Anda di halaman 1dari 9

Adendum ANDAL dan RKL-RPL Pembangunan Pabrik Semen di Distrik Manokwari Selatan dan

Distrik Warmare Kabupaten Manokwari, Provinsi Papua Barat.

DAFTAR ISI
Halaman
KATA PENGANTAR .................................................................................................................... i
SURAT PERNYATAAN ................................................................................................................... ii
DAFTAR ISI ......................................................................................................................... iii
DAFTAR TABEL ......................................................................................................................... vi
DAFTAR GAMBAR .......................................................................................................................... x
DAFTAR LAMPIRAN ..................................................................................................................... xii

BAB I. PENDAHULUAN .................................................................................................................. I-1


1.1. Latar Belakang .................................................................................................................................... I-1
1.2 Tujuan dan Manfaat Kegiatan ...............................................................................................................I-3
1.2.1 Tujuan ....................................................................................................................................I-3
1.2.2 Manfaat .................................................................................................................................. I-4
1.3 Pelaksana Studi................................................................................................................................... I-4
1.3.1 Pemrakarsa ........................................................................................................................... I-4
1.3.2 Lembaga Penyedia Jasa Penyusun (LPJP) AMDAL .................................................................. I-4
1.3.3 Penyusun Studi....................................................................................................................... I-4

BAB II. DESKRIPSI KEGIATAN ....................................................................................................... II-1


2.1 Deskripsi Ringkas Kegiatan Eksisting .................................................................................................. II-1
2.1.1. Kegiatan Utama .....................................................................................................................II-3
2.1.2. Kegiatan Pendukung ........................................................................................................... II-96
2.3. Deskripsi Rencana Kegiatan Perubahan (Adendum AMDAL) ............................................................ II-78
2.3.1. Kesesuaian Lokasi Dengan RTRW ......................................................................................... II-78
2.3.2. Deskripsi Umum .................................................................................................................. II-78
2.4.3 Tahap Kegiatan Perubahan ........................................................................................................... II-78

BAB III.RONA LINGKUNGAN HIDUP AWAL ..................................................................................... III-1


3.1. Komponen-Komponen Lingkungan Hidup ........................................................................................... III-1
3.1.1. Komponen Geo fisik Kimia ...................................................................................................... III-1
3.1.2. Lingkup komponen Biologi ................................................................................................. III-38
3.1.3. Komponen Sosial Ekonomi .................................................................................................. III-49
3.1.4. Komponen Sosial Budaya ................................................................................................... III-69
3.1.5. Komponen Kesehatan Masyarakat ...................................................................................... III-77
3.2.Usaha dan/atau Kegiatan Lain Sekitar ...........................................................................................III-82
3.2.1. Permukiman penduduk ...................................................................................................... III-85
3.2.2. Usaha pemecahan batu kali dan penambangan batu/kerikil/pasir.................................... III-86
3.2.3. Transportasi Darat............................................................................................................. III-87
3.2.4. Perusahaan Daerah Air Minum .......................................................................................... III-88
3.2.5. Kios dan Warung ............................................................................................................... III-88

BAB IV.EVALUASI KEGIATAN EKSISTING....................................................................................... IV-1


4.1. Evaluasi Dampak Yang Telah Dikelola ................................................................................................ IV-1
4.1.1. Geo Fisik Kimia ..................................................................................................................... IV-3

PT. SDIC Papua Cement Indonesia iii


Adendum ANDAL dan RKL-RPL Pembangunan Pabrik Semen di Distrik Manokwari Selatan dan
Distrik Warmare Kabupaten Manokwari, Provinsi Papua Barat.

4.1.2. Biologi .................................................................................................................................. IV-7


4.1.3. Sosial Ekonomi Budaya ......................................................................................................... IV-9
4.1.4. Kesehatan Masyarakat ........................................................................................................ IV-14
4.2. Evaluasi kinerja dan efektivitas pengelolaan dan pemantauan lingkungan (Eksisting) ..................... IV-17
4.2.1. Evaluasi Kecenderungan...................................................................................................... IV-17
4.2.2. Evaluasi Tingkat Kritis ......................................................................................................... IV-17
4.2.3. Evaluasi Penaatan ..............................................................................................................IV-20
4.3. Identifikasi Dan Evaluasi Terhadap Jenis-Jenis Dampak Penting Hipotetik (DPH) Yang Telah
Dilingkup Dalam Dokumen Amdal Sebelumnya Yang Berpotensi Mengalami Perubahan Besaran
Dan Sifat Pentingnya Akibat Terjadinya Perubahan Usaha Dan/Atau Kegiatan ............................... IV-24
4.3.1. Identifikasi Dampak Potensial............................................................................................. IV-24
4.3.2. Evaluasi Dampak Potensial .................................................................................................. IV-41

BAB V. PRAKIRAAN DAN EVALUASI DAMPAK PENTING................................................................... V-1


5.1. Prakiraan Dampak Penting .................................................................................................................V-1
5.1.1. Kriteria Prakiraan Dampak .....................................................................................................V-1
5.1.2. Prakiraan Tingkat Penting Dampak ....................................................................................... V-3
5.2. Evaluasi Secara Holistik ................................................................................................................ V-84
5.3. Arahan Pengelolaan Lingkungan Hidup .......................................................................................... V-89
5.4. Rekomendasi Kelayakan Lingkungan Hidup .................................................................................... V-94

BAB VI. RENCANA PENGELOLAAN DAN PEMANTAUAN LINGKUNGAN HIDUP (RKL-RPL) ............. VI-1
6.1. Rencana Pengelolaan Lingkungan Hidup (RKL) .................................................................................... V-1
6.2.Rencana Pemantauan Lingkungan Hidup (RPL) ................................................................................ V-23

BAB VII. JUMLAH DAN IZIN PPLH YANG DIBUTUHKAN ................................................................. VII-1
DAFTAR PUSTAKA
LAMPIRAN

PT. SDIC Papua Cement Indonesia iv


Adendum ANDAL dan RKL-RPL Pembangunan Pabrik Semen di Distrik Manokwari Selatan dan
Distrik Warmare Kabupaten Manokwari, Provinsi Papua Barat.

DAFTAR TABEL
Tabel 1. 1. Jenis perubahan usaha dan / atau kegiataan ..................................................................... I-2
Tabel 1. 2. Susunan Tim ADENDUM ANDAL, RKL-RPL Pabrik Semen (Untuk Rencana Pembangunan
Pusat Workshop, Cement Storage, Jembatan, Clinkers Production Line, Crane dan PLTU
oleh PT. SDIC Papua Cement Indonesia................................................................................ I-5
Tabel 2. 1. Peralatan utama yang digunakan pada pabrik semen dan fasilitas penunjangnya .............. II-4
Tabel 2. 2. Tipe dan Struktur Bangunan ............................................................................................... II-7
Tabel 2. 3. Daftar Konsumsi Air ...........................................................................................................II-9
Tabel 2. 4. Neraca Bahan ..................................................................................................................... I-I11
Tabel 2. 5. Spesifikasi alat dan tingkat emisinya ................................................................................. II-12
Tabel 2. 6. Deskripsi Teknis Pembangkit Listrik Batubara ................................................................... II-21
Tabel 2. 7. Spesifikasi Peralatan Power Plant 2 x18 MW dan Penyimpanan Batubara .......................... II-21
Tabel 2. 8. Spesifikasi Peralatan Power Plant 6 MW .......................................................................... II-22
Tabel 2. 9. Kandungan batubara ........................................................................................................ II-24
Tabel 2. 10. Konsumsi air .................................................................................................................... II-25
Tabel 2. 11. Spesifikasi Dermaga......................................................................................................... II-27
Tabel 2. 12. Luasan kolam pelabuhan .................................................................................................. II-29
Tabel 2. 13. Pembagian ruang dari bangunan kantor ........................................................................... II-32
Tabel 2. 14. Pembagian ruang dari bangunan bengkel ........................................................................ II-33
Tabel 2. 15. Pembagian ruang dari bangunan guest house ................................................................. II-35
Tabel 2. 16. Pembagian ruang dari bangunan staff house .................................................................. II-35
Tabel 2. 17. Pembagian ruang dari bangunan mess karyawan............................................................ II-36
Tabel 2. 18. Pembagian ruang dari bangunan poliklinik........................................................................ II-37
Tabel 2. 19. Fasilitas yang akan dibangun oleh PT. SDIC Papua Cement Indonesia .............................. II-39
Tabel 2. 20. Kebutuhan Tenaga Kerja pada Konstruksi Pembangunan Lini Produksi 2 oleh
PT. SDIC Papua Cement Indonesia (PT.SPCI) .................................................................... II-50
Tabel 2. 21. Daftar Peralatan Kerja Yang Akan Digunakan pada Tahap Konstruksi Pembangunan
oleh PT. SDIC Papua Cement Indonesia (PT.SPCI) ............................................................. II-52
Tabel 2. 22. Jenis dan Jumlah Material dan Bahan Bangunan yang Dibutuhkan pada Pembangunan
oleh PT. SDIC Papua Cement Indonesia ............................................................................ II-53
Tabel 2. 23. Peralatan utama yang digunakan pada pabrik semen dan fasilitas penunjangnya ............II-55
Tabel 2. 24. Deskripsi Teknis Pembangkit Listrik Tenaga Uap (PLTU) ................................................... II-64
Tabel 2. 25. Spesifikasi Peralatan Power Plant 20 MW ....................................................................... II-65
Tabel 2. 26. Model Peralatan Power Plant 20 MW ............................................................................... II-65
Tabel 2. 27. Tenaga Kerja Indonesia pada PT. SDIC Papua Cement Indonesia (PT.SPCI) ...................... II-69
Tabel 2. 28. Tenaga Kerja Asing pada PT. SDIC Papua Cement Indonesia (PT.SPCI).............................. II-73
Tabel 2. 29. Bahan Baku yang Dibutukan Oleh Semen PT. SDIC Papua Cement Indonesia ..................... II-74
Tabel 2. 30. Neraca Bahan ................................................................................................................... II-75
Tabel 2. 31. Kandungan batubara ........................................................................................................II-82
Tabel 2. 32. Konsumsi air ....................................................................................................................II-82
Tabel 3. 1. Rata-Rata Curah Hujan, Hari Hujan, Dan Kriteria Tipe Hujan Di Wilayah Studi
Periode 22 Tahun (1996 – 2017) ......................................................................................... III-1
Tabel 3. 2. Range Nilai Q dan Kriteria Iklim Schmidt – Ferguson......................................................... III-2
Tabel 3. 3. BK, BL, BB Kriteria Schmidth – Ferguson untuk Data Curah Hujan Wilayah Studi ............... III-2

PT. SDIC Papua Cement Indonesia v


Adendum ANDAL dan RKL-RPL Pembangunan Pabrik Semen di Distrik Manokwari Selatan dan
Distrik Warmare Kabupaten Manokwari, Provinsi Papua Barat.

Tabel 3. 4. Suhu Rataan, Suhu Maksimum Dan Suhu Minimum ............................................................III-3


Tabel 3. 5. Kelembaban Relatif Periode 21 Tahun (1996 – 2017) .......................................................... III-5
Tabel 3. 6. Gambaran kekuatan angin, menurut skala Beaufort .......................................................... III-7
Tabel 3. 7. Hasil analisis kualitas udara di lokasi Rencana Pembangunan Cement Storage
PT. SDIC Papua Cement Indonesia .....................................................................................III-8
Tabel 3. 8. Hasil analisis kualitas udara di lokasi Rencana Pembangunan Power Plant PT. SDIC
Papua Cement Indonesia ...................................................................................................III-9
Tabel 3. 9. Hasil analisis kualitas udara di lokasi Rencana Pembangunan Clinker Production Line
PT. SDIC Papua Cement Indonesia .....................................................................................III-9
Tabel 3. 10. Hasil analisis kualitas udara di lokasi Rencana Pembangunan Pusat Workshop
PT. SDIC Papua Cement Indonesia .....................................................................................III-9
Tabel 3. 11. Hasil analisis kualitas udara di lokasi Rencana Pembangunan Fasilitas Olahraga
PT. SDIC Papua Cement Indonesia ................................................................................... III-10
Tabel 3. 12. Hasil analisis kualitas udara di lokasi Rencana Pembangunan Crane PT. SDIC Papua
Cement Indonesia ............................................................................................................ III-10
Tabel 3. 13. Perbandingan kualitas udara berdasarkan periode pemantauan yang berbeda ................ III-11
Tabel 3. 14. Hasil analisis kebisingan di lokasi rencana pembangunan Pusat Workshop, Cement
Storage, Clinker Production Line, Crane dan PLTU PT. SDIC Papua Cement Indonesia ...... III-12
Tabel 3. 15. Potensi run-off berdasarkan kelompok tanah .................................................................. III-15
Tabel 3. 16. Koefisien run-off berdasarkan kelompok tanah ................................................................III-16
Tabel 3. 17. Koefisien run-off berdasarkan kelompok tanah ..............................................................III-16
Tabel 3. 18. Data kualitas air buangan PLTU ........................................................................................ III-17
Tabel 3. 19. Data kualitas air Laut di Sekitar Dermaga ....................................................................... III-18
Tabel 3. 20. Data kualitas air Sungai Maruni di Sekitar PLTU ...............................................................III-19
Tabel 3. 21. Data kualitas air Sumur Kompleks 55..............................................................................III-20
Tabel 3. 22. Data Hasil Uji Mikro Biologi ............................................................................................... III-21
Tabel 3. 23. Tren perubahan kualitas air laut selama periode pemantauan 2015 - 2019 ..................... III-22
Tabel 3. 24. Klasifikasi relief (morfologi) ............................................................................................ III-23
Tabel 3. 25. Formasi Geologi yang dijumpai pada areal pembangunan ................................................ III-24
Tabel 3. 26. Tabel kelas lereng ........................................................................................................... III-27
Tabel 3. 27. Nisbah Volume Per Kapasitas (V/C Ratio) atau derajat kejenuhan (DS) .......................... III-37
Tabel 3. 28. Tingkat Pelayanan Jalan .................................................................................................. III-37
Tabel 3. 29. Klasifikasi jenis dominan berdasarkan indeks nilai penting tingkat pertumbuhan
semai ............................................................................................................................. III-39
Tabel 3. 30. Klasifikasi Jenis dominan berdasarkan Indeks Nilai Penting Tingkat Pertumbuhan
Pancang ..........................................................................................................................III-40
Tabel 3. 31. Klasifikasi jenis dominan berdasarkan indeks nilai penting tingkat pertumbuhan
tiang ................................................................................................................................III-40
Tabel 3. 32. Klasifikasi Jenis dominan berdasarkan Indeks Nilai Penting Tingkat Pertumbuhan
Pohon ..............................................................................................................................III-40
Tabel 3. 33. Indeks keragaman jenis vegetasi hutan dataran rendah .................................................. III-41
Tabel 3. 34. Indeks Keragaman (H), Keseragaman (E) dan Dominansi (C) pada air laut I .................... III-44
Tabel 3. 35. Indeks Keragaman (H), Keseragaman (E) dan Dominansi (C) pada air laut II ................... III-44
Tabel 3. 36. Indeks Keragaman (H), Keseragaman (E) dan Dominansi (C) pada air laut III .................. III-45
Tabel 3. 37. Indeks Keragaman (H), Keseragaman (E) dan Dominansi (C) pada air laut IV .................. III-46
Tabel 3. 38. Indeks Keragaman (H), Keseragaman (E) dan Dominansi (C) pada air laut V ................... III-46
Tabel 3. 39. Indeks Keragaman (H), Keseragaman (E) dan Dominansi (C) ........................................... III-47

PT. SDIC Papua Cement Indonesia vi


Adendum ANDAL dan RKL-RPL Pembangunan Pabrik Semen di Distrik Manokwari Selatan dan
Distrik Warmare Kabupaten Manokwari, Provinsi Papua Barat.

Tabel 3. 40. Jenis Ikan yang ditemukan di sekitar lokasi kegiatan dari hasil tangkapan nelayan ......... III-48
Tabel 3. 41. Kepadatan penduduk di wilayah studi ............................................................................. III-50
Tabel 3. 42. Jumlah penduduk, rumah tangga dan rata-rata jiwa per KK di wilayah studi tahun
2018 ................................................................................................................................. III-51
Tabel 3. 43. Struktur Penduduk di Wilayah Studi Berdasarkan Jenis Kelamin Tahun 2018 .................. III-52
Tabel 3. 44. Struktur Penduduk Berdasarkan Umur di Wilayah Studi, 2018 ........................................ III-53
Tabel 3. 45. Struktur Penduduk Berdasarkan Tingkat Pendidikan di Wilayah Studi .............................III-55
Tabel 3. 46. Pendapatan Masyarakat di Wilayah Studi..........................................................................III-61
Tabel 3. 47. Produk Domestik Regional Bruto Atas Dasar Harga Berlaku Menurut Lapangan Usaha
Di Kabupaten Manokwari tahun 2015-2017 (juta rupiah) ................................................. III-66
Tabel 3. 48. Struktur pendapatan daerah kabupaten manokwari tahun 2014-2016 ............................. III-67
Tabel 3. 49. Fasilitas Pendidikan di Wilayah Studi Tahun 2013 ............................................................ III-76
Tabel 3. 50. Sarana peribadatan di wilayah studi, 2013 ...................................................................... III-76
Tabel 3. 51. Sepuluh Besar Penyakit Puskesmas Maripi Distrik Manokwari Selatan Tahun 2017 ......... III-78
Tabel 3. 52. Sepuluh Besar Penyakit Di Puskesmas Warmare Distrik Warmare Tahun 2017 ............... III-79
Tabel 3. 53. Kondisi Sarana Pelayanan Kesehatan di Wilayah Studi Tahun 2013 .................................. III-81
Tabel 3. 54. Jarak dan Arah kampung terhadap areal pabrik ........................................................... III-85
Tabel 3. 55. Jarak dan arah kegiatan penambangan pasir dan batu terhadap Faslutas tambahan ..... III-87
Tabel 3. 56. Jarak dan Arah Jalur Trasportasi Terhadap Fasiltas Tambahan ..................................... III-87
Tabel 3. 57. Jarak dan arah jalur perpipaan Fasilitas Tambahan ....................................................... III-88
Tabel 4. 1. Matriks Evaluasi Dampak Komponen Geofisik Kimia Yang Telah Dikelola Pada Tahap
Operasi ............................................................................................................................. IV-3
Tabel 4. 2. Matriks Evaluasi Dampak Komponen Biologi Yang Telah Dikelola Pada Tahap Operasi ....... IV-7
Tabel 4. 3. Matriks Evaluasi Dampak Komponen Sosial Ekonomi Budaya Yang Telah Dikelola Pada
Tahap Operasi ................................................................................................................... VI-9
Tabel 4. 4. Matriks Evaluasi Dampak Komponen Kesehatan Masyarakat Yang Telah Dikelola Pada
Tahap Operasi .................................................................................................................. VI-14
Tabel 4. 5. Evaluasi Tingkat Kritis Kualitas Udara Area Dermaga .......................................................VI-18
Tabel 4. 6. Evaluasi Tingkat Kritis Kualitas Udara di Kompleks 55 ......................................................VI-18
Tabel 4. 7. Evaluasi Tingkat Kritis Kualitas Udara di Are Pos 3 ..........................................................VI-18
Tabel 4. 8. Evaluasi Tingkat Kritis Kualitas Udara di Area Pos 4 .........................................................VI-18
Tabel 4. 9. Evaluasi Tingkat Kritis Kualitas Udara di Area Pos 5.........................................................VI-19
Tabel 4. 10. Evaluasi Tingkat Kritis Kualitas Udara di Kantor Produksi.................................................VI-19
Tabel 4. 11. Evaluasi Tingkat Kritis terhadap Tingkat Kebisingan .........................................................VI-19
Tabel 4. 12. Evaluasi Tingkat Kritis Kualitas Air Laut di Pelabuhan .......................................................VI-19
Tabel 4. 13. Evaluasi Tingkat Kritis Kualitas Air Sumur di Kompleks 55 ...............................................VI-19
Tabel 4. 14. Evaluasi Tingkat Kritis Kualitas Air LImbah ......................................................................VI-20
Tabel 4. 15. Tabel Kepatuhan Terhadap Ketentuan Izin Lingkungan .....................................................VI-20
Tabel 4. 16. Matriks interaksi sederhana antara rencana kegiatan dan komponen lingkungan ........... VI-26
Tabel 4. 17. Identifikasi Dampak Potensial .......................................................................................... VI-29
Tabel 4. 18. Evaluasi Dampak Potensial .............................................................................................. VI-42
Tabel 5. 1. Prakiraan peningkatan kadar debu saat mobilisasi peralatan ............................................ V-11
Tabel 5. 2. Nilai Emission Rate (Q) yang dihasilkan oleh setiap kendaraan pengangkut material
pembangunan pusat workshop, cement storage, clinker production line, crane dan
PLTU, PT. SDIC Papua Cement Indonesia (PT. SPCI) ........................................................... V-12
Tabel 5. 3. Prakiraan peningkatan kadar gas polutan saat mobilisasi peralatan dan material ............V-13
Tabel 5. 4. Nilai Ambang Batas (NAB) getaran mekanik.......................................................................V-18

PT. SDIC Papua Cement Indonesia vii


Adendum ANDAL dan RKL-RPL Pembangunan Pabrik Semen di Distrik Manokwari Selatan dan
Distrik Warmare Kabupaten Manokwari, Provinsi Papua Barat.

Tabel 5. 5. Prakiraan peningkatan kadar debu saat transportasi material bangunan ........................ V-22
Tabel 5. 6. Nilai Emission Rate (Q) yang dihasilkan oleh setiap kendaraan pengangkut material
bangunan untuk pembangunan pusat workshop, cement storage, clinker production
line, crane dan PLTU, PT. SDIC Papua Cement Indonesia (PT. SPCI) .................................. V-23
Tabel 5. 7. Prakiraan peningkatan kadar gas polutan saat mobilisasi peralatan dan material ........... V-24
Tabel 5. 8. Nilai Ambang Batas (NAB) getaran mekanik..................................................................... V-30
Tabel 5. 9. Prakiraan peningkatan kadar debu saat pembangunan pabrik ........................................ V-38
Tabel 5. 10. Nilai Emission Rate (Q) yang dihasilkan oleh setiap kendaraan pengangkut material
pembangunan pusat workshop, cement storage, clinker production line, crane dan
PLTU, PT. SDIC Papua Cement Indonesia (PT. SPCI) ..........................................................V-59
Tabel 5. 11. Prakiraan peningkatan kadar gas polutan saat mobilisasi tanah lempung dari lokasi
penambangan tanah lempung ke stockpile pabrik. ........................................................... V-60
Tabel 5. 12. Ringkasan Hasil Kajian Prakiraan Sifat Penting Dampak ................................................... V-84
Tabel 5. 13. Arahan Pengelolaan dan Pemantauan Lingkungan ........................................................... V-90
Tabel 5. 14. Penilaian Kelayakan Lingkungan Hidup ..............................................................................V-95
Tabel 6. 1. Pengelolaan Lingkungan Hidup........................................................................................... VI-4
Tabel 6. 2. Pemantauan Lingkungan Hidup ........................................................................................ VI-23

PT. SDIC Papua Cement Indonesia viii


Adendum ANDAL dan RKL-RPL Pembangunan Pabrik Semen di Distrik Manokwari Selatan dan
Distrik Warmare Kabupaten Manokwari, Provinsi Papua Barat.

DAFTAR GAMBAR
Gambar 2. 1. Lokasi pembangunan pabrik semen dan fasilitas pendukungnya ...................................... II-2
Gambar 2. 2. Tata Letak Fasilitas Dermaga ........................................................................................II-28
Gambar 2. 3. Belt Conveyor ................................................................................................................ II-34
Gambar 2. 4. Model IPAL pengolahan air limbah domestic pabrik semen SDIC................................... II-38
Gambar 2. 5. Peta Lokasi Kegiatan Adendum ...................................................................................... II-42
Gambar 2. 6. Peta Kesesuaian Lokasi Studi dengan RTRW .................................................................. II-43
Gambar 2. 7. Peta Kesesuaian Lokasi Kegiatan Dengan PIPIB ............................................................. II-44
Gambar 2. 8. Peta Keseuaian Lokasi Kegiatan dengan Fungsi Kawasan Hutan .................................... II-45
Gambar 2. 9. Peta Penggunaan lahan ................................................................................................. II-46
Gambar 2. 10. Lay Out Lini Produksi 2 yang akan ditambahkan............................................................. II-47
Gambar 2. 11. Lay Out Lokasi Pembangkit Tambahan ........................................................................... II-48
Gambar 2. 12. Lay Out Crane yang akan ditambahkan pada Dermaga Khusus ..................................... II-49
Gambar 2. 13. Lokasi lini produksi 2, berada disamping lokasi lini produksi 1. ......................................... II-62
Gambar 2. 14. Pembangkit yang ada saat ini (36 MW) ......................................................................... II-63
Gambar 2. 15. Lokasi Pembangkit yang baru. ...................................................................................... II-63
Gambar 2. 16. Lokasi Menara Pendingin ............................................................................................... II-64
Gambar 2. 17. Crane yang saat ini terpasang...................................................................................... II-66
Gambar 2. 18. Cement Storage yang saat ini ada (6 buah) ................................................................... II-67
Gambar 2. 19. Lokasi gudang yang akan dibangun di sekitar dermaga. ................................................ II-67
Gambar 2. 20. Resort SDIC ................................................................................................................... II-84
Gambar 2. 21. Lobby/Plaza ................................................................................................................. II-85
Gambar 2. 22. Ruang pertemuan ......................................................................................................... II-85
Gambar 3. 1. Fluktuasi suhu udara rata-rata di lokasi pembangunan .................................................. III-4
Gambar 3. 2. Fluktuasi suhu udara minimum rata-rata di lokasi pembangunan................................... III-4
Gambar 3. 3. Fluktuasi suhu udara maksimum rata-rata di lokasi pembangunan ................................ III-5
Gambar 3. 4. Windrose arah dan kecepatan angin di lokasi Pembangunan (data rata-rata
Januari 2012 – Maret 2016 dari European Centre for Medium-Range Weather
Forecasts - ECMWF) .......................................................................................................III-6
Gambar 3. 5. Contoh Arah Angin Pada tgl 29.0000 UTC 2009 ............................................................. III-7
Gambar 3. 6. Distribusi frekwensi klas kecepatan angin di area pembangunan ................................... III-7
Gambar 3. 7. Perubahan kualitas udara dan kebisingan di lokasi studi menurut periode pemantauan III-11
Gambar 3. 8. Perubahan kualitas air laut untuk beberapa parameter selama periode pemantauan .. III-22
Gambar 3. 9. Nilai Spektral Percepatan Di Permukaan Dari Gempa Risk ........................................... III-26
Gambar 3. 10. SNI-1726-2012 Standar Perencanaan Ketahanan Gempa untuk Struktur Bangunan
Gedung Wilayah Gempa Indonesia dengan percepatan puncak batuan dasar. ............... III-26
Gambar 3. 11. Peta Hidrologi............................................................................................................... III-29
Gambar 3. 12. Peta Geologi ................................................................................................................ III-30
Gambar 3. 13. Peta Jalur Sesar ...........................................................................................................III-31
Gambar 3. 14. Peta Topografi .............................................................................................................. III-32
Gambar 3. 15. Peta Jenis Tanah ......................................................................................................... III-33
Gambar 3. 16. Struktur Penduduk Berdasarkan Mata Pencaharian di Wilayah Studi .......................... III-56
Gambar 3. 17. Kondisi Ketenagakerjaan DI kabupaten Manowkari ....................................................... III-57
Gambar 3. 18. Sektor Jasa dalam 7 (tujuh) Tahun terakhir ................................................................ III-63
Gambar 3. 19. Produk domestik regional bruto atas dasar harga berlaku menurut lapangan usaha

PT. SDIC Papua Cement Indonesia iii


Adendum ANDAL dan RKL-RPL Pembangunan Pabrik Semen di Distrik Manokwari Selatan dan
Distrik Warmare Kabupaten Manokwari, Provinsi Papua Barat.

di kabupaten manokwari tahun 2009-2011 (juta rupiah) ............................................... III-64


Gambar 3. 20. Perkembangan PDRB (Agregat) Kab. Manokwari 2015-2017 ......................................... III-65
Gambar 3. 21. Peta Usaha dan/atau Kegiatan Lain Sekitar ................................................................. III-84
Gambar 3. 22. Lokasi Pengambilan Sampel ........................................................................................ III-90
Gambar 4. 1. Bagan Alir Identifikasi Dampak ..................................................................................... IV-28
Gambar 5. 1. Tingkat kebisingan yang diterima oleh penduduk pada jarak tertentu dari jalan
akses pengangkut material.............................................................................................V-16
Gambar 5. 2. Baku Tingkat Getaran untuk Kenyamanan dan Kesehatan ...............................................V-19
Gambar 5. 3. Tingkat kebisingan yang diterima oleh penduduk pada jarak tertentu dari jalan
akses pengangkut material............................................................................................ V-27
Gambar 5. 4. Baku Tingkat Getaran untuk Kenyamanan dan Kesehatan ............................................. V-30
Gambar 5. 5. Tingkat kebisingan yang diterima oleh penduduk pada jarak tertentu dari jalan
akses pengangkut material (Sumber: Analisis Konsultan, 2018) ................................... V-63
Gambar 5. 6. Bagan Alir Hubungan Keterkaitan dan Interaksi Dampak Penting pada tahap
Konstruksi .................................................................................................................... V-86
Gambar 5. 7. Bagan Alir hubungan Keterkaitan dan Interaksi Dampak Penting pada Tahap
Konstruksi ..................................................................................................................... V-87
Gambar 5. 8. Bagan Alir hubungan Keterkaitan dan Interaksi Dampak Penting pada Tahap
Operasi. ........................................................................................................................ V-89
Gambar 5. 9. Bagan Alir Hubungan Keterkaitan dan Interaksi Dampak Penting pada tahap
Pasca Operasi .............................................................................................................. V-89

PT. SDIC Papua Cement Indonesia iv


Adendum ANDAL dan RKL-RPL Pembangunan Pabrik Semen di Distrik Manokwari Selatan dan
Distrik Warmare Kabupaten Manokwari, Provinsi Papua Barat.

DAFTAR LAMPIRAN
No.
Keterangan Halaman
Lampiran
Registrasi Kompetensi Lembaga Penyedia Jasa Penyusun L-1
1 (LPJP) AMDAL PT. ECOTROPIKA MULTI
KONSULTAN
2 Sertifikat Kompetensi Penyusun AMDAL L-2
3 Ijazah/Sertifikat personil penyusun AMDAL L-3
4 Surat pernyataan personil penyusun AMDAL L-4
5 CV Tim Penyusun AMDAL L-5
6 Foto Rona Lingkungan Hidup Awal L-6
7 Foto-foto Sampling L-7
8 Hasil Analisis Laboratorium Sampel Air Dan Biota Perairan L-8
9 Hasil Analisis Laboratorium Sampel Udara L-9

PT. SDIC Papua Cement Indonesia v

Anda mungkin juga menyukai