IV PEKERJAAN DINDING
A. Lantai Basement ( Elev - 4.00 s/d + 0.00 )
1. Pek. Dinding 1 Bata 1 Pc : 2 Ps 1,792.00 M2 194,550.00 112,950.00 Rp. 551,040,000.00
2. Pek. Plesteran Dinding 1 Bata camp. 1 : 2 finishing di aci 3,584.00 M2 69,617.25 Rp. 18,842.25 Rp. 50,775.00 Rp. 249,508,224.00
3. Pek. Dinding 1/2 camp. Bata 1 Pc : 2 Ps 8,671.46 M2 150,847.50 Rp. 91,822.50 Rp. 59,025.00 Rp. 1,308,068,062.35
4. Pek. Plesteran Bata 1 : 2 finishing di aci . 17,342.92 M2 69,617.25 Rp. 18,842.25 Rp. 50,775.00 Rp. 1,207,366,397.37
5. Pek. Kolom Praktis 13/13 Beton f'c 14,5 Mpa (K-175) 20.37 M3 5,941,998.66 Rp. 4,700,338.41 Rp. 1,241,660.25 Rp. 121,038,512.76
6. Pek. Balok Praktis 13/13 Beton f'c 14,5 Mpa (K-175) di atas kosen 74.20 M3 5,941,998.66 Rp. 4,700,338.41 Rp. 1,241,660.25 Rp. 440,896,300.78
7. Pek. Afwerking Beton 1 : 3 finishing di aci. 40.74 M2 66,357.75 Rp. 15,582.75 Rp. 50,775.00 Rp. 2,703,414.74
8. Pek. Plat Meja Wastafel tbl = 10 cm Beton f'c 14,5 Mpa (K-175) 2.10 M3 4,693,394.46 Rp. 3,567,945.96 Rp. 1,125,448.50 Rp. 9,856,128.36
9. Pek. Keramik 20 x 25 Dinding toilet & Meja wastafel 749.28 M2 381,487.50 Rp. 187,612.50 Rp. 193,875.00 Rp. 285,840,954.00
10. Pek. Dinding Partisi Fiber sekat Toilet 112.00 M2 425,000.00 Rp. 425,000.00 Rp. - Rp. 47,600,000.00
11. Pek. Railling Tangga Stainless 186.20 M2 850,000.00 Rp. 850,000.00 Rp. - Rp. 158,270,000.00
A.1 BANGUNAN UTAMA ( 59.000 m2 , BERLANTAI 9 )
HARGA HARGA HARGA JUMLAH
No URAIAN PEKERJAAN VOLUME SAT SATUAN SATUAN BAHAN SATUAN UPAH HARGA
A B C D E F G = C x( E+ F)
IV PEKERJAAN DINDING
B. Lantai 1 ( Elev +0.00 s/d +4.00 )
1. Pek. Dinding 1/2 Bata camp. 1 Pc : 2 Ps 1,460.69 M2 150,847.50 Rp. 91,822.50 Rp. 59,025.00 Rp. 220,341,434.78
2. Pek. Dinding 1/2 Bata camp. 1 Pc : 4 Ps 13,324.08 M2 138,468.75 Rp. 79,443.75 Rp. 59,025.00 Rp. 1,844,968,702.50
3. Pek. Plesteran Bata 1 : 2 finishing di aci . 2,921.38 M2 69,617.25 Rp. 18,842.25 Rp. 50,775.00 Rp. 203,378,441.81
4. Pek. Plesteran Bata 1 : 4 finishing di aci . 26,648.16 M2 64,260.00 Rp. 13,485.00 Rp. 50,775.00 Rp. 1,712,410,761.60
5. Pek. Kolom Praktis 13/13 Beton f'c 14,5 Mpa (K-175) 28.98 M3 5,941,998.66 Rp. 4,700,338.41 Rp. 1,241,660.25 Rp. 172,199,121.25
6. Pek. Balok Praktis 13/13 Beton f'c 14,5 Mpa (K-175) di atas kosen 28.14 M3 5,941,998.66 Rp. 4,700,338.41 Rp. 1,241,660.25 Rp. 167,207,842.37
7. Pek. Afwerking Beton 1 : 3 finishing di aci. 758.59 M2 66,357.75 Rp. 15,582.75 Rp. 50,775.00 Rp. 50,338,325.57
8. Pek. Plat Meja Wastafel tbl = 10 cm Beton f'c 14,5 Mpa (K-175) 4.06 M3 4,693,394.46 Rp. 3,567,945.96 Rp. 1,125,448.50 Rp. 19,055,181.49
9. Pek. Keramik 20 x 25 Dinding toilet & Meja wastafel 1,001.00 M2 381,487.50 Rp. 187,612.50 Rp. 193,875.00 Rp. 381,868,987.50
10. Pek. Allumunium Composite Panel (lengkap rangka terpasang) 2,972.06 M2 1,140,000.00 Rp. 590,000.00 Rp. 196,000.00 Rp. 2,336,039,160.00
11. Pek. Pas. Kaca Stopsol Warna tbl 10 mm + Rangka Terpasang 938.00 M2 Rp. 545,000.00 Rp. 117,500.00 Rp. 621,425,000.00
12. Pek. Dinding Partisi Fiber sekat Toilet 112.00 M2 425,000.00 Rp. 425,000.00 Rp. - Rp. 47,600,000.00
13. Pek. Railling Tangga Stainless 395.50 M2 850,000.00 Rp. 850,000.00 Rp. - Rp. 336,175,000.00
-
C. Lantai 2 ( Elev +4.00 s/d +8.00 ) -
1. Pek. Dinding 1/2 Bata camp. 1 Pc : 2 Ps 1,077.72 M2 150,847.50 Rp. 91,822.50 Rp. 59,025.00 Rp. 162,571,367.70
2. Pek. Dinding 1/2 Bata camp. 1 Pc : 4 Ps 13,672.05 M2 138,468.75 Rp. 79,443.75 Rp. 59,025.00 Rp. 1,893,151,673.44
3. Pek. Plesteran Bata 1 : 2 finishing di aci . 2,169.44 M2 69,617.25 Rp. 18,842.25 Rp. 50,775.00 Rp. 151,030,446.84
4. Pek. Plesteran Bata 1 : 4 finishing di aci . 27,344.10 M2 64,260.00 Rp. 13,485.00 Rp. 50,775.00 Rp. 1,757,131,866.00
5. Pek. Kolom Praktis 13/13 Beton f'c 14,5 Mpa (K-175) 27.23 M3 5,941,998.66 Rp. 4,700,338.41 Rp. 1,241,660.25 Rp. 161,800,623.59
6. Pek. Balok Praktis 13/13 Beton f'c 14,5 Mpa (K-175) di atas kosen 19.88 M3 5,941,998.66 Rp. 4,700,338.41 Rp. 1,241,660.25 Rp. 118,126,933.42
7. Pek. Afwerking Beton 1 : 3 finishing di aci. 952.07 M2 66,357.75 Rp. 15,582.75 Rp. 50,775.00 Rp. 63,177,223.04
8. Pek. Plat Meja Wastafel tbl = 10 cm Beton f'c 14,5 Mpa (K-175) 8.54 M3 4,693,394.46 Rp. 3,567,945.96 Rp. 1,125,448.50 Rp. 40,081,588.66
9. Pek. Keramik 20 x 25 Dinding toilet & Meja wastafel 925.40 M2 381,487.50 Rp. 187,612.50 Rp. 193,875.00 Rp. 353,028,532.50
10. Pek. Allumunium Composite Panel (lengkap rangka terpasang) 3,429.65 M2 1,140,000.00 Rp. 590,000.00 Rp. 196,000.00 Rp. 2,695,704,900.00
11. Pek. Pas. Kaca Stopsol Warna tbl 10 mm + Rangka Terpasang 812.00 M2 Rp. 545,000.00 Rp. 117,500.00 Rp. 537,950,000.00
12. Pek. Dinding Partisi Fiber sekat Toilet 112.00 M2 425,000.00 Rp. 425,000.00 Rp. - Rp. 47,600,000.00
13. Pek. Railling Tangga Stainless 588.00 M2 850,000.00 Rp. 850,000.00 Rp. - Rp. 499,800,000.00
-
D. Lantai 3 ( Elev +8.00 s/d +12.00 ) -
1. Pek. Dinding 1/2 Bata camp. 1 Pc : 2 Ps 1,736.07 M2 150,847.50 Rp. 91,822.50 Rp. 59,025.00 Rp. 261,881,819.33
2. Pek. Dinding 1/2 Bata camp. 1 Pc : 4 Ps 16,062.76 M2 138,468.75 Rp. 79,443.75 Rp. 59,025.00 Rp. 2,224,190,298.75
3. Pek. Plesteran Bata 1 : 2 finishing di aci . 3,472.14 M2 69,617.25 Rp. 18,842.25 Rp. 50,775.00 Rp. 241,720,838.42
4. Pek. Plesteran Bata 1 : 4 finishing di aci . 32,125.59 M2 64,260.00 Rp. 13,485.00 Rp. 50,775.00 Rp. 2,064,390,413.40
5. Pek. Kolom Praktis 13/13 Beton f'c 14,5 Mpa (K-175) 39.76 M3 5,941,998.66 Rp. 4,700,338.41 Rp. 1,241,660.25 Rp. 236,253,866.83
6. Pek. Balok Praktis 13/13 Beton f'c 14,5 Mpa (K-175) di atas kosen 17.36 M3 5,941,998.66 Rp. 4,700,338.41 Rp. 1,241,660.25 Rp. 103,153,096.79
7. Pek. Afwerking Beton 1 : 3 finishing di aci. 1,199.94 M2 66,357.75 Rp. 15,582.75 Rp. 50,775.00 Rp. 79,625,318.54
8. Pek. Plat Meja Wastafel tbl = 10 cm Beton f'c 14,5 Mpa (K-175) 15.47 M3 4,693,394.46 Rp. 3,567,945.96 Rp. 1,125,448.50 Rp. 72,606,812.24
9. Pek. Keramik 20 x 25 Dinding toilet & Meja wastafel 1,554.00 M2 381,487.50 Rp. 187,612.50 Rp. 193,875.00 Rp. 592,831,575.00
10. Pek. Allumunium Composite Panel (lengkap rangka terpasang) 2,972.06 M2 1,140,000.00 Rp. 590,000.00 Rp. 196,000.00 Rp. 2,336,039,160.00
11. Pek. Pas. Kaca Stopsol Warna tbl 10 mm + Rangka Terpasang 1,371.72 M2 Rp. 545,000.00 Rp. 117,500.00 Rp. 908,764,500.00
12. Pek. Dinding Partisi Fiber sekat Toilet 140.00 M2 425,000.00 Rp. 425,000.00 Rp. - Rp. 59,500,000.00
13. Pek. Dinding Partisi GRC Rangka Hollow ( Ruang Interior ) 3,371.20 M2 485,000.00 Rp. 485,000.00 Rp. - Rp. 1,635,032,000.00
14. Pek. Railling Tangga Stainless 197.75 M2 850,000.00 Rp. 850,000.00 Rp. - Rp. 168,087,500.00
-
E. Lantai 4 ( Elev +12.00 s/d +16.00 ) -
1. Pek. Dinding 1/2 Bata camp. 1 Pc : 2 Ps 1,702.47 M2 150,847.50 Rp. 91,822.50 Rp. 59,025.00 Rp. 256,813,343.33
2. Pek. Dinding 1/2 Bata camp. 1 Pc : 4 Ps 11,163.04 M2 138,468.75 Rp. 79,443.75 Rp. 59,025.00 Rp. 1,545,732,195.00
3. Pek. Plesteran Bata 1 : 2 finishing di aci . 3,404.94 M2 69,617.25 Rp. 18,842.25 Rp. 50,775.00 Rp. 237,042,559.22
4. Pek. Plesteran Bata 1 : 4 finishing di aci . 22,326.08 M2 64,260.00 Rp. 13,485.00 Rp. 50,775.00 Rp. 1,434,673,900.80
5. Pek. Kolom Praktis 13/13 Beton f'c 14,5 Mpa (K-175) 31.01 M3 5,941,998.66 Rp. 4,700,338.41 Rp. 1,241,660.25 Rp. 184,261,378.53
6. Pek. Balok Praktis 13/13 Beton f'c 14,5 Mpa (K-175) di atas kosen 31.85 M3 5,941,998.66 Rp. 4,700,338.41 Rp. 1,241,660.25 Rp. 189,252,657.41
7. Pek. Afwerking Beton 1 : 3 finishing di aci. 967.33 M2 66,357.75 Rp. 15,582.75 Rp. 50,775.00 Rp. 64,189,842.31
8. Pek. Plat Meja Wastafel tbl = 10 cm Beton f'c 14,5 Mpa (K-175) 6.02 M3 4,693,394.46 Rp. 3,567,945.96 Rp. 1,125,448.50 Rp. 28,254,234.63
9. Pek. Keramik 20 x 25 Dinding toilet & Meja wastafel 2,385.32 M2 381,487.50 Rp. 187,612.50 Rp. 193,875.00 Rp. 909,969,763.50
10. Pek. Allumunium Composite Panel (lengkap rangka terpasang) 3,109.26 M2 1,140,000.00 Rp. 590,000.00 Rp. 196,000.00 Rp. 2,443,878,360.00
11. Pek. Pas. Kaca Stopsol Warna tbl 10 mm + Rangka Terpasang 1,464.40 M2 Rp. 545,000.00 Rp. 117,500.00 Rp. 970,165,000.00
12. Pek. Dinding Partisi Fiber sekat Toilet 112.00 M2 425,000.00 Rp. 425,000.00 Rp. - Rp. 47,600,000.00
13. Pek. Dinding Partisi GRC Rangka Hollow ( Ruang Interior ) 1,965.60 M2 485,000.00 Rp. 485,000.00 Rp. - Rp. 953,316,000.00
14. Pek. Railling Tangga Stainless 197.75 M2 850,000.00 Rp. 850,000.00 Rp. - Rp. 168,087,500.00
-
F. Lantai 5 ( Elev +16.00 s/d +20.00 ) -
1. Pek. Dinding 1/2 Bata camp. 1 Pc : 2 Ps 2,050.65 M2 150,847.50 Rp. 91,822.50 Rp. 59,025.00 Rp. 309,335,425.88
2. Pek. Dinding 1/2 Bata camp. 1 Pc : 4 Ps 8,260.42 M2 138,468.75 Rp. 79,443.75 Rp. 59,025.00 Rp. 1,143,810,031.88
3. Pek. Plesteran Bata 1 : 2 finishing di aci . 4,101.30 M2 69,617.25 Rp. 18,842.25 Rp. 50,775.00 Rp. 285,521,227.43
4. Pek. Plesteran Bata 1 : 4 finishing di aci . 16,520.77 M2 64,260.00 Rp. 13,485.00 Rp. 50,775.00 Rp. 1,061,624,680.20
5. Pek. Kolom Praktis 13/13 Beton f'c 14,5 Mpa (K-175) 21.98 M3 5,941,998.66 Rp. 4,700,338.41 Rp. 1,241,660.25 Rp. 130,605,130.61
6. Pek. Balok Praktis 13/13 Beton f'c 14,5 Mpa (K-175) di atas kosen 29.75 M3 5,941,998.66 Rp. 4,700,338.41 Rp. 1,241,660.25 Rp. 176,774,460.22
7. Pek. Afwerking Beton 1 : 3 finishing di aci. 795.83 M2 66,357.75 Rp. 15,582.75 Rp. 50,775.00 Rp. 52,809,488.18
8. Pek. Plat Meja Wastafel tbl = 10 cm Beton f'c 14,5 Mpa (K-175) 7.42 M3 4,693,394.46 Rp. 3,567,945.96 Rp. 1,125,448.50 Rp. 34,824,986.87
9. Pek. Keramik 20 x 25 Dinding toilet & Meja wastafel 2,222.92 M2 381,487.50 Rp. 187,612.50 Rp. 193,875.00 Rp. 848,016,193.50
10. Pek. Allumunium Composite Panel (lengkap rangka terpasang) 2,652.02 M2 1,140,000.00 Rp. 590,000.00 Rp. 196,000.00 Rp. 2,084,487,720.00
11. Pek. Pas. Kaca Stopsol Warna tbl 10 mm + Rangka Terpasang 1,920.38 M2 Rp. 545,000.00 Rp. 117,500.00 Rp. 1,272,251,750.00
12. Pek. Dinding Partisi Fiber sekat Toilet 112.00 M2 425,000.00 Rp. 425,000.00 Rp. - Rp. 47,600,000.00
13. Pek. Dinding Partisi GRC Rangka Hollow ( Ruang Interior ) 2,184.00 M2 485,000.00 Rp. 485,000.00 Rp. - Rp. 1,059,240,000.00
14. Pek. Railling Tangga Stainless 197.75 M2 850,000.00 Rp. 850,000.00 Rp. - Rp. 168,087,500.00
A.1 BANGUNAN UTAMA ( 59.000 m2 , BERLANTAI 9 )
HARGA HARGA HARGA JUMLAH
No URAIAN PEKERJAAN VOLUME SAT SATUAN SATUAN BAHAN SATUAN UPAH HARGA
A B C D E F G = C x( E+ F)
IV PEKERJAAN DINDING
G. Lantai 6 ( Elev +20.00 s/d +24.00 )
1. Pek. Dinding 1/2 Bata camp. 1 Pc : 2 Ps 2,050.65 M2 150,847.50 Rp. 91,822.50 Rp. 59,025.00 Rp. 309,335,425.88
2. Pek. Dinding 1/2 Bata camp. 1 Pc : 4 Ps 8,260.42 M2 138,468.75 Rp. 79,443.75 Rp. 59,025.00 Rp. 1,143,810,031.88
3. Pek. Plesteran Bata 1 : 2 finishing di aci . 4,101.30 M2 69,617.25 Rp. 18,842.25 Rp. 50,775.00 Rp. 285,521,227.43
4. Pek. Plesteran Bata 1 : 4 finishing di aci . 16,520.77 M2 64,260.00 Rp. 13,485.00 Rp. 50,775.00 Rp. 1,061,624,680.20
5. Pek. Kolom Praktis 13/13 Beton f'c 14,5 Mpa (K-175) 24.22 M3 5,941,998.66 Rp. 4,700,338.41 Rp. 1,241,660.25 Rp. 143,915,207.61
6. Pek. Balok Praktis 13/13 Beton f'c 14,5 Mpa (K-175) di atas kosen 30.87 M3 5,941,998.66 Rp. 4,700,338.41 Rp. 1,241,660.25 Rp. 183,429,498.72
7. Pek. Afwerking Beton 1 : 3 finishing di aci. 848.12 M2 66,357.75 Rp. 15,582.75 Rp. 50,775.00 Rp. 56,279,334.93
8. Pek. Plat Meja Wastafel tbl = 10 cm Beton f'c 14,5 Mpa (K-175) 7.42 M3 4,693,394.46 Rp. 3,567,945.96 Rp. 1,125,448.50 Rp. 34,824,986.87
9. Pek. Keramik 20 x 25 Dinding toilet & Meja wastafel 2,139.76 M2 381,487.50 Rp. 187,612.50 Rp. 193,875.00 Rp. 816,291,693.00
10. Pek. Allumunium Composite Panel (lengkap rangka terpasang) 2,652.02 M2 1,140,000.00 Rp. 590,000.00 Rp. 196,000.00 Rp. 2,084,487,720.00
11. Pek. Pas. Kaca Stopsol Warna tbl 10 mm + Rangka Terpasang 1,920.38 M2 Rp. 545,000.00 Rp. 117,500.00 Rp. 1,272,251,750.00
12. Pek. Dinding Partisi Fiber sekat Toilet 112.00 M2 425,000.00 Rp. 425,000.00 Rp. - Rp. 47,600,000.00
13. Pek. Dinding Partisi GRC Rangka Hollow ( Ruang Interior ) 2,402.40 M2 485,000.00 Rp. 485,000.00 Rp. - Rp. 1,165,164,000.00
14. Pek. Railling Tangga Stainless 197.75 M2 850,000.00 Rp. 850,000.00 Rp. - Rp. 168,087,500.00
-
H. Lantai 7 ( Elev +24.00 s/d +28.00 ) -
1. Pek. Dinding 1/2 Bata camp. 1 Pc : 2 Ps 2,050.65 M2 150,847.50 Rp. 91,822.50 Rp. 59,025.00 Rp. 309,335,425.88
2. Pek. Dinding 1/2 Bata camp. 1 Pc : 4 Ps 8,260.42 M2 138,468.75 Rp. 79,443.75 Rp. 59,025.00 Rp. 1,143,810,031.88
3. Pek. Plesteran Bata 1 : 2 finishing di aci . 4,101.30 M2 69,617.25 Rp. 18,842.25 Rp. 50,775.00 Rp. 285,521,227.43
4. Pek. Plesteran Bata 1 : 4 finishing di aci . 16,520.77 M2 64,260.00 Rp. 13,485.00 Rp. 50,775.00 Rp. 1,061,624,680.20
5. Pek. Kolom Praktis 13/13 Beton f'c 14,5 Mpa (K-175) 24.15 M3 5,941,998.66 Rp. 4,700,338.41 Rp. 1,241,660.25 Rp. 143,499,267.71
6. Pek. Balok Praktis 13/13 Beton f'c 14,5 Mpa (K-175) di atas kosen 30.87 M3 5,941,998.66 Rp. 4,700,338.41 Rp. 1,241,660.25 Rp. 183,429,498.72
7. Pek. Afwerking Beton 1 : 3 finishing di aci. 848.12 M2 66,357.75 Rp. 15,582.75 Rp. 50,775.00 Rp. 56,279,334.93
8. Pek. Plat Meja Wastafel tbl = 10 cm Beton f'c 14,5 Mpa (K-175) 7.42 M3 4,693,394.46 Rp. 3,567,945.96 Rp. 1,125,448.50 Rp. 34,824,986.87
9. Pek. Keramik 20 x 25 Dinding toilet & Meja wastafel 2,139.76 M2 381,487.50 Rp. 187,612.50 Rp. 193,875.00 Rp. 816,291,693.00
10. Pek. Allumunium Composite Panel (lengkap rangka terpasang) 2,652.02 M2 1,140,000.00 Rp. 590,000.00 Rp. 196,000.00 Rp. 2,084,487,720.00
11. Pek. Pas. Kaca Stopsol Warna tbl 10 mm + Rangka Terpasang 1,920.38 M2 Rp. 545,000.00 Rp. 117,500.00 Rp. 1,272,251,750.00
12. Pek. Dinding Partisi Fiber sekat Toilet 112.00 M2 425,000.00 Rp. 425,000.00 Rp. - Rp. 47,600,000.00
13. Pek. Dinding Partisi GRC Rangka Hollow ( Ruang Interior ) 2,402.40 M2 485,000.00 Rp. 485,000.00 Rp. - Rp. 1,165,164,000.00
14. Pek. Railling Tangga Stainless 197.75 M2 850,000.00 Rp. 850,000.00 Rp. - Rp. 168,087,500.00
-
I. Lantai 8 ( Elev +28.00 s/d +32.00 ) -
1. Pek. Dinding 1/2 Bata camp. 1 Pc : 2 Ps 2,050.65 M2 150,847.50 Rp. 91,822.50 Rp. 59,025.00 Rp. 309,335,425.88
2. Pek. Dinding 1/2 Bata camp. 1 Pc : 4 Ps 8,260.42 M2 138,468.75 Rp. 79,443.75 Rp. 59,025.00 Rp. 1,143,810,031.88
3. Pek. Plesteran Bata 1 : 2 finishing di aci . 4,101.30 M2 69,617.25 Rp. 18,842.25 Rp. 50,775.00 Rp. 285,521,227.43
4. Pek. Plesteran Bata 1 : 4 finishing di aci . 16,520.77 M2 64,260.00 Rp. 13,485.00 Rp. 50,775.00 Rp. 1,061,624,680.20
5. Pek. Kolom Praktis 13/13 Beton f'c 14,5 Mpa (K-175) 24.15 M3 5,941,998.66 Rp. 4,700,338.41 Rp. 1,241,660.25 Rp. 143,499,267.71
6. Pek. Balok Praktis 13/13 Beton f'c 14,5 Mpa (K-175) di atas kosen 30.87 M3 5,941,998.66 Rp. 4,700,338.41 Rp. 1,241,660.25 Rp. 183,429,498.72
7. Pek. Afwerking Beton 1 : 3 finishing di aci. 848.12 M2 66,357.75 Rp. 15,582.75 Rp. 50,775.00 Rp. 56,279,334.93
8. Pek. Plat Meja Wastafel tbl = 10 cm Beton f'c 14,5 Mpa (K-175) 7.42 M3 4,693,394.46 Rp. 3,567,945.96 Rp. 1,125,448.50 Rp. 34,824,986.87
9. Pek. Keramik 20 x 25 Dinding toilet & Meja wastafel 2,139.76 M2 381,487.50 Rp. 187,612.50 Rp. 193,875.00 Rp. 816,291,693.00
10. Pek. Allumunium Composite Panel (lengkap rangka terpasang) 2,880.64 M2 1,140,000.00 Rp. 590,000.00 Rp. 196,000.00 Rp. 2,264,183,040.00
11. Pek. Pas. Kaca Stopsol Warna tbl 10 mm + Rangka Terpasang 1,691.76 M2 Rp. 545,000.00 Rp. 117,500.00 Rp. 1,120,791,000.00
12. Pek. Dinding Partisi Fiber sekat Toilet 112.00 M2 425,000.00 Rp. 425,000.00 Rp. - Rp. 47,600,000.00
13. Pek. Dinding Partisi GRC Rangka Hollow ( Ruang Interior ) 2,402.40 M2 485,000.00 Rp. 485,000.00 Rp. - Rp. 1,165,164,000.00
14. Pek. Railling Tangga Stainless 197.75 M2 850,000.00 Rp. 850,000.00 Rp. - Rp. 168,087,500.00
-
J. Lantai 9 ( Elev +32.00 s/d +37.20 ) -
1. Pek. Dinding 1/2 Bata camp. 1 Pc : 2 Ps 576.17 M2 150,847.50 Rp. 91,822.50 Rp. 59,025.00 Rp. 86,913,804.08
2. Pek. Dinding 1/2 Bata camp. 1 Pc : 4 Ps 5,858.93 M2 138,468.75 Rp. 79,443.75 Rp. 59,025.00 Rp. 811,278,713.44
3. Pek. Plesteran Bata 1 : 2 finishing di aci . 1,152.27 M2 69,617.25 Rp. 18,842.25 Rp. 50,775.00 Rp. 80,217,868.66
4. Pek. Plesteran Bata 1 : 4 finishing di aci . 11,717.86 M2 64,260.00 Rp. 13,485.00 Rp. 50,775.00 Rp. 752,989,683.60
5. Pek. Kolom Praktis 13/13 Beton f'c 14,5 Mpa (K-175) 7.63 M3 5,941,998.66 Rp. 4,700,338.41 Rp. 1,241,660.25 Rp. 45,337,449.80
6. Pek. Balok Praktis 13/13 Beton f'c 14,5 Mpa (K-175) di atas kosen 9.45 M3 5,941,998.66 Rp. 4,700,338.41 Rp. 1,241,660.25 Rp. 56,151,887.36
7. Pek. Afwerking Beton 1 : 3 finishing di aci. 276.64 M2 66,357.75 Rp. 15,582.75 Rp. 50,775.00 Rp. 18,357,207.96
8. Pek. Plat Meja Wastafel tbl = 10 cm Beton f'c 14,5 Mpa (K-175) 2.52 M3 4,693,394.46 Rp. 3,567,945.96 Rp. 1,125,448.50 Rp. 11,827,354.03
9. Pek. Keramik 20 x 25 Dinding toilet & Meja wastafel 463.26 M2 381,487.50 Rp. 187,612.50 Rp. 193,875.00 Rp. 176,727,899.25
10. Pek. Allumunium Composite Panel (lengkap rangka terpasang) 2,080.12 M2 1,140,000.00 Rp. 590,000.00 Rp. 196,000.00 Rp. 1,634,974,320.00
11. Pek. Dinding Partisi Fiber sekat Toilet 37.31 M2 425,000.00 Rp. 425,000.00 Rp. - Rp. 15,856,750.00
12. Pek. Dinding Partisi GRC Rangka Hollow 752.64 M2 485,000.00 Rp. 485,000.00 Rp. - Rp. 365,030,400.00
13. Pek. Railling Tangga Stainless 1,264.48 M2 850,000.00 Rp. 850,000.00 Rp. - Rp. 1,074,808,000.00
SUB TOTAL B III Rp. 81,544,396,834.99
V PEKERJAAN KOSEN , PINTU , JENDELA & VENTILASI
A. Lantai Basement ( Elev - 4.00 s/d + 0.00 )
1. Pek. Kosen & Pintu Type P1 217.00 Unit 3,850,000.00 Rp. 5,126,163.78 Rp. 1,307,113.28 Rp. 1,396,021,119.85
2. Pek. Kosen & Pintu Type P2 16.00 Unit 2,700,000.00 Rp. 8,165,354.63 Rp. 2,195,985.75 Rp. 165,781,446.08
Pek. Kosen & Pintu Type P3 3.00 Unit 2,700,000.00 Rp. 15,625,178.00 Rp. 602,751.75 Rp. 48,683,789.25
Pek. Kosen & Pintu Type P5 1.00 Unit 2,700,000.00 Rp. 4,806,989.76 Rp. 1,217,403.60 Rp. 6,024,393.36
3. Pek. Kosen & Pintu Type P6 7.00 Unit 2,150,000.00 Rp. 4,422,381.12 Rp. 1,112,697.30 Rp. 38,745,548.94
4. Pek. Kosen & Pintu Type PJ2 ( Pintu Sensor Buka Otomatis ) 1.00 Unit 1,375,000.00 Rp. 74,625,710.00 Rp. 6,243,936.80 Rp. 80,869,646.80
B. Lantai 1 ( Elev +0.00 s/d +4.00 )
1. Pek. Kosen & Pintu Type P1 61.00 Unit 3,850,000.00 Rp. 5,126,163.78 Rp. 1,307,113.28 Rp. 392,429,900.05
2. Pek. Kosen & Pintu Type P2 12.00 Unit 2,700,000.00 Rp. 8,165,354.63 Rp. 2,195,985.75 Rp. 124,336,084.56
3. Pek. Kosen & Pintu Type P3 2.00 Unit 2,700,000.00 Rp. 15,625,178.00 Rp. 602,751.75 Rp. 32,455,859.50
4. Pek. Kosen & Pintu Type P4 5.00 Unit 2,700,000.00 Rp. 7,174,120.07 Rp. 1,777,160.55 Rp. 44,756,403.10
5. Pek. Kosen & Pintu Type P5 6.00 Unit 2,700,000.00 Rp. 4,806,989.76 Rp. 1,217,403.60 Rp. 36,146,360.16
6. Pek. Kosen & Pintu Type P6 9.00 Unit 2,700,000.00 Rp. 4,422,381.12 Rp. 1,112,697.30 Rp. 49,815,705.78
7. Pek. Kosen & Pintu Type P7 1.00 Unit 2,700,000.00 Rp. 15,396,524.00 Rp. 595,065.60 Rp. 15,991,589.60
8. Pek. Kosen & Pintu Type PJ1 ( Pintu Sensor Buka Otomatis ) 2.00 Unit Rp. 66,474,831.00 Rp. 5,924,008.25 Rp. 144,797,678.50
9. Pek. Kosen & Pintu Type PJ2 ( Pintu Sensor Buka Otomatis ) 1.00 Unit Rp. 74,625,710.00 Rp. 6,243,936.80 Rp. 80,869,646.80
10. Pek. Kosen & Jendela Type J3 1.00 Unit Rp. 10,275,236.10 Rp. 469,053.45 Rp. 10,744,289.55
11. Pek. Kosen & Jendela Type J4 1.00 Unit Rp. 13,810,271.10 Rp. 614,559.90 Rp. 14,424,831.00
12. Pek. Kosen & Jendela Type J6 1.00 Unit Rp. 12,367,835.21 Rp. 552,423.22 Rp. 12,920,258.43
13. Pek. Kosen & Jendela Type J7 1.00 Unit Rp. 14,078,113.35 Rp. 690,455.18 Rp. 14,768,568.53
14. Pek. Kosen & Jendela Type J9 1.00 Unit Rp. 16,110,889.41 Rp. 779,459.51 Rp. 16,890,348.92
A.1 BANGUNAN UTAMA ( 59.000 m2 , BERLANTAI 9 )
HARGA HARGA HARGA JUMLAH
No URAIAN PEKERJAAN VOLUME SAT SATUAN SATUAN BAHAN SATUAN UPAH HARGA
A B C D E F G = C x( E+ F)
I PEKERJAAN PONDASI
1. Pek. Galian Tanah Basement 937.50 M1 Rp. - Rp. 99,750.00 Rp. 93,515,625.00
2. Pek. Pengeboran Tanah Pondasi Bore Pile , L = 14 m' 2,616.00 M1 Rp. - Rp. 390,170.85 Rp. 1,020,686,938.93
3. Pek. Galian Tanah Pile cap , sloof & ground tank 264.78 M3 Rp. - Rp. 99,750.00 Rp. 26,411,805.00
4. Pek. Cor Bore Pile f 80 cm Beton f'c 21,7 MPa ( K-250 ) , L = 40 m' 2,160.00 M1 Rp. 2,602,567.13 Rp. 134,370.65 Rp. 4,636,748,134.80
5. Pek. Cor Bore Pile f 60 cm Beton f'c 21,7 MPa (K-250),L : 38 m' 456.00 M1 Rp. 2,012,272.01 Rp. 134,370.65 Rp. 978,869,050.68
6. Pek. Pengujian Beban Pondasi ( Loading Test ) 1.00 Ttk Rp. 43,339,500.00 Rp. 40,080,000.00 Rp. 83,419,500.00
7. Pek. Pengujian Pile Dynamic Analysis ( PDA Test ) 2.00 Ttk Rp. 14,500,000.00 Rp. - Rp. 29,000,000.00
8. Pek. Pile Cap PC2:3.50x1.60x1,25 m' , Beton f'c 26.4 MPa (K-300) 56.00 M3 Rp. 4,699,776.68 Rp. 676,786.50 Rp. 301,087,538.27
9. Pek. Pile Cap PC3:3.50x3.25x1,25 m' , Beton f'c 26.4 MPa (K-300) 61.52 M3 Rp. 4,606,136.38 Rp. 740,673.75 Rp. 328,935,759.10
10. Pek. Pile Cap PC4:3.50x3.25x1,25 m' , Beton f'c 26.4 MPa (K-300) 68.06 M3 Rp. 4,606,136.38 Rp. 740,673.75 Rp. 363,903,897.34
11. Pek. Sloof 35 x 70 Elev - 3.60 , Beton f'c 26.4 MPa ( K-300 ) 30.41 M3 Rp. 6,102,242.75 Rp. 1,198,301.25 Rp. 222,009,543.04
12. Pek. Sloof 25 x 50 Elev - 3.60 , Beton f'c 26.4 MPa ( K-300 ) 28.87 M3 Rp. 5,286,485.25 Rp. 1,213,410.00 Rp. 187,651,975.87
13. Pek. Urugan Pasir di bawah Pondasi 9.46 M3 Rp. 201,600.00 Rp. 39,900.00 Rp. 2,284,590.00
14. Pek. Lantai Kerja Pondasi , Beton f'c 7.4 MPa ( K-100 ) 9.46 M3 Rp. 915,911.50 Rp. 194,400.00 Rp. 10,503,546.79
15. Pek. Urugan Tanah Sisa Galian Pondasi 79.43 M3 Rp. - Rp. 27,615.00 Rp. 2,193,459.45
V PEKERJAAN LANTAI
A. Lantai Basement ( Elev - 4.00 s/d + 0.00 )
1. Pek. Lantai Keramik 40 x 40 setara Roman 407.82 M2 Rp. 205,991.25 Rp. 107,250.00 Rp. 127,746,046.58
2. Pek. Lantai Keramik 20 x 20 setara Roman 77.28 M2 Rp. 160,616.25 Rp. 107,250.00 Rp. 20,700,703.80
VI PEKERJAAN PLAFOND
A. Lantai Basement ( Elev - 4.00 s/d + 0.00 )
1. Pek. Plafond Gypsum tbl 9 mm , Rangka Metal Furing 285.47 M2 Rp. 86,665.58 Rp. 111,750.00 Rp. 56,641,694.20
2. Pek. List Profil Plafond Gypsum 952.68 M1 Rp. 45,700.00 Rp. 19,012.50 Rp. 61,650,304.50
VI PEKERJAAN PLAFOND
C. Lantai 2 ( Elev +4.00 s/d +8.00 )
1. Pek. Plafond Gypsum tbl 9 mm , Rangka Metal Furing 468.98 M2 Rp. 86,665.58 Rp. 111,750.00 Rp. 93,052,936.36
2. Pek. List Profil Plafond Gypsum 1,157.35 M1 Rp. 45,700.00 Rp. 19,012.50 Rp. 74,895,011.88
A B C D E F G = C x( E+ F)
I PEKERJAAN PONDASI
1. Pek. Cerucuk Kayu f 12 cm , L = 4 m' 688.00 Btg Rp. 40,000.00 Rp. 37,995.00 Rp. 53,660,560.00
2. Pek. Galian Tanah Pondasi 166.36 M3 Rp. - Rp. 99,750.00 Rp. 19,464,120.00
3. Pek. Urugan Pasir di bawah Pondasi 13.43 M3 Rp. 201,600.00 Rp. 39,900.00 Rp. 3,243,345.00
4. Pek. Lantai Kerja Pondasi , Beton f'c 7.4 MPa ( K-100 ) 13.43 M3 Rp. 915,911.50 Rp. 194,400.00 Rp. 14,911,483.45
5. Pek. Pile Cap 0,80 x 0,80 x 0,30 m' , Beton f'c 21.7 MPa ( K-250 ) 6.14 M3 Rp. 6,139,868.48 Rp. 1,072,552.50 Rp. 44,284,264.84
6. Pek. Sloof 20 x 40 Elev + 0.00 , Beton f'c 21.7 MPa ( K-250 ) 19.42 M3 Rp. 6,112,398.75 Rp. 1,386,763.50 Rp. 145,633,730.90
7. Pek. Pondasi 1 Bata camp 1 : 2 145.62 M2 Rp. 194,550.00 Rp. 112,950.00 Rp. 44,778,150.00
8. Pek. Raben Pondasi camp 1 : 2 291.24 M2 Rp. 18,842.25 Rp. 50,775.00 Rp. 20,275,327.89
9. Pek. Urugan Tanah Sisa Galian Pondasi 33.27 M3 Rp. - Rp. 27,615.00 Rp. 88,331.85
II PEKERJAAN STRUKTUR
1. Pek. Kolom 30 x 30 , Beton f'c 21.7 Mpa ( K-250 ) 11.52 M3 Rp. 5,770,255.30 Rp. 1,376,055.00 Rp. 82,325,494.66
2. Pek. Pelat Dinding tbl 20 cm , Beton f'c 21,7 MPa ( K-250 ) 38.51 M3 Rp. 6,292,248.38 Rp. 1,123,344.00 Rp. 285,574,462.37
3. Pek. Ring Balok 20 x 30 , Beton f'c 21.7 MPa ( K-250 ) 12.37 M3 Rp. 6,578,011.95 Rp. 1,204,462.50 Rp. 96,269,208.99
4. Pek. Pelat Dag tbl 10 cm , Beton f'c 21.7 MPa ( K-250 ) 44.32 M3 Rp. 4,325,868.95 Rp. 1,201,555.50 Rp. 244,975,451.69
5. Pek. Lysplank 10 x 60 cm , Beton f'c 14,5 MPa ( K-175 ) 9.41 M3 Rp. 3,567,945.96 Rp. 1,125,448.50 Rp. 44,164,841.83
IV PEKERJAAN LANTAI
1. Pek. Urugan Tanah di Bawah Lantai 279.60 M3 Rp. 117,000.00 Rp. 12,040.50 Rp. 36,079,723.80
2. Pek. Urugan Tanah di Pasir Lantai 37.28 M3 Rp. 201,600.00 Rp. 39,900.00 Rp. 9,003,120.00
3. Pek. Pelat Lantai Dasar tbl 20 cm , Beton f'c 21,7 MPa ( K-250 ) 83.88 M3 Rp. 4,147,976.25 Rp. 774,706.50 Rp. 412,914,629.07
4. Pek. Finishing Lantai dengan Floor Hardener 466.00 M2 Rp. 61,500.00 Rp. 35,190.00 Rp. 45,057,540.00
1 1 M2 Pembersihan Lokasi
Upah :
0.1400 Oh Pekerja Rp 127,500.00 Rp 17,850.00
0.0600 Oh Mandor Rp 165,000.00 Rp 9,900.00 Rp 27,750.00
Rp 27,750.00
2 1 M1 Pemasangan Bowplank
Upah :
0.1000 Oh Pekerja Rp 127,500.00 Rp 12,750.00
0.1000 Oh Tukang Kayu Rp 142,500.00 Rp 14,250.00
0.0050 Oh Kepala Tukang Rp 150,000.00 Rp 750.00
0.0100 Oh Mandor Rp 165,000.00 Rp 1,650.00 Rp 29,400.00
Bahan :
0.0070 M3 Kayu Papan 2/30 Rp 2,925,000.00 Rp 20,475.00
0.0120 M' Kayu 5/7 Rp 2,925,000.00 Rp 35,100.00
0.0200 Kg Paku Biasa Rp 28,012.50 Rp 560.25 Rp 56,135.25
Rp 85,535.25
3 1 M3 Galian Tanah
Upah :
0.7500 Oh Pekerja Rp 127,500.00 Rp 95,625.00
0.0250 Oh Mandor Rp 165,000.00 Rp 4,125.00 Rp 99,750.00
Rp 99,750.00
5 1 M3 Pasir Urug
Upah :
0.3000 Oh Pekerja Rp 127,500.00 Rp 38,250.00
0.0100 Oh Mandor Rp 165,000.00 Rp 1,650.00 Rp 39,900.00
Bahan :
1.2000 M3 Pasir Urug Rp 168,000.00 Rp 201,600.00 Rp 201,600.00
Rp 241,500.00
1
15 1 M Pengeboran Tanah untuk Pondasi Bore Pile
Alat :
0.2023 Jam Bore Pile Machine + Equipment Rp 625,000.00 Rp 126,437.50
0.2023 Jam Crane on Track 35 Ton Rp 315,000.00 Rp 63,724.50
0.2023 Jam Genset 100 Kva Rp 275,000.00 Rp 55,632.50
0.2023 Jam Water Tanker kap. 5000 Ltr Rp 160,000.00 Rp 32,368.00
0.2023 Jam Water Pump Rp 55,000.00 Rp 11,126.50
40.0000 Ltr Air Bersih Rp 350.00 Rp 14,000.00
0.2000 Jam Alat Ukur ( Theodilite / T.Station ) Rp 60,000.00 Rp 12,000.00
0.2500 M1 Setting Out ( Bowplank ) Rp 85,535.25 Rp 21,383.81
0.2000 Ltr Pelumas / Gemuk Rp 20,000.00 Rp 4,000.00
1.2000 M1 Kayu f 12 cm Landasan Rp 18,000.00 Rp 21,600.00
1.0000 Ls Alat Bantu ( pipa air lift , sling , baut - Rp 2,000.00 Rp 2,000.00
rantai , kunci pipa , tank gegep , dll ) Rp 364,272.81
Upah :
0.1191 Oh Pekerja Rp 127,500.00 Rp 15,181.61
0.0476 Oh Tukang Besi Rp 142,500.00 Rp 6,787.07
0.0238 Oh Mandor Rp 165,000.00 Rp 3,929.36 Rp 25,898.04
Rp 390,170.85
Bahan :
0.5024 M3 Beton Ready Mix K-250 Rp 1,653,257.50 Rp 830,596.57
78.6500 Kg Besi Beton Rp 22,466.25 Rp 1,766,970.56
1.0000 Ls Alat Bantu ( Pipa Tremie , dll ) Rp 5,000.00 Rp 5,000.00 Rp 2,602,567.13
Upah :
0.8290 Oh Pekerja Rp 127,500.00 Rp 105,692.40
0.1382 Oh Tukang Batu Rp 142,500.00 Rp 19,687.80
0.0141 Oh Kepala Tukang Rp 150,000.00 Rp 2,110.08
0.0417 Oh Mandor Rp 165,000.00 Rp 6,880.37 Rp 134,370.65
Rp 2,736,937.78
Bahan :
0.2826 M3 Beton Ready Mix K-250 Rp 1,653,257.50 Rp 467,210.57
68.5500 Kg Besi Beton Rp 22,466.25 Rp 1,540,061.44
1.0000 Ls Alat Bantu ( Pipa Tremie , dll ) Rp 5,000.00 Rp 5,000.00 Rp 2,012,272.01
Upah :
0.8290 Oh Pekerja Rp 127,500.00 Rp 105,692.40
0.1382 Oh Tukang Batu Rp 142,500.00 Rp 19,687.80
0.0141 Oh Kepala Tukang Rp 150,000.00 Rp 2,110.08
0.0417 Oh Mandor Rp 165,000.00 Rp 6,880.37 Rp 134,370.65
Rp 2,146,642.66
No URAIAN PEKERJAAN HARGA JUMLAH TOTAL
3
20 1 M Membuat Pile Cap Type PC 1 : 1.40 x 1.40 m' tbl 1.25 m' Beton f'c 26.4 MPa ( K-300 )
Bahan :
415.0000 Kg Semen Type I Rp 1,800.00 Rp 747,000.00
0.7560 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 436,590.00
0.4860 M3 Pasir Cor Rp 292,500.00 Rp 142,155.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
156.3900 Kg Besi Beton Ulir Rp 18,525.00 Rp 2,897,124.75
4.7600 Kg Besi Beton Polos Rp 16,350.00 Rp 77,826.00
0.5571 Kg Kawat Beton Rp 24,000.00 Rp 13,371.43
0.6240 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 175,500.00
0.0743 M3 Kayu Klas III Rp 2,925,000.00 Rp 217,285.71
0.5571 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 15,606.96
0.1857 Ltr Minyak Bekisting Rp 15,000.00 Rp 2,785.71 Rp 4,821,995.57
Tenaga Kerja :
3.7338 Oh Pekerja Rp 127,500.00 Rp 476,059.50
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.0215 Oh Tukang Besi Rp 142,500.00 Rp 145,563.75
0.5311 Oh Tukang Kayu Rp 142,500.00 Rp 75,681.75
0.1833 Oh Kepala Tukang Rp 150,000.00 Rp 27,495.00
0.1945 Oh Mandor Rp 165,000.00 Rp 32,092.50 Rp 796,080.00
Rp 5,618,075.57
3
21 1 M Membuat Pile Cap Type PC 2 : 3.30 x 1.40 m' tbl 1.25 m' Beton f'c 26.4 MPa ( K-300 )
Bahan :
415.0000 Kg Semen Type I Rp 1,800.00 Rp 747,000.00
0.7560 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 436,590.00
0.4860 M3 Pasir Cor Rp 292,500.00 Rp 142,155.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
156.3900 Kg Besi Beton Ulir Rp 18,525.00 Rp 2,897,124.75
4.7600 Kg Besi Beton Polos Rp 16,350.00 Rp 77,826.00
0.3968 Kg Kawat Beton Rp 24,000.00 Rp 9,522.08
0.4444 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 124,977.27
0.0529 M3 Kayu Klas III Rp 2,925,000.00 Rp 154,733.77
0.3968 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 11,114.05
0.1323 Ltr Minyak Bekisting Rp 15,000.00 Rp 1,983.77 Rp 4,699,776.68
Tenaga Kerja :
3.2266 Oh Pekerja Rp 127,500.00 Rp 411,391.50
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
0.8902 Oh Tukang Besi Rp 142,500.00 Rp 126,853.50
0.3432 Oh Tukang Kayu Rp 142,500.00 Rp 48,906.00
0.1513 Oh Kepala Tukang Rp 150,000.00 Rp 22,695.00
0.1682 Oh Mandor Rp 165,000.00 Rp 27,753.00 Rp 676,786.50
Rp 5,376,563.18
3
22 1 M Membuat Pile Cap Type PC 3 : 3.50 x 3.25 m' tbl 1.25 m' Beton f'c 26.4 MPa ( K-300 )
Bahan :
415.0000 Kg Semen Type I Rp 1,800.00 Rp 747,000.00
0.7560 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 436,590.00
0.4860 M3 Pasir Cor Rp 292,500.00 Rp 142,155.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
156.3900 Kg Besi Beton Ulir Rp 18,525.00 Rp 2,897,124.75
4.7600 Kg Besi Beton Polos Rp 16,350.00 Rp 77,826.00
0.2739 Kg Kawat Beton Rp 24,000.00 Rp 6,572.83
0.3067 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 86,268.33
0.0365 M3 Kayu Klas III Rp 2,925,000.00 Rp 106,808.41
0.2739 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 7,671.72
0.0913 Ltr Minyak Bekisting Rp 15,000.00 Rp 1,369.34 Rp 4,606,136.38
Tenaga Kerja :
3.3990 Oh Pekerja Rp 127,500.00 Rp 433,372.50
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.2268 Oh Tukang Besi Rp 142,500.00 Rp 174,819.00
0.2611 Oh Tukang Kayu Rp 142,500.00 Rp 37,206.75
0.1768 Oh Kepala Tukang Rp 150,000.00 Rp 26,520.00
0.1792 Oh Mandor Rp 165,000.00 Rp 29,568.00 Rp 740,673.75
Rp 5,346,810.13
No URAIAN PEKERJAAN HARGA JUMLAH TOTAL
3
23 1 M Membuat Pile Cap Type PC 4 : 5.60 x 3.50 m' tbl 1.25 m' Beton f'c 26.4 MPa ( K-300 )
Bahan :
415.0000 Kg Semen Type I Rp 1,800.00 Rp 747,000.00
0.7560 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 436,590.00
0.4860 M3 Pasir Cor Rp 292,500.00 Rp 142,155.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
156.3900 Kg Besi Beton Ulir Rp 18,525.00 Rp 2,897,124.75
4.7600 Kg Besi Beton Polos Rp 16,350.00 Rp 77,826.00
0.1811 Kg Kawat Beton Rp 24,000.00 Rp 4,345.71
0.2028 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 57,037.50
0.0241 M3 Kayu Klas III Rp 2,925,000.00 Rp 70,617.86
0.1811 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 5,072.26
0.0604 Ltr Minyak Bekisting Rp 15,000.00 Rp 905.36 Rp 4,535,424.44
Tenaga Kerja :
2.8057 Oh Pekerja Rp 127,500.00 Rp 357,726.75
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
0.8105 Oh Tukang Besi Rp 142,500.00 Rp 115,496.25
0.1726 Oh Tukang Kayu Rp 142,500.00 Rp 24,595.50
0.1263 Oh Kepala Tukang Rp 150,000.00 Rp 18,945.00
0.1466 Oh Mandor Rp 165,000.00 Rp 24,189.00 Rp 580,140.00
Rp 5,115,564.44
3
24 1 M Membuat Pile Cap Type PC 5 : 5.70 x 4.20 m' tbl 1.25 m' Beton f'c 26.4 MPa ( K-300 )
Bahan :
415.0000 Kg Semen Type I Rp 1,800.00 Rp 747,000.00
0.7560 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 436,590.00
0.4860 M3 Pasir Cor Rp 292,500.00 Rp 142,155.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
156.3900 Kg Besi Beton Ulir Rp 18,525.00 Rp 2,897,124.75
4.7600 Kg Besi Beton Polos Rp 16,350.00 Rp 77,826.00
0.1613 Kg Kawat Beton Rp 24,000.00 Rp 3,870.68
0.1806 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 50,802.63
0.0215 M3 Kayu Klas III Rp 2,925,000.00 Rp 62,898.50
0.1613 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 4,517.81
0.0538 Ltr Minyak Bekisting Rp 15,000.00 Rp 806.39 Rp 4,520,341.75
Tenaga Kerja :
2.7483 Oh Pekerja Rp 127,500.00 Rp 350,408.25
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
0.7908 Oh Tukang Besi Rp 142,500.00 Rp 112,689.00
0.1538 Oh Tukang Kayu Rp 142,500.00 Rp 21,916.50
0.1225 Oh Kepala Tukang Rp 150,000.00 Rp 18,375.00
0.1436 Oh Mandor Rp 165,000.00 Rp 23,694.00 Rp 566,270.25
Rp 5,086,612.00
3
25 1 M Membuat Pile Cap Type PC 6 : 6.90 x 4.20 m' tbl 1.25 m' Beton f'c 26.4 MPa ( K-300 )
Bahan :
415.0000 Kg Semen Type I Rp 1,800.00 Rp 747,000.00
0.7560 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 436,590.00
0.4860 M3 Pasir Cor Rp 292,500.00 Rp 142,155.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
156.3900 Kg Besi Beton Ulir Rp 18,525.00 Rp 2,897,124.75
4.7600 Kg Besi Beton Polos Rp 16,350.00 Rp 77,826.00
0.1567 Kg Kawat Beton Rp 24,000.00 Rp 3,760.26
0.1755 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 49,353.42
0.0209 M3 Kayu Klas III Rp 2,925,000.00 Rp 61,104.23
0.1567 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 4,388.93
0.0522 Ltr Minyak Bekisting Rp 15,000.00 Rp 783.39 Rp 4,516,835.98
Tenaga Kerja :
2.7280 Oh Pekerja Rp 127,500.00 Rp 347,820.00
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
0.7792 Oh Tukang Besi Rp 142,500.00 Rp 111,036.00
0.1494 Oh Tukang Kayu Rp 142,500.00 Rp 21,289.50
0.1209 Oh Kepala Tukang Rp 150,000.00 Rp 18,135.00
0.1425 Oh Mandor Rp 165,000.00 Rp 23,512.50 Rp 560,980.50
Rp 5,077,816.48
No URAIAN PEKERJAAN HARGA JUMLAH TOTAL
3
26 1 M Membuat Pile Cap 0.80 x 0.80 m' tbl 0.3 m' Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
212.0450 Kg Besi Beton Ulir Rp 18,525.00 Rp 3,928,133.63
3.1807 Kg Kawat Beton Rp 24,000.00 Rp 76,336.20
1.0080 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 283,500.00
0.1200 M3 Kayu Klas III Rp 2,925,000.00 Rp 351,000.00
3.1807 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 89,098.66
0.3000 Ltr Minyak Bekisting Rp 15,000.00 Rp 4,500.00 Rp 6,139,868.48
Tenaga Kerja :
4.8503 Oh Pekerja Rp 127,500.00 Rp 618,413.25
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.4843 Oh Tukang Besi Rp 142,500.00 Rp 211,512.75
0.8580 Oh Tukang Kayu Rp 142,500.00 Rp 122,265.00
0.2622 Oh Kepala Tukang Rp 150,000.00 Rp 39,330.00
0.2536 Oh Mandor Rp 165,000.00 Rp 41,844.00 Rp 1,072,552.50
Rp 7,212,420.98
3
27 1 M Membuat Pondasi Setempat 0.60 x 0.60 m' tbl 0.2 m' Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
188.4300 Kg Besi Beton Ulir Rp 18,525.00 Rp 3,490,665.75
2.8265 Kg Kawat Beton Rp 24,000.00 Rp 67,834.80
1.3440 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 378,000.00
0.1600 M3 Kayu Klas III Rp 2,925,000.00 Rp 468,000.00
2.8265 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 79,175.93
0.4000 Ltr Minyak Bekisting Rp 15,000.00 Rp 6,000.00 Rp 5,896,976.48
Tenaga Kerja :
5.2750 Oh Pekerja Rp 127,500.00 Rp 672,562.50
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.3190 Oh Tukang Besi Rp 142,500.00 Rp 187,957.50
1.1440 Oh Tukang Kayu Rp 142,500.00 Rp 163,020.00
0.2743 Oh Kepala Tukang Rp 150,000.00 Rp 41,145.00
0.2728 Oh Mandor Rp 165,000.00 Rp 45,012.00 Rp 1,148,884.50
Rp 7,045,860.98
3
28 1 M Membuat Sloof 30 x 60 Beton f'c 26.40 Mpa / K-300
Bahan :
415.0000 Kg Semen Type I Rp 1,800.00 Rp 747,000.00
0.7560 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 436,590.00
0.4860 M3 Pasir Cor Rp 292,500.00 Rp 142,155.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
147.7000 Kg Besi Beton Ulir Rp 18,525.00 Rp 2,736,142.50
45.9800 Kg Besi Beton Polos Rp 16,350.00 Rp 751,773.00
9.6840 Kg Kawat Beton Rp 24,000.00 Rp 232,416.00
1.4560 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 409,500.00
0.1733 M3 Kayu Klas III Rp 2,925,000.00 Rp 507,000.00
1.3000 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 36,416.25
0.4333 Ltr Minyak Bekisting Rp 15,000.00 Rp 6,500.00 Rp 6,102,242.75
Tenaga Kerja :
5.4844 Oh Pekerja Rp 127,500.00 Rp 699,261.00
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.3558 Oh Tukang Besi Rp 142,500.00 Rp 193,201.50
1.2393 Oh Tukang Kayu Rp 142,500.00 Rp 176,600.25
0.2875 Oh Kepala Tukang Rp 150,000.00 Rp 43,125.00
0.2844 Oh Mandor Rp 165,000.00 Rp 46,926.00 Rp 1,198,301.25
Rp 7,300,544.00
No URAIAN PEKERJAAN HARGA JUMLAH TOTAL
3
29 1 M Membuat Sloof 25/50 Beton f'c 26.4 MPa ( K-300 )
Bahan :
415.0000 Kg Semen Type I Rp 1,800.00 Rp 747,000.00
0.7560 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 436,590.00
0.4860 M3 Pasir Cor Rp 292,500.00 Rp 142,155.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
99.4100 Kg Besi Beton Ulir Rp 18,525.00 Rp 1,841,570.25
49.9900 Kg Besi Beton Polos Rp 16,350.00 Rp 817,336.50
2.2410 Kg Kawat Beton Rp 24,000.00 Rp 53,784.00
1.7472 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 491,400.00
0.2080 M3 Kayu Klas III Rp 2,925,000.00 Rp 608,400.00
1.5600 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 43,699.50
0.5200 Ltr Minyak Bekisting Rp 15,000.00 Rp 7,800.00 Rp 5,286,485.25
Tenaga Kerja :
5.6703 Oh Pekerja Rp 127,500.00 Rp 722,963.25
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.0459 Oh Tukang Besi Rp 142,500.00 Rp 149,040.75
1.4872 Oh Tukang Kayu Rp 142,500.00 Rp 211,926.00
0.2813 Oh Kepala Tukang Rp 150,000.00 Rp 42,195.00
0.2915 Oh Mandor Rp 165,000.00 Rp 48,097.50 Rp 1,213,410.00
Rp 6,499,895.25
3
30 1 M Membuat Sloof 20/40 Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
124.2700 Kg Besi Beton Ulir Rp 18,525.00 Rp 2,302,101.75
61.6300 Kg Besi Beton Polos Rp 16,350.00 Rp 1,007,650.50
2.7885 Kg Kawat Beton Rp 24,000.00 Rp 66,924.00
2.0160 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 567,000.00
0.2400 M3 Kayu Klas III Rp 2,925,000.00 Rp 702,000.00
1.8000 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 50,422.50
0.6000 Ltr Minyak Bekisting Rp 15,000.00 Rp 9,000.00 Rp 6,112,398.75
Tenaga Kerja :
6.3833 Oh Pekerja Rp 127,500.00 Rp 813,870.75
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.3013 Oh Tukang Besi Rp 142,500.00 Rp 185,435.25
1.7160 Oh Tukang Kayu Rp 142,500.00 Rp 244,530.00
0.3297 Oh Kepala Tukang Rp 150,000.00 Rp 49,455.00
0.3290 Oh Mandor Rp 165,000.00 Rp 54,285.00 Rp 1,386,763.50
Rp 7,499,162.25
3
31 1 M Membuat Sloof 20/30 Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
109.4100 Kg Besi Beton Ulir Rp 18,525.00 Rp 2,026,820.25
31.3500 Kg Besi Beton Polos Rp 16,350.00 Rp 512,572.50
2.1114 Kg Kawat Beton Rp 24,000.00 Rp 50,673.60
1.6800 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 472,500.00
0.2000 M3 Kayu Klas III Rp 2,925,000.00 Rp 585,000.00
1.5000 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 42,018.75
0.5000 Ltr Minyak Bekisting Rp 15,000.00 Rp 7,500.00 Rp 5,104,385.10
Tenaga Kerja :
5.4953 Oh Pekerja Rp 127,500.00 Rp 700,650.75
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
0.9853 Oh Tukang Besi Rp 142,500.00 Rp 140,405.25
1.4300 Oh Tukang Kayu Rp 142,500.00 Rp 203,775.00
0.2695 Oh Kepala Tukang Rp 150,000.00 Rp 40,425.00
0.2823 Oh Mandor Rp 165,000.00 Rp 46,579.50 Rp 1,171,023.00
Rp 6,275,408.10
No URAIAN PEKERJAAN HARGA JUMLAH TOTAL
3
32 1 M Membuat Kolom 80/80 Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
97.9450 Kg Besi Beton Ulir Rp 18,525.00 Rp 1,814,431.13
40.4900 Kg Besi Beton Polos Rp 16,350.00 Rp 662,011.50
2.0765 Kg Kawat Beton Rp 24,000.00 Rp 49,836.60
0.1300 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 36,562.50
0.1300 M3 Kayu Klas III Rp 2,925,000.00 Rp 380,250.00
0.0488 M3 Balok Skor Kayu Klas II 4,312,500.00 Rp 210,234.38
0.9750 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 27,312.19
0.3250 Ltr Minyak Bekisting Rp 15,000.00 Rp 4,875.00 Rp 4,592,813.29
Tenaga Kerja :
6.8233 Oh Pekerja Rp 127,500.00 Rp 869,970.75
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.3014 Oh Tukang Besi Rp 142,500.00 Rp 185,449.50
1.9360 Oh Tukang Kayu Rp 142,500.00 Rp 275,880.00
0.3517 Oh Kepala Tukang Rp 150,000.00 Rp 52,755.00
0.3510 Oh Mandor Rp 165,000.00 Rp 57,915.00 Rp 1,481,157.75
Rp 6,073,971.04
3
33 1 M Membuat Kolom 75/75 Type K1 , Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
201.4000 Kg Besi Beton Ulir Rp 18,525.00 Rp 3,730,935.00
31.7950 Kg Besi Beton Polos Rp 16,350.00 Rp 519,848.25
3.4979 Kg Kawat Beton Rp 24,000.00 Rp 83,950.20
0.1387 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 39,000.00
0.1387 M3 Kayu Klas III Rp 2,925,000.00 Rp 405,600.00
0.0520 M3 Balok Skor Kayu Klas II 4,312,500.00 Rp 224,250.00
1.0400 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 29,133.00
0.3467 Ltr Minyak Bekisting Rp 15,000.00 Rp 5,200.00 Rp 6,445,216.45
Tenaga Kerja :
5.7992 Oh Pekerja Rp 127,500.00 Rp 739,398.00
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.6324 Oh Tukang Besi Rp 142,500.00 Rp 232,617.00
1.2584 Oh Tukang Kayu Rp 142,500.00 Rp 179,322.00
0.3171 Oh Kepala Tukang Rp 150,000.00 Rp 47,565.00
0.3021 Oh Mandor Rp 165,000.00 Rp 49,846.50 Rp 1,287,936.00
Rp 7,733,152.45
3
34 1 M Membuat Kolom 70/70 Type K2 , Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
226.7700 Kg Besi Beton Ulir Rp 18,525.00 Rp 4,200,914.25
31.4250 Kg Besi Beton Polos Rp 16,350.00 Rp 513,798.75
3.8729 Kg Kawat Beton Rp 24,000.00 Rp 92,950.20
0.1486 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 41,785.71
0.1486 M3 Kayu Klas III Rp 2,925,000.00 Rp 434,571.43
0.0557 M3 Balok Skor Kayu Klas II 4,312,500.00 Rp 240,267.86
1.1143 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 31,213.93
0.3714 Ltr Minyak Bekisting Rp 15,000.00 Rp 5,571.43 Rp 6,968,373.56
Tenaga Kerja :
6.1539 Oh Pekerja Rp 127,500.00 Rp 784,622.25
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.8074 Oh Tukang Besi Rp 142,500.00 Rp 257,554.50
1.3483 Oh Tukang Kayu Rp 142,500.00 Rp 192,132.75
0.3436 Oh Kepala Tukang Rp 150,000.00 Rp 51,540.00
0.3211 Oh Mandor Rp 165,000.00 Rp 52,981.50 Rp 1,378,018.50
Rp 8,346,392.06
No URAIAN PEKERJAAN HARGA JUMLAH TOTAL
3
35 1 M Membuat Kolom 65/65 , Type K3 Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
207.6600 Kg Besi Beton Ulir Rp 18,525.00 Rp 3,846,901.50
36.3800 Kg Besi Beton Polos Rp 16,350.00 Rp 594,813.00
3.6606 Kg Kawat Beton Rp 24,000.00 Rp 87,854.40
0.1477 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 41,538.46
0.1477 M3 Kayu Klas III Rp 2,925,000.00 Rp 432,000.00
0.0554 M3 Balok Skor Kayu Klas II 4,312,500.00 Rp 238,846.15
1.1077 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 31,029.23
0.3692 Ltr Minyak Bekisting Rp 15,000.00 Rp 5,538.46 Rp 6,685,821.21
Tenaga Kerja :
6.5941 Oh Pekerja Rp 127,500.00 Rp 840,747.75
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.7083 Oh Tukang Besi Rp 142,500.00 Rp 243,432.75
1.6179 Oh Tukang Kayu Rp 142,500.00 Rp 230,550.75
0.3606 Oh Kepala Tukang Rp 150,000.00 Rp 54,090.00
0.3424 Oh Mandor Rp 165,000.00 Rp 56,496.00 Rp 1,464,504.75
Rp 8,150,325.96
3
36 1 M Membuat Kolom 60/60 , Type K4 Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
191.4700 Kg Besi Beton Ulir Rp 18,525.00 Rp 3,546,981.75
38.5000 Kg Besi Beton Polos Rp 16,350.00 Rp 629,475.00
3.4496 Kg Kawat Beton Rp 24,000.00 Rp 82,789.20
0.1733 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 48,750.00
0.1733 M3 Kayu Klas III Rp 2,925,000.00 Rp 507,000.00
0.0650 M3 Balok Skor Kayu Klas II 4,312,500.00 Rp 280,312.50
1.3000 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 36,416.25
0.4333 Ltr Minyak Bekisting Rp 15,000.00 Rp 6,500.00 Rp 6,545,524.70
Tenaga Kerja :
6.4055 Oh Pekerja Rp 127,500.00 Rp 816,701.25
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.6098 Oh Tukang Besi Rp 142,500.00 Rp 229,396.50
1.5729 Oh Tukang Kayu Rp 142,500.00 Rp 224,138.25
0.3463 Oh Kepala Tukang Rp 150,000.00 Rp 51,945.00
0.3323 Oh Mandor Rp 165,000.00 Rp 54,829.50 Rp 1,416,198.00
Rp 7,961,722.70
3
37 1 M Membuat Kolom 55/55 Type K5 , Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
243.8500 Kg Besi Beton Ulir Rp 18,525.00 Rp 4,517,321.25
26.3800 Kg Besi Beton Polos Rp 16,350.00 Rp 431,313.00
4.0535 Kg Kawat Beton Rp 24,000.00 Rp 97,282.80
0.1745 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 49,090.91
0.1745 M3 Kayu Klas III Rp 2,925,000.00 Rp 510,545.45
0.0655 M3 Balok Skor Kayu Klas II 4,312,500.00 Rp 282,272.73
1.3091 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 36,670.91
0.4364 Ltr Minyak Bekisting Rp 15,000.00 Rp 6,545.45 Rp 7,338,342.50
Tenaga Kerja :
7.1716 Oh Pekerja Rp 127,500.00 Rp 914,379.00
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.8916 Oh Tukang Besi Rp 142,500.00 Rp 269,553.00
1.8150 Oh Tukang Kayu Rp 142,500.00 Rp 258,637.50
0.3987 Oh Kepala Tukang Rp 150,000.00 Rp 59,805.00
0.3726 Oh Mandor Rp 165,000.00 Rp 61,479.00 Rp 1,603,041.00
Rp 8,941,383.50
No URAIAN PEKERJAAN HARGA JUMLAH TOTAL
3
38 1 M Membuat Kolom 50/50 Type K6 Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
149.8500 Kg Besi Beton Ulir Rp 18,525.00 Rp 2,775,971.25
33.1800 Kg Besi Beton Polos Rp 16,350.00 Rp 542,493.00
2.7455 Kg Kawat Beton Rp 24,000.00 Rp 65,890.80
0.1920 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 54,000.00
0.1920 M3 Kayu Klas III Rp 2,925,000.00 Rp 561,600.00
0.0720 M3 Balok Skor Kayu Klas II 4,312,500.00 Rp 310,500.00
1.4400 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 40,338.00
0.4800 Ltr Minyak Bekisting Rp 15,000.00 Rp 7,200.00 Rp 5,765,293.05
Tenaga Kerja :
6.4160 Oh Pekerja Rp 127,500.00 Rp 818,040.00
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.2812 Oh Tukang Besi Rp 142,500.00 Rp 182,571.00
1.7424 Oh Tukang Kayu Rp 142,500.00 Rp 248,292.00
0.3304 Oh Kepala Tukang Rp 150,000.00 Rp 49,560.00
0.3378 Oh Mandor Rp 165,000.00 Rp 55,737.00 Rp 1,393,387.50
Rp 7,158,680.55
3
39 1 M Membuat Kolom 45/45 Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
138.7500 Kg Besi Beton Ulir Rp 18,525.00 Rp 2,570,343.75
41.7800 Kg Besi Beton Polos Rp 16,350.00 Rp 683,103.00
2.7080 Kg Kawat Beton Rp 24,000.00 Rp 64,990.80
0.2133 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 60,000.00
0.2133 M3 Kayu Klas III Rp 2,925,000.00 Rp 624,000.00
0.0800 M3 Balok Skor Kayu Klas II 4,312,500.00 Rp 345,000.00
1.6000 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 44,820.00
0.5333 Ltr Minyak Bekisting Rp 15,000.00 Rp 8,000.00 Rp 5,807,557.55
Tenaga Kerja :
6.7857 Oh Pekerja Rp 127,500.00 Rp 865,176.75
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.2637 Oh Tukang Besi Rp 142,500.00 Rp 180,077.25
1.9360 Oh Tukang Kayu Rp 142,500.00 Rp 275,880.00
0.3480 Oh Kepala Tukang Rp 150,000.00 Rp 52,200.00
0.3488 Oh Mandor Rp 165,000.00 Rp 57,552.00 Rp 1,470,073.50
Rp 7,277,631.05
3
40 1 M Membuat Kolom 40/40 Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
124.2700 Kg Besi Beton Ulir Rp 18,525.00 Rp 2,302,101.75
40.7500 Kg Besi Beton Polos Rp 16,350.00 Rp 666,262.50
2.4753 Kg Kawat Beton Rp 24,000.00 Rp 59,407.20
0.2400 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 67,500.00
0.2400 M3 Kayu Klas III Rp 2,925,000.00 Rp 702,000.00
0.0900 M3 Balok Skor Kayu Klas II 4,312,500.00 Rp 388,125.00
1.8000 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 50,422.50
0.6000 Ltr Minyak Bekisting Rp 15,000.00 Rp 9,000.00 Rp 5,652,118.95
Tenaga Kerja :
7.1611 Oh Pekerja Rp 127,500.00 Rp 913,040.25
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.1551 Oh Tukang Besi Rp 142,500.00 Rp 164,601.75
2.1780 Oh Tukang Kayu Rp 142,500.00 Rp 310,365.00
0.3613 Oh Kepala Tukang Rp 150,000.00 Rp 54,195.00
0.3668 Oh Mandor Rp 165,000.00 Rp 60,522.00 Rp 1,541,911.50
Rp 7,194,030.45
No URAIAN PEKERJAAN HARGA JUMLAH TOTAL
3
41 1 M Membuat Kolom 30/30 Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
147.2800 Kg Besi Beton Ulir Rp 18,525.00 Rp 2,728,362.00
38.0000 Kg Besi Beton Polos Rp 16,350.00 Rp 621,300.00
2.7792 Kg Kawat Beton Rp 24,000.00 Rp 66,700.80
0.1867 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 52,500.00
0.1867 M3 Kayu Klas III Rp 2,925,000.00 Rp 546,000.00
0.0700 M3 Balok Skor Kayu Klas II 4,312,500.00 Rp 301,875.00
1.4000 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 39,217.50
0.4667 Ltr Minyak Bekisting Rp 15,000.00 Rp 7,000.00 Rp 5,770,255.30
Tenaga Kerja :
6.3350 Oh Pekerja Rp 127,500.00 Rp 807,712.50
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.2970 Oh Tukang Besi Rp 142,500.00 Rp 184,822.50
1.6940 Oh Tukang Kayu Rp 142,500.00 Rp 241,395.00
0.3271 Oh Kepala Tukang Rp 150,000.00 Rp 49,065.00
0.3265 Oh Mandor Rp 165,000.00 Rp 53,872.50 Rp 1,376,055.00
Rp 7,146,310.30
3
42 1 M Membuat Kolom 20/20 Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
126.8400 Kg Besi Beton Ulir Rp 18,525.00 Rp 2,349,711.00
35.5500 Kg Besi Beton Polos Rp 16,350.00 Rp 581,242.50
2.4359 Kg Kawat Beton Rp 24,000.00 Rp 58,460.40
1.5120 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 425,250.00
0.1800 M3 Kayu Klas III Rp 2,925,000.00 Rp 526,500.00
0.0675 M3 Balok Skor Kayu Klas II 4,312,500.00 Rp 291,093.75
1.3500 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 37,816.88
0.4500 Ltr Minyak Bekisting Rp 15,000.00 Rp 6,750.00 Rp 5,684,124.53
Tenaga Kerja :
6.0538 Oh Pekerja Rp 127,500.00 Rp 771,859.50
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.1368 Oh Tukang Besi Rp 142,500.00 Rp 161,994.00
1.6335 Oh Tukang Kayu Rp 142,500.00 Rp 232,773.75
0.3050 Oh Kepala Tukang Rp 150,000.00 Rp 45,750.00
0.3113 Oh Mandor Rp 165,000.00 Rp 51,364.50 Rp 1,302,929.25
Rp 6,987,053.78
3
43 1 M Membuat Balok 35/70 Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
122.4300 Kg Besi Beton Ulir Rp 18,525.00 Rp 2,268,015.75
60.9500 Kg Besi Beton Polos Rp 16,350.00 Rp 996,532.50
2.7507 Kg Kawat Beton Rp 24,000.00 Rp 66,016.80
1.0354 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 291,214.29
0.1233 M3 Kayu Klas III Rp 2,925,000.00 Rp 360,551.02
0.0555 M3 Balok Skor Kayu Klas II Rp 4,312,500.00 Rp 239,211.73
8.0000 Btg Kayu Perancah f 8 - 12 cm Rp 18,000.00 Rp 144,000.00
0.9245 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 25,897.27
0.3082 Ltr Minyak Bekisting Rp 15,000.00 Rp 4,622.45 Rp 5,803,361.81
Tenaga Kerja :
5.1709 Oh Pekerja Rp 127,500.00 Rp 659,289.75
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.2837 Oh Tukang Besi Rp 142,500.00 Rp 182,927.25
1.1186 Oh Tukang Kayu Rp 142,500.00 Rp 159,400.50
0.2682 Oh Kepala Tukang Rp 150,000.00 Rp 40,230.00
0.2682 Oh Mandor Rp 165,000.00 Rp 44,253.00 Rp 1,125,288.00
Rp 6,928,649.81
3
47 1 M Membuat Balok 20/40 Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
124.2675 Kg Besi Beton Ulir Rp 18,525.00 Rp 2,302,055.44
62.0891 Kg Besi Beton Polos Rp 16,350.00 Rp 1,015,157.19
2.7953 Kg Kawat Beton Rp 24,000.00 Rp 67,088.39
1.2768 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 359,100.00
0.1520 M3 Kayu Klas III Rp 2,925,000.00 Rp 444,600.00
0.0684 M3 Balok Skor Kayu Klas II Rp 4,312,500.00 Rp 294,975.00
18.0000 Btg Kayu Perancah f 8 - 12 cm Rp 18,000.00 Rp 324,000.00
1.1400 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 31,934.25
0.3800 Ltr Minyak Bekisting Rp 15,000.00 Rp 5,700.00 Rp 6,251,910.27
Tenaga Kerja :
5.7133 Oh Pekerja Rp 127,500.00 Rp 728,445.75
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.3045 Oh Tukang Besi Rp 142,500.00 Rp 185,891.25
1.3794 Oh Tukang Kayu Rp 142,500.00 Rp 196,564.50
0.2964 Oh Kepala Tukang Rp 150,000.00 Rp 44,460.00
0.2955 Oh Mandor Rp 165,000.00 Rp 48,757.50 Rp 1,243,306.50
Rp 7,495,216.77
3
48 1 M Membuat Balok 20/30 Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
165.6900 Kg Besi Beton Ulir Rp 18,525.00 Rp 3,069,407.25
42.1801 Kg Besi Beton Polos Rp 16,350.00 Rp 689,644.23
3.1181 Kg Kawat Beton Rp 24,000.00 Rp 74,833.23
1.0976 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 308,700.00
0.1307 M3 Kayu Klas III Rp 2,925,000.00 Rp 382,200.00
0.0588 M3 Balok Skor Kayu Klas II Rp 4,312,500.00 Rp 253,575.00
20.0000 Btg Kayu Perancah f 8 - 12 cm Rp 18,000.00 Rp 360,000.00
0.9800 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 27,452.25
0.3267 Ltr Minyak Bekisting Rp 15,000.00 Rp 4,900.00 Rp 6,578,011.95
Tenaga Kerja :
5.4763 Oh Pekerja Rp 127,500.00 Rp 698,228.25
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.4547 Oh Tukang Besi Rp 142,500.00 Rp 207,294.75
1.1858 Oh Tukang Kayu Rp 142,500.00 Rp 168,976.50
0.2920 Oh Kepala Tukang Rp 150,000.00 Rp 43,800.00
0.2847 Oh Mandor Rp 165,000.00 Rp 46,975.50 Rp 1,204,462.50
Rp 7,782,474.45
3
49 1 M Membuat Balok 15/20 Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
173.0946 Kg Besi Beton Polos Rp 16,350.00 Rp 2,830,096.71
2.5964 Kg Kawat Beton Rp 24,000.00 Rp 62,314.06
1.5680 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 441,000.00
0.1867 M3 Kayu Klas III Rp 2,925,000.00 Rp 546,000.00
1.4000 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 39,217.50
0.4667 Ltr Minyak Bekisting Rp 15,000.00 Rp 7,000.00 Rp 5,332,928.27
Tenaga Kerja :
6.2497 Oh Pekerja Rp 127,500.00 Rp 796,836.75
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.2116 Oh Tukang Besi Rp 142,500.00 Rp 172,653.00
1.6940 Oh Tukang Kayu Rp 142,500.00 Rp 241,395.00
0.3186 Oh Kepala Tukang Rp 150,000.00 Rp 47,790.00
0.3216 Oh Mandor Rp 165,000.00 Rp 53,064.00 Rp 1,350,926.25
Rp 6,683,854.52
3
50 1 M Membuat Balok dan Kolom Praktis 13/13 Beton 1 : 2 : 3
Bahan :
326.0000 Kg Semen Type I Rp 1,800.00 Rp 586,800.00
0.7622 M3 Batu Kerikil Rp 322,500.00 Rp 245,809.50
0.5429 M3 Pasir Cor Rp 292,500.00 Rp 158,798.25
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
182.0704 Kg Besi Beton Polos Rp 16,350.00 Rp 2,976,851.65
2.7311 Kg Kawat Beton Rp 24,000.00 Rp 65,545.36
1.2923 Lbr Plywood tbl 6 mm Rp 202,500.00 Rp 261,692.31
0.0923 M3 Kayu Klas III Rp 2,925,000.00 Rp 270,000.00
1.1538 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 32,322.12
0.3846 Ltr Minyak Bekisting Rp 15,000.00 Rp 5,769.23 Rp 4,700,338.41
Tenaga Kerja :
5.7168 Oh Pekerja Rp 127,500.00 Rp 728,892.00
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.2745 Oh Tukang Besi Rp 142,500.00 Rp 181,616.25
1.3962 Oh Tukang Kayu Rp 142,500.00 Rp 198,958.50
0.2951 Oh Kepala Tukang Rp 150,000.00 Rp 44,265.00
0.2954 Oh Mandor Rp 165,000.00 Rp 48,741.00 Rp 1,241,660.25
Rp 5,941,998.66
3
51 1 M Membuat Anak Tangga 18/30 Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
158.8890 Kg Besi Beton Polos Rp 16,350.00 Rp 2,597,834.60
2.3833 Kg Kawat Beton Rp 24,000.00 Rp 57,200.03
1.0920 Lbr Plywood tbl 6 mm Rp 202,500.00 Rp 221,130.00
0.1300 M3 Kayu Klas III Rp 2,925,000.00 Rp 380,250.00
0.9750 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 27,312.19
0.3250 Ltr Minyak Bekisting Rp 15,000.00 Rp 4,875.00 Rp 4,695,901.82
Tenaga Kerja :
5.0020 Oh Pekerja Rp 127,500.00 Rp 637,755.00
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
0.9925 Oh Tukang Besi Rp 142,500.00 Rp 141,431.25
1.1798 Oh Tukang Kayu Rp 142,500.00 Rp 168,121.50
0.2452 Oh Kepala Tukang Rp 150,000.00 Rp 36,780.00
0.2577 Oh Mandor Rp 165,000.00 Rp 42,520.50 Rp 1,065,795.75
Rp 5,761,697.57
3
52 1 M Membuat Pelat Dinding Grountank dan Reservoar tbl 20 cm Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
207.4767 Kg Besi Beton Ulir Rp 18,525.00 Rp 3,843,505.83
3.1122 Kg Kawat Beton Rp 24,000.00 Rp 74,691.61
0.9240 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 259,875.00
0.1100 M3 Kayu Klas III Rp 2,925,000.00 Rp 321,750.00
0.0413 M3 Balok Skor Kayu Klas II Rp 4,312,500.00 Rp 177,890.63
10.0000 Btg Kayu Perancah f 8 - 12 cm Rp 18,000.00 Rp 180,000.00
0.8250 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 23,110.31
0.2750 Ltr Minyak Bekisting Rp 15,000.00 Rp 4,125.00 Rp 6,292,248.38
Tenaga Kerja :
5.0989 Oh Pekerja Rp 127,500.00 Rp 650,109.75
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.4524 Oh Tukang Besi Rp 142,500.00 Rp 206,967.00
0.9983 Oh Tukang Kayu Rp 142,500.00 Rp 142,257.75
0.2731 Oh Kepala Tukang Rp 150,000.00 Rp 40,965.00
0.2658 Oh Mandor Rp 165,000.00 Rp 43,857.00 Rp 1,123,344.00
Rp 7,415,592.38
3
53 1 M Membuat Pelat Tangga tbl 20 cm Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
111.1482 Kg Besi Beton Ulir Rp 18,525.00 Rp 2,059,020.98
62.5473 Kg Besi Beton Polos Rp 16,350.00 Rp 1,022,648.25
2.6054 Kg Kawat Beton Rp 24,000.00 Rp 62,530.39
0.9240 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 259,875.00
0.1100 M3 Kayu Klas III Rp 2,925,000.00 Rp 321,750.00
0.0413 M3 Balok Skor Kayu Klas II Rp 4,312,500.00 Rp 177,890.63
16.0000 Btg Kayu Perancah f 8 - 12 cm Rp 18,000.00 Rp 288,000.00
0.8250 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 23,110.31
0.2750 Ltr Minyak Bekisting Rp 15,000.00 Rp 4,125.00 Rp 5,626,250.55
Tenaga Kerja :
4.8624 Oh Pekerja Rp 127,500.00 Rp 619,956.00
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.2159 Oh Tukang Besi Rp 142,500.00 Rp 173,265.75
0.9983 Oh Tukang Kayu Rp 142,500.00 Rp 142,257.75
0.2494 Oh Kepala Tukang Rp 150,000.00 Rp 37,410.00
0.2523 Oh Mandor Rp 165,000.00 Rp 41,629.50 Rp 1,053,706.50
Rp 6,679,957.05
3
54 1 M Membuat Pelat Lantai Dasar Groundtank tbl 20 cm Beton f'c 21.70 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
207.4767 Kg Besi Beton Ulir Rp 18,525.00 Rp 3,843,505.83
3.1122 Kg Kawat Beton Rp 24,000.00 Rp 74,691.61
0.6011 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 169,046.74
0.0716 M3 Kayu Klas III Rp 2,925,000.00 Rp 209,295.96
0.0268 M3 Balok Skor Kayu Klas II Rp 4,312,500.00 Rp 115,716.52
0.5367 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 15,033.09
0.1789 Ltr Minyak Bekisting Rp 15,000.00 Rp 2,683.28 Rp 5,837,273.02
Tenaga Kerja :
4.4011 Oh Pekerja Rp 127,500.00 Rp 561,140.25
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.4524 Oh Tukang Besi Rp 142,500.00 Rp 206,967.00
0.6494 Oh Tukang Kayu Rp 142,500.00 Rp 92,539.50
0.2382 Oh Kepala Tukang Rp 150,000.00 Rp 35,730.00
0.2309 Oh Mandor Rp 165,000.00 Rp 38,098.50 Rp 973,662.75
Rp 6,810,935.77
3
55 1 M Membuat Pelat Lantai tbl 12 cm Beton K-250
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
89.7960 Kg Besi Beton Polos Rp 16,350.00 Rp 1,468,164.75
1.3469 Kg Kawat Beton Rp 24,000.00 Rp 32,326.56
1.4000 Lbr Plywood tbl 6 mm Rp 202,500.00 Rp 283,500.00
0.1667 M3 Kayu Klas III Rp 2,925,000.00 Rp 487,500.00
0.0625 M3 Balok Skor Kayu Klas II Rp 4,312,500.00 Rp 269,531.25
16.0000 Btg Kayu Perancah f 8 - 12 cm Rp 18,000.00 Rp 288,000.00
1.2500 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 35,015.63
0.4167 Ltr Minyak Bekisting Rp 15,000.00 Rp 6,250.00 Rp 4,277,588.19
Tenaga Kerja :
5.3036 Oh Pekerja Rp 127,500.00 Rp 676,209.00
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
0.6286 Oh Tukang Besi Rp 142,500.00 Rp 89,575.50
1.5125 Oh Tukang Kayu Rp 142,500.00 Rp 215,531.25
0.2421 Oh Kepala Tukang Rp 150,000.00 Rp 36,315.00
0.2702 Oh Mandor Rp 165,000.00 Rp 44,583.00 Rp 1,101,401.25
Rp 5,378,989.44
3
56 1 M Membuat Pelat Lantai tbl 10 cm Beton K-250
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
75.4286 Kg Besi Beton Polos Rp 16,350.00 Rp 1,233,258.39
1.1314 Kg Kawat Beton Rp 24,000.00 Rp 27,154.31
1.6800 Lbr Plywood tbl 6 mm Rp 202,500.00 Rp 340,200.00
0.2000 M3 Kayu Klas III Rp 2,925,000.00 Rp 585,000.00
0.0750 M3 Balok Skor Kayu Klas II Rp 4,312,500.00 Rp 323,437.50
20.0000 Btg Kayu Perancah f 8 - 12 cm Rp 18,000.00 Rp 360,000.00
1.5000 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 42,018.75
0.5000 Ltr Minyak Bekisting Rp 15,000.00 Rp 7,500.00 Rp 4,325,868.95
Tenaga Kerja :
5.8080 Oh Pekerja Rp 127,500.00 Rp 740,520.00
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
0.5280 Oh Tukang Besi Rp 142,500.00 Rp 75,240.00
1.8150 Oh Tukang Kayu Rp 142,500.00 Rp 258,637.50
0.2623 Oh Kepala Tukang Rp 150,000.00 Rp 39,345.00
0.2947 Oh Mandor Rp 165,000.00 Rp 48,625.50 Rp 1,201,555.50
Rp 5,527,424.45
3
57 1 M Membuat Pelat Canopy Jendela 10/60 Beton 1 : 2 : 3
Bahan :
326.0000 Kg Semen Type I Rp 1,800.00 Rp 586,800.00
0.7622 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 440,170.50
0.5429 M3 Pasir Cor Rp 292,500.00 Rp 158,798.25
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
85.7300 Kg Besi Beton Polos Rp 16,350.00 Rp 1,401,685.50
1.2860 Kg Kawat Beton Rp 24,000.00 Rp 30,862.80
1.4700 Lbr Plywood tbl 6 mm Rp 202,500.00 Rp 297,675.00
0.1750 M3 Kayu Klas III Rp 2,925,000.00 Rp 511,875.00
1.3125 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 36,766.41
0.4375 Ltr Minyak Bekisting Rp 15,000.00 Rp 6,562.50 Rp 3,567,945.96
Tenaga Kerja :
5.4264 Oh Pekerja Rp 127,500.00 Rp 691,866.00
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
0.6001 Oh Tukang Besi Rp 142,500.00 Rp 85,514.25
1.5881 Oh Tukang Kayu Rp 142,500.00 Rp 226,304.25
0.2468 Oh Kepala Tukang Rp 150,000.00 Rp 37,020.00
0.2761 Oh Mandor Rp 165,000.00 Rp 45,556.50 Rp 1,125,448.50
Rp 4,693,394.46
3
58 1 M Membuat Pelat Lantai Dasar Saluran tbl 15 cm Beton f'c 21.70 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
132.0000 Kg Besi Beton Polos Rp 16,350.00 Rp 2,158,200.00
1.9800 Kg Kawat Beton Rp 24,000.00 Rp 47,520.00
0.4164 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 117,119.02
0.0496 M3 Kayu Klas III Rp 2,925,000.00 Rp 145,004.50
0.0186 M3 Balok Skor Kayu Klas II Rp 4,312,500.00 Rp 80,170.76
0.3718 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 10,415.23
0.1239 Ltr Minyak Bekisting Rp 15,000.00 Rp 1,859.03 Rp 3,967,588.53
Tenaga Kerja :
3.4738 Oh Pekerja Rp 127,500.00 Rp 442,909.50
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
0.9240 Oh Tukang Besi Rp 142,500.00 Rp 131,670.00
0.4499 Oh Tukang Kayu Rp 142,500.00 Rp 64,110.75
0.1654 Oh Kepala Tukang Rp 150,000.00 Rp 24,810.00
0.1808 Oh Mandor Rp 165,000.00 Rp 29,832.00 Rp 732,519.75
Rp 4,700,108.28
3
59 1 M Membuat Pelat Dinding Saluran tbl 15 cm Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
132.0000 Kg Besi Beton Polos Rp 16,350.00 Rp 2,158,200.00
1.9800 Kg Kawat Beton Rp 24,000.00 Rp 47,520.00
0.9333 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 262,500.00
0.0833 M3 Kayu Klas III Rp 2,925,000.00 Rp 243,750.00
0.0333 M3 Balok Skor Kayu Klas II Rp 4,312,500.00 Rp 143,750.00
0.8333 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 23,343.75
0.2778 Ltr Minyak Bekisting Rp 15,000.00 Rp 4,166.67 Rp 4,290,530.42
Tenaga Kerja :
4.5907 Oh Pekerja Rp 127,500.00 Rp 585,314.25
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
0.9240 Oh Tukang Besi Rp 142,500.00 Rp 131,670.00
1.0083 Oh Tukang Kayu Rp 142,500.00 Rp 143,682.75
0.2212 Oh Kepala Tukang Rp 150,000.00 Rp 33,180.00
0.2366 Oh Mandor Rp 165,000.00 Rp 39,039.00 Rp 972,073.50
Rp 5,262,603.92
3
60 1 M Membuat Pelat Atas Saluran tbl 15 cm Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
132.0000 Kg Besi Beton Polos Rp 16,350.00 Rp 2,158,200.00
1.9800 Kg Kawat Beton Rp 24,000.00 Rp 47,520.00
0.6720 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 189,000.00
0.0600 M3 Kayu Klas III Rp 2,925,000.00 Rp 175,500.00
0.0300 M3 Balok Skor Kayu Klas II Rp 4,312,500.00 Rp 129,375.00
0.6000 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 16,807.50
0.2000 Ltr Minyak Bekisting Rp 15,000.00 Rp 3,000.00 Rp 4,126,702.50
Tenaga Kerja :
4.0260 Oh Pekerja Rp 127,500.00 Rp 513,315.00
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
0.9240 Oh Tukang Besi Rp 142,500.00 Rp 131,670.00
0.7260 Oh Tukang Kayu Rp 142,500.00 Rp 103,455.00
0.1930 Oh Kepala Tukang Rp 150,000.00 Rp 28,950.00
0.2084 Oh Mandor Rp 165,000.00 Rp 34,386.00 Rp 850,963.50
Rp 4,977,666.00
3
61 1 M Membuat Balok Pengaku Saluran 15/20 Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
150.0000 Kg Besi Beton Polos Rp 16,350.00 Rp 2,452,500.00
1.8000 Kg Kawat Beton Rp 24,000.00 Rp 43,200.00
1.5680 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 441,000.00
0.1400 M3 Kayu Klas III Rp 2,925,000.00 Rp 409,500.00
1.4000 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 39,217.50
0.4667 Ltr Minyak Bekisting Rp 15,000.00 Rp 7,000.00 Rp 4,799,717.50
Tenaga Kerja :
6.0880 Oh Pekerja Rp 127,500.00 Rp 776,220.00
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
1.0500 Oh Tukang Besi Rp 142,500.00 Rp 149,625.00
1.6940 Oh Tukang Kayu Rp 142,500.00 Rp 241,395.00
0.3024 Oh Kepala Tukang Rp 150,000.00 Rp 45,360.00
0.3124 Oh Mandor Rp 165,000.00 Rp 51,546.00 Rp 1,303,333.50
Rp 6,103,051.00
3
62 1 M Membuat Pelat Lantai Dasar Saluran tbl 10 cm Beton f'c 21.70 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
90.0000 Kg Besi Beton Polos Rp 16,350.00 Rp 1,471,500.00
1.3500 Kg Kawat Beton Rp 24,000.00 Rp 32,400.00
0.4250 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 119,534.10
0.0506 M3 Kayu Klas III Rp 2,925,000.00 Rp 147,994.59
0.0190 M3 Balok Skor Kayu Klas II Rp 4,312,500.00 Rp 81,823.93
0.3795 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 10,630.00
0.1265 Ltr Minyak Bekisting Rp 15,000.00 Rp 1,897.37 Rp 3,273,079.99
Tenaga Kerja :
3.1983 Oh Pekerja Rp 127,500.00 Rp 407,783.25
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
0.6300 Oh Tukang Besi Rp 142,500.00 Rp 89,775.00
0.1592 Oh Tukang Kayu Rp 142,500.00 Rp 22,686.00
0.1369 Oh Kepala Tukang Rp 150,000.00 Rp 20,535.00
0.1649 Oh Mandor Rp 165,000.00 Rp 27,208.50 Rp 607,175.25
Rp 3,880,255.24
3
63 1 M Membuat Pelat Dinding Saluran tbl 10 cm Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
90.0000 Kg Besi Beton Polos Rp 16,350.00 Rp 1,471,500.00
1.3500 Kg Kawat Beton Rp 24,000.00 Rp 32,400.00
1.2000 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 337,500.00
0.1071 M3 Kayu Klas III Rp 2,925,000.00 Rp 313,392.86
0.0429 M3 Balok Skor Kayu Klas II Rp 4,312,500.00 Rp 184,821.43
1.0714 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 30,013.39
0.3571 Ltr Minyak Bekisting Rp 15,000.00 Rp 5,357.14 Rp 3,782,284.82
Tenaga Kerja :
4.8728 Oh Pekerja Rp 127,500.00 Rp 621,282.00
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
0.6300 Oh Tukang Besi Rp 142,500.00 Rp 89,775.00
1.2964 Oh Tukang Kayu Rp 142,500.00 Rp 184,737.00
0.2206 Oh Kepala Tukang Rp 150,000.00 Rp 33,090.00
0.2486 Oh Mandor Rp 165,000.00 Rp 41,019.00 Rp 1,009,090.50
Rp 4,791,375.32
No URAIAN PEKERJAAN HARGA JUMLAH TOTAL
1
64 1 M Membuat Drill Besi Penutup Saluran
Bahan :
8.3800 Kg Besi Hollow 70 x 70 x 2 mm Rp 31,649.75 Rp 265,224.91
14.4440 Kg Besi Hollow 50 x 50 x 2 mm Rp 31,649.75 Rp 457,148.99
1.4800 M2 Cat Sincrumit Rp 59,038.50 Rp 87,376.98
1.4800 M2 Cat Minyak setara Platone Rp 145,877.50 Rp 215,898.70 Rp 1,025,649.57
Rp 1,025,649.57
3
65 1 M Membuat Pelat Lantai Dasar Box Culvert tbl 25 cm Beton f'c 21.70 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
95.0000 Kg Besi Beton Ulir Rp 22,466.25 Rp 2,134,293.75
1.4250 Kg Kawat Beton Rp 24,000.00 Rp 34,200.00
0.6720 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 189,000.00
0.0800 M3 Kayu Klas III Rp 2,925,000.00 Rp 234,000.00
0.0300 M3 Balok Skor Kayu Klas II Rp 4,312,500.00 Rp 129,375.00
0.6000 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 16,807.50
0.2000 Ltr Minyak Bekisting Rp 15,000.00 Rp 3,000.00 Rp 4,147,976.25
Tenaga Kerja :
3.7670 Oh Pekerja Rp 127,500.00 Rp 480,292.50
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
0.6650 Oh Tukang Besi Rp 142,500.00 Rp 94,762.50
0.7260 Oh Tukang Kayu Rp 142,500.00 Rp 103,455.00
0.1671 Oh Kepala Tukang Rp 150,000.00 Rp 25,065.00
0.1936 Oh Mandor Rp 165,000.00 Rp 31,944.00 Rp 774,706.50
Rp 4,922,682.75
3
66 1 M Membuat Pelat Dinding Box Culvert tbl 25 cm Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
95.0000 Kg Besi Beton Ulir Rp 22,466.25 Rp 2,134,293.75
1.4250 Kg Kawat Beton Rp 24,000.00 Rp 34,200.00
1.0752 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 302,400.00
0.0960 M3 Kayu Klas III Rp 2,925,000.00 Rp 280,800.00
0.0384 M3 Balok Skor Kayu Klas II Rp 4,312,500.00 Rp 165,600.00
0.9600 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 26,892.00
0.3200 Ltr Minyak Bekisting Rp 15,000.00 Rp 4,800.00 Rp 4,356,285.75
Tenaga Kerja :
4.6382 Oh Pekerja Rp 127,500.00 Rp 591,370.50
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
0.6650 Oh Tukang Besi Rp 142,500.00 Rp 94,762.50
1.1616 Oh Tukang Kayu Rp 142,500.00 Rp 165,528.00
0.2107 Oh Kepala Tukang Rp 150,000.00 Rp 31,605.00
0.2372 Oh Mandor Rp 165,000.00 Rp 39,138.00 Rp 961,591.50
Rp 5,317,877.25
3
67 1 M Membuat Pelat Atas Box Culvert tbl 25 cm Beton f'c 21.7 MPa ( K-250 )
Bahan :
400.0000 Kg Semen Type I Rp 1,800.00 Rp 720,000.00
0.8200 M3 Batu Pecah ( Split ) Rp 577,500.00 Rp 473,550.00
0.4000 M3 Pasir Cor Rp 292,500.00 Rp 117,000.00
215.0000 Ltr Air Bersih ( Standar PDAM ) Rp 450.00 Rp 96,750.00
95.0000 Kg Besi Beton Ulir Rp 22,466.25 Rp 2,134,293.75
1.4250 Kg Kawat Beton Rp 24,000.00 Rp 34,200.00
1.3440 Lbr Plywood tbl 9 mm Rp 281,250.00 Rp 378,000.00
0.1200 M3 Kayu Klas III Rp 2,925,000.00 Rp 351,000.00
0.0600 M3 Balok Skor Kayu Klas II Rp 4,312,500.00 Rp 258,750.00
1.2000 Kg Paku Biasa pjg 5 s/d 10 cm Rp 28,012.50 Rp 33,615.00
0.4000 Ltr Minyak Bekisting Rp 15,000.00 Rp 6,000.00 Rp 4,603,158.75
Tenaga Kerja :
5.4780 Oh Pekerja Rp 127,500.00 Rp 698,445.00
0.2750 Oh Tukang Batu Rp 142,500.00 Rp 39,187.50
0.9240 Oh Tukang Besi Rp 142,500.00 Rp 131,670.00
1.4520 Oh Tukang Kayu Rp 142,500.00 Rp 206,910.00
0.2656 Oh Kepala Tukang Rp 150,000.00 Rp 39,840.00
0.2810 Oh Mandor Rp 165,000.00 Rp 46,365.00 Rp 1,162,417.50
Rp 5,765,576.25
2
89 1 M Memasang Lantai Vynil
Upah :
0.1000 Oh Pekerja Rp 127,500.00 Rp 12,750.00
0.1750 Oh Tukang Cat Rp 142,500.00 Rp 24,937.50
0.0175 Oh Kepala Tukang Rp 150,000.00 Rp 2,625.00
0.0100 Oh Mandor Rp 165,000.00 Rp 1,650.00 Rp 41,962.50
Bahan :
2
1.0500 M Vinyl Rp 487,500.00 Rp 511,875.00
1.0000 Ls Bahan Bantu Rp 4,000.00 Rp 4,000.00
1.0000 Ls Alat Bantu Rp 1,500.00 Rp 1,500.00 Rp 517,375.00
Rp 559,337.50
1
90 1 M Memasang Kosen Alumunium 4 inch ex. YKK
Upah :
0.0430 Oh Pekerja Rp 127,500.00 Rp 5,482.50
0.0430 Oh Tukang Kayu Rp 142,500.00 Rp 6,127.50
0.0043 Oh Kepala Tukang Rp 150,000.00 Rp 645.00
0.0021 Oh Mandor Rp 165,000.00 Rp 346.50 Rp 12,601.50
Bahan :
1.1000 M1 Kosen Alumunium 4 " ex.YKK Rp 169,500.00 Rp 186,450.00
2.0000 Bh Skrup Fixer Rp 1,875.00 Rp 3,750.00
0.0600 Tube Sealant Rp 87,000.00 Rp 5,220.00 Rp 195,420.00
Rp 208,021.50
1
91 1 M Memasang Sponengan Kosen Alumunium 4 inch ( untuk pintu )
Upah :
0.0430 Oh Pekerja Rp 127,500.00 Rp 5,482.50
0.0430 Oh Tukang Kayu Rp 142,500.00 Rp 6,127.50
0.0043 Oh Kepala Tukang Rp 150,000.00 Rp 645.00
0.0021 Oh Mandor Rp 165,000.00 Rp 346.50 Rp 12,601.50
Bahan :
1
1.0500 M Sponengan Allumunium Kosen 4 inch Rp 48,750.00 Rp 51,187.50
0.0600 Tube Sealant Rp 87,000.00 Rp 5,220.00 Rp 56,407.50
Rp 69,009.00
1
93 1 M Memasang Sponengan Kosen Alumunium 3 inch ( untuk jendela )
Upah :
0.0430 Oh Pekerja Rp 127,500.00 Rp 5,482.50
0.0430 Oh Tukang Kayu Rp 142,500.00 Rp 6,127.50
0.0043 Oh Kepala Tukang Rp 150,000.00 Rp 645.00
0.0021 Oh Mandor Rp 165,000.00 Rp 346.50 Rp 12,601.50
Bahan :
1
1.0500 M Sponengan Allumunium Kosen 3 inch Rp 58,125.00 Rp 61,031.25
0.0600 Tube Sealant Rp 87,000.00 Rp 5,220.00 Rp 66,251.25
Rp 78,852.75
1
94 1 M Memasang Frame Jendela Alumunium 3 inch , ex.YKK
Upah :
0.0430 Oh Pekerja Rp 127,500.00 Rp 5,482.50
0.0430 Oh Tukang Kayu Rp 142,500.00 Rp 6,127.50
0.0043 Oh Kepala Tukang Rp 150,000.00 Rp 645.00
0.0021 Oh Mandor Rp 165,000.00 Rp 346.50 Rp 12,601.50
Bahan :
1
1.0500 M Frame Jendela Alumunium 3", ex.YKK Rp 102,750.00 Rp 107,887.50
2.0000 Bh Skrup Fixer Rp 1,875.00 Rp 3,750.00
0.0600 Tube Sealant Rp 87,000.00 Rp 5,220.00 Rp 116,857.50
Rp 129,459.00
2
95 1 M Membuat Pintu Panil Kayu Klas I
Upah :
1.0000 Oh Pekerja Rp 127,500.00 Rp 127,500.00
3.0000 Oh Tukang Kayu Rp 142,500.00 Rp 427,500.00
0.3000 Oh Kepala Tukang Rp 150,000.00 Rp 45,000.00
0.0500 Oh Mandor Rp 165,000.00 Rp 8,250.00 Rp 608,250.00
Bahan :
0.0450 M3 Kayu Klas I Rp 7,331,250.00 Rp 329,906.25 Rp
0.5000 kg Lem Kayu Rp 35,250.00 Rp 17,625.00 Rp 347,531.25
Rp 955,781.25
2
96 1 M Membuat Pintu Rangka Kayu Klas I Lapis Multiplek tbl 6 mm ( Double )
Upah :
0.7000 Oh Pekerja Rp 127,500.00 Rp 89,250.00
2.1000 Oh Tukang Kayu Rp 142,500.00 Rp 299,250.00
0.2100 Oh Kepala Tukang Rp 150,000.00 Rp 31,500.00
0.0350 Oh Mandor Rp 165,000.00 Rp 5,775.00 Rp 425,775.00
Bahan :
3
0.0196 M Kayu Klas I Rp 7,331,250.00 Rp 143,692.50
0.0300 Kg Paku Biasa Rp 28,012.50 Rp 840.38
0.3000 Ltr Lem Kayu Rp 35,250.00 Rp 10,575.00
1.0000 Lbr Plywood Fiber tbl 6 mm ' Rp 202,500.00 Rp 202,500.00 357,607.88
Rp 783,382.88
2
97 1 M Memasang Kaca Polos tbl 5 mm
Upah :
0.0150 Oh Pekerja Rp 127,500.00 Rp 1,912.50
0.1500 Oh Tukang Kayu Rp 142,500.00 Rp 21,375.00
0.0150 Oh Kepala Tukang Rp 150,000.00 Rp 2,250.00
0.0075 Oh Mandor Rp 165,000.00 Rp 1,237.50 Rp 26,775.00
Bahan :
2
1.1000 M Kaca Polos tbl 5 mm Rp 183,000.00 Rp 201,300.00
4.0000 M1 Karet Kaca Type C Rp 4,500.00 Rp 18,000.00 219,300.00
Rp 246,075.00
2
98 1 M Memasang Kaca Berwarna tbl 5 mm
Upah :
0.0150 Oh Pekerja Rp 127,500.00 Rp 1,912.50
0.1500 Oh Tukang Kayu Rp 142,500.00 Rp 21,375.00
0.0150 Oh Kepala Tukang Rp 150,000.00 Rp 2,250.00
0.0075 Oh Mandor Rp 165,000.00 Rp 1,237.50 Rp 26,775.00
Bahan :
2
1.1000 M Kaca Polos tbl 5 mm Rp 277,500.00 Rp 305,250.00
4.0000 M1 Karet Kaca Type C Rp 4,500.00 Rp 18,000.00 323,250.00
Rp 350,025.00
2
99 1 M Memasang Kaca Polos tbl 8 mm
Upah :
0.0150 Oh Pekerja Rp 127,500.00 Rp 1,912.50
0.1500 Oh Tukang Kayu Rp 142,500.00 Rp 21,375.00
0.0150 Oh Kepala Tukang Rp 150,000.00 Rp 2,250.00
0.0075 Oh Mandor Rp 165,000.00 Rp 1,237.50 Rp 26,775.00
Bahan :
2
1.1000 M Kaca Polos tbl 8 mm Rp 402,750.00 Rp 443,025.00
4.0000 M1 Karet Kaca Type C Rp 4,500.00 Rp 18,000.00 461,025.00
Rp 487,800.00
2
100 1 M Memasang Kaca Berwarna tbl 8 mm
Upah :
0.0150 Oh Pekerja Rp 127,500.00 Rp 1,912.50
0.1500 Oh Tukang Kayu Rp 142,500.00 Rp 21,375.00
0.0150 Oh Kepala Tukang Rp 150,000.00 Rp 2,250.00
0.0075 Oh Mandor Rp 165,000.00 Rp 1,237.50 Rp 26,775.00
Bahan :
1.1000 M2 Kaca Berwarna tbl 8 mm Rp 525,000.00 Rp 577,500.00
4.0000 M1 Karet Kaca Type C Rp 4,500.00 Rp 18,000.00 595,500.00
Rp 622,275.00
2
101 1 M Memasang Kaca Polos tbl 10 mm
Upah :
0.0150 Oh Pekerja Rp 127,500.00 Rp 1,912.50
0.1500 Oh Tukang Kayu Rp 142,500.00 Rp 21,375.00
0.0150 Oh Kepala Tukang Rp 150,000.00 Rp 2,250.00
0.0075 Oh Mandor Rp 165,000.00 Rp 1,237.50 Rp 26,775.00
Bahan :
2
1.1000 M Kaca Polos tbl 10 mm Rp 577,500.00 Rp 635,250.00
4.0000 M1 Karet Kaca Type C Rp 4,500.00 Rp 18,000.00 653,250.00
Rp 680,025.00
2
102 1 M Memasang Kaca Polos tbl 12 mm
Upah :
0.0150 Oh Pekerja Rp 127,500.00 Rp 1,912.50
0.1500 Oh Tukang Kayu Rp 142,500.00 Rp 21,375.00
0.0150 Oh Kepala Tukang Rp 150,000.00 Rp 2,250.00
0.0075 Oh Mandor Rp 165,000.00 Rp 1,237.50 Rp 26,775.00
Bahan :
1.1000 M2 Kaca Polos tbl 12 mm Rp 607,500.00 Rp 668,250.00
4.0000 M1 Karet Kaca Type C Rp 4,500.00 Rp 18,000.00 686,250.00
Rp 713,025.00
2
103 1 M Memasang Kaca Tempered Glass tbl 12 mm
Upah :
0.0150 Oh Pekerja Rp 127,500.00 Rp 1,912.50
0.1500 Oh Tukang Kayu Rp 142,500.00 Rp 21,375.00
0.0150 Oh Kepala Tukang Rp 150,000.00 Rp 2,250.00
0.0075 Oh Mandor Rp 165,000.00 Rp 1,237.50 Rp 26,775.00
Bahan :
2
1.1000 M Kaca Tempered Glass tbl 12 mm Rp 849,750.00 Rp 934,725.00
4.0000 M1 Karet Kaca Type C Rp 4,500.00 Rp 18,000.00 952,725.00
Rp 979,500.00
106 1 Unit Memasang Kunci Tanam + Vhiting untuk Pintu Kaca Tempered Glass
Upah :
0.0200 Oh Pekerja Rp 127,500.00 Rp 2,550.00
0.3000 Oh Tukang Rp 142,500.00 Rp 42,750.00
0.0300 Oh Kepala Tukang Rp 150,000.00 Rp 4,500.00
0.0100 Oh Mandor Rp 165,000.00 Rp 1,650.00 Rp 51,450.00
Bahan :
1.0000 Unit Kunci + VhitingTanam Rp 840,000.00 Rp 840,000.00
1.0000 Ls Alat Bantu Rp 5,000.00 Rp 5,000.00 Rp 845,000.00
Rp 896,450.00
107 1 Unit Memasang Handel Stainless 3,8 x 80 cm untuk Pintu Kaca Tempered Glass
Upah :
0.0200 Oh Pekerja Rp 127,500.00 Rp 2,550.00
0.3000 Oh Tukang Rp 142,500.00 Rp 42,750.00
0.0300 Oh Kepala Tukang Rp 150,000.00 Rp 4,500.00
0.0100 Oh Mandor Rp 165,000.00 Rp 1,650.00 Rp 51,450.00
Bahan :
1.0000 Unit Handel Stainless 3,8 x 80 cm Rp 1,237,500.00 Rp 1,237,500.00
1.0000 Ls Alat Bantu Rp 5,000.00 Rp 5,000.00 Rp 1,242,500.00
Rp 1,293,950.00
1
132 1 M Membuat Kerb / Kanstin Pracetak
Bahan :
0.0680 M3 Beton 1 : 2 : 3 Rp 1,334,115.25 Rp 90,719.84
0.0150 M3 Lantai Kerja 1 : 3 : 5 Rp - Rp -
0.0150 M3 Urugan Pasir Rp 241,500.00 Rp 3,622.50
0.3000 M2 Bekisting Rp 85,000.00 Rp 25,500.00 119,842.34
119,842.34
I. UPAH
1 Pekerja Oh Rp. 127,500.00
3 Tukang batu Oh Rp. 142,500.00
4 Tukang besi Oh Rp. 142,500.00
5 Tukang kayu Oh Rp. 142,500.00
6 Tukang cat Oh Rp. 142,500.00
7 Kepala Tukang Oh Rp. 150,000.00
9 Mandor Oh Rp. 165,000.00
II. BAHAN