PERENCANAAN GORDING
A. Data-data Perencanaan
dkk = 5 m = 5000 mm
dgord = 1.73 m = 1730 mm
dsgrd = 1.60 m = 1600 mm
α = 25 °
Wang = 25 kg/m2
Watp = 11 kg/m2
Wplafond = 0 kg/m2
P = 100 kg
Mutu Baja = BJ37
fy = 240 Mpa
fu = 370 Mpa
fr = 70 Mpa
Analisis Pembebanan :
1. Beban Mati
qbs = 4.961 kg/m
qatp = 20.997 kg/m
qplf = 0.000 kg/m
qbm = 25.958 kg/m = 0.260 N/mm
qbmx = 10.970 kg/m = 0.110 N/mm
qbmy = 23.526 kg/m = 0.235 N/mm
Momen maks tengah bentang :
Mx = 73.519 kgm
My = 3.511 kgm
Kombinasi Pembebanan
Beban Beban kombinasi
Momen
Mati (D) Hidup (La) Angin (W) I II III (a) III (b)
Mx 73.519 113.288 14.913 102.927 144.867 281.415 257.555
My 3.511 18.278 0.000 4.915 13.352 33.458 33.458
δ = 0 maka
δy = 15.601 mm
δx = 1.082 mm
δtot = 15.639 < 20.833 mm
OK
3. Perencanaan Sagrod
Rx1 = 87.7635514495 kg
Rx2 = 211.30913087 kg
kombinasi 1 = 122.868972029 kg = 1228.6897203 N
kombinasi 2 = 443.410871132 kg = 4434.1087113 N
Gaya perencanaan diambil nilai terbesar antara kombinasi 1 dan kombinasi 2. Gaya Perencanaan dipilih yang terbesa
ry = 19.111 mm G
Lp = 970.952 mm E
J = 893.869 mm4
a = 0.352
Iw = 317084931 mm6
X1 = 49133.970 Mpa
X2 = 0.0000198544 mm4/N2
Lr = 7811.559 mm
Mpx = 5256000
Mpy = 1492800
1
Mrx = 3723000
Mry = 1057400
1 OK
ncanaan dipilih yang terbesar yai4434.109
3. Beban Angin
= 0.1
= 4.772109 kg/m = N/mm
A. Data-data Perencanaan
dkk = 4.05 m = 4050 mm
dgord = 1.73 m = 1730 mm
α = 20 ° 1/2 α 10 °
Wang = 35 kg/m2
Watp = 10 kg/m2
Wplafond = 18 kg/m2
P = 100 kg
Wgord = 4.51 kg/m
Mutu Baja = BJ37
fy = 240 Mpa
fu = 370 Mpa
fr = 70 Mpa
Dicoba profil siku ganda = 2L 50x50x6
Wbkk = 8.85 kg/m
B. Analisis Pembebanan
1. Beban Mati
a) Beban Penutup atap
P1=P9 = 29.091 kg = 290.9115
P2=P3=P4=P5=P6=P7=P8 = 58.182 kg = 581.823
b) Beban Gording
P1=P2=P3=P4=P6=P7=P8=P9 = 20.092 kg = 200.9205
P5 = 40.184 kg = 401.841
c) Beban Sendiri kuda-kuda
P1=P9 = 13.564 kg = 135.6378
P2=P8 = 39.326 kg = 393.2551
P3=P7 = 38.904 kg = 389.040
P4=P6 = 38.904 kg = 389.040
P5 = 45.897 kg = 458.966
d) Beban Plafond
P1=P9 = 49.208 kg = 492.075
P10=P11=P12=P13=P14=P15=P16 = 104.728 kg = 1047.281
2. Beban Hidup
a) Beban Air Hujan
P1=P9 = 29.82382 kg = 298.2382
P2=P3=P4=P5=P6=P7=P8 = 59.64763 kg = 596.4763
b) Beban Hidup Terpusat 100 kg
P1=P2=P3=P4=P5=P6=P7 = 100 kg = 1000
Digunakan yang terbesar yaitu = 100 kg = 1000
3. Beban Angin
a) Beban Angin Kanan
Pada Sisi Tekan
P1=P5a = 0 kg = 0.00
P2=P3=P4 = 0 kg = 0.00
Pada Sisi Hisap
P9=P5b = -40.7276 kg = -407.28
P6=P7=P8 = -81.4552 kg = -814.55
N
N
N
N
Validasi dengan Metode Cremona (B. Hidup)
Beban Total
(N)
1119.54 0 0.000 1350 mm
1176.00 1.35 1587.598
1171.78 2.7 3163.815
1171.78 4.05 4745.722
1442.63 5.4 7790.204
1171.78 6.75 7909.537
1171.78 8.1 9491.445
1176.00 9.45 11113.186
1119.54 10.8 23401.722
1047.28
1047.28
1047.28
1047.28 mati hidup
1047.28 a1 -10983.11 -7000.00
1047.28 b1 9158.8199 6294.964
1047.28 2166.83 d1 8344.9722
18051.820 69203.230
6407.706
6407.706
6407.706
12815.413
-12815.413
mona (B. Hidup) Validasi dengan Metode Cremona (B. Mati)
Kondisi Leleh :
Tn1 = 501120 N fy =
Kondisi Fraktur :
Tn2 = 547230 N fu =
Kelangsingan Ideal
λiy = 85.60
Syarat : 85.60 > 30.29
Kelangsingan Ideal
λiy = 56.91
Syarat : 56.91 > 30.29
Kondisi Fraktur :
Tn2 = 163225.5 N fu =
Dari perencanaan diatas, akhirnya hasil perencanaan dimensi batang kuda-kuda disajikan dalam tabel berikut :
Tabel II. 5. Perencanaan dimensi batang kuda-kuda :
Batang Profil
a1 s/d a6 ; b1s/db6 2Lx60x60x5
v4 dan d1 s/d d8 2Lx30x30x3
v1,v2,v3,v5,v6,v7 2Lx340x40x4
Batang Panjang
a1 2.320
2L45x45x5 a2 2.320 Batang Panjang
a3 2.320 b1 2.320
a4 2.320 b2 2.320
a5 2.320 b3 2.320
a6 2.320 b4 2.320
12.8 a7 2.320 b5 2.320
14.1 a8 2.320 b6 2.320
240 Mpa
370 Mpa
60x60x6
50x50x6 60
mm 50 60
50 6
6 10.85
8.85 1382
1128 456000
252000 456000
252000 5280
3550 5280
3550 43
35.6 43
35.6
240 Mpa
2320.00 mm
250 mm s/d 500 mm
200000 Mpa
ω = 1
ω = 2.142
ω = 2.421
80000 Mpa
60x60x6
60
60
6
10.85
1382
456000
456000
5280
5280
43
43
240 Mpa
2320.00 mm
250 mm s/d 500 mm
200000 Mpa
ω = 1
ω = 2.1419133
ω = 2.4206913
80000 Mpa
Kondisi Fraktur :
Kondisi Fraktur :
An = 680 mm2
fu = 370 Mpa Tn2 = 141525 N
fy = 240 Mpa
Ld2 = 2000.00 mm
L1 = 250 mm s/d 500 mm
E = 200000 Mpa
ω = 1
< 1.2 maka ω = 3.8077786
ω = 4.1748859
(DICekkkkkkkkkkkk)
G = 80000 Mpa
ang untuk profil tunggal Lb1.h1.t1 = 2L45x45x5
Lv3 = 1180
< 240
gan ukuran yang lebih besar
mm
fy = 240 Mpa
fu = 370 Mpa
= 141525 N
(dari tabel II.4) (Oke)
E. Perencanaan Alat Sambung
misal digunakan a = 6 mm
Kekuatan dukung geser las terhadap elektrode las,
Rel = 1052.1857 N/mm
Kekuatan dukung geser las terhadap plat profil baja,
Rplat = 706.293 N/mm
Kekuatan dukung geder las Rlas diambil nilai terkecil,
Jadi kekuatan dukung las, Rlas = 706.293 N/mm
( 7<tpb<10 mm )
(tpb>6.4 mm )
F. Perencanaan Plat Buhul
Buhul A
Potongan I-I
N = 3929.64 N
V = 19730.39 N α =
d1 = 83.40 mm Nu d1 =
d2 = 83.40 mm Nua1x =
M = 5804923.50 Nmm Nua1y =
Anetto = 2000.00 mm2
Inetto = 6666666.67 mm4 Nud1x =
Wnetto = 66666.67 mm 3
Nud1y =
Buhul B
* Jika Batang a2 dan batang a3 terputus
Plat penyambung : b = 50 mm
t = 6 mm
AMAN `
BUHUL C
*Jika batang A4 dan A5 terputus
Hitungan Panjang Sambungan Las
Gaya Batang L1 (mm) L2 (mm)
Batang L las (mm)
Perlu (N) Terhitung Terpasang Terhitung Terpasang
d1 89927.20 63.66 22.81 22.00 40.85 40.50
v1 90255.76 63.89 22.90 22.00 41.00 39.50
b1 22568.35 15.98 5.72 15.00 10.25 27.00
31 °
36766.52 N
32836.88 N ey = 16.6 mm
19730.39 N fy = 240 Mpa
35429.34 N
9825.43 N
OK
Gaya Batang
Batang ABSOLUT
Perlu (N)
a1 -38308.6 38308.60
a2 -68694.04 68694.04
a3 -85900.36 85900.36
a4 -89927.2 89927.20
a5 -90255.76 90255.76
a6 -79909.48 79909.48
a7 -64094.84 64094.84
a8 -38308.52 38308.52
b1 42688.68 42688.68
b2 72198.12 72198.12
b3 88528.36 88528.36
706.29 mm b4 80894.92 80894.92
10 mm b5 62999.88 62999.88
b6 38089.56 38089.56
11803.37 N d1 36766.52 36766.52
7092.18 N d2 25415.36 25415.36
16.6 mm d3 14064.56 14064.56
d4 6465.05 6465.05
d5 12901.87 12901.87
d6 16260.32 16260.32
d7 23223.92 23223.92
d8 32805.4 32805.40
v1 -20467.24 20467.24
v2 -13770.2 13770.20
(oke) v3 -7073.16 7073.16
v4 22568.35 22568.35
v5 -8366.12 8366.12
v6 -12477.2 12477.20
v7 -18130.2 18130.20
706.293
10
11803.37
7092.18
16.6
(oke)
706.293 mm
10 mm
69340.48 N
41663.96 N
43 mm
(oke)
706.293
10
69340.48
41663.96
35.9
(oke)
G. Perencanaan Plat Kopel
h3 ≥ 1084462.000 mm3
h ≥ 102.740 mm = 60 mm
Tinggi plat kopel, h= 102.740 mm ≥ 80 mm
Karena h > 80 ,maka digunakan tinggi plat kopel = 105 mm
Catatan : Jika alat sambung dari baut, maka h ≥ 80 mm
499.2 1084462
5 mm
105 mm
10 mm
5 mm
atau 200 mm
atau 200 mm
70
30
60
h3
370
30913.272 N
mm
BAB I PEMBEBANAN GABLE FRAME
A. Data-data perencanaan
dkk = 5 m = 5000
dgord = 1.73 m = 1730
α = 25 °
Wang = 25 kg/m2
Watp = 11 kg/m2
Wplafond = 0 kg/m2
P = 100 kg
Wgord = 6.05 kg/m
Mutu Baja = BJ37
fy = 240 Mpa
fu = 370 Mpa
fr = 70 Mpa
B. ANALISA PEMBEBANAN
1. Beban Mati
b) Beban plafond
P tepi = 0.00 kg
P tengah = P atas = 0.00 kg
c) Beban Gording
P tepi = P tengah = 33.28 kg
P atas = 66.55 kg
2. Beban Hidup
Gaya P tepi, P tengah, P atas nilainya diambil yang menentukan (yang terbesar) diantara kedua nilai diatas, yaitu :
P tepi = 100 kg = 1000
P tengah = 173 kg = 1730
P atas = 173 kg = 1730
3. Beban Angin
4. Beban Gempa
Gempa : H =
T = 0.346 detik
Berdasarkan nilai T ,lihat grafik respons spektra berdasarkan wilayah dan jenis tanah
Diperoleh, C = 0.7 ss=
Bangunan didesain dengan prinsip elastik penuh, R =
V = 3492.619375 N
Gaya geser gempa, didistribusikan menjadi PB, PC, dan PD
PB = PD =
PC =
Validasi
MA = -8220.177 kgm ∑M uk =
MB = -4242.858 kgm
MC = -263.812 kgm
MD = -4242.858 kgm
-16969.705 kgm
23281.925397
170568782.62
17056.878
81.57132
Data Gable Frame
mm L = 20.8
mm H = 6.5
r = 5
Berat sendiri batang rafter, misal diasumsikan dari baja profil IW
dengan Wbs = 32
b = 150
h = 300
tb = 5.5
ts = 8
= 332.75 N
= 665.5 N
= 304.48 N
= 608.96 N
= 865 N
= 1730 N
= 100 kg = 1000
kg
6.5 m
3143.3574375 kgm
119%
118.5233475626
m = 20800 mm
m = 6500 mm
m = 5000 mm
sumsikan dari baja profil IWF 300x150x5,5X8
kg/m
mm rx = 124.00 mm
mm ry = 329.00 mm
mm Ix = 63200000 mm4
mm Iy = 4420000 mm4
Zx = 424000 mm3
Zy = 59300 mm3
validasi
manual sap
a 5675506.484375 a 9712030
b 20082561.40625 b 6127580
c 5675506.484375 c 6127580
d d 9712030
31433574.375 31679220
error 0.8%
Tabel II.5. Hasil perhitungan Gaya-Gaya dalam Gable Frame Akibat Beban Hidup
Batang Ujung Gaya Lintang (N) Gaya Aksial (N) Momen (N.mm)
A -15945.35 -21828.33 -68350.58 68350.58
AB
B -15945.35 -21828.33 35294.17
B -11862.55 -23395.58 -35294.17
BC
C 6129.45 -14745.58 -2215.58
C -6129.45 -14745.58 -2215.58
CD
D 11862.55 -23395.58 -35294.17
D -15945.35 -21828.33 -35294.17
DE
E -15945.35 -21828.33 68350.58
Tabel II.6. Hasil perhitungan Gaya-Gaya dalam Gable Frame Akibat Beban Angin Kanan
Batang Ujung Gaya Lintang (N) Gaya Aksial (N) Momen (N.mm)
A 9.79 0.52 37.92 37.92
AB
B 2.48 0.52 -1.95
B -0.6 2.46 1.95
BC
C 0.84 2.46 0.59
C -3.32 0.88 0.59
CD
D 2.44 0.88 5.67
D 0.65 3.38 5.67
DE
E 3.9 3.38 20.44
Tabel II.7. Hasil perhitungan Gaya-Gaya dalam Gable Frame Akibat Beban Angin Kiri
Batang Ujung Gaya Lintang (N) Gaya Aksial (N) Momen (N.mm)
A -3.9 3.38 -20.44 20.44
AB
B -0.65 3.38 -5.67
B 3.32 0.88 5.67
BC
C -2.44 0.88 0.59
C -0.84 2.46 0.59
CD
D 0.6 2.46 1.95
D -2.48 0.52 1.95
DE
E -9.79 0.52 -37.92
Tabel II.8. Hasil perhitungan Gaya-Gaya dalam Gable Frame Akibat Beban Gempa
Batang Ujung Gaya Lintang (N) Gaya Aksial (N) Momen (N.mm)
A 1667.63 509.29 9712.03 9712.03
AB
B 1667.63 509.29 -1127.58
B 1667.63 972.15 1127.58
BC
C 97.71 972.15 -4.547E-13
C 97.71 -972.15 -2.274E-13
CD
D 97.71 -972.15 -1127.58
D 1667.63 -509.29 -1127.58
DE
E 1667.63 -509.29 9712.03
160322.74
16.032274
Kombinasi Pembebanan
Kombinasi 1 = 1,4 D
Kombinasi II = 1,2 D + 0,5 La
Kombinasi III = 1,2 D + 1,6 La + 0,8 W
Kombinasi IV = 1,2 D + 1,0 E
Tabel II.9. Hasil Perhitungan Gaya Aksial dalam Gable Frame Akibat Beban Kombinasi
Beban Kombinasi
Batang Ujung
I II III (kanan) III(kiri)
A -48462.358 -52453.329 -76464.076 -76461.788
AB
B -36523.844 -42220.317 -66231.064 -66228.776
B -39379.522 -45451.666 -71184.836 -71186.1
BC
C -24831.52 -28656.95 -44875.12 -44876.384
C -39379.522 -41126.666 -57346.1 -44875.12
CD
D -24831.52 -32981.95 -58716.384 -71186.1
D -48462.358 -52453.329 -76461.788 #REF!
DE
E -36523.844 -42220.317 -66228.776 #REF!
Tabel II.9. Hasil Perhitungan Gaya Geser dalam Gable Frame Akibat Beban Kombinasi
Beban Kombinasi
Batang Ujung
I II III (kanan) III(kiri)
A -26843.46 -30981.355 -48513.408 -48524.36
AB
B -26843.46 -30981.355 -48519.256 -48521.76
B -19957.406 -23037.623 -36086.908 -36083.772
BC
C 10302.446 11895.393 18638.46 18635.836
C 19957.406 14041.623 7301.18 7298.556
CD
D -10302.446 -2899.393 10146.756 10149.892
D 26843.46 15036.005 -2503.36 -2505.864
DE
E 26843.46 15036.005 -2500.76 -2511.712
Tabel II.9. Hasil Perhitungan Momen Lentur dalam Gable Frame Akibat Beban Kombinasi
Beban Kombinasi
Batang Ujung
I II III (kanan) III(kiri)
A -115082.478 -132817.414 -207972.716 -208019.404
AB
B 59400.012 68561.381 107383.408 107380.432
B -59400.012 -68561.381 -107383.408 -107380.432
BC
C -3693.368 -4273.534 -6710.2 -6710.2
C -59400.012 -52022.086 -54458.752 -54458.752
CD
D -3693.368 -20812.829 -59631.88 -59634.856
D 115082.478 80995.039 42175.988 42173.012
DE
E -59400.012 -16739.006 58462.984 58416.296
1kg 10N
1m 1000mm
Tabel II.2. Hasil perhitungan Gaya-G
Batang Ujung
A
AB
B
B
BC
C
C
CD
kibat Beban Kombinasi D
D
Nu (N) DE
IV E
-41029.874 -76464.076 71186.1
-30796.862 -66231.064 Tabel II.3. Hasil perhitungan Gaya-G
-32781.726 -71186.1 Batang Ujung
-20312.01 -44876.384 A
AB
-34726.026 -57346.1 B
-22256.31 -71186.1 B
BC
-42048.454 #REF! C
-31815.442 #REF! #REF! C
CD
D
ibat Beban Kombinasi D
DE
E
Vu (N)
IV
-21341.05 -48524.36 18638.46 Tabel II.4. Hasil perhitungan Gaya-G
-21341.05 -48521.76 Batang Ujung
-15438.718 -36086.908 A
AB
8928.378 18638.46 B
17204.058 7298.556 B
BC
-8732.958 10149.892 C
24676.31 -2505.864 C
CD
24676.31 -2511.712 D
D
DE
Akibat Beban Kombinasi E
Mu (Nmm)
IV Tabel II.5. Hasil perhitungan Gaya-G
-88930.094 -208019.404 107383.408 Batang Ujung
49786.716 107383.408 A
AB
-49786.716 -107383.408 B
-3165.744 -3165.744 B
BC
-50914.296 -50914.296 C
-4293.324 -59634.856 C
CD
97514.544 42173.012 D
-41202.266 58462.984 D
DE
E
asi 1 = 1,4 D
asi II = 1,2 D + 0,5 La
asi III = 1,2 D + 1,6 La + 0,8 W
asi IV = 1,2 D + 1,0 E
7. Hasil Perhitungan Gaya Aksial dalam Gable Frame Akibat Beban Kombinasi
Beban Kombinasi
Nu (N)
I II III (kanan) III(kiri) IV
-48462.358 -52453.329 -76464.076 -76461.788 -41029.874 -76464.076 71186.1
-36523.844 -42220.317 -66231.064 -66228.776 -30796.862 -66231.064
-39379.522 -45451.666 -71184.836 -71186.1 -32781.726 -71186.1 71186.1
-24831.52 -28656.95 -44875.12 -44876.384 -20312.01 -44876.384
-24831.52 -28656.95 -44876.384 -44875.12 -22256.31 -44876.384
-39379.522 -45451.666 -71186.1 -71184.836 -34726.026 -71186.1
-36523.844 -42220.317 -66228.776 -66231.064 -31815.442 -66231.064
-48462.358 -52453.329 -76461.788 -76464.076 -42048.454 -76464.076 66231.064
8. Hasil Perhitungan Gaya Geser dalam Gable Frame Akibat Beban Kombinasi
Beban Kombinasi
Vu (N)
I II III (kanan) III(kiri) IV
-26843.46 -30981.355 -48513.408 -48524.36 -21341.05 -48524.36 36088.38
-26843.46 -30981.355 -48519.256 -48521.76 -21341.05 -48521.76
-19957.406 -23037.623 -36086.908 -36083.772 -15438.718 -36086.908
10302.446 11895.393 18638.46 18635.836 8928.378 18638.46
-10302.446 -11895.393 -18640.444 -18638.46 -8732.958 -18640.444
19957.406 23037.623 36088.38 36086.908 17204.058 36088.38
26843.46 15036.005 -2503.36 -2505.864 24676.31 -2505.864
26843.46 15036.005 -2500.76 -2511.712 24676.31 -2511.712
9. Hasil Perhitungan Momen Lentur dalam Gable Frame Akibat Beban Kombinasi
Beban Kombinasi
Mu (Nmm)
I II III (kanan) III(kiri) IV
-115082478 -132817414 -207972716 -208019404 -88930094 -208019404 208019404
59400012 68561381 107383408 107380432 44786716 107383408
-59400012 -68561381 -107383408 -107380432 -44786716 -107383408 107383408
-3693368 -4273534 -6710200 -6710200 -3165744 -3165744
-3693368 -4273534 -6710200 -6710200 -3165744 -3165744
-59400012 -68561381 -107380432 -107383408 -57041876 -107383408
-59400012 -68561381 -107380432 -107383408 -57041876 -107383408
115082478 132817414 208019404 207972716 108354154 208019404
BAB II PERENCANAAN BATANG RAFTER
Nni =
λr =
Penampang kompak
Mn1 =
Lp <
16715.445 <
Mn2 =
Mu =
20.8 m = 20800 mm
6.5 m = 6500 mm
5m = 5000 mm
11.54 m = 11539.50 mm
186.121 mm
14.897
186.121
2.052 < 0.25 ᾠ = 1
antara 0,25 & 1,2 ᾠ = 6.356
> 1.2 ᾠ = 5.265
4.516
0.125 =>> λp = 72.256912
91584000 N.mm
67393.83 mm4
95922000000.00 mm6
9022.86 mpa
0.000530 mpa
16715.445 mm
70 Mpa
24716.118 mm
dg/cos a
2309.401 maka,
1396817369.63607 Nmm Mr = 72080000
554064 N
0.2 =>> = 0.407 < 1 OKE
107383408
fy = 240 mpa
E = 200000 mpa
= 2716 mm2
= 63200000 mm4
= 4420000 mm4
= 424000 mm3
= 59300 mm3
= 421333.3333333 mm3
pakai
Mp = 101760000
PERENCAAN KOLOM
GA (jepit) = 1
GB = 22.64
K = 2 Nomogram Sni
a. Kolom sebagai batang tekan
λx = 85.526
λy = 73.529
λmax = 85.526
λc = 0.94 < 0.25 ᾠ
antara 0,25 & 1,2 ᾠ
> 1.2 ᾠ
λr = 163.535 λs < λp
Penampang kompak
Mn1 = 496800000 N.mm
H < Lr
6500.000 < 22467.712
Mn2 = 496800000 Nmm diambil terkecil Mn1 dan Mn2
Mn = 496800000.0 Nmm
Cm = 0.08
delTa b = 0.08 krn deTla b < 1 maka, deTla b = 1,0
NEA = 509.29 N
MEB = 6127580 Nmm
dela s = 1.000053925
Mup = 6,235,294 Nmm
Mu = 208,019,404 Nmm
diambil Mu terbesar, maka Mu
Mu = 208,019,404
karena tidak aman, maka pada kolom dipasang lateral bracing di ketinggian 2,5 m dan 5 m dari dasar kolom. Hitungan
Menghitung kelangsingan batang maks
*arah sumbu y-y (batang AC) Lb = 3000
λmax = 85.53
*arah sumbu X-X
λy1 = 27.15
λmax = 85.53 diambil nilai terbesar dari λmax dan λy1
λc = 0.94 maka, antara 0,25 & 1,2
rafter
42.4 cm3 = 42400 mm3
5.93 cm3 = 5930 mm3
Sx = 421333.3333 mm3
6320 cm4 = 63200000 mm4
= 1
= 1.477
= 1.112 pakai
N AMAN
penampang kompak
N
1 AMAN
mm
ᾠ = 1.48
N OK
Lr = 22467.712 mm maka,
PERENCANAAN SAMBUNGAN
Buhul C Buhul B
1. data sambungan 1. data sambungan
Vu = 36088.380 N 14727.021 N Vu
Mu = -3165744.00 N Mu
D baut = 12 mm 105 D baut
fu baut = 500 Mpa fu baut
tp = 12 mm tp
2. tata letak baut 2. tata letak baut
36 < S < 180 /200 mm 36
S= 70 mm S
18 < S1 < 148 18
S1 = 40 mm S1
jmlh baut = 8 baut jmlh baut
1/2n = 4 baris 1/2n
150 Cek 150 b
290 OK 290 h
3. reaksi pada baut 3. reaksi pada baut
akibat Vu akibat Vu
Ry = 1840.878 N Ry
akibat Mu akibat Mu
b = 150 mm b
8t = 96 mm 8t
be = 96 mm be
Ab = 113.10 mm2 Ab
Persamaan (goal seek) Persamaan (goal seek)
d1 = 40 mm d1
d2 = 110 mm d2
d3 = 180 mm Tprofil 290 d3
d4 = 250 mm d4
ye = 43.70 mm hitung dengan manual d5
menghitung nilai I ye
2670191.292 = 14826646.997895 menghitung nilai I
I = 17496838.290167 mm4 5734213
gaya tarik maksimum baut I
Tb = -4221.5455671572 n gaya tarik maksimum ba
4. Periksa keamanan baut Tb
Ry = 1840.878 N 4. Periksa keamanan baut
r1 = 0.5 N Ry
r2 = 1.9 N r1
1840.877565 < 21205.750411731 OKE r2
ft = 379.074 Mpa 2255.5238
-4221.54557 < 32154.180 OKE ft
181869.94
759.88 226.19467 Hitung manual dengan kalkulator 226.19467
1595748 131192.91 ye= 43.698259 203575.2
4559.28 904.77868 904.77868
Plat dasar kolom
1. data sambungan f'c =
= 36088.380 N fu =
= 208019404.00 N fy =
= 12 mm data profil kolom
= 500 Mpa b =
= 12 mm h =
2. tata letak baut PONDASI
< S < 200 s =
= 70 mm d =
< S1 < 100 148 1. dPlat dasar bersifat jepit
= 40 mm Nu =
= 16 baut Vu =
= 8 baris Mu =
150 Cek 150 b e =
570 OK 570 h h/2 =
3. reaksi pada baut =
Tu =
= 2255.524 N Aangkr =
D Angkr =
= 150 mm n agkr =
= 96 mm =
= 96 mm A plat dsr =
= 113.10 mm2 A =
Persamaan (goal seek) dicoba B =
= 40 mm =
= 110 mm f1 =
= 180 mm =
= 250 mm f2 =
= 320 mm Tprofil 360 momen plat =
= 56.38 mm hitung dengan manual T plat dasar =
menghitung nilai I Tebal pengelasan
= 28367586.7955 Llas =
= 34101800.2127 mm4 I las =
gaya tarik maksimum baut Fuw =
= 181869.943174 n akibat Vu
4. Periksa keamanan baut Ry =
= 2255.524 N akibat Mu
= 0.5 N Rx =
= 1.9 N Rtot-las =
< 21205.7504117 OKE Tebal las a =
= 372.108 Mpa Tebal las a =
< 31563.309 Tambah baris baut/diameter diperbesar T las trpkai =
Hitung manual dengan kalkulator
ye= 56.37777838
Perencanaan Sambungan
Plat dasar kolom Sendi
27.5 mpa f'c = 25
410 mpa fu = 410
250 mpa fy = 250
data profil kolom
150 mm b = 150
150 mm h = 150
Gaya Yang Diteruskan
20 MM Nu =
30 MM HU =
r bersifat jepit Ukuran Plat Dasar Kolom
-37285.956 N AB = 2924.389
-16651.180 N A = 250
0.000 Nmm B = 250
0.000 mm m = 53.750
75 mm n = 61.25
hitung A Tebal Plat Dasar
15400.721 N t1 = 3.914
66.778 N t2 = 4.460
36 mm t = 4.460
0.066 Diameter Angkur
1 satu sisi Dangkur-1 = 6.5133239
-1560.445 mm2 Dangkur-2 = 1.692
350 mm Dangkur = 6.5133239
300 mm Plat Siku
105000 mm2 OKE tb kolom = 7
-0.221 Mpa 0,5*tb = 3.500
14.03 Mpa OKE tplat siku = 5.00
-0.188 mpa dbaut = 12.000
-262.373 Rbaut-1 = 61992.000
Err:502 mm Rbaut-2 = 42411.501
Rbaut = 42411.501
846.000 mm n = 0.393
2898666.667 mm4
#REF! Mpa
-19.682
0.000
19.682
0.151 mm
#REF! mm
#REF! mm
mpa fu baut 500
mpa
mpa
mm
mm
37285.96
16651.18
> h+100
>b+100
5 mm
6 mm
N
N
= 2 baut
Perencanaan Sambungan
Buhul C
1. data sambungan
Vu = Vuc = 36088.380 N h= 350
Mu = Muc = -3165744.00 N b= 350
D baut = 12 mm
fu baut = 500 Mpa
tp = 12 mm
2. tataletak baut
36 < S < 180 atau 200
S= 50 mm
18 < S1 < 148 di coba
S1 = 60 mm
jmlh baut = 10 baut
1/2n = 5 /1 baris
170 OK 350 b
320 OK 320 h
3. reaksi pada baut
akibat Vu
Ry = 3608.838 N
akibat Mu
b = 350 mm
8t = 96 mm d5 = 260
be = 96 mm d6 = 310
Ab = 113.04 mm2 d7 = 360
Persamaan (goal seek) d8 = 410
d1 = 60 mm d9 = 460
d2 = 110 mm
d3 = 160 mm Tprofil 320
d4 = 210
ye = 43.69825879 mm hitung dengan kalkulator
menghitung nilai I 91657.815 = 131467.48826 harus sama
2670191.29 = 20941897.797583 -39809.672842
I = 23612089.089855 mm4
gaya tarik maksimum baut
Tb = -3154.654193826 n
4. Periksa keamanan baut
Ry = 3608.838 N
r1 = 0.5 N
r2 = 1.9 N
3608.838 < 21195 OKE
f = 349.342 Mpa
-3154.65419 < 29617.206 OKE
goal seek
set cell -39809.67284
to value 0
chang ye
Perencanaan Sambungan
Buhul B
1. data sambungan
Vub=Vud = 27013.287 N
Mub=Mud = 92765855.19 N
D baut = 12 mm
fu baut = 500 Mpa
tp = 12 mm
2. tataletak baut
36 < S < 180 atau 200
S= 50 mm
18 < 60 < 148 di coba
S1 = 60 mm
jmlh baut = 16 baut
1/2n = 8 /1 baris
170 OK 350 b
470 OK 470 h
3. reaksi pada baut
akibat Vu
Ry = 1688.330 N
akibat Mu
b = 350 mm
8t = 96 mm d5 = 260
be = 96 mm d6 = 310
Ab = 113.04 mm2 d7 = 360
Persamaan (goal seek) d8 = 410
d1 = 60 mm d9 = 460
d2 = 110 mm d10 = 510
d3 = 160 mm Tprofil 670 d11 560
d4 = 210 d12 610
ye = 56.38 mm hitung dengan kalkulator
menghitung nilai I 152565.79 = 323063.29harus sama
5734213 = 81444683.4608 -170498
I = 87178896.878 mm4
gaya tarik maksimum baut
Tb = 27281.8148769 n
4. Periksa keamanan baut
Ry = 1688.330 N
r1 = 0.5 N
r2 = 1.9 N
1688.330 < 21195 OKE
f = 381.622 Mpa
27281.815 < 32353.929 OKE
Perencanaan Sambungan
Plat dasar kolom (sendi)
f'c = 30 mpa Fu baut =
fu = 410 mpa
fy = 250 mpa
data profil kolom
b = 350 mm
h = 350 mm
diameter angkur
D angkur 1 = 14.344 mm
D angkur 2 = 6.580 mm
D = 14.34 mm
15.000 mm
plat siku
tebal badan profil kolom =
t plat siku = 8 mm > 5.5
d baut = 12.000 mm
R baut 1 = 70848.000 N
R baut 2 = 42390 N
R baut = 70848.000 N
n = 0.685
dipakai jumlah baut = 1.000
500
TABLE: Element Forces - Frames
Frame Station OutputCase CaseType P V2 V3 T M2
Text mm Text Text N N N N-mm N-mm
AB 0 MATI LinStatic -22446.41 -10604.41 0 0 0
AB 3250 MATI LinStatic -22446.41 -10604.41 0 0 0
AB 6500 MATI LinStatic -22446.41 -10604.41 0 0 0
AB 0 HIDUP LinStatic -13393 -6191.56 0 0 0
AB 3250 HIDUP LinStatic -13393 -6191.56 0 0 0
AB 6500 HIDUP LinStatic -13393 -6191.56 0 0 0
AB 0 ANGIN KANAN LinStatic 1927.19 11236.14 0 0 0
AB 3250 ANGIN KANAN LinStatic 1927.19 6629.27 0 0 0
AB 6500 ANGIN KANAN LinStatic 1927.19 2022.39 0 0 0
AB 0 ANGIN KIRI LinStatic 4876.81 -4548.51 0 0 0
AB 3250 ANGIN KIRI LinStatic 4876.81 -2501.01 0 0 0
AB 6500 ANGIN KIRI LinStatic 4876.81 -453.51 0 0 0
AB 0 GEMPA LinStatic 394.56 2192.86 0 0 0
AB 3250 GEMPA LinStatic 394.56 2192.86 0 0 0
AB 6500 GEMPA LinStatic 394.56 2192.86 0 0 0
BC 0 MATI LinStatic -16336.04 -13881.59 0 0 0
BC 1436.6 MATI LinStatic -16336.04 -13881.59 0 0 0
BC 1436.6 MATI LinStatic -15491.68 -11561.21 0 0 0
BC 2873.2 MATI LinStatic -15491.68 -11561.21 0 0 0
BC 2873.2 MATI LinStatic -14647.31 -9240.82 0 0 0
BC 4309.81 MATI LinStatic -14647.31 -9240.82 0 0 0
BC 4309.81 MATI LinStatic -13802.95 -6920.43 0 0 0
BC 5746.41 MATI LinStatic -13802.95 -6920.43 0 0 0
BC 5746.41 MATI LinStatic -12958.59 -4600.05 0 0 0
BC 7183.01 MATI LinStatic -12958.59 -4600.05 0 0 0
BC 7183.01 MATI LinStatic -12114.23 -2279.66 0 0 0
BC 8619.61 MATI LinStatic -12114.23 -2279.66 0 0 0
BC 8619.61 MATI LinStatic -11269.86 40.73 0 0 0
BC 10056.22 MATI LinStatic -11269.86 40.73 0 0 0
BC 10056.22 MATI LinStatic -10425.5 2361.12 0 0 0
BC 11492.82 MATI LinStatic -10425.5 2361.12 0 0 0
BC 0 HIDUP LinStatic -9557.57 -8158.59 0 0 0
BC 1436.6 HIDUP LinStatic -9557.57 -8158.59 0 0 0
BC 1436.6 HIDUP LinStatic -9059 -6788.48 0 0 0
BC 2873.2 HIDUP LinStatic -9059 -6788.48 0 0 0
BC 2873.2 HIDUP LinStatic -8560.43 -5418.37 0 0 0
BC 4309.81 HIDUP LinStatic -8560.43 -5418.37 0 0 0
BC 4309.81 HIDUP LinStatic -8061.87 -4048.26 0 0 0
BC 5746.41 HIDUP LinStatic -8061.87 -4048.26 0 0 0
BC 5746.41 HIDUP LinStatic -7563.3 -2678.16 0 0 0
BC 7183.01 HIDUP LinStatic -7563.3 -2678.16 0 0 0
BC 7183.01 HIDUP LinStatic -7064.73 -1308.05 0 0 0
BC 8619.61 HIDUP LinStatic -7064.73 -1308.05 0 0 0
BC 8619.61 HIDUP LinStatic -6566.17 62.06 0 0 0
BC 10056.22 HIDUP LinStatic -6566.17 62.06 0 0 0
BC 10056.22 HIDUP LinStatic -6067.6 1432.17 0 0 0
BC 11492.82 HIDUP LinStatic -6067.6 1432.17 0 0 0
BC 0 ANGIN KANAN LinStatic 2559.49 1119.45 0 0 0
BC 1436.6 ANGIN KANAN LinStatic 2559.49 1119.45 0 0 0
BC 1436.6 ANGIN KANAN LinStatic 2559.49 1119.45 0 0 0
BC 2873.2 ANGIN KANAN LinStatic 2559.49 1119.45 0 0 0
BC 2873.2 ANGIN KANAN LinStatic 2559.49 1119.45 0 0 0
BC 4309.81 ANGIN KANAN LinStatic 2559.49 1119.45 0 0 0
BC 4309.81 ANGIN KANAN LinStatic 2559.49 1119.45 0 0 0
BC 5746.41 ANGIN KANAN LinStatic 2559.49 1119.45 0 0 0
BC 5746.41 ANGIN KANAN LinStatic 2559.49 1119.45 0 0 0
BC 7183.01 ANGIN KANAN LinStatic 2559.49 1119.45 0 0 0
BC 7183.01 ANGIN KANAN LinStatic 2559.49 1119.45 0 0 0
BC 8619.61 ANGIN KANAN LinStatic 2559.49 1119.45 0 0 0
BC 8619.61 ANGIN KANAN LinStatic 2559.49 1119.45 0 0 0
BC 10056.22 ANGIN KANAN LinStatic 2559.49 1119.45 0 0 0
BC 10056.22 ANGIN KANAN LinStatic 2559.49 1119.45 0 0 0
BC 11492.82 ANGIN KANAN LinStatic 2559.49 1119.45 0 0 0
BC 0 ANGIN KIRI LinStatic 1241.47 4737.9 0 0 0
BC 1436.6 ANGIN KIRI LinStatic 1241.47 3832.84 0 0 0
BC 1436.6 ANGIN KIRI LinStatic 1241.47 3832.84 0 0 0
BC 2873.2 ANGIN KIRI LinStatic 1241.47 2927.78 0 0 0
BC 2873.2 ANGIN KIRI LinStatic 1241.47 2927.78 0 0 0
BC 4309.81 ANGIN KIRI LinStatic 1241.47 2022.72 0 0 0
BC 4309.81 ANGIN KIRI LinStatic 1241.47 2022.72 0 0 0
BC 5746.41 ANGIN KIRI LinStatic 1241.47 1117.66 0 0 0
BC 5746.41 ANGIN KIRI LinStatic 1241.47 1117.66 0 0 0
BC 7183.01 ANGIN KIRI LinStatic 1241.47 212.6 0 0 0
BC 7183.01 ANGIN KIRI LinStatic 1241.47 212.6 0 0 0
BC 8619.61 ANGIN KIRI LinStatic 1241.47 -692.46 0 0 0
BC 8619.61 ANGIN KIRI LinStatic 1241.47 -692.46 0 0 0
BC 10056.22 ANGIN KIRI LinStatic 1241.47 -1597.52 0 0 0
BC 10056.22 ANGIN KIRI LinStatic 1241.47 -1597.52 0 0 0
BC 11492.82 ANGIN KIRI LinStatic 1241.47 -2502.57 0 0 0
BC 0 GEMPA LinStatic 1156.34 -0.91 0 0 0
BC 1436.6 GEMPA LinStatic 1156.34 -0.91 0 0 0
BC 1436.6 GEMPA LinStatic 1156.34 -0.91 0 0 0
BC 2873.2 GEMPA LinStatic 1156.34 -0.91 0 0 0
BC 2873.2 GEMPA LinStatic 1156.34 -0.91 0 0 0
BC 4309.81 GEMPA LinStatic 1156.34 -0.91 0 0 0
BC 4309.81 GEMPA LinStatic 1156.34 -0.91 0 0 0
BC 5746.41 GEMPA LinStatic 1156.34 -0.91 0 0 0
BC 5746.41 GEMPA LinStatic 1156.34 -0.91 0 0 0
BC 7183.01 GEMPA LinStatic 1156.34 -0.91 0 0 0
BC 7183.01 GEMPA LinStatic 1156.34 -0.91 0 0 0
BC 8619.61 GEMPA LinStatic 1156.34 -0.91 0 0 0
BC 8619.61 GEMPA LinStatic 1156.34 -0.91 0 0 0
BC 10056.22 GEMPA LinStatic 1156.34 -0.91 0 0 0
BC 10056.22 GEMPA LinStatic 1156.34 -0.91 0 0 0
BC 11492.82 GEMPA LinStatic 1156.34 -0.91 0 0 0
CD 0 MATI LinStatic -10425.5 -2361.12 0 0 0
CD 1436.6 MATI LinStatic -10425.5 -2361.12 0 0 0
CD 1436.6 MATI LinStatic -11269.86 -40.73 0 0 0
CD 2873.2 MATI LinStatic -11269.86 -40.73 0 0 0
CD 2873.2 MATI LinStatic -12114.23 2279.66 0 0 0
CD 4309.81 MATI LinStatic -12114.23 2279.66 0 0 0
CD 4309.81 MATI LinStatic -12958.59 4600.05 0 0 0
CD 5746.41 MATI LinStatic -12958.59 4600.05 0 0 0
CD 5746.41 MATI LinStatic -13802.95 6920.43 0 0 0
CD 7183.01 MATI LinStatic -13802.95 6920.43 0 0 0
CD 7183.01 MATI LinStatic -14647.31 9240.82 0 0 0
CD 8619.61 MATI LinStatic -14647.31 9240.82 0 0 0
CD 8619.61 MATI LinStatic -15491.68 11561.21 0 0 0
CD 10056.22 MATI LinStatic -15491.68 11561.21 0 0 0
CD 10056.22 MATI LinStatic -16336.04 13881.59 0 0 0
CD 11492.82 MATI LinStatic -16336.04 13881.59 0 0 0
CD 0 HIDUP LinStatic -6067.6 -1432.17 0 0 0
CD 1436.6 HIDUP LinStatic -6067.6 -1432.17 0 0 0
CD 1436.6 HIDUP LinStatic -6566.17 -62.06 0 0 0
CD 2873.2 HIDUP LinStatic -6566.17 -62.06 0 0 0
CD 2873.2 HIDUP LinStatic -7064.73 1308.05 0 0 0
CD 4309.81 HIDUP LinStatic -7064.73 1308.05 0 0 0
CD 4309.81 HIDUP LinStatic -7563.3 2678.16 0 0 0
CD 5746.41 HIDUP LinStatic -7563.3 2678.16 0 0 0
CD 5746.41 HIDUP LinStatic -8061.87 4048.26 0 0 0
CD 7183.01 HIDUP LinStatic -8061.87 4048.26 0 0 0
CD 7183.01 HIDUP LinStatic -8560.43 5418.37 0 0 0
CD 8619.61 HIDUP LinStatic -8560.43 5418.37 0 0 0
CD 8619.61 HIDUP LinStatic -9059 6788.48 0 0 0
CD 10056.22 HIDUP LinStatic -9059 6788.48 0 0 0
CD 10056.22 HIDUP LinStatic -9557.57 8158.59 0 0 0
CD 11492.82 HIDUP LinStatic -9557.57 8158.59 0 0 0
CD 0 ANGIN KANAN LinStatic 1241.47 2502.57 0 0 0
CD 1436.6 ANGIN KANAN LinStatic 1241.47 1597.52 0 0 0
CD 1436.6 ANGIN KANAN LinStatic 1241.47 1597.52 0 0 0
CD 2873.2 ANGIN KANAN LinStatic 1241.47 692.46 0 0 0
CD 2873.2 ANGIN KANAN LinStatic 1241.47 692.46 0 0 0
CD 4309.81 ANGIN KANAN LinStatic 1241.47 -212.6 0 0 0
CD 4309.81 ANGIN KANAN LinStatic 1241.47 -212.6 0 0 0
CD 5746.41 ANGIN KANAN LinStatic 1241.47 -1117.66 0 0 0
CD 5746.41 ANGIN KANAN LinStatic 1241.47 -1117.66 0 0 0
CD 7183.01 ANGIN KANAN LinStatic 1241.47 -2022.72 0 0 0
CD 7183.01 ANGIN KANAN LinStatic 1241.47 -2022.72 0 0 0
CD 8619.61 ANGIN KANAN LinStatic 1241.47 -2927.78 0 0 0
CD 8619.61 ANGIN KANAN LinStatic 1241.47 -2927.78 0 0 0
CD 10056.22 ANGIN KANAN LinStatic 1241.47 -3832.84 0 0 0
CD 10056.22 ANGIN KANAN LinStatic 1241.47 -3832.84 0 0 0
CD 11492.82 ANGIN KANAN LinStatic 1241.47 -4737.9 0 0 0
CD 0 ANGIN KIRI LinStatic 2559.49 -1119.45 0 0 0
CD 1436.6 ANGIN KIRI LinStatic 2559.49 -1119.45 0 0 0
CD 1436.6 ANGIN KIRI LinStatic 2559.49 -1119.45 0 0 0
CD 2873.2 ANGIN KIRI LinStatic 2559.49 -1119.45 0 0 0
CD 2873.2 ANGIN KIRI LinStatic 2559.49 -1119.45 0 0 0
CD 4309.81 ANGIN KIRI LinStatic 2559.49 -1119.45 0 0 0
CD 4309.81 ANGIN KIRI LinStatic 2559.49 -1119.45 0 0 0
CD 5746.41 ANGIN KIRI LinStatic 2559.49 -1119.45 0 0 0
CD 5746.41 ANGIN KIRI LinStatic 2559.49 -1119.45 0 0 0
CD 7183.01 ANGIN KIRI LinStatic 2559.49 -1119.45 0 0 0
CD 7183.01 ANGIN KIRI LinStatic 2559.49 -1119.45 0 0 0
CD 8619.61 ANGIN KIRI LinStatic 2559.49 -1119.45 0 0 0
CD 8619.61 ANGIN KIRI LinStatic 2559.49 -1119.45 0 0 0
CD 10056.22 ANGIN KIRI LinStatic 2559.49 -1119.45 0 0 0
CD 10056.22 ANGIN KIRI LinStatic 2559.49 -1119.45 0 0 0
CD 11492.82 ANGIN KIRI LinStatic 2559.49 -1119.45 0 0 0
CD 0 GEMPA LinStatic -1156.34 -0.91 0 0 0
CD 1436.6 GEMPA LinStatic -1156.34 -0.91 0 0 0
CD 1436.6 GEMPA LinStatic -1156.34 -0.91 0 0 0
CD 2873.2 GEMPA LinStatic -1156.34 -0.91 0 0 0
CD 2873.2 GEMPA LinStatic -1156.34 -0.91 0 0 0
CD 4309.81 GEMPA LinStatic -1156.34 -0.91 0 0 0
CD 4309.81 GEMPA LinStatic -1156.34 -0.91 0 0 0
CD 5746.41 GEMPA LinStatic -1156.34 -0.91 0 0 0
CD 5746.41 GEMPA LinStatic -1156.34 -0.91 0 0 0
CD 7183.01 GEMPA LinStatic -1156.34 -0.91 0 0 0
CD 7183.01 GEMPA LinStatic -1156.34 -0.91 0 0 0
CD 8619.61 GEMPA LinStatic -1156.34 -0.91 0 0 0
CD 8619.61 GEMPA LinStatic -1156.34 -0.91 0 0 0
CD 10056.22 GEMPA LinStatic -1156.34 -0.91 0 0 0
CD 10056.22 GEMPA LinStatic -1156.34 -0.91 0 0 0
CD 11492.82 GEMPA LinStatic -1156.34 -0.91 0 0 0
DE 0 MATI LinStatic -22446.41 10604.41 0 0 0
DE 3250 MATI LinStatic -22446.41 10604.41 0 0 0
DE 6500 MATI LinStatic -22446.41 10604.41 0 0 0
DE 0 HIDUP LinStatic -13393 6191.56 0 0 0
DE 3250 HIDUP LinStatic -13393 6191.56 0 0 0
DE 6500 HIDUP LinStatic -13393 6191.56 0 0 0
DE 0 ANGIN KANAN LinStatic 4876.81 4548.51 0 0 0
DE 3250 ANGIN KANAN LinStatic 4876.81 2501.01 0 0 0
DE 6500 ANGIN KANAN LinStatic 4876.81 453.51 0 0 0
DE 0 ANGIN KIRI LinStatic 1927.19 -11236.14 0 0 0
DE 3250 ANGIN KIRI LinStatic 1927.19 -6629.27 0 0 0
DE 6500 ANGIN KIRI LinStatic 1927.19 -2022.39 0 0 0
DE 0 GEMPA LinStatic -394.56 2192.86 0 0 0
DE 3250 GEMPA LinStatic -394.56 2192.86 0 0 0
DE 6500 GEMPA LinStatic -394.56 2192.86 0 0 0
T1 0 MATI LinStatic 459.32 1265.46 0 0 0
T1 718.09 MATI LinStatic 459.32 1265.46 0 0 0
T1 1436.18 MATI LinStatic 459.32 1265.46 0 0 0
T1 0 HIDUP LinStatic 341.18 940 0 0 0
T1 718.09 HIDUP LinStatic 341.18 940 0 0 0
T1 1436.18 HIDUP LinStatic 341.18 940 0 0 0
T1 0 ANGIN KANAN LinStatic 0 -5.821E-10 0 0 0
T1 718.09 ANGIN KANAN LinStatic 0 -5.821E-10 0 0 0
T1 1436.18 ANGIN KANAN LinStatic 0 -5.821E-10 0 0 0
T1 0 ANGIN KIRI LinStatic 0 2.547E-10 0 0 0
T1 718.09 ANGIN KIRI LinStatic 0 2.547E-10 0 0 0
T1 1436.18 ANGIN KIRI LinStatic 0 2.547E-10 0 0 0
T1 0 GEMPA LinStatic -14.82 5.38 0 0 0
T1 718.09 GEMPA LinStatic -14.82 5.38 0 0 0
T1 1436.18 GEMPA LinStatic -14.82 5.38 0 0 0
T2 0 MATI LinStatic 459.32 -1265.46 0 0 0
T2 718.09 MATI LinStatic 459.32 -1265.46 0 0 0
T2 1436.18 MATI LinStatic 459.32 -1265.46 0 0 0
T2 0 HIDUP LinStatic 341.18 -940 0 0 0
T2 718.09 HIDUP LinStatic 341.18 -940 0 0 0
T2 1436.18 HIDUP LinStatic 341.18 -940 0 0 0
T2 0 ANGIN KANAN LinStatic 4.657E-10 -1.019E-10 0 0 0
T2 718.09 ANGIN KANAN LinStatic 4.657E-10 -1.019E-10 0 0 0
T2 1436.18 ANGIN KANAN LinStatic 4.657E-10 -1.019E-10 0 0 0
T2 0 ANGIN KIRI LinStatic 0 2.328E-10 0 0 0
T2 718.09 ANGIN KIRI LinStatic 0 2.328E-10 0 0 0
T2 1436.18 ANGIN KIRI LinStatic 0 2.328E-10 0 0 0
T2 0 GEMPA LinStatic 14.82 5.38 0 0 0
T2 718.09 GEMPA LinStatic 14.82 5.38 0 0 0
T2 1436.18 GEMPA LinStatic 14.82 5.38 0 0 0
M3 FrameElem ElemStation
N-mm Text mm
-34464334 AB-1 0
7.276E-09 AB-1 3250
34464334.49 AB-1 6500
-20122569.8 AB-1 0
3.638E-09 AB-1 3250
20122569.79 AB-1 6500
26535908.4 AB-1 0
-2495390.63 AB-1 3250
-16554345.9 AB-1 6500
-10346391.6 AB-1 0
1109062.5 AB-1 3250
5910141.6 AB-1 6500
7126801.62 AB-1 0
-1.819E-09 AB-1 3250
-7126801.62 AB-1 6500
-50601431 BC-1 0
-30659098.6 BC-1 1436.6
-30659098.6 BC-1 1436.6
-14050240.6 BC-1 2873.2
-14050240.6 BC-1 2873.2
-774856.54 BC-1 4309.81
-774856.54 BC-1 4309.81
9167053.5 BC-1 5746.41
9167053.5 BC-1 5746.41
15775489.54 BC-1 7183.01
15775489.54 BC-1 7183.01
19050451.57 BC-1 8619.61
19050451.57 BC-1 8619.61
18991939.61 BC-1 10056.22
18991939.61 BC-1 10056.22
15599953.65 BC-1 11492.82
-29659959.7 BC-1 0
-17939313.5 BC-1 1436.6
-17939313.5 BC-1 1436.6
-8186967.36 BC-1 2873.2
-8186967.36 BC-1 2873.2
-402921.18 BC-1 4309.81
-402921.18 BC-1 4309.81
5412825 BC-1 5746.41
5412825 BC-1 5746.41
9260271.18 BC-1 7183.01
9260271.18 BC-1 7183.01
11139417.36 BC-1 8619.61
11139417.36 BC-1 8619.61
11050263.55 BC-1 10056.22
11050263.55 BC-1 10056.22
8992809.73 BC-1 11492.82
6432809.09 BC-1 0
4824606.82 BC-1 1436.6
4824606.82 BC-1 1436.6
3216404.54 BC-1 2873.2
3216404.54 BC-1 2873.2
1608202.27 BC-1 4309.81
1608202.27 BC-1 4309.81
-4.547E-10 BC-1 5746.41
-4.547E-10 BC-1 5746.41
-1608202.27 BC-1 7183.01
-1608202.27 BC-1 7183.01
-3216404.54 BC-1 8619.61
-3216404.54 BC-1 8619.61
-4824606.82 BC-1 10056.22
-4824606.82 BC-1 10056.22
-6432809.09 BC-1 11492.82
13357007.98 BC-1 0
7200632.73 BC-1 1436.6
7200632.73 BC-1 1436.6
2344468.21 BC-1 2873.2
2344468.21 BC-1 2873.2
-1211485.58 BC-1 4309.81
-1211485.58 BC-1 4309.81
-3467228.63 BC-1 5746.41
-3467228.63 BC-1 5746.41
-4422760.94 BC-1 7183.01
-4422760.94 BC-1 7183.01
-4078082.52 BC-1 8619.61
-4078082.52 BC-1 8619.61
-2433193.37 BC-1 10056.22
-2433193.37 BC-1 10056.22
511906.52 BC-1 11492.82
-5211.78 BC-1 0
-3908.84 BC-1 1436.6
-3908.84 BC-1 1436.6
-2605.89 BC-1 2873.2
-2605.89 BC-1 2873.2
-1302.95 BC-1 4309.81
-1302.95 BC-1 4309.81
1.581E-10 BC-1 5746.41
1.581E-10 BC-1 5746.41
1302.95 BC-1 7183.01
1302.95 BC-1 7183.01
2605.89 BC-1 8619.61
2605.89 BC-1 8619.61
3908.84 BC-1 10056.22
3908.84 BC-1 10056.22
5211.78 BC-1 11492.82
15599953.65 CD-1 0
18991939.61 CD-1 1436.6
18991939.61 CD-1 1436.6
19050451.57 CD-1 2873.2
19050451.57 CD-1 2873.2
15775489.54 CD-1 4309.81
15775489.54 CD-1 4309.81
9167053.5 CD-1 5746.41
9167053.5 CD-1 5746.41
-774856.54 CD-1 7183.01
-774856.54 CD-1 7183.01
-14050240.6 CD-1 8619.61
-14050240.6 CD-1 8619.61
-30659098.6 CD-1 10056.22
-30659098.6 CD-1 10056.22
-50601431 CD-1 11492.82
8992809.73 CD-1 0
11050263.55 CD-1 1436.6
11050263.55 CD-1 1436.6
11139417.36 CD-1 2873.2
11139417.36 CD-1 2873.2
9260271.18 CD-1 4309.81
9260271.18 CD-1 4309.81
5412825 CD-1 5746.41
5412825 CD-1 5746.41
-402921.18 CD-1 7183.01
-402921.18 CD-1 7183.01
-8186967.36 CD-1 8619.61
-8186967.36 CD-1 8619.61
-17939313.5 CD-1 10056.22
-17939313.5 CD-1 10056.22
-29659959.7 CD-1 11492.82
511906.52 CD-1 0
-2433193.37 CD-1 1436.6
-2433193.37 CD-1 1436.6
-4078082.52 CD-1 2873.2
-4078082.52 CD-1 2873.2
-4422760.94 CD-1 4309.81
-4422760.94 CD-1 4309.81
-3467228.63 CD-1 5746.41
-3467228.63 CD-1 5746.41
-1211485.58 CD-1 7183.01
-1211485.58 CD-1 7183.01
2344468.21 CD-1 8619.61
2344468.21 CD-1 8619.61
7200632.73 CD-1 10056.22
7200632.73 CD-1 10056.22
13357007.98 CD-1 11492.82
-6432809.09 CD-1 0
-4824606.82 CD-1 1436.6
-4824606.82 CD-1 1436.6
-3216404.54 CD-1 2873.2
-3216404.54 CD-1 2873.2
-1608202.27 CD-1 4309.81
-1608202.27 CD-1 4309.81
4.547E-10 CD-1 5746.41
4.547E-10 CD-1 5746.41
1608202.27 CD-1 7183.01
1608202.27 CD-1 7183.01
3216404.54 CD-1 8619.61
3216404.54 CD-1 8619.61
4824606.82 CD-1 10056.22
4824606.82 CD-1 10056.22
6432809.09 CD-1 11492.82
-5211.78 CD-1 0
-3908.84 CD-1 1436.6
-3908.84 CD-1 1436.6
-2605.89 CD-1 2873.2
-2605.89 CD-1 2873.2
-1302.95 CD-1 4309.81
-1302.95 CD-1 4309.81
1.581E-10 CD-1 5746.41
1.581E-10 CD-1 5746.41
1302.95 CD-1 7183.01
1302.95 CD-1 7183.01
2605.89 CD-1 8619.61
2605.89 CD-1 8619.61
3908.84 CD-1 10056.22
3908.84 CD-1 10056.22
5211.78 CD-1 11492.82
34464334.49 DE-1 0
-7.276E-09 DE-1 3250
-34464334 DE-1 6500
20122569.79 DE-1 0
-3.638E-09 DE-1 3250
-20122569.8 DE-1 6500
10346391.6 DE-1 0
-1109062.5 DE-1 3250
-5910141.6 DE-1 6500
-26535908.4 DE-1 0
2495390.63 DE-1 3250
16554345.9 DE-1 6500
7126801.62 DE-1 0
-9.095E-10 DE-1 3250
-7126801.62 DE-1 6500
908712 T1-1 0
-1.523E-08 T1-1 718.09
-908712 T1-1 1436.18
675000 T1-1 0
-1.216E-08 T1-1 718.09
-675000 T1-1 1436.18
-4.075E-07 T1-1 0
1.053E-08 T1-1 718.09
4.285E-07 T1-1 1436.18
1.819E-07 T1-1 0
-0.000000001 T1-1 718.09
-1.838E-07 T1-1 1436.18
3863.87 T1-1 0
6.205E-09 T1-1 718.09
-3863.87 T1-1 1436.18
-908712 T2-1 0
1.364E-09 T2-1 718.09
908712 T2-1 1436.18
-675000 T2-1 0
-9.095E-10 T2-1 718.09
675000 T2-1 1436.18
-6.548E-08 T2-1 0
7.663E-09 T2-1 718.09
8.081E-08 T2-1 1436.18
1.601E-07 T2-1 0
-7.122E-09 T2-1 718.09
-1.743E-07 T2-1 1436.18
3863.87 T2-1 0
-3.357E-10 T2-1 718.09
-3863.87 T2-1 1436.18
TABLE: Program Control
ProgramName Version ProgLevel LicenseNum LicenseOS LicenseSC LicenseBR LicenseHT
Text Text Text Text Text Text Text Text
SAP2000 14.0.0 Advanced Yes Yes Yes No
CurrUnits SteelCode ConcCode AlumCode ColdCode BridgeCode RegenHinge
Text Text Text Text Text Text Text
N, mm, C AISC-LRFD93 ACI 318-05/IBC2003 AA-ASD 2000 AISI-ASD96 AASHTO LRFD 2007 Yes
BSchedGUID
Text