Anda di halaman 1dari 37

TATA CARA OPERASI JARINGAN IRIGASI

DAN PENGISIAN BLANGKO OPERASI

TATA CARA PENGISIAN BLANGKO


OPERASI
JARINGAN IRIGASI

DAERAH IRIGASI GDE


BONGOH
DAERAH IRIGASI
GDE BONGOH
KEC. BATU KLIANG
KAB. LOMBOK
TENGAH

SKEMA JARINGAN IRIGASI GDE


BONGOH
BD. 1Kr
30.00 Ha

BD. 3 Kr
35.00 Ha

29.74 l/dt
A = 399.00
Q = 651.9
L = 582.60

Ha
m3/dt
m

A = 339.00
Q = 553.9
L = 210.10

BD. 5 Kr

34.69 l/dt

Ha
m3/dt
m

BBD.2

TOTAL
LUAS
DI
GDEBONGOH
BONGOH
SKEMA
JARINGAN
DI. GEDE
A
=
2.644
Ha
A = 2644 Ha

BBD.1

25.00 Ha

Ha
m3/dt
m

SALURAN SEKUNDER

BBD.6

SALURAN TERSIER

Ha
m3/dt
m

SALURAN PEMBUANG
PARIT GENDONG

BD. 5 Kn

BD. 4 Kn

59.47 l/dt

A = 127.00
Q = 207.5
L = 200.5

BBD.5

A = 279.00
Q = 455.9
L = 180.30

BBD.3

BD. 2 Kn
60.00 Ha

SALURAN INDUK

Ha
m3/dt
m

BBD.4

SAL. SEK. BODAK

LEGENDA / LEGEND

115.00 Ha 113.99 l/dt

A = 308.00
Q = 496.7
L = 421.50

37.00 Ha

24.78 l/dt

SALURAN SUPLESI

BD. 6 Kn

36.68 l/dt

SALURAN TERTUTUP

127.00 Ha 125.89 l/dt

JL. DESA / JL. INSPEKSI YANG ADA


A = 429.00
Q = 700.9
L = 188.13

Ha
m3/dt
m

KAMPUNG ATAU PERMUKIMAN


BANGUNAN TERJUN

BR. 3 Kr
8.00 Ha

PELIMPAH SAMPING

7.93 l/dt

GORONG-GORONG SILANG

BR. 2 Kr
10.00 Ha

BR. 4 Kn

KANTONG LUMPUR DG. PINTU PENGURAS

150.50 Ha 149.18 l/dt

9.91 l/dt

BANGUNAN UKUR
A = 414.69
Q = 678.4
L = 59.00

BENDUNG GEDE BONGOH


BG.0

BB.1

SAL. SEK. MANTANG KIRI

BBR.2

Ha
m3/dt
m

A = 336.55
Q = 550.7
L = 303.80

BBR.3

Ha
m3/dt
m

A = 186.55
Q = 304.8
L = 241.30

Ha
m3/dt
m

BANGUNAN BAGI

BBR.5

BANGUNAN BAGI SADAP

BR. 5 Kr
75.25 Ha

BBR.4

SAL. SEK. BARA BALI

Ha
m3/dt
m

SUPLESI KE SALURAN SEKUNDER

74.59 l/dt

BANGUNAN SADAP

JEMBATAN ORANG

PT. 3 Kr
85.00 Ha

A = 843.60
Q = 472.5
L = 285.27

Ha
m3/dt
m

BPT.2

44.54 Ha

GB. 12 Kr
32.00 Ha

31.72 l/dt

SAL. SEK. PETUNG

TALANG

120.50 Ha 129.85 l/dt

SYPHON

GB. 7 Kn
102.00 Ha 101.11 l/dt

GB. 9 Kn
9.00 Ha

BMTg.1

BGB.13

GB. 10 Kn
8.00 Ha

Ha
m3/dt
m

MTg. 5Kr

Ha
m3/dt
m

A = 150.00 Ha
Q = 245.1
m3/dt
L = 188. 65 m

MTg. 1Kn
45.00 Ha

69.39 l/dt

7.93 l/dt

MKn.1 Kn
10.00 Ha

9.91 l/dt

A = 110.00
Q = 179.7
L = 315.00

44.61 l/dt

BMW.1

MW. 1Kn
27.00 Ha
A = 120.00
Q = 196.1
L = 299.00

26.76 l/dt

Ha
m3/dt
m

A = 40.00
Ha
Q = 65.4
m3/dt
L = 251. 50 m

BMW.2
BMKn.1 Kn

MKn.3 Kr

Ha
m3/dt
m

95.16 l/dt

117.47 Ha 116.44 l/dt

A = 1079.47 Ha
A = 502.47
Q = 1,763.8 m3/dt Q = 821.0
L = 1,209.97 m
L = 833.00

BMTg.2

BGB.12

GB. 11 Kn
70.00 Ha

8.92 l/dt

96.00 Ha

44.61 l/dt

A = 1124.47 Ha
Q = 1,837.4 m3/dt
L = 172.35 m

A = 2133.07 Ha
Q = 4,718.4 m3/dt
L = 665.71 m

SAL. SEK. MANTANG KANAN

GB. 6 Kn
117.00 Ha 115.98 l/dt

A = 2235.07 Ha
Q = 4,870.6 m3/dt
L = 519.56 m

A = 1169.47 Ha
Q = 1,910.9 m3/dt
L = 161.74 m

PT. 4 Kn

A = 352.47
Q = 575.9
L = 209.00

Ha
m3/dt
m

A = 235.00
Q = 384.0
L = 220.00

Ha
m3/dt
m

MTg. 7
A = 60.00
Ha
Q = 98.0
m3/dt
L = 812.00 m

60.00 Ha

59.46 l/dt

MTg. 6Kn
175.00 Ha 173.47 l/dt

MW. 1Kr
83.00 Ha

82.27 l/dt

MW. 2Kr
40.00 Ha

39.65 l/dt

Tgl

No. Rev

yang direvisi

Oleh Direnc. Diset.

75.00 Ha 74.34 l/dt

BMKn.2 Kn

GB. 5 Kn

Ha
m3/dt
m

A = 2165.0 7 Ha
Q = 4,718.1 m3/dt
L = 478.74 m

A =577.00
Q = 942.8
L = 749.15

MTg. 2Kr

31.72 l/dt

SAL. SEK. MERTAK WARENG

A = 2254.57
Q = 4,913.1
L = 43.97

A = 2243.07 Ha
Q = 4,888
m3/dt
L = 767.28 m

BGB.8

BGB.6

BGB.7

A = 2505.57 Ha
Q = 5,459.9
m3/dt
L = 366.11 m

BGB.11

BGB.9

A = 2252.07 Ha
Q = 4,907.6 m3/dt
L = 1474.33 m

A = 2388.57 Ha
Q = 5,205
m3/dt
L = 186.07 m

BGB.5

POST PENJAGAAN

PT. 5 Kn

44.15 l/dt

45.00 Ha

4.46 l/dt

TEMPAT CUCI / MANDI ORANG

BPT.5

BMTg.7

32.00 Ha

4.50 Ha

BPT.4

Ha
m3/dt
m

100.00 Ha 99.12 l/dt

BPT.1

PT. 1 Kr

2.48 l/dt

GB. 7 Kr

BGB.4
A = 2510.07 Ha
Q = 5,469.7
m3/dt
L = 32.37
m

A = 432.50
Q = 706.1
L = 100.68

TEMPAT MANDI HEWAN

A = 251.50 Ha
Q = 410.9
m3/dt
L = 155
m

BMTg.6

GB. 8 Kr
2.50 Ha

6.44 l/dt

Ha
m3/dt
m

GORONG-GORONG

GOT MIRING

A = 2517.07 Ha
Q = 5,483.9 m3/dt
L = 67.68
m

GB. 4 Kn

Ha
m3/dt
m

PT. 2 Kn

BGB.3

7.68 l/dt

A = 347.50
Q = 567.8
L = 47.23

BPT.3
A =532.50
Q = 870.1
L = 1,259

Ha
m3/dt
m

BGB.10

GB. 3 Kn

PT. 5 Kr
131.00 Ha 119.44 l/dt

84.26 l/dt

BMTg.5

A = 2524.82
Q = 5,501.7
L = 233.06

MASUKAN DRAINASI
JEMBATAN KENDARAAN

BGB.2

5.63 l/dt

BR. 5 Kn
111.30 Ha 110.33 l/dt

40.39 l/dt

BMTg.4

GB. 2 Kn

BR. 3 Kn
40.75 Ha

19.22 l/dt

BMTg.3

GB. 1Kn

Ha
m3/dt
m

BR. 1 Kn
19.39 Ha

KETERANGAN
RENCANA PEMBANGUNAN SALURAN BARU

PEMERINTAH PROVINSI NUSA TENGGARA BARAT

DINAS PEK ERJ AAN UM UM


Jalan Majapahit No. 08 ( 0370 ) 629284, 636320, Fax. ( 0370 ) 632154

MATARAM
A = 75.00 Ha
Q = 122.5
m3/dt
L = 565.00 m

BM.3 Kn

A = 2630.50
Q = 5,513.1
L = 608.92

113.37 Ha 112.38 l/dt

6.50 Ha

A = 385.30
Q = 630.4
L = 489.50

KOTAK TERSIER

BGB.1

7.75 Ha

BBR.1
A = 395.30
Q = 646.7
L = 584.90

A = 2644
Ha
Q = 5,760.1
m3/dt
L = 176.99 m

5.68 Ha

Ha
m3/dt
m

GAMBAR

NUSA TENGGARA BARAT

KABUPATEN
LOMBOK TENGAH

PEKERJAAN
STUDI KINERJA DAERAH IRIGASI GEDE BONGOH
LOMBOK TENGAH

NO. REGISTER :

SKEMA JARINGAN DI. GEDE BONGOH

MKn.2 Kn
35 Ha

PROVINSI

34.69 l/dt

CV. CITRA DIMENSI Consultant

DIRENCANA

Survey, Design and Supervision

DIGAMBAR

DIPERIKSA

Pengawas

: Eko Rusdianto, ST,M,Eng

DISETUJUI

PPK

: H. Yayan Supriatna, ST.MM

NO. LEMBAR
TANGGAL
1 Juli 2015

: 03/41
KONTRAK
NOMOR :
15/Kont/Prc/PPK-SDA/
DPU/2015

SKEMA JARINGAN IRIGASI GDE


BONGOH
DIBAGI BLOK-3 ANTARA LAIN :
- Blok 1 Primer Gde Bongoh (GB) + Mantang Kn
Blok 2 Primer Mantang Tg (MTg),
Mertak Wareng (MW) dan Petung (PT)
Blok 3 Primer MTKr (MTg Kr)
TOTAL LUAS DI GDE BONGOH

= 630 Ha
= 1169 Ha
= 844 Ha
= 2644 Ha

BLOK
A = 844.19 Ha

3
1

SKEMA JARINGAN IRIGASI GDE BONGOH


BLOK 3
BLOK-3 MELIPUTI : - Blok A Sek Mantang Tengah Mertak Wareng
(MTg-MW)
Blok B Sekunder Mantang Tengah
(MTg)
Blok C Sekunder Petung
(PT)

PT 2kn
100 Ha 99 l/dt

A = 577 Ha
Qt = 943 l/dt

BMW-1

SMW-2
A = 40 Ha
Qt = 65 l/dt
BMW-2

BPT5

BPT4

SMTg-5
A = 352 Ha
Qt = 576 l/dt
MW 1kr
83 Ha 82 l/dt

MW 2kr
40 Ha 39 l/dt

BMTg5

SMW-1
A = 150 Ha
Qt = 245 l/dt

Saluran Sekunder
Mertak Wareng

BMTg3

BMTg2

MTg 5kr

BMTg4

BMTg1

Saluran Sekunder Mantang Tengah

Blok A
MTg MW
240 Ha

PT 4kn
96 Ha 95 l/dt

117 Ha 116 l/dt


SMTg-4
A = 502 Ha
Qt = 821 l/dt
Saluran Sekunder Mantang Tengah

SMTg-3
A = 1079 Ha
Qt = 1764 l/dt

MW 1kn
27 Ha 26 l/dt

PT 5kn
121 Ha 100 l/dt

BMTg6

BPT-1

SPT-1

MTg 1kn
45 Ha 44 l/dt

PT 5kr
131 Ha 119 l/dt

Saluran Sekunder Petung


SPT-5
SPT-3
SPT-4
A
=
252 Ha
A = 433 Ha
A = 348 Ha
Qt = 411 l/dt
Qt = 706 l/dt
Qt = 568 l/dt

MTg 2kr
45 Ha 44 l/dt

SMTg-2
A = 1124 Ha
Qt = 1837 l/dt

BPT3

SPT-2
A = 533 Ha
Qt = 870 l/dt

PT 1kr
45 Ha 44 l/dt

SMTg-1
A = 1169 Ha
Qt = 1911 l/dt

PT 3kr
85 Ha 84 l/dt

BPT2

Blok C
PT
577 Ha

= 240 Ha
= 352 Ha
= 577 Ha

SMTg-6
A = 235 Ha
Qt = 384 l/dt

BMTg7

1169
Ha

SMTg-7
A = 60 Ha
Qt = 59 l/dt

MTg 6kn
175 Ha 173 l/dt

MTg 7
60 Ha 98 l/dt

Blok B
MTg
352 Ha

PENANGGALAN BLANGKO OPERASI


JARINGAN IRIGASI

KOMIR
MT1 PDI
100%

LUAS
AREA
1169 HA
GP3A
MT1 PDI
100%
MT2 PDI
25%
MT2 POL
75%
MT3 POL
100%

MT2 PDI
20%
MT2 POL
70%
MT3 POL
85%

LUAS
AREA
1169
HA

RENCANA POLA TANAM JARINGAN IRIGASI


MANTANG TENGAH, MERTA WARENG &
PETUNG
(MTg, MW DAN PT)

GP3A

KOMIR

MT1 PDI
100%

MT1 PDI
100%

MT2 PDI
25%
MT2 POL
75%

MT2 PDI
20%
MT2 POL
70%

LUAS AREA
MASING2 BLOK

Waktu
Pembagian Air
akan
disesuaikan dari
hasil analisa
Factor K

LUAS
AREA
MASING2
KOMIR
BLOK
MT1 PDI
100%

MT2 PDI
20%
MT2 POL
70%

Waktu
Pembagian Air
akan
disesuaikan dari
hasil analisa
Factor K

LUAS
SAWAH
MTg,
MW &
PT =
1169
Ha

KOMIR
MT1 PDI
100%
MT2 PDI
20%
MT2 POL
70%
BERO
10%

TANAMA
N
PDI
Mengolah
15%
Tumbuh
85%
POL
Banyak air
40%

MT2 PDI
20%
MT2 POL
70%
BERO

Kol.(4), (8), (14)=T x Li x K

EM

KOMIR

LUAS
Blok C
577 HA

iD

EM

240 HA

LUAS
Blok B
352 HA

iD

PDI
Mengolah
15%
Tumbuh
85%
POL
Banyak air
40%
LUAS
Dikit air
60% A
Blok

B (m)
H (m)

Rumus Debit Limpas di Atas Bendung


Q = Cd x 2/3 x V(2/3xgxB) x H3/2

Definisi & Fungsional


Bangunan Bagi-Sadap Bangunan air yang berfungsi untuk

mengatur pembagian air ke saluran


sekunder atau petak tersier.

Pengatur debit air irigasi dilakukan dengan pengaturan :

1. Bangunan pengatur
2. Pengaturan Pintu
3. Bangunan Ukur

ALAT UKUR DEBIT


TIPE DREMPEL

Q = 1.71 x B x H1.5
1.71 = KOEFISIEN
B = LEBAR DREMPEL (M)
H = TINGGI AIR DI ATAS
DREMPEL (CM)
Q = 1.71 x B x H1.5

ALAT UKUR DEBIT


CYPOLETTI

Q = 1.86 x B x H1.5
1.86 = KOEF. CIPOLETTI
B = LEBAR AMBANG (M)
H = TINGGI AIR DI ATAS
DREMPEL (CM)
Q = 1.71 x B x H1.5

Kolom(12)
di BlokA
(125/607)
x360 =74
Jam dst.
unt blk B
&C

Dari 06O kolom


(5) Dari 06-O
kolom (3)
tgl 30
April

Dari (03O)
kol(6)+
kol(9)

Dari 05-O
brs 8
kol(5),
(9), (15)

Nilai K dan
sistim beri
air dari
(09-O)

Detail pmberian
air Dari 07-O
kolom (12)
masing2 Blok
Tersier

N
PDI
Mengolah
15%
Tumbuh
85%
CONTOH LUAS
Blok=A
POL
Kol(4) -> 45x0.2x0.15
Banyak
air
45 HA
1
40%
45x0.2x0.85 =
Dikit
air
8 dst
60%
Kol(5) ->
kol(4)x(2)x(3)x1.25
= 2 (baris 1)
kol(4)x(2)x(4)x1.25
= 8 (baris 2)
Kol(6) -> kol(5) x 0.2 dst
Kol(7) -> kol(5)+kol(6)
dst
Kol(8) ->
kol(5i)/kol(5)xQa
Contoh -> di blok A (baris
2)
10/125x288
=23
Contoh -> di blok C
126/300x288=120
Kol(9) -> blo (n)/blo
KOMIR
x360 PDI
MT2
Contoh
20%
->125/607x360=74
Ja
MT2
POL

PENGISIAN PAPAN OPERASI

PAPAN OPERASI DIPASANG DI


SETIAP BANGUNAN BAGI,
SADAP
DAN BANGUNAN TERSIER

o Pengaturan debit berdasar RPA, diinformasikan/diberitahukan


ke Petani dengan papan operasi
o Bentuk dan isi informasi papan operasi

Data dari
blanko
perhitungan
pemberian air
di petak
Tersier

Dari blangko (07


O)
kol(7), (8), (9),
Tot (10),
Area (11)
x keb
air/ha
1169 x 1.250 =
1462

Anda mungkin juga menyukai