Pemberi Kerja
Kegiatan
Penyusunan RI SPAM
Lokasi
Kabupaten Bireuen
Nomor DIPA
Tahun Anggaran
2014
No.
I.
Uraian
Biaya ( Rp )
333,000,000
150,000,000
C. Tenaga Penunjang
43,500,000
JUMLAH I
II.
526,500,000
A. Operasional Kantor
11,250,000
B. Sewa
60,500,000
C. Belanja Perjalanan
21,000,000
D. Pelaporan
13,070,000
105,820,000
A.
JUMLAH ( I + II )
B.
PPN 10 %
C.
JUMLAH BIAYA
D.
PEMBULATAN
Terbilang
632,320,000
63,232,000
695,552,000
695,550,000
Enam ratus sembilan puluh lima juta lima ratus lima puluh ribu rupia
Bireuen ,
Januari 2014
Pengguna Anggaran
Dinas Bina Marga, Cipta Karya dan Perumahan Rakyat
F A D L I, ST
Pembina/Nip. 19700915 199903 1 001
I.
A.
No.
Uraian
Satuan
Volume
1.
OrangBulan
2.00
2.
OrangBulan
5.00
3.
OrangBulan
5.00
4.
OrangBulan
5.00
5.
OrangBulan
5.00
6.
OrangBulan
5.00
7.
OrangBulan
5.00
JUMLAH 1.A.
B.
32.00
No.
Uraian
Satuan
Volume
1.
OrangBulan
5.00
2.
OrangBulan
5.00
3.
OrangBulan
5.00
4.
OrangBulan
5.00
5.
OrangBulan
5.00
6.
OrangBulan
5.00
JUMLAH 1.A.
C.
30.00
Tenaga Penunjang
No.
Uraian
Satuan
Volume
1.
Surveyor 1 ( 1 orang)
OrangBulan
3.00
2.
Surveyor 2 (1 orang)
OrangBulan
3.00
3.
Operator Komputer
OrangBulan
5.00
2.
Operator CAD
OrangBulan
5.00
3.
Sekretaris
OrangBulan
5.00
JUMLAH 1.B.
21.00
II.
A.
Operasional Kantor
No.
Uraian
Satuan
Volume
1.
Bulan
5.00
2.
Bulan
5.00
3.
Bulan
5.00
4.
Bulan
5.00
JUMLAH 2.A.
B.
Sewa
No.
Uraian
Satuan
Volume
1.
Unit Bulan
5.00
2.
Unit Bulan
10.00
2.
Sewa Theodolite
Unit Bulan
3.00
2.
Sewa Waterpass
Unit Bulan
3.00
2.
Sewa Kantor
Unit Bulan
5.00
3.
Unit Bulan
5.00
JUMLAH 2.B.
C.
Mobilisasi/Demobilisasi
No.
Uraian
Mobilisasi/Demobilisasi
Team Leader
b
c
Satuan
Volume
2.00
OK
12.00
OK
Ass.Tenaga Ahli
13.00
OK
JUMLAH 2.C.
D.
No.
1.
Pelaporan
Uraian
Laporan Pendahuluan (Inception Report)
Satuan
Exp
Volume
10.00
2.
Exp
10.00
3.
Exp
10.00
4.
Exp
10.00
Exp
10.00
Exp
1.00
6.
Exp
10.00
7.
Biaya Diskusi/Seminar
sesi
2.00
JUMLAH 2.D.
Harga Satuan
(Rp)
Total
(Rp)
9,000,000
18,000,000
10,500,000
52,500,000
10,500,000
52,500,000
10,500,000
52,500,000
10,500,000
52,500,000
10,500,000
52,500,000
10,500,000
52,500,000
333,000,000
Harga Satuan
(Rp)
Total
(Rp)
5,000,000
25,000,000
5,000,000
25,000,000
5,000,000
25,000,000
5,000,000
25,000,000
5,000,000
25,000,000
5,000,000
25,000,000
150,000,000
Harga Satuan
(Rp)
Total
(Rp)
3,500,000
10,500,000
3,500,000
10,500,000
1,500,000
7,500,000
1,500,000
7,500,000
1,500,000
7,500,000
43,500,000
Harga Satuan
(Rp)
Total
(Rp)
750,000
3,750,000
750,000
3,750,000
500,000
2,500,000
250,000
1,250,000
11,250,000
Harga Satuan
(Rp)
Total
(Rp)
4,000,000
20,000,000
1,000,000
10,000,000
4,000,000
12,000,000
2,000,000
6,000,000
5,000,000
2,500,000
12,500,000
60,500,000
Harga Satuan
(Rp)
Total
(Rp)
1,500,000
3,000,000
1,500,000
18,000,000
1,500,000
19,500,000
21,000,000
Harga Satuan
(Rp)
50,000
Total
(Rp)
500,000
50,000
500,000
60,000
600,000
75,000
750,000
15,000
150,000
270,000
270,000
30,000
300,000
5,000,000
10,000,000
13,070,000
ISI DISINI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
0
1
10
11
12
13
14
15
16
17
18
19
2
3
4
5
6
7
8
9
SATU
SEPULUH
SEBELAS
DUA BELAS
TIGA BELAS
EMPAT BELAS
LIMA BELAS
ENAM BELAS
TUJUH BELAS
DELAPAN BELAS
SEMBILAN BELAS
DUA
TIGA
EMPAT
LIMA
ENAM
TUJUH
DELAPAN
SEMBILAN
695,550,000
9
0.00695550000000
000695550000
0
0
0
0
0
0
6
ENAM RATUS
1 Enam ratus
9
SEMBILAN PULUH
1 sembilan puluh
5
LIMA
1 lima
5
LIMA RATUS
1 lima ratus
5
LIMA PULUH
1 lima puluh
0
0
0
0
0
0
0
0
PROGRAM INI DIBUAT ATAS KREASI : YIYI RIZAL
ALAMAT
: JALAN SAMPANGAN BARU I/D.158
SEMARANG
Enam ratus sembilan puluh lima juta lima ratus lima puluh ribu rupiah
Mengetahui :
Direktur Utama PDAM Rembang
Dibuat oleh :
Konsultan CV. Prambanan
H. Gus Wakhid,ST,MM
Yiyi Rizal,ST
Team Leader
Mengetahui :
Direktur Utama PDAM Rembang
Dibuat oleh :
Konsultan CV. Prambanan
H. Gus Wakhid,ST,MM
Yiyi Rizal,ST
Team Leader
mbilan puluh
juta
h:
mbanan
T
er
ribu
1 00000000000
2 0000000000
3 000000000
4 00000000
5 0000000
6 000000
7 00000
8 0000
9 000
10 00
11 0
12
h:
mbanan
T
er