MENGGUNAKAN APLIKASI
MS TOWER
presented by :
Zakarya Nugraha (87111331Z)
Workshop
2
MS Tower
Overview
More Detail…
4
MS Tower - Process
ANALYSIS
BUILD RESULT
TOWER &
TOWER DATA TOWER LOAD &
(GEOMETRY) MEMBER
REPORT
CHECK
5
Menu & Toolbar
6
Tower Data
7
Analysis
8
Section Library
Castellated
10
Report – Support Reaction
11
Desain
Geometri Tower
13
Nama Member Tower
14
Kriteria Desain Geometri Tower
15
Geometri Tower
Maximum Sag
16
Jarak Minimum Crossarm Earthwire- Konduktor - Konduktor
Shielding Angle
IEC 61936-1
18
Minimum Electrical Clearance #2
IEC 61936-1 19
Jarak Penghantar Antar Sirkit (1/2)
21
Andongan Maksimum
Persamaan Persamaan
parabola hiperbola
x 3q 2 H qx
Yx cosh 1
l x x
2 q H
24 H H qL
S cosh 1
x2q 2 q 2H
Tx H
8H qx
Tx H cosh
H
L2 q
S lx
H
sinh
qx
8H q H
22
Jarak Bebas Minimum Vertikal
23
Pemodelan Geometri MS Tower
#Step 1
#Step Selanjutnya
User Guide
25
Desain
Pembebanan Tower
Load
Combination
Dead Load
STRUCTURAL Based on :
LOADING ASCE Manuals No.
74,“Guidelines for Electrical
Wheater Transmission Line Structural
Related Loading”
Load
IEC 60826 – 2003 Special
Load
27
Arah Beban
1. Vertical Load
2. Transversal Load
3. Logitudinal Load
28
Macam Beban Berdasarkan Arah
Weight of the conductors and the ground wires and the accessories supported
Vertical Load Wc
by the supporting structure
Weight of the insulator strings and the fittings supported by the supporting
Wi
structure
Wind pressure of the supporting structure under the maximum wind velocity
Ht
IEC 60826 – 2003
Wind pressure of the conductors and the ground wires supported by the Design Criteria of
Hc
Horizontal Transverse Load
supporting structure under the maximum wind velocity Overhead
Wind pressure of the insulator strings and the fittings supported by the
supporting structure
Hi Transmission Lines
A horizontal transverse component of the maximum tension of the conductors
Ha
and the ground wires supported by the supporting structure
Wind pressure of the supporting structure under the maximum wind velocity
Ht'
Horizontal Longitudinal Load
A horizontal longitudinal component of the unbalanced maximum tension of the
P
conductors and the ground wires supported by the supporting structure
29
Vertical Load
(1)“Wt"
"Wt" is weight of the supporting structure.
(2)"Wc"
"Wc" is calculated by the following formula. h1 h2
Wc (Wc'Wts g ) n [N]
where, Wc':Unit weight of a conductor [kg/m]
Wts :Weight span [m]
g :apparent gravity, 9.8[m/s2]
n :Number of conductors
(3)"Wi"
"Wi" Is calculated as follow.
Wi (a N I ) g [N]
where, a :Weight of an insulator disc [kg]
Weight Span (Wts)
N :Number of insulator discs
I :Weight of fittings for the insulator discs [kg]
g : apparent gravity, 9.8[m/s2]
(4) “Ww” is weight of worker
30
Transversal Load (1/2)
(1)"Ht"
"Ht" is calculated multiplying a wind pressure by the sum of the projected areas of
all members of transverse face. Wind pressure "P" is obtained from the following equation.
P (1 / 2 ρ V 2 ) C g [N/m2]
h1
where, P :Wind pressure h2
31
Transversal Load (2/2)
(3)"Hi"
"Hi" is calculated multiplying a wind pressure by the sum of the projected areas of insulator
assembly of transverse face. The wind pressure of the standard insulator strings is as follows.
(4)"Ha"
Ha
"Ha" is calculated as follow.
Ha 2TSin( ) [N]
2
where, T : Horizontal component of maximum working tension of conductors [N]
θ:Horizontal angle of conductors
32
Longitudinal Load
(1)"Ht'"
"Ht'" is calculated multiplying a wind pressure by the sum of the projected areas of all
members of longitudinal face.
(2)"P"
A horizontal longitudinal component of the unbalanced maximum working tension (MWT) of
conductors and ground wires is considered.
Points to be considered are as follows (Special Load)
a. Unbalanced loads
b. Assumption of a case where a conductor would be broken.
33
Case Transverse Wind 90˚
(Broken Condition)
120 kg/m2 (for Normal Condition = 0)
120 kg/m2
(Broken Condition)
(Normal Condition = 0)
Loading Tree
34
Case Wind 45˚
84 kg/m2
84 kg/m2
Loading Tree
35
Case Broken Wire (1/2)
4 CCT
Breakage of four phases of
conductors on the same
side of tower or breakage of
three phase of conductors
and one earth-wire.
36
Case Broken Wire (2/2)
120 kg/m2
120 kg/m2
Loading Tree
37
Case Construction Maintenance _ One Side Stringing
Loading Tree
38
Overload Factor / Safety Factor
39
Loading Calculation Sheet & Loading Tree
40
Loading Combination (Exp. Tower 2 CCT)
42
Pembebanan MS Tower (Tower Load)
STEP
Tower
Load Tower
Make Tower Loading File
Process
43
Latihan Bersama
#Step 1
#Step Selanjutnya
User Guide
44
Analysis
&
Result Intrepretation
46
Konsep Analisis (2/2)
Slenderness Ratio
𝐾𝐿 𝐿
=
𝑟 𝑟
- Leg & Main Member : 120
- Compression Member : 200
- Secondary Member : 250
- Tension Member : 350
Stress Ratio (SPLN T5 004 2010)
Output analisis
- kapasitas kekuatan penampang
- rasio tegangan
- kelangsingan penampang,
- kapasitas sambungan,
- reaksi kaki tower