Anda di halaman 1dari 1

PROFIL MEMANJANG

RENCANA JALUR PIPA


TRANSMISI
KOTA KONOHA

LEGENDA

Jalur pipa

Muka Tanah

1150
Intake
WTP
21,17°
1125
11,25° Garis EGL

1100
22,50°
Garis HGL

1075
11,25° Water Treatment
WTP Plan (Instalasi
Pengolahan Air)
1050
22,50°
11,25°
1025 11,25°

1000
22,50°

975

Titik Patok 0 A B C D E F R

Jarak (m) 74,94 50,85 126,606 42,12 49,14 70,35 70,83

Elevasi Muka Tanah (m) 991 1000 1025 1050 1075 1100 1125 1136,244

Elevasi Pipa (m) 990,457 999,005 1025,271 1050,241 1074,180 1099,757 1124,240 1135,318 TUGAS BESAR
TEKNIK PENYEDIAAN AIR
Panjang Pipa (m) 75,970 56,807 130,007 48,424 56,651 74,809 72,618 MINUM
Kontraksi Gate Check Bend Bend Bend Bend Bend Pompa Bend Bend Bend Gate
Aksesoris Ekspansi
Pompa Valve Valve 22,5° 11,25° 11,25° 22,5° 11,25° 22,5° 11,25° 22,5° Valve MAHASISWA
HGL (m) 1074,937 1074,711 1074,6124 1074,380 1135,917 1135,815 1135,687 1135,433
ALIF MUHAMMAD IHSAN
EGL (m) 1075,052 1034,826 1074,727 1074,494 1136,032 1135,930 1135,802 1135,548

NIM

25116026

DOSEN PEMBIMBING

ALFIAN ZURFI, S.T, M.SI.

SKALA

1 : 2000

Anda mungkin juga menyukai