REKAPITULASI

TOTAL BIAYA
NO URAIAN
(Rp)

I BIAYA LANGSUNG PERSONIL 76,902,875.00

II BIAYA LANGSUNG NON PERSONIL 78,918,000.00

JUMLAH 155,820,875.00
PPN 10 % 15,582,087.50
TOTAL 171,402,962.50
DIBULATKAN 171,400,000.00
TERBILANG :

Manado, 2012
PT.
PEKERJAAN : PERENCANAAN RUAS JALAN TAMAKO - ENEMAWIRA

TAHUN ANGGARAN : 2012

BIAYA LANGSUNG PERSONIL


Biaya Satuan Jumlah Biaya
No. Uraian Satuan Vol
(Rp) (Rp)

I PROFESIONAL STAF
a. Team Leader / Ahli Jembatan OB 1 x 2.00 13,425,000.00 26,850,000.00
e. Ahli Survey dan Pengukuran OB 1 x 0.50 11,948,250.00 5,974,125.00
f. Ahli Estimasi Kuantitas Biaya OB 1 x 1.00 11,948,250.00 11,948,250.00
Sub Jumlah 44,772,375.00

III SUPORTING STAFF


a. Administrasi OB 1 x 2.00 6,175,500.00 12,351,000.00
b. Juru gambar / Drafter OB 1 x 1.00 6,444,000.00 6,444,000.00
c. Surveyor OB 2 x 0.50 5,996,500.00 5,996,500.00
d. Operator Komputer OB 1 x 2.00 3,669,500.00 7,339,000.00
Sub Jumlah 32,130,500.00
JUMLAH BIAYA LANGSUNG PERSONIL 76,902,875.00
BIAYA LANGSUNG NON PERSONIL

Harga Satuan Jumlah Harga


No. Uraian Satuan Volume
(Rp) (Rp)

1 OPERASIONAL KANTOR
ANALISA DATA, DRAWING, COST & QUANTITY
1. Komputer + Printer (Sewa) Set/Bln 1 x 2.00 1,611,000.00 3,222,000.00
2. ATK dan Bahan Habis Pakai Bln 2.00 2,148,000.00 4,296,000.00
Sub Jumlah 7,518,000.00

2 BIAYA PERJALANAN DINAS


a. Perjalanan Tenaga Ahli Org/Trip 3 x 4 150,000.00 1,800,000.00
c. Perjalanan Supporting Staff Org/Trip 2 x 4 150,000.00 1,200,000.00
Sub Jumlah 3,000,000.00

3 BIAYA LAPORAN
Kontrak Perencanaan Set 5 1,250,000.00 6,250,000.00
Laporan Perencanaan Set 5 300,000.00 1,500,000.00
Gambar Rencana Uk. A3 Set 5 250,000.00 1,250,000.00
Dokumen Tender (RKS, EE, BOQ) Set 5 250,000.00 1,250,000.00
Disket / CD Buah 10 50,000.00 500,000.00
Sub Jumlah 10,750,000.00

4 BIAYA TRANSPORTASI & SEWA KENDARAAN


Sewa Kendaraan Roda 4 Buah/bulan 1 x 1.00 7,500,000.00 7,500,000.00
Sewa Kendaraan Roda 2 Buah/bulan 1 x 2.00 1,450,000.00 2,900,000.00
Sub Jumlah 10,400,000.00

5 BIAYA PENYELIDIKAN TANAH

a. Mobilisasi LS 1 7,500,000.00 7,500,000.00


b. Pengukuran Lahan & Kontur LS 1 3,500,000.00 3,500,000.00
c. Penggambaran LS 1 750,000.00 750,000.00
d. Sondir Ttk 6 5,000,000.00 30,000,000.00
e. Soil Test (SPT) Ttk 1 2,500,000.00 2,500,000.00
d. Pengambilan Sampel & Penyelidikan Laboratorium
Test 6 500,000.00 3,000,000.00
e. Laporan & Rekomendasi LS 1 500,000.00
e. Perlengkapan Lapangan LS 1 1,000,000.00
Sub Jumlah 47,250,000.00
JUMLAH BIAYA LANGSUNG NON PERSONIL 78,918,000.00