Anda di halaman 1dari 12

REKAPITULASI ANGGARAN BIAYA

Pemberi Kerja

Dinas Bina Marga, Cipta Karya dan Perumahan Rakyat

Kegiatan

Penyusunan RI SPAM

Lokasi

Kabupaten Bireuen

Nomor DIPA

Tahun Anggaran

2014

No.
I.

Uraian

Biaya ( Rp )

BIAYA LANGSUNG PERSONIL


A. Tenaga Ahli

333,000,000

B. Asisten Tenaga Ahli

150,000,000

C. Tenaga Penunjang

43,500,000

JUMLAH I
II.

526,500,000

BIAYA LANGSUNG NON PERSONIL

A. Operasional Kantor

11,250,000

B. Sewa

60,500,000

C. Belanja Perjalanan

21,000,000

D. Pelaporan

13,070,000

E. Lain - Lain Pengeluaran


JUMLAH II

105,820,000

A.

JUMLAH ( I + II )

B.

PPN 10 %

C.

JUMLAH BIAYA

D.

PEMBULATAN

Terbilang

632,320,000
63,232,000
695,552,000
695,550,000

Enam ratus sembilan puluh lima juta lima ratus lima puluh ribu rupia

Bireuen ,
Januari 2014
Pengguna Anggaran
Dinas Bina Marga, Cipta Karya dan Perumahan Rakyat

F A D L I, ST
Pembina/Nip. 19700915 199903 1 001

I.
A.

BIAYA LANGSUNG PERSONIL


Tenaga Ahli

No.

Uraian

Satuan

Volume

1.

Team Leader/Ahli Senior Teknik Lingkungan

OrangBulan

2.00

2.

Tenaga Ahli Lingkungan/Penyehatan

OrangBulan

5.00

3.

Tenaga Ahli Teknik Hidrologi/Geohidrologi

OrangBulan

5.00

4.

Tenaga Ahli Management Perusahaan

OrangBulan

5.00

5.

Tenaga Ahl iSoisial Ekonomi/Keuangan

OrangBulan

5.00

6.

Tenaga Ahli Kelembagaan/Manajemen.

OrangBulan

5.00

7.

Tenaga Ahli Perencanaan Kota/Planologi

OrangBulan

5.00

JUMLAH 1.A.
B.

32.00

Asisten Tenaga Ahli

No.

Uraian

Satuan

Volume

1.

Ass.Tenaga Ahli Lingkungan/Penyehatan

OrangBulan

5.00

2.

Ass.Tenaga Ahli Teknik Hidrologi/Geohidrologi

OrangBulan

5.00

3.

Ass.Tenaga Ahli Management Perusahaan

OrangBulan

5.00

4.

Ass.Tenaga Ahl iSoisial Ekonomi/Keuangan

OrangBulan

5.00

5.

Ass.Tenaga Ahli Kelembagaan/Manajemenl.

OrangBulan

5.00

6.

Ass.Tenaga Ahli Perencanaan Kota/Planologi

OrangBulan

5.00

JUMLAH 1.A.
C.

30.00

Tenaga Penunjang

No.

Uraian

Satuan

Volume

1.

Surveyor 1 ( 1 orang)

OrangBulan

3.00

2.

Surveyor 2 (1 orang)

OrangBulan

3.00

3.

Operator Komputer

OrangBulan

5.00

2.

Operator CAD

OrangBulan

5.00

3.

Sekretaris

OrangBulan

5.00

JUMLAH 1.B.

21.00

II.

BIAYA LANGSUNG NON PERSONIL

A.

Operasional Kantor

No.

Uraian

Satuan

Volume

1.

Alat Tulis Kantor

Bulan

5.00

2.

Biaya Komunikasi (Telepon, Fax, Surat)

Bulan

5.00

3.

Sewa Komputer (2 Unit)

Bulan

5.00

4.

Sewa Printer (2 Unit)

Bulan

5.00

JUMLAH 2.A.
B.

Sewa

No.

Uraian

Satuan

Volume

1.

Sewa Kendaraan Roda 4

Unit Bulan

5.00

2.

Sewa Kendaraan Roda 2 (2 unit)

Unit Bulan

10.00

2.

Sewa Theodolite

Unit Bulan

3.00

2.

Sewa Waterpass

Unit Bulan

3.00

2.

Sewa Kantor

Unit Bulan

5.00

3.

Sewa Alat Ukur Debit

Unit Bulan

5.00

JUMLAH 2.B.

C.

Mobilisasi/Demobilisasi

No.

Uraian

Mobilisasi/Demobilisasi

Team Leader

b
c

Satuan

Volume

2.00

OK

Tenaga Ahli & Asisten Tenaga Ahli

12.00

OK

Ass.Tenaga Ahli

13.00

OK

JUMLAH 2.C.
D.
No.
1.

Pelaporan
Uraian
Laporan Pendahuluan (Inception Report)

Satuan
Exp

Volume
10.00

2.

Laporan Antara (Interim Report)

Exp

10.00

3.

Laporan Akhir Sementara (Draft Final Report)

Exp

10.00

4.

Laporan Akhir ( Final Report)

Exp

10.00

CD Copy Laporan Akhir

Exp

10.00

USB Flash disk (5 GB)

Exp

1.00

6.

Ringkasan Executif ( Executive Summary)

Exp

10.00

7.

Biaya Diskusi/Seminar

sesi

2.00

JUMLAH 2.D.

Harga Satuan
(Rp)

Total
(Rp)

9,000,000

18,000,000

10,500,000

52,500,000

10,500,000

52,500,000

10,500,000

52,500,000

10,500,000

52,500,000

10,500,000

52,500,000

10,500,000

52,500,000
333,000,000

Harga Satuan
(Rp)

Total
(Rp)

5,000,000

25,000,000

5,000,000

25,000,000

5,000,000

25,000,000

5,000,000

25,000,000

5,000,000

25,000,000

5,000,000

25,000,000
150,000,000

Harga Satuan
(Rp)

Total
(Rp)

3,500,000

10,500,000

3,500,000

10,500,000

1,500,000

7,500,000

1,500,000

7,500,000

1,500,000

7,500,000
43,500,000

Harga Satuan
(Rp)

Total
(Rp)

750,000

3,750,000

750,000

3,750,000

500,000

2,500,000

250,000

1,250,000
11,250,000

Harga Satuan
(Rp)

Total
(Rp)

4,000,000

20,000,000

1,000,000

10,000,000

4,000,000

12,000,000

2,000,000

6,000,000

5,000,000
2,500,000

12,500,000
60,500,000

Harga Satuan
(Rp)

Total
(Rp)

1,500,000

3,000,000

1,500,000

18,000,000

1,500,000

19,500,000
21,000,000

Harga Satuan
(Rp)
50,000

Total
(Rp)
500,000

50,000

500,000

60,000

600,000

75,000

750,000

15,000

150,000

270,000

270,000

30,000

300,000

5,000,000

10,000,000
13,070,000

ISI DISINI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

0
1
10
11
12
13
14
15
16
17
18
19
2
3
4
5
6
7
8
9

SATU
SEPULUH
SEBELAS
DUA BELAS
TIGA BELAS
EMPAT BELAS
LIMA BELAS
ENAM BELAS
TUJUH BELAS
DELAPAN BELAS
SEMBILAN BELAS
DUA
TIGA
EMPAT
LIMA
ENAM
TUJUH
DELAPAN
SEMBILAN

695,550,000
9
0.00695550000000
000695550000
0
0
0
0
0
0
6
ENAM RATUS
1 Enam ratus
9
SEMBILAN PULUH
1 sembilan puluh
5
LIMA
1 lima
5
LIMA RATUS
1 lima ratus
5
LIMA PULUH
1 lima puluh
0
0
0
0
0
0
0
0
PROGRAM INI DIBUAT ATAS KREASI : YIYI RIZAL
ALAMAT
: JALAN SAMPANGAN BARU I/D.158
SEMARANG

Enam ratus sembilan puluh lima juta lima ratus lima puluh ribu rupiah

NILAI INI MASUKAN KE SEL DIMAKSUD JANGAN MERUBAH FORMAT

Mengetahui :
Direktur Utama PDAM Rembang

Dibuat oleh :
Konsultan CV. Prambanan

H. Gus Wakhid,ST,MM

Yiyi Rizal,ST
Team Leader

Mengetahui :
Direktur Utama PDAM Rembang

Dibuat oleh :
Konsultan CV. Prambanan

H. Gus Wakhid,ST,MM

Yiyi Rizal,ST
Team Leader

mbilan puluh
juta

h:
mbanan

T
er

ribu

1 00000000000
2 0000000000
3 000000000
4 00000000
5 0000000
6 000000
7 00000
8 0000
9 000
10 00
11 0
12

h:
mbanan

T
er

Anda mungkin juga menyukai