BARO
a. Tahanan Ujung
Pb = ω * Ab * qc
P ijin = A * qc / 3 + K * L * qf / 5
qc = Nilai Konus
A= Luas Penampang Tiang Bor (m²),
qf = Nilai Hambatan Lekat Rata-rata
K= Keliling Penampang Tiang Bor (m),
L= Panjang Tiang Bor (m),
Diameter bore pile, D= 0,50 m
Luas Penampang bore pile, π / 4 * D² = 0,196 m²
Keliling Penampang bore pile, π*D= 1,570 m
Tahanan penetrasi kerucut statis,
qc = 115 kg / cm² qc = 11500,00 kN / m²
Nilai hambatan lekat rata-rata, qf = 6759,091 kN / m²
Daya Dukung Ijin tiang bore pile :
P ijin = A * qc / 3 + K * L * qf / 5 = 28342,90 kN
c. Tahanan Ultimate
H = yo * kh * D / [ 2 * β * e * (β + 1) ]
dengan, β = √ [ kh * D / ( 4 * Ep * Ip) ]
70
60
320
320 180
200
70
60
70
60 255
365 255
366 70
60
850
650
Gaya aksial maksimum dan minimum yang diterima satu bore pile :
P max = P / n + Mx * X max / ∑ X²
P min = P / n - Mx * X max / ∑ X²
Gaya aksial maksimum dan minimum yang diterima satu bore pile :
P max = P / n + My * Y max / ∑ Y²
P min = P / n - My * Y max / ∑ Y²
No KOMBINASI BEBAN KERJA % P ijin P max Kontrol Terhadap Daya P ijin Keterangan
(kN) Dukung Ijin (kN)
1 KOMBINASI 1 100 % 1172,89 < 100% * Pijin = 170057,40 OK
2 KOMBINASI 2 125 % 675,63 < 125% * Pijin = 170057,40 OK
3 KOMBINASI 3 140 % 677,64 < 140% * Pijin = 170057,40 OK
4 KOMBINASI 4 140 % 678,04 < 140% * Pijin = 170057,40 OK
5 KOMBINASI 5 150 % 1753,63 < 140% * Pijin = 170057,40 OK
No KOMBINASI BEBAN KERJA % P ijin P max Kontrol Terhadap Daya P ijin Keterangan
(kN) Dukung Ijin (kN)
1 KOMBINASI 1 100 % 1006,59 < 100% * Pijin = 170057,40 OK
2 KOMBINASI 2 125 % 722,47 < 125% * Pijin = 170057,40 OK
3 KOMBINASI 3 140 % 3018,32 < 140% * Pijin = 170057,40 OK
4 KOMBINASI 4 140 % 3477,49 < 140% * Pijin = 170057,40 OK
5 KOMBINASI 5 150 % 2476,55 < 140% * Pijin = 170057,40 OK
No KOMBINASI BEBAN KERJA % H ijin H max Kontrol Terhadap Daya H ijin Keterangan
(kN) Dukung Ijin (kN)
1 KOMBINASI 1 100 % 184,24 < 100% * H ijin = 492,64 OK
2 KOMBINASI 2 125 % 163,18 < 125% * H ijin = 615,80 OK
3 KOMBINASI 3 140 % 163,44 < 140% * H ijin = 689,70 OK
4 KOMBINASI 4 140 % 163,55 < 140% * H ijin = 689,70 OK
5 KOMBINASI 5 150 % 312,02 < 140% * H ijin = 738,97 OK
5. PEMBESIAN PILE CAP
Gaya aksial maksimum dan minimum yang diterima satu bore pile :
Pu max = P / n + Mx * X max / ∑ X²
Pu min = P / n - Mx * X max / ∑ X²
Gaya aksial maksimum dan minimum yang diterima satu bore pile :
Pu max = P / n + My * Y max / ∑ Y²
Pu min = P / n - My * Y max / ∑ Y²
Jarak Tiang Terhadap Pusat X Lengan Terhadap Sisi Luar Dinding M = ny*Pmax*Xp
(m) Xp (m) (kN m)
X1 1,80 Xp1 = X1 - Bd / 2 = 1,6 16691,95
As = π / 4 * D² * b / s = 1192,31 mm²
As = π / 4 * D² * b / s = 596,154 mm²
5.4. TULANGAN GESER PILE CAP
L2 = M / F = 4,895 m
Jumlah momen terhadap titik S : SMS = 0 maka : F * ( 2*L2) = H * (L2 + Ld + La)
Gaya lateral yg di tahan kelompok tiang , H = F * ( 2 * L2) / (L2 + Ld + La) = 17023,63 kN