SOAL PROYEKSI PENDUDUK

Pertumbuhan Pertumbuhan
Tahun Jumlah (Jiwa) Aritmetik Geometri Tahun n
2011 3057
31 1.01% 2015 0
2012 3088 2016 1
30 0.97% 2017 2
2013 3118 2018 3
32 1.03% 2019 4
2014 3150
31 0.98%
2015 3181
Jumlah 124 4.00%
rata-rata 31 1.00%
I PENDUDUK

Metode Aritmetik Metoda Geometri Proyeksi rata-rata

Pn = Po + nr Pn = Po (1 + r)n
3181 3181 3181
3212 3213 3212
3243 3245 3244
3274 3277 3276
3305 3310 3308
Tabel 5 - 2.
PROYEKSI KEBUTUHAN AIR BERSIH
DESA ................. KEC......................

Tahun Proyeksi Ke n ANALISA PERHITUNGAN


Tahun
No Uraian Satuan Perencanaa 5th 10th 15th KODE CARA HITUNG
n

1 Jumlah penduduk jiwa 1,000 1,051 1,105 1,161 1


Pelayanan penduduk % 80 100 100 100 2
jiwa 800 1,051 1,105 1,161 3
2 Pelayanan SR % 90 100 100 100 4
jiwa 720 1,051 1,105 1,161 5 (5)= ((4)*(3))/100
jiwa/sb 5 5 5 5 6
Jmlh. Sb 144 210 221 232 7 (7)= (5) / (6)
Pemakaian Air Lt/org/hr 90 90 90 90 8
Lt/sb/hr 450 450 450 450 9 (9)= (8) x (6)
Lt/det 0.75 1.09 1.15 1.21 10 (10)=(5)x(8)/86400
3 Pelayanan KU / HU % 10 - - - 11 (11)= 100 - (4)
jiwa 80 - - - 12 (12)=(11)/100*(3)
jiwa/HU 100 100 100 100 13
Jmlh. HU 1 - - - 14 (14)=(12)/(13)
Pemakaian Air Lt/org/hr 60 60 60 60 15
Lt/HU/hr 6,000 6,000 6,000 6,000 16 (16)=(13)*(15)
Lt/det 0.06 - - - 17 (17)=(12)*(15)/86400
4 Total Domestik Lt/det 0.81 1.09 1.15 1.21 18 (18)=(10)+(17)
5 Total Non Domestik % 0 0 0 0 19
Lt/det - - - - 20
6 Total Kebutuhan Air Lt/det 0.81 1.09 1.15 1.21 21 (21)=(18) + (20)
7 Kehilangan Air % 25 25 25 25 22
Lt/det 0.20 0.27 0.29 0.30 23 (23)=(21)*(22)/100
8 Kebutuhan Air
- Rata-rata Lt/det 1.01 1.37 1.44 1.51 24 (24)=(21)+ 23)
- Harian Puncak Faktor 1.1 1.1 1.1 1.1 25
Lt/det 1.11 1.51 1.58 1.66 26 (26)=(24)* (25)
M3/hari 3.99 5.42 5.70 5.99 27 (27)=(26)x3600/1000
M3/hari 95.70 130.06 136.68 143.65 28 (28)=(27)*24
- Jam Puncak Faktor 1.5 1.5 1.5 1.5 29
Lt/det 1.51 2.05 2.16 2.27 30 (30)=(24)*(27)
9 Kebutuhan Air Baku Faktor 3.0 3.0 3.0 3.0 31
Lt/det 3.32 4.52 4.75 4.99 32 (32)=(26)*(33)

10 Volume Resevoir M3 19.14 26.01 27.34 28.73 33 (30)=(0.2)*(28)


Tabel 5 - 2.
EBUTUHAN AIR BERSIH
...... KEC......................

Diisikan sesuai dengan kenyataan jumlah


penduduk yang ada pada lokasi rencana
KETERANGAN pelayanan dan jika tersedia mengikuti data
rata-rata pertumbuhan penduduk pada
.lokasi tersebut

rata2 kenaikan % pertahun


berdasarkan hitungan
juklak 100% pelayanan

juklak / survei

juklak

juklak

juklak

juklak

juklak

juklak

juklak (minimum)

faktor keamanan
Besarnya debit perencanaan
3X kebutuhan air baku
Minimum 20% harian Maks
Kriteria perencanaan
TABEL HASIL PENGUKURAN
Elevasi Jarak Jml Rumah Jml Layanan
No Patok Node
( Mtr ) ( Mtr ) ( Unit ) ( Jiwa )
MA 45 0
MA - A A 32 50 955 50
A - B B 30 50 955
B - C C 26 50 955
C - E E 28 50 955
E - F F 29 50 955
F - G G 32 50 955
G - H H 31 50 955
H - I I 34 50 955
RES
I - J RES 35 50 955

32 M

32 M

Keterangan

14 : Jumlah Rumah
60 : Jarak Antar Patok
X : Node/Nmr Patok
Y,Z M : Elevasi
: Blok Layanan
MA
45 M
0
50
Perhitungan Hydrolis Desa Kan
Kriteria Desain :

Kebut. Air = 90 lt / org / hari


Pertumbuhan Pddk = 1.00% % / thn
Periode Desain = 15 thn
Faktor harian Puncak, = 1.1
Minor Loss = 10 %

DATA BEBAN NODE BEBAN PIP


No Jalur Node Elevasi Beda Tinggi Pjg Pipa Slope Jmlh. Pddk Kebuth. Air Jmlh. Pddk Kebut. Air Kebut air Jmlh. Pddk
Pipa h ^h L S yg dilayani Proy 15 thn Proy 15 thn Harian Puncak yg disuplai
(+ m) (m) (m) (%) (jiwa) (lt/d) (jiwa) (lt/dt) (l/dt) (jiwa)

MA 45.00
1 MA - A A 32.00 13.00 50 26.00 955 0.99 956 1.00 1.10 955
2 A-B B 30.00 2.00 50 4.00 955 0.99 956 1.00 1.10 955
3 B-C C 26.00 4.00 50 8.00 955 0.99 956 1.00 1.10 955
4 C-E E 28.00 -2.00 50 (4.00) 955 0.99 956 1.00 1.10 955
5 E-F F 29.00 -1.00 50 (2.00) 955 0.99 956 1.00 1.10 955
6 F-G G 32.00 -3.00 50 (6.00) 955 0.99 956 1.00 1.10 955
7 G-H H 31.00 1.00 50 2.00 955 0.99 956 1.00 1.10 955
8 H-I I 34.00 -3.00 50 (6.00) 955 0.99 956 1.00 1.10 955
9 I-J RES 35.00 -1.00 50 (2.00) 955 0.99 956 1.00 1.10 955
450 7.96 7651 7.97 8.77
Desa Kanjopang
Formula Hazen William :
S (slope) = ( ^H/L)*100
D (diam) teoritis = ((3.59*Q*10^6)/(S^0.54*C))^0.38
Hloss / 100 m = ((3.59*Q*10^6)/(D^2.63*C))^1.85
V = 4*Q/1000(3.14*(D/1000)^2)

BEBAN PIPA PERHITUNGAN HEAD LOSS


Jmlh. Pddk Flow Flow Koeff HW Diam. Pipa Diam. Pipa Hloss Total Hloss HGL Sisa Kcptan
Proy 15 thn Harian Puncak C D teoritis D desain per 100 m (+10% minor) Tekan V
(jiwa) (lt/dt) (lt/dt) (mm) (mm) (m) (m) (m) (m) (m/dtk)

45.00
956 1.00 1.10 130 25.85 57.00 0.56 0.31 44.69 12.69 0.43
956 1.00 1.10 130 37.95 57.00 0.56 0.31 44.39 14.39 0.43
956 1.00 1.10 130 32.92 57.00 0.56 0.31 44.08 18.08 0.43
956 1.00 1.10 130 37.95 57.00 0.56 0.31 43.77 15.77 0.43
956 1.00 1.10 130 43.75 57.00 0.56 0.31 43.47 14.47 0.43
956 1.00 1.10 130 34.92 57.00 0.56 0.31 43.16 11.16 0.43
956 1.00 1.10 130 43.75 57.00 0.56 0.31 42.85 11.85 0.43
956 1.00 1.10 130 34.92 57.00 0.56 0.31 42.55 8.55 0.43
956 1.00 1.10 130 43.75 57.00 0.56 0.31 42.24 7.24 0.43
TABEL HASIL PENGUKURAN
Elevasi Jarak Jml Rumah Jml Layanan
No Patok Node
( Mtr ) ( Mtr ) ( Unit ) ( Jiwa )
R 35
R - A A 28.2 300 0 0
A - B B 25.4 120 20 100
B - C C 24.5 70 26 130
C - E E 21.6 70 11 55
E - F F 14.7 190 5 25 BLOK II
F - G G 14 64 8 40
G - H H 12.1 80 9 45
H - I I 11.3 264 10 50
I - J J 7.9 60 14 70
A 28.2
A - I I 22.7 118 18 90
R
I - II II 22.6 70 15 75
BLOK III 35,5 M
II - III III 23.1 198 6 30
III - IV IV 22.3 88 16 80
IV - V V 20.7 100 5 25
21,9 M
V - VI VI 21.1 100 13 65
C 24.5
C - D D 21.9 250 15 75

BLOK I
TOTAL 955

Keterangan

14 : Jumlah Rumah
60 : Jarak Antar Patok
X : Node/Nmr Patok 14,0 M
Y,Z M : Elevasi
: Blok Layanan
12,1M
Perhitungan Hydrolis Desa Kan
Kriteria Desain :

Kebut. Air = 90 lt / org / hari


Pertumbuhan Pddk = 1.00% % / thn
Periode Desain = 15 thn
Faktor Jam Puncak, jp = 1.5
Minor Loss = 10 %

DATA BEBAN NODE BEBAN PIP


No Jalur Node Elevasi Beda Tinggi Pjg Pipa Slope Jmlh. Pddk Kebuth. Air Jmlh. Pddk Kebut. Air Kebut air Jmlh. Pddk
Pipa h ^h L S yg dilayani Proy 15 thn Proy 15 thn jam puncak yg disuplai
(+ m) (m) (m) (%) (jiwa) (lt/d) (jiwa) (lt/dt) (l/dt) (jiwa)

R 35.00
1 R-A A 28.20 6.80 300 2.27 0 0.00 0 0.00 0.00 955
2 A-B B 25.40 2.80 120 2.33 100 0.10 100 0.10 0.16 590
3 B-C C 24.50 0.90 70 1.29 130 0.14 130 0.14 0.20 490
4 C-E E 21.60 2.90 70 4.14 55 0.06 55 0.06 0.09 285
5 E-F F 14.70 6.90 190 3.63 25 0.03 25 0.03 0.04 230
6 F-G G 14.00 0.70 64 1.09 40 0.04 40 0.04 0.06 205
7 G-H H 12.10 1.90 80 2.38 45 0.05 45 0.05 0.07 165
8 H-I I 11.30 0.80 264 0.30 50 0.05 50 0.05 0.08 120
9 I-J J 7.90 3.40 60 5.67 70 0.07 70 0.07 0.11 70
515 0.54 516 0.54 0.81

A 28.20 6.80
10 A-I I 22.70 5.50 118 4.66 90 0.09 90 0.09 0.14 365
11 I - II II 22.60 0.10 70 0.14 75 0.08 75 0.08 0.12 275
12 II - III III 23.10 -0.50 198 (0.25) 30 0.03 30 0.03 0.05 200
13 III - IV IV 22.30 0.80 88 0.91 80 0.08 80 0.08 0.13 170
14 IV - V V 20.70 1.60 100 1.60 25 0.03 25 0.03 0.04 90
15 V - VI VI 21.10 -0.40 100 (0.40) 65 0.07 65 0.07 0.10 65
365 0.38 366 0.38 0.57
C 24.50
16 C-D D 21.90 2.60 250 1.04 75 0.08 75 0.08 0.12 75

2,142 955 0.92 881 0.92 1.38


Desa Kanjopang
Formula Hazen William :
S (slope) = ( ^H/L)*100
D (diam) teoritis = ((3.59*Q*10^6)/(S^0.54*C))^0.38
Hloss / 100 m = ((3.59*Q*10^6)/(D^2.63*C))^1.85
V = 4*Q/1000(3.14*(D/1000)^2)

BEBAN PIPA PERHITUNGAN HEAD LOSS


Jmlh. Pddk Flow Flow Koeff HW Diam. Pipa Diam. Pipa Hloss Total Hloss HGL Sisa Kcptan
Proy 15 thn Jam Puncak C D teoritis D desain per 100 m (+10% minor) Tekan V
(jiwa) (lt/dt) (lt/dt) (mm) (mm) (m) (m) (m) (m) (m/dtk)

35.00
956 1.00 1.49 130 47.97 81.40 0.17 0.58 34.42 6.22 0.29
591 0.62 0.92 130 39.71 57.00 0.41 0.54 33.89 8.49 0.36
491 0.51 0.77 130 41.82 57.00 0.29 0.22 33.66 9.16 0.30
285 0.30 0.45 130 26.77 45.20 0.33 0.25 33.41 11.81 0.28
230 0.24 0.36 130 25.35 36.20 0.65 1.35 32.06 17.36 0.35
205 0.21 0.32 130 31.05 36.20 0.52 0.37 31.69 17.69 0.31
165 0.17 0.26 130 24.38 36.20 0.35 0.31 31.38 19.28 0.25
120 0.13 0.19 130 32.96 36.20 0.19 0.56 30.82 19.52 0.18
70 0.07 0.11 130 14.73 36.20 0.07 0.05 30.77 22.87 0.11

366 0.38 0.57 130 28.71 81.40 0.03 0.04 34.38 11.68 0.11
275 0.29 0.43 130 52.71 57.00 0.10 0.08 34.31 11.71 0.17
200 0.21 0.31 130 41.55 57.00 0.05 0.12 34.19 11.09 0.12
170 0.18 0.27 130 30.03 45.20 0.13 0.12 34.07 11.77 0.17
90 0.09 0.14 130 21.00 45.20 0.04 0.04 34.02 13.32 0.09
65 0.07 0.10 130 24.67 36.20 0.06 0.07 33.96 12.86 0.10

75 0.08 0.12 130 21.41 36.20 0.08 0.22 33.44 11.54 0.11
PAMSIMAS

TABEL PERHITUNGAN O & M BERDASARKAN PEMANFAAT AWAL (KU/HU) & SR


KOMPONEN BIAYA JUMLAH KOMPONEN BIAYA JUMLAH
A. Penduduk 4.9 H. Biaya Pemeliharaan (direncanakan)
1 Jumlah penduduk awal (Po) 1,200 Jiwa 1 Persentase pertahun 1%
2 Jumlah KK awal 243 KK 2 Biaya Pemeliharaan pertahu 1,870,000
3 Pertumbuhan penduduk 1.0% Persen 3 Biaya Pemeliharaan perbula 155,833
4 Tahun proyeksi 15 Tahun
5 Penduduk proyeksi (Pn) 1,393 Jiwa I. Total Biaya Pengelolaan 1,846,667
6 Jumlah KK proyeksi 282 KK
7 Pemanfaat air minum yg direncanakan 550 Jiwa J. Harga Air 1,954
Tarif Harga Air Dibulatkan 2,000
B. Biaya investasi SPAM (RKM) 187,000,000 Rupiah
L. Iuran Rata-rata 23,083.33
C. Waktu Operasional 24 Jam/hari
D. Sistem Pelayanan (RKM) M. Iuran Tetap (Riil)
1 Sambungan Rumah (SR) 50 Unit 1 Pemakaian air rata-rata 13.5
2 Hidran Umum (HU) - Unit 2 Harga air perkubik 1,710
3 Kran Umum (KU) 2 Unit 3 Harga air per kubik dibulatk 1,800
4 Sambungan Sosial - Unit 4 Iuran tetap bulanan 24,300
5 Sambungan Sekolah - Unit
E. Kebutuhan air K. Iuran Menurut Klasifikasi
1 Keb. air domestik SR 90 Lt/org/hari 1 Harga air Rata-rata 1,800
2 Keb. air domestik KU/HU 60 Lt/org/hari 2 Mampu (SR) 2,000
3 Persentase kebocoran 25% Persen 3 Tidak Mampu (HU/KU) 1,200
4 Air SR, KU/HU & kebocoran 188 Lt/org/hari
5 Pemakaian air rata-rata 108,000 Lt/hari IURAN YANG DITERAPKAN
6 Pemakaian air rata-rata 108 M3/hari L. Iuran Progresif (SR)
F. Penyusutan 1 Golongan I (<10 M3) 2,000
1 Biaya investasi (dg inkind) 187,000,000 Rupiah 2 Golongan II (10 < 20 M3) 2,300
2 Persentase penyusutan (5 - 10) % 7.0% Persen 3 Golongan III (20 < 30 M3) 2,500

Perhitungan Rencana SR untuk Kebutuhan Biaya Operasional Pemeliharaaan 25


PAMSIMAS

3 Biaya penyusutan pertahun 13,090,000 Rupiah 4 Golongan IV (> 30 M3) 2,800


4 Biaya penyusutan perbulan 1,090,833 Rupiah
G Biaya Operasional 1% 0.5% M Iuran HU/KU
1 Honor tenaga perbulan (direncanakan) 200,000 Rupiah 1 Banyak Pemakaian air 10
2 Kualitas air & promkes (direncanakan) 100,000 Rupiah 2 Iuran KK perbulan 12,000
3 Pengembangan perbulan (direncanakan) 300,000 Rupiah
MINIMAL TARGET PENGGUNA
Penyusutan 6%, biaya investasi dicapai dalam periode : 30 KK untuk Iuran HU/KU/Sosial 360,000
14 tahun 74 Unit SR & Iuran Sekolah 1,486,667
TARGET AWAL UNTUK O & M 1,846,667

Perhitungan Rencana SR untuk Kebutuhan Biaya Operasional Pemeliharaaan 25


PAMSIMAS

BERDASARKAN PEMANFAAT AWAL (KU/HU) & SR


JUMLAH

Persen
Rupiah
Rupiah

Rupiah/Bulan

Rupiah/M3
Rupiah/M3

Rupiah/KK/Bulan

M3/bulan
Rupiah/M3
Rupiah/M3
Rupiah/KK/Bulan

Rupiah/M3
Rupiah/M3
Rupiah/M3

Rupiah/M3
Rupiah/M3
Rupiah/M3

Perhitungan Rencana SR untuk Kebutuhan Biaya Operasional Pemeliharaaan 25


PAMSIMAS

Rupiah/M3

M3/bulan
Rp/KK/bulan

p/bulan
p/bulan
Rp/bulan

Perhitungan Rencana SR untuk Kebutuhan Biaya Operasional Pemeliharaaan 25


PAMSIMAS

TABEL PERHITUNGAN O & M BERDASARKAN PEMANFAAT AWAL (KU/HU) & SR


KOMPONEN BIAYA JUMLAH KOMPONEN BIAYA
A. Penduduk 5.1 H. Biaya Pemeliharaan (direncanakan)
1 Jumlah penduduk awal (Po) 856 Jiwa 1 Persentase pertahun
2 Jumlah KK awal 169 KK 2 Biaya Pemeliharaan pertahun
3 Pertumbuhan penduduk 1.0% Persen 3 Biaya Pemeliharaan perbulan
4 Tahun proyeksi 15 Tahun
5 Penduduk proyeksi (Pn) 994 Jiwa I. Total Biaya Pengelolaan
6 Jumlah KK proyeksi (Pn) 196 KK
7 Pemanfaat air minum yg direncanakan 600 Jiwa J. Harga Air
Tarif Harga Air Dibulatkan
B. Biaya investasi SPAM (RKM) 204,000,000 Rupiah
L. Iuran Rata-rata
C. Waktu Operasional 4 Jam/hari
D. Sistem Pelayanan (RKM) M. Iuran Tetap (Riil)
1 Sambungan Rumah (SR) 40 Unit 1 Pemakaian air rata-rata
2 Hidran Umum (HU) - Unit 2 Harga air perkubik
3 Kran Umum (KU) 2 Unit 3 Harga air per kubik dibulatkan
4 Sambungan Sosial - Unit 4 Iuran tetap bulanan
5 Sambungan Sekolah - Unit
E. Kebutuhan air K. Iuran Menurut Klasifikasi
1 Keb. air domestik SR 90 Lt/org/hari 1 Harga air Rata-rata
2 Keb. air domestik KU/HU 60 Lt/org/hari 2 Mampu (SR)
3 Persentase kebocoran 25% Persen 3 Tidak Mampu (HU/KU)
4 Air SR, KU/HU & kebocoran 188 Lt/org/hari
5 Pemakaian air rata-rata 77,040 Lt/hari IURAN YANG DITERAPKAN
6 Pemakaian air rata-rata 77 M3/hari L. Iuran Progresif (SR)
F. Penyusutan 1 Golongan I (<10 M3)
1 Biaya investasi (dg inkind) 204,000,000 Rupiah 2 Golongan II (10 < 20 M3)
2 Persentase penyusutan (5 - 10) % 6.0% Persen 3 Golongan III (20 < 30 M3)

Perhitungan Rencana SR untuk Kebutuhan Biaya Operasional Pemeliharaaan 25


PAMSIMAS

3 Biaya penyusutan pertahun 12,240,000 Rupiah 4 Golongan IV (> 30 M3)


4 Biaya penyusutan perbulan 1,020,000 Rupiah
G Biaya Operasional (perpipaan pompa) 1% 0.5% M Iuran HU/KU
1 Honor tenaga perbulan (direncanakan) 200,000 Rupiah 1 Banyak Pemakaian air
2 Kualitas air & promkes (direncanakan) 100,000 Rupiah 2 Iuran KK perbulan
3 Biaya listrik/ BBM & ganti olie untuk ge 700,000 Rupiah
MINIMAL TARGET PENGGUNA
4 Pengembangan perbulan (direncanakan) 400,000 Rupiah 30 KK untuk pengguna HU/KU/Sosial
64 Unit SR & Iuran Sekolah
Penyusutan 6%, biaya investasi dicapai dalam periode : TARGET AWAL UNTUK O & M

Perhitungan Rencana SR untuk Kebutuhan Biaya Operasional Pemeliharaaan 25


PAMSIMAS

M BERDASARKAN PEMANFAAT AWAL (KU/HU) & SR


JUMLAH

2% krn menggunakan pompa


4,080,000 Rupiah
340,000 Rupiah

2,760,000 Rupiah/Bulan

3,407 Rupiah/M3
3,400 Rupiah/M3

39,429 Rupiah/KK/Bulan

13.5 M3/bulan
2,921 Rupiah/M3
3,000 Rupiah/M3
40,500 Rupiah/KK/Bulan

3,000 Rupiah/M3
3,400 Rupiah/M3
2,000 Rupiah/M3

3,400 Rupiah/M3
3,700 Rupiah/M3
3,900 Rupiah/M3

Perhitungan Rencana SR untuk Kebutuhan Biaya Operasional Pemeliharaaan 25


PAMSIMAS

4,200 Rupiah/M3

10 M3/bulan
20,000 Rp/KK/bulan

600,000 Rp/bulan
2,160,000 Rp/bulan
2,760,000 Rp/bulan

Perhitungan Rencana SR untuk Kebutuhan Biaya Operasional Pemeliharaaan 25