UKURAN DIMENSI INTAKE DEBIT MAKSIMAL MASA CURAH HUJAN (mm) UKURAN LUAS PENAMPANG SUNGAI DEBIT MAKSIMAL DEBIT AIR SUNGAI MAKSIMAL
NO. NAMA D.I. KELURAHAN KECAMATAN
Tinggi Lebar L. Penampang (m³/dtk) TANAM 2015 2016 Tinggi Muka Air Lebar L. Penampang (m³/dtk) (ltr/dtk) 2016 2017
1 D.I. Ngancar Kedungmundu Tembalang 0.5 m 1 m 0.5 m² 0.229 228.50 I Januari 238 399 0.30 m 10 m 3 m² 1.371 1,371 1,371.0
Februari 273 298 0.34 m 10 m 3.4 m² 1.554 1,554 1,553.8
Maret 212 250 0.28 m 10 m 2.8 m² 1.280 1,280 1,279.6
II
April 258 188 0.16 m 10 m 1.6 m² 0.731 731 731.2
Mei 185 165 0.10 m 10 m 1 m² 0.457 457 457.0
Juni 69 79 0.09 m 10 m 0.9 m² 0.411 411 411.3
Juli 2 82 0.09 m 10 m 0.9 m² 0.411 411 411.3
III
Agustus 6 50 0.08 m 10 m 0.8 m² 0.366 366 365.6
September 1 67 0.08 m 10 m 0.8 m² 0.366 366 365.6
Oktober 0 132 0.08 m 10 m 0.8 m² 0.366 366 365.6
I November 280 204 0.12 m 10 m 1.2 m² 0.548 548 548.4
Desember 209 268 0.16 m 10 m 1.6 m² 0.731 731 731.2

2016 2017
KEBUTUHAN AIR DI Okt Nov Des Jan Feb Mar Apr Mei Jun Jul Ags Sep
URAIAN SAWAH (l/det/ha) 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2
MT. 1 MT. 2 / 3
Padi
Pengolahan + Persemaian 1.25 1.13 340 260 98
Pertumbuhan / Pemasakan 0.73 0.80 197 197 197 197 197 197 185 185 185 185 185 185 70 70 70 70
Panen
Tebu
Pengolahan + Persemaian 0.85
Tebu Muda (MT. 1) 0.36
Tebu Tua (MT. 2) 0.30
Palawija
Yang perlu banyak air 0.30 12 12 12 12 12 12 12 12 46 46 46 46 46 46
Yang perlu sedikit air 0.25
Gadu tidak ijin
Lain-lain
Jumlah di sawah
Faktor Tersier 1.25 1.25
Kebutuhan Air 340 197 197 197 197 197 197 0 272 197 197 197 197 197 197 12 144 116 116 116 116 46 0 0
KEBUTUHAN AIR KETERSEDIAAN AIR SURPLUS
NO BULAN MINGGU
(l/dt) (l/dt) (l/dt)
1 I - 365.60 365.60
SEPTEMBER
2 II - 365.60 365.60
3 I 339.58 365.60 26.02
OKTOBER
4 II 196.96 365.60 168.64
5 I 196.96 548.40 351.44
NOVEMBER
6 II 196.96 548.40 351.44
7 I 196.96 731.20 534.24
DESEMBER
8 II 196.96 731.20 534.24
9 I 196.96 1,371.00 1,174.04
JANUARI
10 II - 1,371.00 1,371.00
11 I 272.00 1,553.80 1,281.80
FEBRUARI
12 II 196.96 1,553.80 1,356.84
13 I 196.96 1,279.60 1,082.64
MARET
14 II 196.96 1,279.60 1,082.64
15 I 196.96 731.20 534.24
APRIL
16 II 196.96 731.20 534.24
17 I 196.96 457.00 260.04
MEI
18 II 12.22 457.00 444.78
19 I 144.25 411.30 267.05
JUNI
20 II 116.00 411.30 295.30
21 I 116.00 411.30 295.30
JULI
22 II 116.00 411.30 295.30
23 I 116.00 365.60 249.60
AGUSTUS
24 II 46.45 365.60 319.15
JUMLAH 3,641.98 15,081.00
RATA-RATA 151.75 718.14

Qter Kebutuhan air yang sampai di 311.3 Lt/dt


petak tersier
Qin Debit rata – rata di intake 228.5 Lt/dt

SPM 73.4%