Anda di halaman 1dari 5

STANDARD OPERATION PROCEDURE

SNUBBING
WELLBORE CLEAN OUT
Doc. : HWU – P.11 Rev : 0 Date : 03 / 06 / 2015

DAFTAR ISI / TABLE OF CONTENTS

I. Tujuan / Purpose of Document .......................................................................................................... 2


II. Ruang Lingkup / Scope of Document ................................................................................................. 2
III. Definisi / Definition ............................................................................................................................ 2
IV. Referensi Dokumen / Referenced Document .................................................................................... 2
V. Keselamatan Kerja dan Lindungan Lingkungan / Safety and Environment ........................................ 2
VI. Tanggung jawab / Responsibilities ..................................................................................................... 2
VII. Prosedur / Procedure ......................................................................................................................... 3
VIII. Diagram Alir / Flow chart .................................................................................................................... 5
IX. Indikator Kinerja / Performance Indicator.......................................................................................... 5
X. Lampiran / Appendix .......................................................................................................................... 5

LEMBAR PENGESAHAN / APPROVAL SHEET

Prepared Approved Approved Approved


Rev. Notes Checked by Checked by
by by by by
00 Dokumen
awal.
ORIGINAL SIGNED
Initial
document. Tanggal: Tanggal: Tanggal: Tanggal: Tanggal: Tanggal:
25 / 05 / 15 26 / 05 / 15 27 / 05 / 15 28 / 05 / 15 29 / 06 / 15 03 / 06 / 15
Deddy Putro Bambang K. Vitra Y. Maulana Lulut Agus R.
B. Imron R. Sugianto Sutiawan
HWU Head of Sect. Head Line Mgr of Buss. Group Mgmt. Rep
Engineer QHSE of System & HWU Mgr of HWU
Procedure & Snubbing

Jika header tidak berwarna, maka dokumen ini tidak dikendalikan.


If header is in Black and White, this document(s) is Uncontrolled Copy.
Page 1 of 5
STANDARD OPERATION PROCEDURE
SNUBBING
WELLBORE CLEAN OUT
Doc. : HWU – P.11 Rev : 0 Date : 03 / 06 / 2015

I. TUJUAN I. PURPOSE OF THE DOCUMENT


Dokumen ini bertujuan untuk menjelaskan The purpose of this document is to explain
langkah-langkah pekerjaan pembersihan step by step of clean out wellbore or
lubang sumur atau tubing dari pasir untuk production tubing from sand problem to
memastikan keselamatan kerja bagi personil ensure safety for all personnel involved.
yang terlibat.

II. RUANG LINGKUP II. SCOPE OF DOCUMENT


Prosedur ini berlaku untuk pekerjaan This procedure applies sand washing from
pembersihan pasir dari lubang sumur atau wellbore or production tubing using mule
tubing dengan menggunakan mule shoe saja shoe.

III. DEFINISI III. DEFINITION


1. Top of Sand (TOS) adalah posisi 1. Top of Sand (TOS) is the depth on wellbore
kedalaman pada sumur dimana mulai that already found sand settlement.
terdapat kumpulan pasir yang
mengganggu lubang sumur.
2. Sirkulasi bottom up adalah sirkulasi 2. Bottom up circulation is circulation with
sebanyak volume tubing. one volume of tubing.
3. Hi-Vis adalah campuran cairan yang 3. Hi-vis is mixed of liquid that have high
memiliki viskositas atau gel yang besar viscosity or gel to help increasing the
untuk menambah kemampuan ability of sand lifting to surface.
pengangkatan pasir ke permukaan.

IV. REFERENSI DOKUMEN IV. REFERENCED DOCUMENT


Tidak ada. None.

V. KESELAMATAN KERJA DAN LINDUNGAN V. SAFETY AND ENVIRONMENT


LINGKUNGAN
1. Personil yang terlibat harus telah 1. All personnel involved should understand
mengetahui aspek bahaya dalam all hazard on this job, and have good
pekerjaan ini dan memiliki pengetahuan knowledge of lifting activity.
yang baik tentang pekerjaan
pengangkatan.
2. Penggunaan alat pelindung diri standar 2. Standard PPE should be used on this job
diwajibkan dalam pekerjaan ini. with additional PPE for working at height.

VI. TANGGUNG JAWAB VI. RESPONSIBILITIES


1. Roughneck bertugas untuk menyiapkan 1. Roughneck should prepare tubular that will

Jika header tidak berwarna, maka dokumen ini tidak dikendalikan.


If header is in Black and White, this document(s) is Uncontrolled Copy.
Page 2 of 5
STANDARD OPERATION PROCEDURE
SNUBBING
WELLBORE CLEAN OUT
Doc. : HWU – P.11 Rev : 0 Date : 03 / 06 / 2015

pipa yang akan dimasukkan ke dalam be run in hole on pipe rack.


lubang sumur di pipe rack.
2. Asisten operator bertanggung jawab dalam 2. Assistant operator is responsible for the
proses mangangkat pipa dari rak menuju lifting process of completion string from
work basket, serta membantu operator pipe rack to work basket, as well as assist
the operator.
3. Pump operator bertanggung jawab dalam 3. Pump operator responsible for the
pengoperasian unit pompa, serta operation of the pumping unit, and helping
membantu pekerjaan di rak. work on the pipe rack.
4. Operator bertanggung jawab dalam 4. The operator is responsible for running in
memasukkan rangkaian pipa ke dalam hole completion string.
sumur.
5. Rig Superintendent dan Supervisor 5. Rig Superintendent and Supervisor is
bertanggung jawab dalam mengawasi responsible for supervise this work.
pekerjaan ini.

VII. PROSEDUR VII. PROCEDURE


1. Buat JSA dan lakukan safety meeting. 1. Create JSA and perform a routine safety
meeting.
2. Pastikan kedalaman Top of Sand (TOS) 2. Make sure depth Top of Sand (TOS) based
berdasarkan data Running Slickline. on slicline running history data.
3. Pastikan rangkaian dan ukuran BHA. 3. Make sure sequence and size BHA.
4. Test sirkulasi (memastikan rangkaian tidak 4. Test circulation (make sure the assy not
buntu sebelum rangkaian masuk kedalam plugged before entering into a series of
sumur). wells).
5. 30 ft sebelum target kedalaman TOS 5. 30 ft before the target depth of TOS, check
lakukan check weight string naik dan weight string up and down.
turun.
6. Lakukan sirkulasi untuk mengetahui rate 6. Perform circulation to determine the rate
dan return, lakukan pencatatan parameter. and return, record all parameters.
7. Jika return sudah normal, lanjutkan dengan 7. While the return already normal, further
menurunkan rangkaian dengan perlahan lowering string slowly to perform sand
untuk pekerjaan sand wash. wash.
8. Lakukan sirkulasi 1,5 bottom up (Direct) 8. Perform bottom-up circulation of 1.5
untuk memastikan pasir keluar di return (Direct) to make sure the sand out in
(shale shaker/tangki return). return (shale shaker / tank return).
9. Sebelum melakukan setiap penyambungan 9. Prior to each pipe connecting should
pipa harus melakukan satu sirkulasi perform a bottom-up circulation tubing to
bottom up tubing untuk menghindari avoid gravitational settling of sand.
adanya gravitasi settling pasir.
10. Jika tidak terjadi hambatan lanjut wash 10. If there is no further obstacle wash down
Jika header tidak berwarna, maka dokumen ini tidak dikendalikan.
If header is in Black and White, this document(s) is Uncontrolled Copy.
Page 3 of 5
STANDARD OPERATION PROCEDURE
SNUBBING
WELLBORE CLEAN OUT
Doc. : HWU – P.11 Rev : 0 Date : 03 / 06 / 2015

down dengan tetap memperhatikan with niticing to Weight Indicator, pump


Weight Indicator, Pumping Pressure dan pressure and return to the program target
return hingga target program tercapai. is reached.
11. Sirkulasi hingga return bersih jika 11. Circulation until get clean return if
diperlukan lakukan pemompaan Hi-vis. required, pump down Hi-vis.
12. Cabut rangkaian BHA ke posisi aman 12. POOH the BHA to a safe position (larger
(Wellbore yang lebih besar), standby untuk wellbore), standby to ensure the sand
memastikan pasir settling selama 1 Jam. settling for 1 Hour.
13. Lakukan tag ulang untuk memastikan 13. Perform a tag to ascertain the depth of the
kedalaman target sudah bersih. target is clean.
14. Cabut rangkaian sand wash hingga habis ke 14. POOH sand wash assy to surface.
permukaan. Note: If there are no obstacles continue to
Note : Jika tidak terdapat hambatan no 23.
lanjutkan ke No.23.
15. Jika terdapat hambatan lakukan jetting 15. If there are obstacles perform jetting
pump (menaikkan rate pompa) (increase pumping rate
16. Jika tidak ditemukan kemajuan pekerjaan 16. If there is no progress while jetting and
setelah di jetting dan diputar lakukan rotating, circulate until clean.
sirkulasi hingga bersih. Note: If there is a no return (formation loss
Note : Jika terjadi hilang return (terjadi happened) before the target is reached.
formation loss) sebelum target tercapai
17. Stop pompa cabut rangkaian BHA hingga 17. Stop the pump pull up the BHA to a safe
posisi aman. position.
18. Observasi dan lakukan program loss 18. Observation and perform circulation loss
circulation untuk mendapatkan return. program to get a return.
19. Jika return sudah normal lanjut sirkulasi 19. If the return already normal, continue
dan yakinkan return sudah bersih dari circulation and further assure the return is
pasir. clean of sand.
20. Lanjut masuk wash down dengan rate 20. Continue wash down with new pumping
pemompaan yang baru sampai target. rate to the target.
21. Jika return sudah normal lanjut sirkulasi 21. If the return to normal circulation and
dan yakinkan return sudah bersih dari further assure the return is clean of sand.
pasir.
22. Cabut rangkaian sampai selesai ke 22. Pull out of hole sand wash string assy to
permukaan. the surface.
23. Pengambilan data baru (gambar). 23. Taking the new data (image).
24. Menunggu program selanjutnya. 24. Waiting for the next program.

Jika header tidak berwarna, maka dokumen ini tidak dikendalikan.


If header is in Black and White, this document(s) is Uncontrolled Copy.
Page 4 of 5
STANDARD OPERATION PROCEDURE
SNUBBING
WELLBORE CLEAN OUT
Doc. : HWU – P.11 Rev : 0 Date : 03 / 06 / 2015

VIII. DIAGRAM ALIR VIII. FLOWCHART

IX. INDIKATOR KINERJA IX. PERFORMANCE INDICATOR

X. LAMPIRAN X. APPENDIX
Tidak ada. None.

Jika header tidak berwarna, maka dokumen ini tidak dikendalikan.


If header is in Black and White, this document(s) is Uncontrolled Copy.
Page 5 of 5

Anda mungkin juga menyukai