BAB V
PERHITUNGAN RENCANA ANGGARAN BIAYA
175
176
0+653 7,8035 0
85,811 674,3758 113,2319
0+739 7,9142 2,6391
85,81 592,2392 113,2306
0+825 5,8893 0
74,965 490,8596 0
0+900 7,2064 0
100 1258,8750 0
1+000 17,9711 0
100 1458,4800 0
1+100 11,1985 0
100 1081,9350 0
1+200 10,4402 0
100 1057,4200 0
1+300 10,7082 0
100 1107,4150 0
1+400 11,4401 0
65,313 740,2216 0
1+465 11,2268 0
83,546 879,5222 89,24801
1+548 9,828 2,1365
83,546 695,9006 89,24801
1+632 6,8311 0
67,595 525,4328 0
1+700 8,7154 0
100 817,0100 0
1+800 7,6248 0
100 667,3100 0
1+900 5,7214 0
100 702,9450 0
2+000 8,3375 0
100 780,5100 0
2+100 7,2727 0
28,655 184,5898 0
2+128 5,6109 0
79,733 551,0826 135,9567
2+208 8,2123 3,4103
79,729 643,2097 135,9499
2+288 7,9226 0
11,883 107,6255 0
2+300 10,1916 0
177
100 1349,8850 0
2+400 16,8061 0
100 1554,4200 0
2+500 14,2823 0
100 1208,0400 0
2+600 9,8785 0
100 790,6600 0
2+700 5,9347 0
52,189 284,1378 0
2+752 4,9541 0
116,414 890,4099 31,93818
2+868 10,3432 0,5487
116,414 1377,3173 31,93818
2+985 13,3192 0
14,983 205,7451 0
3+000 14,1446 0
100 1176,0000 0
3+100 9,3754 0
100 883,5950 0
3+200 8,2965 0
100 810,2200 0
3+300 7,9079 0
100 875,5800 0
3+400 9,6037 0
100 1003,5350 0
3+500 10,467 0
100 1138,6700 0
3+600 12,3064 0
47,158 555,2595 0
3+647 11,2425 0
84,37 923,5604 354,7168
3+731 10,6506 8,4086
84,37 837,2584 354,7168
3+815 9,1967 0
84,102 818,2788 0
3+900 10,2625 0
100 1526,9850 0
4+000 20,2772 0
100 2109,4550 0
4+100 21,9119 0
100 2191,5450 0
178
4+200 21,919 0
92,871 1486,5768 0
4+292 10,0948 0
132,478 930,6977 306,5607
4+425 3,9558 4,6281
132,479 784,4678 306,563
4+557 7,8871 0
42,172 362,0761 0
4+600 9,2843 0
100 958,9750 0
4+700 9,8952 0
100 918,7650 0
4+800 8,4801 0
100 812,2350 0
4+900 7,7646 0
100 709,2200 0
5+000 6,4198 0
222,1074 0
36
5+036 5,9195 0
Total 49702,9461 2063,299
Sumber: Perhitungan Excel 2015
1. Excavator
Diketahui:
Jawab :
= 373,72 ⁄
= 373,72 ⁄ x 0,83
181
= 310,19 ⁄
2. Bulldozer
Diketahui:
Model = D9N/9SU/140HP
Tinggi blade = 1,815 m
Lebar blade = 4,32 m
Kecepatan gusur = 6,90 ⁄
Jawab :
Kapasitas aktual = 0,8 x 4,32 m x (1,815)2m = 11,385 m3
Waktu siklus:
= 406,56 ⁄
= 216,23 ⁄
3. Motor Grader
Dik :
Kecepatan pada :
a. Lintasan 1 = 4,1 ⁄
b. Lintasan 2 = 5,5 ⁄
c. Lintasan 3 = 10,2 ⁄
d. Lintasan 4 = 15,2 ⁄
Jawab :
Waktu siklus :
⁄
a. Waktu Lintasan 1 = = 14,63 menit
⁄
⁄
b. Waktu Lintasan 2 = = 10,91 menit
⁄
⁄
c. Waktu Lintasan 3 = = 5,88 menit
⁄
⁄
d. Waktu Lintasan 4 = = 3,95 menit
⁄
⁄
= 3700 m2 x = 5366,21 m2/jam
= 4453,95 m2/jam
= 5366,21 ⁄
= 935,33 m3/jam
Model = 408 B
Kapasitas tangki air = 8 m3 = 8000 liter
184
Jarak angkut = 2 Km
Faktor eff. kerja = 0,83
Waktu suplaying = 10 menit
Kecepatan angkut = 50 ⁄
Kecepatan kosong = 70 ⁄
Jawab :
⁄
b. Waktu angkut = = 2,4 menit
⁄
⁄
= 8 m3 x
= 14,070 m3/jam
= 11,678 m3/jam
185
5. Tandem Roller
Dik :
Jawab :
Lapis permukaan :
1. AC-WC :
⁄
PKK =
= 126 ⁄
= 126 ⁄ x 0,83
= 104,58 m3/jam
2. AC-BC :
⁄
PKK =
= 144 ⁄
186
= 144 ⁄ x 0,83
= 119,52 m3/jam
3. AC-Base :
⁄
PKK =
= 324 ⁄
= 324 ⁄ x 0,83
= 268,92 m3/jam
Lapis pondasi atas
⁄
PKK =
= 270 m3/jam
PKA = PKK x faktor effisiensi kerja
⁄
PKK =
= 378 ⁄
= 378 ⁄ x 0,83
= 313,74 ⁄
187
Bahu jalan
⁄
PKK =
= 594 ⁄
= 594 ⁄ x 0,83
= 493,02 ⁄
6. Wheel Loader
Dik :
Jawab :
Waktu siklus :
⁄
= 2,80 m3 x = 215, 38 m3/jam
7. Dump Truck
Dik :
= 23,60 m3 x 0,86
= 20,296 m3
Waktu siklus :
a. Waktu muat = ⁄
189
= ⁄ = 6,91 menit
⁄
b. Waktu angkut = ⁄
= ⁄ = 9 menit
⁄
c. Waktu kembali = ⁄
=
⁄
⁄ = 7,2 menit
⁄
= 20,296 m3 x
= 44,92 m3/jam
= 37,28 m3/jam
8. Asphalt Finisher
Dik :
= 61,25 m3/jam
Jawab :
PKK =
⁄
=
= 63 m2/jam
= 63 m3/jam x 0,83
= 52,29 m3/jam
Jumlah lintasan =
14m
= 1,48m
= 9,46 ~10 lintasan
= 106,56 ⁄
Produksi Kerja Actual (PKA) = Produksi Kerja Kasar x Faktor efisiensi kerja
= 106,56 ⁄ x 0,83
= 88,44 m3/jam
Waktu siklus
⁄
Waktu angkut =
⁄
= = 2,4 menit
⁄
⁄
Waktu kembali =
⁄
= = 1,43 menit
⁄
⁄
Waktu pengisian =
⁄
= = 12,44 menit
⁄
⁄
Waktu spraying =
⁄
= = 7,73 menit +
⁄
= 24 menit
193
⁄
PKK =
⁄
=
= 2125 ⁄
1. Pekerjaan Pembersihan
a. Jumlah alat =
Buldozer =
= = 1 unit
Wheel loader =
Dum truck =
=
194
b. Koefisien alat =
Buldozer =
Wheel loader =
Dump truck =
1 mandor =
4 pekerja =
2. Pekerjaan Galian
PKA excavator = 310,19 m³/jam
a. Jumlah alat =
Excavator =
Bulldozer =
Dump truck =
=
195
b. Koefisien alat
Excavator =
Bulldozer =
Dump truck =
1 mandor =
4 pekerja =
3. Pekerjaan Timbunan
PKA wheel loader = 178,76 m³/jam
a. Jumlah Alat =
Wheel loader =
Buldozer =
Dump truck =
Vibratory roller =
196
b. Koefisien alat
Wheel loader =
Bulldozer =
Dump truck =
Vibratory roller =
1 mandor =
4 pekerja =
a. Jumlah alat =
Thandem roller =
197
= = 1 unit
Wheeloader = = 1 unit
Untuk Water Tank Truck, tidak dilakukan perhitungan seperti diatas, hal
ini disebabkan karena jumlah air yang dipakai tergantung dari kondisi tanah yang
akan dihampar (tergantung kadar air optimum). Apabila kadar air tanah yang
dihampar lebih besar dari pada kadar air optimum, maka Water Tank tidak
diperlukan, dan sebaliknya jika kadar air yang dihampar lebih kecil dari pada
kadar air optimum maka Water Tank diperlukan.
Penghamparan I
c. W kurang =2%
100 m
7m
0,25 m
198
Dari gambar diatas, maka dapat kita ketahui volume sekali hampar.
= 100 m x 7 m x 0,25 m
= 175 m3
Penghamparan II
c. W kurang = 6%
100 m
7m
0,25 m
Dari gambar diatas, maka dapat kita ketahui volume sekali hampar.
= 100 m x 7 m x 0,25 m
199
= 175 m3
Karena jumlah air yang dibutuhkan tergantung dari kadar air tanah yang
dihampar, maka diasumsikan jumlah Water Tank yang digunakan untuk pekerjaan
timbunan sebanyak 2 unit.
b. Koefisien alat
Thandem roller = = 0,0032
1 mandor =
4 pekerja =
200
a. Jumlah alat =
Tandem roller =
= = 1 unit
Motor grader =
= = 1 unit
Dump truck =
= = 1 unit
Wheel loader =
= = 1 unit
= = 1 unit
b. koefisien alat
Tandem roller = = 0,0045
1 mandor =
4 pekerja =
= 0.006
d. Koefisien material
Agregat kelas A = komposisi x faktor gembur x 1m
= 80% x 1,2 x 1 m³
= 0,96 m³
Agregat Halus = 20% x faktor gembur x 1 m3
= 20% x 1,2 x 1m3
= 0,24 m3
6. Pekerjaan Lapis Permukaan
1. AC-WC
Asphalt finisher =
Thandem roller =
Dump truck =
Wheel Loader =
AMP =
b. Koefisien alat
Asphalt finisher = = 0,0041
PTR = = 0,0191
AMP = = 1
1 mandor =
4 pekerja =
= 0.0163
203
d. koefisien material
agregat kasar = komposisi x 1 m³
= 54,33% x 1 m³ = 0,5433 m³
Agregat halus = komposisi x 1 m³
= 37,88% x 1 m³
= 0,3788 m³
Filler = komposisi x 1 m³
= 1,89% x 1 m³
= 0,0189 m³
Asphalt = komposisi x 1 m³ x Bj Asphal
= 5,9% x 1 m³ x1,03 gr/cm3
= 0,059 m3 x 1030 kg/m3
= 60,77 kg
2. AC-BC
d. Jumlah alat
Asphalt finisher =
= = 1 unit
=
204
Thandem roller =
Dump truck =
Wheel Loader =
AMP =
e. Koefisien alat
Asphalt finisher = = 0,0041
PTR = = 0,0191
AMP = = 1
1 mandor =
4 pekerja =
= 0.0163
205
d. koefisien material
= 59,33% x 1 m³ = 0,5933 m³
= 33,38% x 1 m³
= 0,3338 m³
Filler = komposisi x 1 m³
= 1,89% x 1 m³
= 0,0189 m³
3. AC-Base
Asphalt finisher =
Thandem roller =
Dump truck =
Wheel Loader =
AMP =
h. Koefisien alat
Asphalt finisher = = 0,0041
PTR = = 0,0191
AMP = = 1
1 mandor =
4 pekerja =
= 0.0163
d. koefisien material
207
b. Jumlah alat =
Tandem roller =
= = 1 unit
Motor grader =
= = 1 unit
208
Dump truck =
= = 1 unit
Wheel loader =
= = 1 unit
= = 1 unit
b. koefisien alat
Tandem roller = = 0,00202
1 mandor =
4 pekerja =
= 0.0027
209
e. Koefisien material
=Tanah biasa,(kondisi semula asli,diolah menjadi gembur)
= Faktor gembur x 1m3
= 1,25 x 1m3 = 1,25 m3
a. Koefisien alat
Asphalt sprayer =
1 mandor =
= 0.57
4 pekerja =
= 2,27
b. Koefisien material
Asphalt = komposisi x fh x 1 kg
= 70% x 1,1 x 1 kg
= 0,77
Korosene = komposisi x fh x 1 ltr
= 30% x 1.1 x 1 ltr
= 0,33
210
c. Koefisien alat
Asphalt sprayer =
= =0.57
4 pekerja = = 2,27
e. Koefisien material
Asphalt = komposisi x fh x 1 kg
= 70% x 1,1 x 1 kg
= 0,77
Korosene = komposisi x fh x 1 ltr
= 30% x 1.1 x 1 ltr
= 0,33
211
Tabel 5.8 Perhitungan Biaya Sewa Alat Per Jam Motor Grader
Tabel 5.9 Perhitungan Biaya Sewa Alat Per Jam Water Tank Truck
Tabel 5.10 Perhitungan Biaya Sewa Alat Per Jam Tandem Roller
Tabel 5.11 Perhitungan Biaya Sewa Alat Per Jam Asphalt Sprayer
Tabel 5.12 Perhitungan Biaya Sewa Alat Per Jam Asphalt Mixing Plant
Tabel 5.13 Perhitungan Biaya Sewa Alat Per Jam Vibratory Roller
Tabel 5.14 Perhitungan Biaya Sewa Alat Per Jam Pneumatic Tire Roller
Tabel 5.15 Perhitungan Biaya Sewa Alat Per Jam Asphalt Finisher
Tabel 5.16 Perhitungan Biaya Sewa Alat Per Jam Dump Truck
Tabel 5.17 Perhitungan Biaya Sewa Alat Per Jam Wheel Loader
B. Material
1 ˗
C. Peralatan
B. Material
1 ˗
C. Peralatan
B. Material
1 Tanah Biasa m³ 1,25 57.000,00 71.250,00
C. Peralatan
1 Wheel Loader Jam 0,0056 395.827,15 2.216,63
2 Bulldozer Jam 0,0046 396.524,95 1.824,01
3 Dump Truck Jam 0,027 391.236,49 10.563,39
4 Vibrator Roller Jam 0,011 437.611,00 4.813,72
5 Pneumatic Tire
jam 0,02 475.330,55 9.506,61
Roller
D Total Harga Tenaga, Material dan Peralatan 100.457,61
E Biaya Umum dan Keuntungan =( 10% x D) 10.045,76
B. Material
Agregat Kelas
m³ 1 359.360,03 359.360,03
1 B
C. Peralatan
1 Tandem Roller Jam 0,0032 235.345,61 753,11
2 Motor Grader Jam 0,0011 346.011,52 380,61
3 Dump Truck Jam 0,027 391.236,49 10.563,39
4 Wheel Loader Jam 0,0056 395.827,15 2.216,63
5 Water Tank
Jam 0,086 313.524,95 26.963,15
Truck
B. Material
1 Agregat Kasar Kelas
m³ 0,8 498.452,00 398.761,60
A
2 Agregat Halus m³ 0,2 578.196,00 115.639,20
C. Peralatan
1 Tandem Roller Jam 0,0045 235.345,61 1.059,06
2 Motor Grader Jam 0,0015 346.011,52 519,02
3 Dump Truck Jam 0,027 391.236,49 10.563,39
4 Wheel Loader Jam 0,0056 395.827,15 2.216,63
5 Water Tank Truck Jam 0,086 313.524,95 26.963,15
B. Material
C. Peralatan
B. Material
C. Peralatan
11. Proyek : Perencanaan Geometrik dan Perkerasan pada Ruas Jalan Lingkar
Betung STA 0+000 – STA 5+036 Provinsi Sumatera Selatan.
Uraian : Pekerjaan Tack Coat
Volume: 56403,2 m³
Tabel 5.26 Perhitungan Harga Satuan Pekerjaan Tack Coat
B. Material
C. Peralatan
Harga Satuan
No Uraian Pekerjaan Satuan Volume (Rp) Jumlah (Rp)
I Persiapan
1.1 Persiapan Umum Ls 1 5.000.000,00 5.000.000,00
1.2 Mobilisasi Ls 1 15.000.000,00 15.000.000,00
1.3 Pengukuran Ls 1 30.000.000,00 30.000.000,00
1.4 Pembersihan m³ 66021,96 16.324,79 1.077.794.632,39
1.5 Direksi Keet Ls 1 2.000.000,00 2.000.000,00
1.6 Beralk Pekerja Ls 1 574.176,54 574.176,54
Total 1.130.368.808,93
II Pekerjaan Tanah
2.1 Pekerjaan Galian m³ 49702,946 15.627,38 776.726.824,26
2.2 Pekerjaan
Timbunan m³ 2063,2988 110.503,38 228.001.491,35
Total 1.004.728.315,61
Pekerjaan Badan
III Jalan
3.1 Pekerjaan Bahu
Jalan m³ 8309,4 113.793,13 945.552.634,42
3.2 Pekerjaan LPB m³ 23710,495 440.321,58 10.440.242.620,98
3.3 Pekerjaan LPA m³ 11.738,92 611.378,80 7.176.924.377,38
3.4 Pekerjaan AC-WC m³ 5428,808 1.452.720,45 7.886.540.400,72
3.5 Pekerjaan AC-BC m³ 6204,352 1.380.632,04 8.565.927.158,64
3.6 Pekerjaan AC-Base m³ 13959,792 752.106,16 10.499.245.555,52
3.7 Pekerjaan Prime
Coat m³ 56,4032 224.130,33 12.641.667,83
3.8 Pekerjaan Tack
Coat m³ 56,4032 224.130,33 12.641.667,83
Total 45.539.716.083,32
IV Pekerjaan Finishing
4.1 Pembersihan Akhir Ls 1 5.000.000,00 5.000.000,00
4.2 Demobilisasi Ls 1 15.000.000,00 15.000.000,00
Total 20.000.000,00
Sumber: Perhitungan Excel 2015
235
Tabel 5.29 Perhitungan Jam Kerja dan Hari Kerja Pekerjaan Pengupasan
Tabel 5.30 Perhitungan Jam Kerja dan Hari Kerja Pekerjaan Galian Tanah
Tabel 5.31 Perhitungan Jam Kerja dan Hari Kerja Pekerjaan Timbunan Tanah
Jam Kerja Hari Kerja
No Jenis Alat PKA (m³/jam) Volume (m³) (Jam) (hari)
1 2 3= 2/1 4= 3/8
1 Bulldozer 216,23 2063,299 9,54 2
2 Wheel Loader 178,76 2063,299 11,54 1
3 Dumpt Truck 37,28 2063,299 55,35 7
4 Vibrator Roller 88,44 2063,299 23,33 3
5 Pneumatic Tire
Roller 52,29 2063,299 39,46 5
Sumber: Perhitungan Excel 2015
Karena hari kerja Wheel Loader hanya 1 hari, maka alat berat tersebut harus
ditambah menjadi 3 buah.
237
238
Tabel 5.32 Perhitungan Jam Kerja dan Hari Kerja Pekerjaan Lapis Pondasi Bawah
Volume Jam Kerja Hari Kerja
No Jenis Alat PKA (m³/jam) (m³) (Jam) (hari)
1 2 3= 2/1 4= 3/8
1 Tandem Roller 313,74 23710,495 75,57 9
2 Motor Grader 935,33 23710,495 25,35 3
3 Dumpt Truck 37,28 23710,495 636,01 80
4 Wheel Loader 178,76 23710,495 132,64 17
5 Water Tank Truck 11,678 474,209 40,61 5
Sumber: Perhitungan Excel 2015
Tabel 5.33 Perhitungan Jam Kerja dan Hari Kerja Pekerjaan Lapis Pondasi Atas
Volume Jam Kerja Hari Kerja
No Jenis Alat PKA (m³/jam) (m³) (Jam) (hari)
1 2 3= 2/1 4= 3/8
1 Tandem Roller 224,1 11738,916 52,38 7
2 Motor Grader 668,09 11738,916 17,57 2
3 Dumpt Truck 37,28 11738,916 314,89 39
4 Wheel Loader 178,76 11738,916 65,67 8
5 Water Tank Truck 11,678 11738,916 1005,22 126
Sumber: Perhitungan Excel 2015
Tabel 5.34 Perhitungan Jam Kerja dan Hari Kerja Pekerjaan Lapis AC-WC
Volume Jam Kerja Hari Kerja
No Jenis Alat PKA (m³/jam) (m³) (Jam) (hari)
1 2 3= 2/1 4= 3/8
1 Asphalt Finisher 61,25 5428,808 88,63 11
Pneumatic Tire
2 Roller 52,29 5428,808 103,82 13
3 Dumpt Truck 37,28 5428,808 145,62 18
4 AMP 41,5 5428,808 130,81 16
5 Wheel Loader 178,76 5428,808 30,37 4
6 Tandem Roller 104,58 5428,808 51,91 6
Sumber: Perhitungan Excel 2015
Tabel 5.35 Perhitungan Jam Kerja dan Hari Kerja Pekerjaan Lapis AC-BC
Volume Jam Kerja Hari Kerja
No Jenis Alat PKA (m³/jam) (m³) (Jam) (hari)
1 2 3= 2/1 4= 3/8
1 Asphalt Finisher 61,25 6204,352 101,30 13
Pneumatic Tire
2 Roller 52,29 6204,352 118,65 15
3 Dumpt Truck 37,28 6204,352 166,43 21
4 AMP 41,5 6204,352 149,50 19
5 Wheel Loader 178,76 6204,352 34,71 4
6 Tandem Roller 119,52 6204,352 51,91 6
Sumber: Perhitungan Excel 2015
Tabel 5.37 Perhitungan Jam Kerja dan Hari Kerja Pekerjaan Bahu Jalan
11. Proyek : Perencanaan Geometrik dan Perkerasan pada Ruas Jalan Lingkar
Betung STA 0+000 – STA 5+036 Provinsi Sumatera Selatan.
Uraian : Pekerjaan Tack Coat
Volume : 56403,2 m³
Tabel 5.39 Perhitungan Jam Kerja dan Hari Kerja Pekerjaan Tack Coat
Jam Kerja Hari Kerja
No Jenis Alat PKA (m³/jam) Volume (m³) (Jam) (hari)
1 2 3= 2/1 4= 3/8
1 Asphalt sprayer 1763,75 56403,20 31,98 4
Sumber: Perhitungan Excel 2015