PT PLN (PERSERO) No.

Dokumen P3BJB-TEK/04/90/2007/032
PENYALURAN DAN PUSAT PENGATUR BEBAN JAWA BALI
Berlaku Efektif Juni 2011
Cinere 16514 – Jakarta Selatan
STANDAR DATA REKOMISIONING GITET

STANDAR PENAMAAN
ANALOG & DIGITAL INPUT , SENSOR & WAKTU PEREKAMAN
UNTUK KEBUTUHAN REKOMISIONING LOKAL DFR GITET

A. Signal Analog Input (1 DFR untuk 2 Bay)

- DFR dengan Fasilitas 8 Analog Input Tiap Bay Line 500 kV terdiri dari:

No Nama Lengkap Analog Input Nama Analog di DFR Contoh *)


1 Voltage Phase R VR [Nama Bay] VR GNDUL1
2 Voltage Phase S VS [Nama Bay] VR GNDUL1
3 Voltage Phase T VT [Nama Bay] VR GNDUL1
4 Voltage SPARE V SPARE V SPARE
5 Current Phase R IR [Nama Bay] IR GNDUL1
6 Current Phase S IS [Nama Bay] IS GNDUL1
7 Current Phase T IT [Nama Bay] IT GNDUL1
8 Current Phase N IN [Nama Bay] IN GNDUL1

Keterangan :
*) : - Maksimum 16 karakter. Nama Bay sesuai standar SCADA (5 huruf) + 1 karakter no sirkit.
- Contoh Lokasi DFR GITET Kembangan Arah Bay Gandul1.

- DFR dengan Fasilitas 8 Analog Input Tiap bay IBT 500/150 kV, sisi 500 kV terdiri dari:

No Nama Lengkap Analog Input Nama Analog di DFR Contoh *)


1 Voltage Phase R VR [Nama Bay IBT] VR IBT1
2 Voltage Phase S VS [Nama Bay IBT] VS IBT1
3 Voltage Phase T VT [Nama Bay IBT] VT IBT1
4 Voltage SPARE V SPARE
5 Current Phase R IR [Nama Bay IBT] IR IBT1
6 Current Phase S IS [Nama Bay IBT] IS IBT1
7 Current Phase T IT [Nama Bay IBT] IT IBT1
8 Current Phase N IN [Nama Bay IBT] IN IBT1

Keterangan :
*) : - Maksimum 16 karakter. Nama Bay IBT : IBT + 1 karakter no IBT.
- Contoh Lokasi DFR GITET Kembangan Arah Bay IBT-1 500/150 kV.

Edisi : 00 Revisi : 00 Halaman : 1 – 3


RUANG LINGKUP SERTIFIKASI ISO 9001:2000
PENGEMBANGAN DAN PEMBINAAN INSTALASI PENYALURAN TENAGA LISTRIK
SISTEM JAWA BALI DI PT PLN (PERSERO) P3B JAWA BALI
PT PLN (PERSERO) No. Dokumen P3BJB-TEK/04/90/2007/032
PENYALURAN DAN PUSAT PENGATUR BEBAN JAWA BALI
Berlaku Efektif Juni 2011
Cinere 16514 – Jakarta Selatan
STANDAR DATA REKOMISIONING GITET

B. Signal Digital Input (1 DFR untuk 2 Bay).

- DFR dengan Fasilitas 16 Digital Input Tiap bay line 500 kV terdiri dari:

No Nama Lengkap Digital Input Nama Digital di DFR Contoh *)


1 Main 1 Protection Operated ( Distance 1) LP A OPRT [Nama Bay] LP A OPRT GNDUL1
2 Main 2 Protection Operated ( Distance 2 ) LP B OPRT [Nama Bay] LP B OPRT GNDUL1
3 CB 7Ax/Bx open CB 7Ax/Bx OPEN CB 7A1 OPEN
4 CB 7ABx open CB 7ABx OPEN CB 7AB1 OPEN
5 A/R In Progress (initiated) A/R INIT [Nama Bay] A/R INIT GNDUL1
6 Carrier send from Distance Main 1 LP A SEND [Nama Bay] LP A SEND GNDUL1
7 Carrier send from Distance Main 2 LP B SEND [Nama Bay] LP B SEND GNDUL1
8 Carrier send from DEF Main1/DEF2 DEFA/B SEND [Nama Bay] DEFA/B SEND GNDUL1
9 Carrier Receive to Distance Main 1 LP A RCV [Nama Bay] LP A RCV GNDUL1
10 Carrier Receive to Distance Main 2 LP B RCV [Nama Bay] LP B RCV GNDUL1
11 Carrier Receive to DEF 1/DEF2 DEF A/B RCV [Nama Bay] DEF A/B RCV GNDUL1
12 Send DTT (perlu padam) DTT SEND [Nama Bay] DTT SEND GNDUL1
13 Receive DTT (perlu padam) DTT RCV [Nama Bay] DTT RCV GNDUL1
14 CCP Operated (khusus untuk GIS) CCP OPRT [Nama Bay] CCP OPRT GNDUL1
15 CBF/SZP 7Ax/7Bx Trip CBF/SZP 7Ax/7Bx OPRT CBF/SZP 7A1 OPRT
16 CBF/SZP 7ABx Trip CBF/SZP 7ABx OPRT CBF/SZP 7AB1 OPRT

Keterangan :
*) : - Maksimum 16 karakter. Nama Bay sesuai standar SCADA (5 huruf) + 1 karakter no sirkit.
- Contoh Lokasi DFR GITET Kembangan Arah Bay Gandul1.

- DFR dengan Fasilitas 32 Digital Input untuk bay IBT 500/150 kV, sisi 500 kV minimal harus terdiri
dari :

No Nama Lengkap Digital Input Nama Digital di DFR Contoh *)


1 Main 1 Protection Operated / Differential DIFF PROT [Nama Bay IBT] DIFF PROT IBT1
2 Main 2 Protection Operated / REF REF PROT [Nama Bay IBT] REF PROT IBT1
3 Back Up Protection 500 kV Operated OC 500 OPRT [Nama Bay IBT] OC 500 OPRT IBT1
4 Back Up Protection 150 kV Operated OC 150 OPRT [Nama Bay IBT] OC 150 OPRT IBT1
5 Over Voltage Operated OV OPRT [Nama Bay IBT] OV OPRT IBT1
6 Bucholz Operated BUCHOLZ [Nama Bay IBT] BUCHOLZ IBT1
7 Jansen Operated JANSEN [Nama Bay IBT] JANSEN IBT1
8 Thermal Relay Operated THERMAL [Nama Bay IBT] THERMAL IBT1
9 Sudden Pressure Operate JANSEN [Nama Bay IBT] JANSEN IBT1
10 PMT 7ABx Open. 7ABx OPEN 7AB1 OPEN
11 PMT 7Ax or 7Bx Open. 7Ax or 7Bx OPEN 7B1 OPEN
12 PMT 150 kV Open 150 kV OPEN 150 kV IBT1 OPEN
13 CCP 1 Operated. CCP A OPRT [Nama Bay IBT] CCP A OPRT IBT1
14 CCP 2 Operated CCP B OPRT [Nama Bay IBT] CCP B OPRT IBT1
15 CBF/SZP 7Ax/7Bx or B Trip. CBF/SZP 7Ax/7Bx or B OPRT CBF/SZP 7B1 OPRT
16 CBF/SZP 7ABx Trip. CBF/SZP 7ABx OPRT CBF/SZP 7AB1 OPRT

Keterangan :
*) : - Maksimum 16 karakter. Nama Bay IBT : IBT + 1 karakter no IBT.
- Contoh Lokasi DFR GITET Kembangan Arah Bay IBT-1 500/150 kV.

Edisi : 00 Revisi : 00 Halaman : 2 – 3


RUANG LINGKUP SERTIFIKASI ISO 9001:2000
PENGEMBANGAN DAN PEMBINAAN INSTALASI PENYALURAN TENAGA LISTRIK
SISTEM JAWA BALI DI PT PLN (PERSERO) P3B JAWA BALI
PT PLN (PERSERO) No. Dokumen P3BJB-TEK/04/90/2007/032
PENYALURAN DAN PUSAT PENGATUR BEBAN JAWA BALI
Berlaku Efektif Juni 2011
Cinere 16514 – Jakarta Selatan
STANDAR DATA REKOMISIONING GITET

C. Sensor Analog
- Jika tersedia hanya 3 Sensor Analog / Bay
1. 3 Under Voltage channel ≤ 80% Vnom
2. 3 Over Current channel ≥ 120% Inom
3. 1 Over Current channel 20 -60% I netral

- Jika tersedia ≥ 12 Sensor Analog


1. Under Voltage Phasa R channel ≤ 80% Vnom
2. Under Voltage Phasa S channel ≤ 80% Vnom
3. Under Voltage Phasa T channel ≤ 80% Vnom
4. Over Voltage Phasa R channel ≥ 120% Vnom
5. Over Voltage Phasa S channel ≥ 120% Vnom
6. Over Voltage Phasa T channel ≥ 120% Vnom
7. Over Current Phasa R channel ≥ 120% Inom
8. Over Current Phasa S channel ≥ 120% Inom
9. Over Current Phasa T channel ≥ 120% Inom
10. Over Current Phasa N channel 20 – 60 % I netral
11. Under frequency channel 49 Hz
12. Over frequency channel 51 Hz

D. Sensor Digital
Sesuai Standar Digital Input yang terpasang.

E. Durasi Perekaman Gangguan


1. Pre Fault 300 ms.
2. Fault Flexible (Max 2500 ms)
3. Post Fault 100 ms.

Edisi : 00 Revisi : 00 Halaman : 3 – 3


RUANG LINGKUP SERTIFIKASI ISO 9001:2000
PENGEMBANGAN DAN PEMBINAAN INSTALASI PENYALURAN TENAGA LISTRIK
SISTEM JAWA BALI DI PT PLN (PERSERO) P3B JAWA BALI