Anda di halaman 1dari 1

Mata Air Saluhu

SKEMA JARINGAN IRIGASI ALAS


L U A S A R E A L = . . . . H a
250.00 50.00

BS.1
KETERANGAN
BS.1a
Jaringan Pembawa Irigasi
Jaringan Pembawa Irigasi
2000.00

BS.2 Sungai / Jaringan Pembuang


Sungai / Jaringan Pembuang Existing
3 Sungai / Jaringan Pembuang Rencana
20.
00
Saluran Existing as
lot
gH
un
nd
RB = Rusak Berat Be

30
190.00
138.0

.00
S.3 Ka BS.3 0
107.0
1.92 ha 3.78 l/dt BHS.1 Kn.9 0 Bangunan Bagi....
239.0
JALAN DESA

BHS.1 Kn.8 0 30.0


Rencana Bangunan Bagi....

140.00
0
BHS.1 Kn.7 219.0
0 12.40
Rencana 130.0
BHS.1 Kn.6 0
Peningkatan 143.0 75.00
0

83.00
HS.1 Kn.9 HS.1 Kn.7 123.0
0 122.00 124.00 BHS.1
BHS.1 Kn.5
26.30 ha 52.07 l/dt 26.30 ha 52.07 l/dt n.2
.1 K
Pos Haslot
S.4 Ka BHS.1 Kn.4
BHS.1 Kn.3 BHS BHS.1 Kn.1
6.59 ha 12.88 l/dt BS.4 JALAN DESA
S.5 Ka
BS.5
HS.1 Kn.8 HS.1 Kn.6 HS.1Kn2 HS.1Ki
26.03 ha 49.26 l/dt
26.30 ha 52.07 l/dt 26.30 ha 52.07 l/dt 26.30 ha 52.07 l/dt 16.93 ha 33.621 l/dt
S.6 Ka

JALAN DESA
33.73 ha 64.47 l/dt BS.6 HS.1Kn5 HS.1Kn4 HS.1Kn3 HS.1Kn1
26.30 ha 52.07 l/dt 26.30 ha 52.07 l/dt 26.30 ha 52.07 l/dt 45.79 ha 90.06 l/dt
S.8 Ka BS.8 S.7 Ki
BS.7
44.32 ha 87.30 l/dt 93.21 ha 193.50 l/dt
S.9 Ka DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
BS.9 Pekerjaan:
REHAB / PENINGKATAN
51.38 ha 101.21 l/dt Jl. Basuki Rahmat No. 01 Gedung A Kantor Gubernur Pertama - Kupang JARINGAN IRIGASI SEDERHANA
D.I. ALAS
GAMBAR : PERENCANAAN
LOKASI D.I. ALAS
S.9 Tg LOKASI
DESA
: D.I. ALAS
: ALAS SELATAN
SKEMA JARINGAN D.I ALAS
KECAMATAN : KOBALIMA TIMUR
14.82 ha 29.20 l/dt
No. Register :
S.9 Ki No/Jlh. Lbr : 1/29
Di Ukur : .............. No. Kontrak :
12.83 ha 25.28 l/dt
.............. ...........................................................................
.............. Tanggal Kontrak :
.............. ...........................................................................

Anda mungkin juga menyukai