25 0,018 1,843 0,603 0,533 0,534 0,568 0,625 2,000 6,704
26 0,014 1,463 0,479 0,423 0,424 0,451 0,496 2,000 5,736
27 0,011 1,162 0,380 0,336 0,337 0,358 0,394 2,000 4,967
28 0,009 0,923 0,302 0,267 0,267 0,284 0,313 2,000 4,357
29 0,007 0,733 0,240 0,212 0,212 0,226 0,249 2,000 3,872
30 0,006 0,582 0,191 0,168 0,169 0,179 0,197 2,000 3,487
31 0,004 0,463 0,151 0,134 0,134 0,142 0,157 2,000 3,181
32 0,004 0,367 0,120 0,106 0,106 0,113 0,125 2,000 2,938
33 0,003 0,292 0,095 0,084 0,085 0,090 0,099 2,000 2,745
34 0,002 0,232 0,076 0,067 0,067 0,071 0,079 2,000 2,592
35 0,002 0,184 0,060 0,053 0,053 0,057 0,062 2,000 2,470
36 0,001 0,146 0,048 0,042 0,042 0,045 0,050 2,000 2,373
37 0,001 0,116 0,038 0,034 0,034 0,036 0,039 2,000 2,296
38 0,001 0,092 0,030 0,027 0,027 0,028 0,031 2,000 2,235
39 0,001 0,073 0,024 0,021 0,021 0,023 0,025 2,000 2,187
40 0,001 0,058 0,019 0,017 0,017 0,018 0,020 2,000 2,149
41 0,000 0,046 0,015 0,013 0,013 0,014 0,016 2,000 2,118
94

Jam Qt Akibat Hujan jam-jaman Qbaseflow Qbanjir


ke (m3/dt) 103,887 27,003 18,942 15,079 12,734 11,131 (m3/dt) (m3/dt)
42 0,000 0,037 0,012 0,011 0,011 0,011 0,012 2,000 2,094
43 0,000 0,029 0,010 0,008 0,008 0,009 0,010 2,000 2,074
44 0,000 0,023 0,008 0,007 0,007 0,007 0,008 2,000 2,059
45 0,000 0,018 0,006 0,005 0,005 0,006 0,006 2,000 2,047
46 0,000 0,015 0,005 0,004 0,004 0,004 0,005 2,000 2,037
47 0,000 0,012 0,004 0,003 0,003 0,004 0,004 2,000 2,030
48 0,000 0,009 0,003 0,003 0,003 0,003 0,003 2,000 2,024
49 0,000 0,007 0,002 0,002 0,002 0,002 0,002 2,000 2,019
50 0,000 0,006 0,002 0,002 0,002 0,002 0,002 2,000 2,015
51 0,000 0,005 0,002 0,001 0,001 0,001 0,002 2,000 2,012
Sumber : Hasil perhitungan

Tabel 3.18 Perhitungan HSS Nakayasu untuk QPMF Tahun


95

Jam Qt Akibat Hujan jam-jaman Qbaseflow Qbanjir


ke (m3/dt) 178,810 46,477 32,602 25,955 21,918 19,159 (m3/dt) (m3/dt)
0 0,000 0,000 0,000 0,000 0,000 0,000 0,000 2,000 2,000
96

Jam Qt Akibat Hujan jam-jaman Qbaseflow Qbanjir


ke (m3/dt) 178,810 46,477 32,602 25,955 21,918 19,159 (m3/dt) (m3/dt)
1 1,461 261,176 0,000 0,000 0,000 0,000 0,000 2,000 263,176
2 7,709 1378,495 67,885 0,000 0,000 0,000 0,000 2,000 1448,381
3 5,638 1008,131 358,300 47,620 0,000 0,000 0,000 2,000 1416,051
4 3,557 635,941 262,035 251,339 37,910 0,000 0,000 2,000 1189,224
5 2,243 401,159 165,294 183,811 200,091 32,014 0,000 2,000 984,368
6 1,415 253,055 104,270 115,950 146,332 168,969 27,984 2,000 818,559
7 1,270 227,138 65,774 73,143 92,308 123,572 147,698 2,000 731,632
8 0,934 167,066 59,038 46,139 58,229 77,950 108,016 2,000 518,438
9 0,687 122,882 43,424 41,414 36,731 49,172 68,138 2,000 363,761
10 0,505 90,383 31,940 30,461 32,969 31,018 42,982 2,000 261,753
11 0,372 66,479 23,493 22,405 24,250 27,841 27,114 2,000 193,582
12 0,354 63,373 17,279 16,479 17,837 20,478 24,337 2,000 161,783
13 0,281 50,333 16,472 12,121 13,119 15,062 17,900 2,000 127,008
14 0,224 39,976 13,083 11,555 9,650 11,079 13,166 2,000 100,508
15 0,178 31,751 10,391 9,177 9,199 8,149 9,684 2,000 80,350
16 0,141 25,218 8,253 7,289 7,306 7,768 7,123 2,000 64,956
17 0,112 20,029 6,555 5,789 5,803 6,170 6,790 2,000 53,135
18 0,089 15,908 5,206 4,598 4,609 4,900 5,393 2,000 42,613
19 0,071 12,634 4,135 3,652 3,660 3,892 4,283 2,000 34,256
20 0,056 10,035 3,284 2,900 2,907 3,091 3,402 2,000 27,619
21 0,045 7,970 2,608 2,304 2,309 2,455 2,702 2,000 22,348
22 0,035 6,330 2,072 1,830 1,834 1,950 2,146 2,000 18,161
23 0,028 5,027 1,645 1,453 1,457 1,549 1,704 2,000 14,836
24 0,022 3,993 1,307 1,154 1,157 1,230 1,354 2,000 12,194
25 0,018 3,171 1,038 0,917 0,919 0,977 1,075 2,000 10,097
26 0,014 2,519 0,824 0,728 0,730 0,776 0,854 2,000 8,431
27 0,011 2,001 0,655 0,578 0,580 0,616 0,678 2,000 7,108
28 0,009 1,589 0,520 0,459 0,460 0,489 0,539 2,000 6,057
29 0,007 1,262 0,413 0,365 0,366 0,389 0,428 2,000 5,222
30 0,006 1,002 0,328 0,290 0,290 0,309 0,340 2,000 4,559
31 0,004 0,796 0,261 0,230 0,231 0,245 0,270 2,000 4,032
32 0,004 0,632 0,207 0,183 0,183 0,195 0,214 2,000 3,614
33 0,003 0,502 0,164 0,145 0,145 0,155 0,170 2,000 3,282
34 0,002 0,399 0,131 0,115 0,116 0,123 0,135 2,000 3,018
35 0,002 0,317 0,104 0,092 0,092 0,098 0,107 2,000 2,809
36 0,001 0,252 0,082 0,073 0,073 0,077 0,085 2,000 2,642
37 0,001 0,200 0,065 0,058 0,058 0,062 0,068 2,000 2,510
38 0,001 0,159 0,052 0,046 0,046 0,049 0,054 2,000 2,405
39 0,001 0,126 0,041 0,036 0,037 0,039 0,043 2,000 2,322
40 0,001 0,100 0,033 0,029 0,029 0,031 0,034 2,000 2,256
41 0,000 0,080 0,026 0,023 0,023 0,024 0,027 2,000 2,203
42 0,000 0,063 0,021 0,018 0,018 0,019 0,021 2,000 2,161
97

Jam Qt Akibat Hujan jam-jaman Qbaseflow Qbanjir


ke (m3/dt) 178,810 46,477 32,602 25,955 21,918 19,159 (m3/dt) (m3/dt)
43 0,000 0,050 0,016 0,014 0,015 0,015 0,017 2,000 2,128
44 0,000 0,040 0,013 0,012 0,012 0,012 0,014 2,000 2,102
45 0,000 0,032 0,010 0,009 0,009 0,010 0,011 2,000 2,081
46 0,000 0,025 0,008 0,007 0,007 0,008 0,009 2,000 2,064
47 0,000 0,020 0,007 0,006 0,006 0,006 0,007 2,000 2,051
48 0,000 0,016 0,005 0,005 0,005 0,005 0,005 2,000 2,040
49 0,000 0,013 0,004 0,004 0,004 0,004 0,004 2,000 2,032
50 0,000 0,010 0,003 0,003 0,003 0,003 0,003 2,000 2,026
51 0,000 0,008 0,003 0,002 0,002 0,002 0,003 2,000 2,020
Sumber : Hasil perhitungan

Tabel 3.19 Rekapitulasi Hujan Rancangan HSS Nakayasu


Jam Qp
ke 25 50 200 1000 PMF
0 2,000 2,000 2,000 2,000 2,000
98

Jam Qp
ke 25 50 200 1000 PMF
1 77,269 87,192 94,503 153,741 263,176
2 418,838 473,788 514,278 842,336 1448,381
3 409,521 463,242 502,828 823,553 1416,051
4 344,151 389,255 422,491 691,768 1189,224
5 293,177 322,434 349,935 572,748 984,368
6 271,829 267,286 291,209 476,415 818,559
7 200,839 234,384 260,421 425,911 731,632
8 139,342 166,351 184,912 302,047 518,438
9 99,008 117,412 130,128 212,180 363,761
10 72,286 85,095 93,999 152,915 261,753
11 56,412 63,461 69,854 113,307 193,582
12 46,194 53,194 58,592 94,833 161,783
13 36,662 42,096 46,275 74,629 127,008
14 29,386 33,632 36,890 59,233 100,508
15 23,842 27,189 29,750 47,521 80,350
16 20,048 22,265 24,298 38,577 64,956
17 16,334 18,421 20,111 31,709 53,135
18 13,385 15,042 16,384 25,596 42,613
19 11,042 12,359 13,425 20,741 34,256
20 9,182 10,227 11,074 16,885 27,619
21 7,704 8,534 9,207 13,822 22,348
22 6,530 7,190 7,724 11,389 18,161
23 5,598 6,122 6,546 9,457 14,836
24 4,858 5,274 5,611 7,923 12,194
25 4,270 4,600 4,868 6,704 10,097
26 3,803 4,065 4,278 5,736 8,431
27 3,432 3,640 3,809 4,967 7,108
28 3,137 3,303 3,437 4,357 6,057
29 2,903 3,035 3,141 3,872 5,222
30 2,717 2,822 2,906 3,487 4,559
31 2,570 2,653 2,720 3,181 4,032
32 2,452 2,518 2,572 2,938 3,614
33 2,359 2,412 2,454 2,745 3,282
34 2,285 2,327 2,361 2,592 3,018
35 2,227 2,260 2,286 2,470 2,809
36 2,180 2,206 2,228 2,373 2,642
37 2,143 2,164 2,181 2,296 2,510
38 2,114 2,130 2,144 2,235 2,405
39 2,090 2,103 2,114 2,187 2,322
40 2,072 2,082 2,091 2,149 2,256
41 2,057 2,065 2,072 2,118 2,203
42 2,045 2,052 2,057 2,094 2,161
99

Jam Qp
ke 25 50 200 1000 PMF
43 2,036 2,041 2,045 2,074 2,128
44 2,029 2,033 2,036 2,059 2,102
45 2,023 2,026 2,029 2,047 2,081
46 2,018 2,021 2,023 2,037 2,064
47 2,014 2,016 2,018 2,030 2,051
48 2,011 2,013 2,014 2,024 2,040
49 2,009 2,010 2,011 2,019 2,032
50 2,007 2,008 2,009 2,015 2,026
51 2,006 2,007 2,007 2,012 2,020
  418,838 473,788 514,278 842,336 1448,381
Sumber : Hasil perhitungan

Dari hasil perhitungan banjir rancangan dengan Hidrograf Nakayasu di atas bisa dibuat
rekapan hujan rancangan netto dan debit banjir rancangan maksimum dari masing-masing
probabilitas adalah sebagai berikut :

Tabel 3.20 Perhitungan Rasio Hujan Jam-Jaman Mononobe


Hujan Jam-Jaman (mm/hari)
No Jam Ke
25th 50th 200th 1000th PMF
1 1,00 51,532 58,325 63,331 103,887 178,810
2 2,00 13,394 15,160 16,461 27,003 46,477
100

3 3,00 9,396 10,634 11,547 18,942 32,602


4 4,00 7,480 8,466 9,193 15,079 25,955
5 5,00 6,317 7,149 7,763 12,734 21,918
6 6,00 5,521 6,249 6,786 11,131 19,159
Probabilitas Hujan
117,050 132,480 143,850 235,970 406,150
harian
Koefisien pengaliran 0,800 0,800 0,800 0,800 0,800
Hujan Efektif
93,640 105,984 115,080 188,776 324,920
(mm/hari)
Sumber : Hasil perhitungan
Tabel 3.21 Rekapitulasi Debit Banjir Rancangan Maksimum
Qp (m3/dt)
Tr (Tahun)
25 50 200 1000 PMF
Hujan Maksimum 418,838 473,788 514,278 842,336 1448,381
Sumber : Hasil perhitungan
101

Gambar 3.32 Grafik Hidrograf Banjir Rancangan Nakayasu


102

Anda mungkin juga menyukai